Hi, my friends faced a very complicated situation and looking for a piece of good advice now.

The situation is following:

The guy from Germany entered the US on his spouse visa. Many years after this, after the naturalization ceremony he got divorced. His ex-spouse is also German and she flew to Germany to terminate the marriage.

A couple of years after this he decided to marry a girl, who is German. So, they filed K-1 petition and received a RFE, where it says that all divorces that were processed in the third country are not legit if both spouses haven't been living there.

They went to the consultation of an immigrant attorney but didn't get any good advice besides to call direct to uscis and ask. Unfortunately according my own experience customer service is not very helpful there.

The question is, what are their options now?

1) file for divorce now in the states and send the copy of it to uscis. But here is the question, won't it be considered as a divorce after the petition was submitted and it will be denied.

2) withdraw the petition, divorce and file again.

Any advice is appreciated.

K-1 Visa Timeline!
Service Center : California Service Center
Consulate : Guanzhou, China

 


I-129F Sent : 2015-01-14 I-129F NOA1 : 2015-01-16                     California SC received: 2015-01-21
I-129F NOA1 hardcopy: 2015-01-27 I-129F NOA2 : 2015-02-06   I-129F NOA2 hardcopy: 2015-02-18
NVC received: 2015-02-18 Consulate Received : 2015-02-27
Fiance received the hard mail from NVC with a new assinged number: 2015-3-3
received instructions (pkt 3): 2015-3-5 (hard mail)          
paid visa fee: 2015-3-12
received appointment letter (pkt 4): 2015-3-12 (email)    
Medical: 2015-04-03 Picked medical up: 2015-04-10
Interview Date : 2015-4-14 Interview Result :Approved   Visa Received :
2015-4-24
US Entry : 2015-5-19
Marriage : 2015-6-27

 
 

AOS:

Spoiler

filed for AOS: 2015-7-16 delivered to Chicago Lockbox: 2015-7-20

Electronic NOA1: 2015-7-23 Hard copies NOA1: 2015-7-28

Biometrics appointment letter: 2015-8-1 Biometrics appointment: 2015-8-12

RFE :( 2015-8-19 RFE hard copy: 2015-8-22

Finally sent RFE back:: 2015-10-02 RFE was delivered: 2015-10-05

USCIS updated status on "request for evidence was received": 2015-10-07

Combo card is being produced: 2015-10-26 (exactly three weeks after submitting RFE)

Case status update; card was mailed: 2015-10-28 Received EAD approval letter: 2015-10-29

Combo card received: 2015-11-2 Interview scheduled: 2015-12-21 (APPROVED :dancing: )

Green card received: 2015-12-21

N-400.319(b)

Spoiler

October 17, 2016 - case filed 

October 25, 2016 - NOA1

December 19, 2016 - Biometrics at GUZ field Office 

December 2, 2017 - Inquiry about the case being outside the processing time norms

January 2, 2018 - notification regarding the inquiry being outside processing time norms, the case has not assigned yet 

February 23, 2018 - scheduled for the Interview 

March 21, 2018 -  a response was sent to my inquiry about why your case is taking longer than our processing time

April 4, 2018 - Interview 

April 12, 2019 - in line for the Oath Ceremony

 

ROC

Spoiler

October 28, 2017 - filed I-751 case

November 6, 2017 - NOA1

November 20, 2017 - biometric at GUZ field office 

March 4, 2018 - status change: Your case was received by your local office 

 

 

Link to comment
Share on other sites

Or, see if you may need a German divorce decree authenticated by a German embassy.

That response of a foreign divorce isn't legal doesn't sound right. If it was legal in Germany, then it should be final. It just sounds like something's missing, but I don't know.

http://travel.state.gov/content/passports/english/abroad/events-and-records/divorce/divorce-legal-issues.html



Signature coming soon...

Link to comment
Share on other sites

Or, see if you may need a German divorce decree authenticated by a German embassy.

That response of a foreign divorce isn't legal doesn't sound right. If it was legal in Germany, then it should be final. It just sounds like something's missing, but I don't know.

http://travel.state.gov/content/passports/english/abroad/events-and-records/divorce/divorce-legal-issues.html

yeah embassy sounds interesting... thank you for the link.

The problem is that in the uscis authorities claim that if both of them do not reside in Germany uscis cannot accept all this divorce papers.... they need one from the country of residence.

K-1 Visa Timeline!
Service Center : California Service Center
Consulate : Guanzhou, China

 


I-129F Sent : 2015-01-14 I-129F NOA1 : 2015-01-16                     California SC received: 2015-01-21
I-129F NOA1 hardcopy: 2015-01-27 I-129F NOA2 : 2015-02-06   I-129F NOA2 hardcopy: 2015-02-18
NVC received: 2015-02-18 Consulate Received : 2015-02-27
Fiance received the hard mail from NVC with a new assinged number: 2015-3-3
received instructions (pkt 3): 2015-3-5 (hard mail)          
paid visa fee: 2015-3-12
received appointment letter (pkt 4): 2015-3-12 (email)    
Medical: 2015-04-03 Picked medical up: 2015-04-10
Interview Date : 2015-4-14 Interview Result :Approved   Visa Received :
2015-4-24
US Entry : 2015-5-19
Marriage : 2015-6-27

 
 

AOS:

Spoiler

filed for AOS: 2015-7-16 delivered to Chicago Lockbox: 2015-7-20

Electronic NOA1: 2015-7-23 Hard copies NOA1: 2015-7-28

Biometrics appointment letter: 2015-8-1 Biometrics appointment: 2015-8-12

RFE :( 2015-8-19 RFE hard copy: 2015-8-22

Finally sent RFE back:: 2015-10-02 RFE was delivered: 2015-10-05

USCIS updated status on "request for evidence was received": 2015-10-07

Combo card is being produced: 2015-10-26 (exactly three weeks after submitting RFE)

Case status update; card was mailed: 2015-10-28 Received EAD approval letter: 2015-10-29

Combo card received: 2015-11-2 Interview scheduled: 2015-12-21 (APPROVED :dancing: )

Green card received: 2015-12-21

N-400.319(b)

Spoiler

October 17, 2016 - case filed 

October 25, 2016 - NOA1

December 19, 2016 - Biometrics at GUZ field Office 

December 2, 2017 - Inquiry about the case being outside the processing time norms

January 2, 2018 - notification regarding the inquiry being outside processing time norms, the case has not assigned yet 

February 23, 2018 - scheduled for the Interview 

March 21, 2018 -  a response was sent to my inquiry about why your case is taking longer than our processing time

April 4, 2018 - Interview 

April 12, 2019 - in line for the Oath Ceremony

 

ROC

Spoiler

October 28, 2017 - filed I-751 case

November 6, 2017 - NOA1

November 20, 2017 - biometric at GUZ field office 

March 4, 2018 - status change: Your case was received by your local office 

 

 

Link to comment
Share on other sites

He needs to research the German divorce laws. Something doesn't sound right because the USCIS will accept the document if it's a valid divorce. Yes, if the divorce happened in Germany, then the divorce decree should be issued under German jurisdiction. Maybe it's not properly translated. If your friend can get a German "certificate of no impediment to marriage" then that should help. The USCIS should be at least citing some piece of law as to why it's not a valid. If a German court accepted and adjudicated the case, then I don't understand. The USCIS is not in the business of applying foreign law; in other words, they don't often overturn a foreign court's decisions.

It really sounds like whatever was provided was not an official German divorce decree. If your friend can get that certificate, then it should be good to go.



Signature coming soon...

Link to comment
Share on other sites

... received a RFE, where it says that all divorces that were processed in the third country are not legit if both spouses haven't been living there.

What "third country" did they get divorced at? By my count, there should only be two countries: US and Germany?



Signature coming soon...

Link to comment
Share on other sites

What "third country" did they get divorced at? By my count, there should only be two countries: US and Germany?

Yeah, my bad. Not a third country just Germany. We read all together the link you sent. And unfortunately it is really said there that if they both were not domicile in Germany during the divorce the marriage inside of US is considered as invalid. Edited by kattaklizm

K-1 Visa Timeline!
Service Center : California Service Center
Consulate : Guanzhou, China

 


I-129F Sent : 2015-01-14 I-129F NOA1 : 2015-01-16                     California SC received: 2015-01-21
I-129F NOA1 hardcopy: 2015-01-27 I-129F NOA2 : 2015-02-06   I-129F NOA2 hardcopy: 2015-02-18
NVC received: 2015-02-18 Consulate Received : 2015-02-27
Fiance received the hard mail from NVC with a new assinged number: 2015-3-3
received instructions (pkt 3): 2015-3-5 (hard mail)          
paid visa fee: 2015-3-12
received appointment letter (pkt 4): 2015-3-12 (email)    
Medical: 2015-04-03 Picked medical up: 2015-04-10
Interview Date : 2015-4-14 Interview Result :Approved   Visa Received :
2015-4-24
US Entry : 2015-5-19
Marriage : 2015-6-27

 
 

AOS:

Spoiler

filed for AOS: 2015-7-16 delivered to Chicago Lockbox: 2015-7-20

Electronic NOA1: 2015-7-23 Hard copies NOA1: 2015-7-28

Biometrics appointment letter: 2015-8-1 Biometrics appointment: 2015-8-12

RFE :( 2015-8-19 RFE hard copy: 2015-8-22

Finally sent RFE back:: 2015-10-02 RFE was delivered: 2015-10-05

USCIS updated status on "request for evidence was received": 2015-10-07

Combo card is being produced: 2015-10-26 (exactly three weeks after submitting RFE)

Case status update; card was mailed: 2015-10-28 Received EAD approval letter: 2015-10-29

Combo card received: 2015-11-2 Interview scheduled: 2015-12-21 (APPROVED :dancing: )

Green card received: 2015-12-21

N-400.319(b)

Spoiler

October 17, 2016 - case filed 

October 25, 2016 - NOA1

December 19, 2016 - Biometrics at GUZ field Office 

December 2, 2017 - Inquiry about the case being outside the processing time norms

January 2, 2018 - notification regarding the inquiry being outside processing time norms, the case has not assigned yet 

February 23, 2018 - scheduled for the Interview 

March 21, 2018 -  a response was sent to my inquiry about why your case is taking longer than our processing time

April 4, 2018 - Interview 

April 12, 2019 - in line for the Oath Ceremony

 

ROC

Spoiler

October 28, 2017 - filed I-751 case

November 6, 2017 - NOA1

November 20, 2017 - biometric at GUZ field office 

March 4, 2018 - status change: Your case was received by your local office 

 

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Nigeria
Timeline

So neither party to the first marriage lived in Germany at the time the divorce was processed ? It sounds like the ex wife flew in , got the papers and came right back home.

This will not be over quickly. You will not enjoy this.

Link to comment
Share on other sites

So neither party to the first marriage lived in Germany at the time the divorce was processed ? It sounds like the ex wife flew in , got the papers and came right back home.

Yes, she flew, got the paper work done, hanged out with relatives and came back.

K-1 Visa Timeline!
Service Center : California Service Center
Consulate : Guanzhou, China

 


I-129F Sent : 2015-01-14 I-129F NOA1 : 2015-01-16                     California SC received: 2015-01-21
I-129F NOA1 hardcopy: 2015-01-27 I-129F NOA2 : 2015-02-06   I-129F NOA2 hardcopy: 2015-02-18
NVC received: 2015-02-18 Consulate Received : 2015-02-27
Fiance received the hard mail from NVC with a new assinged number: 2015-3-3
received instructions (pkt 3): 2015-3-5 (hard mail)          
paid visa fee: 2015-3-12
received appointment letter (pkt 4): 2015-3-12 (email)    
Medical: 2015-04-03 Picked medical up: 2015-04-10
Interview Date : 2015-4-14 Interview Result :Approved   Visa Received :
2015-4-24
US Entry : 2015-5-19
Marriage : 2015-6-27

 
 

AOS:

Spoiler

filed for AOS: 2015-7-16 delivered to Chicago Lockbox: 2015-7-20

Electronic NOA1: 2015-7-23 Hard copies NOA1: 2015-7-28

Biometrics appointment letter: 2015-8-1 Biometrics appointment: 2015-8-12

RFE :( 2015-8-19 RFE hard copy: 2015-8-22

Finally sent RFE back:: 2015-10-02 RFE was delivered: 2015-10-05

USCIS updated status on "request for evidence was received": 2015-10-07

Combo card is being produced: 2015-10-26 (exactly three weeks after submitting RFE)

Case status update; card was mailed: 2015-10-28 Received EAD approval letter: 2015-10-29

Combo card received: 2015-11-2 Interview scheduled: 2015-12-21 (APPROVED :dancing: )

Green card received: 2015-12-21

N-400.319(b)

Spoiler

October 17, 2016 - case filed 

October 25, 2016 - NOA1

December 19, 2016 - Biometrics at GUZ field Office 

December 2, 2017 - Inquiry about the case being outside the processing time norms

January 2, 2018 - notification regarding the inquiry being outside processing time norms, the case has not assigned yet 

February 23, 2018 - scheduled for the Interview 

March 21, 2018 -  a response was sent to my inquiry about why your case is taking longer than our processing time

April 4, 2018 - Interview 

April 12, 2019 - in line for the Oath Ceremony

 

ROC

Spoiler

October 28, 2017 - filed I-751 case

November 6, 2017 - NOA1

November 20, 2017 - biometric at GUZ field office 

March 4, 2018 - status change: Your case was received by your local office 

 

 

Link to comment
Share on other sites

If either spouse had German citizenship, they may be considered domiciled in Germany. Domicile can mean different things. The link also states," If you anticipate that you will seek recognition of your foreign divorce in the United States or another country, you may need certified, authenticated, and/or translated copies of your foreign marriage certificates and/or divorce decrees."

He might need to try that first. If the German courts granted a divorce, then one of the parties may have had enough domicile status. If that's the case, it may be a valid divorce.



Signature coming soon...

Link to comment
Share on other sites

And a little further on the link, he may be able to get the divorce "reaffirmed" by his secretary of state. That sounds like a process, but probably affordable.



Signature coming soon...

Link to comment
Share on other sites

Filed: K-1 Visa Country: Germany
Timeline

What I don't understand is that he is German and you say the (ex-)wife too. How can she petition for a spouse, unless she has dual citizenship, or was she an LPR?

In legalese they will call this a "third country", even if there's only two countries in your logic.

Fortunately, I haven't ever been divorced in Germany, but to the best of my knowledge there is no flying in, grabbing the papers and - bang - divorced. It's a process and takes a while. Maybe she just filed and it's never been finalized? I also only know of cases where both had to appear before the judge.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Morocco
Timeline

legal marriage in any country is legal here

legal divorce is the same so your friend does not have the proper paper supporting the divorce

if the country recognizes a union or dissolving the union, the US accepts it

for years americans have traveled to other countries like Mexico to get a quicky divorce

Edited by Adil & Jeanne
Link to comment
Share on other sites

What I don't understand is that he is German and you say the (ex-)wife too. How can she petition for a spouse, unless she has dual citizenship, or was she an LPR?

In legalese they will call this a "third country", even if there's only two countries in your logic.

Fortunately, I haven't ever been divorced in Germany, but to the best of my knowledge there is no flying in, grabbing the papers and - bang - divorced. It's a process and takes a while. Maybe she just filed and it's never been finalized? I also only know of cases where both had to appear before the judge.

Back the time the ex wife filed for him, she was a LPR.

and about the divorce process, I don't know details. I just now she did it and that's it.

K-1 Visa Timeline!
Service Center : California Service Center
Consulate : Guanzhou, China

 


I-129F Sent : 2015-01-14 I-129F NOA1 : 2015-01-16                     California SC received: 2015-01-21
I-129F NOA1 hardcopy: 2015-01-27 I-129F NOA2 : 2015-02-06   I-129F NOA2 hardcopy: 2015-02-18
NVC received: 2015-02-18 Consulate Received : 2015-02-27
Fiance received the hard mail from NVC with a new assinged number: 2015-3-3
received instructions (pkt 3): 2015-3-5 (hard mail)          
paid visa fee: 2015-3-12
received appointment letter (pkt 4): 2015-3-12 (email)    
Medical: 2015-04-03 Picked medical up: 2015-04-10
Interview Date : 2015-4-14 Interview Result :Approved   Visa Received :
2015-4-24
US Entry : 2015-5-19
Marriage : 2015-6-27

 
 

AOS:

Spoiler

filed for AOS: 2015-7-16 delivered to Chicago Lockbox: 2015-7-20

Electronic NOA1: 2015-7-23 Hard copies NOA1: 2015-7-28

Biometrics appointment letter: 2015-8-1 Biometrics appointment: 2015-8-12

RFE :( 2015-8-19 RFE hard copy: 2015-8-22

Finally sent RFE back:: 2015-10-02 RFE was delivered: 2015-10-05

USCIS updated status on "request for evidence was received": 2015-10-07

Combo card is being produced: 2015-10-26 (exactly three weeks after submitting RFE)

Case status update; card was mailed: 2015-10-28 Received EAD approval letter: 2015-10-29

Combo card received: 2015-11-2 Interview scheduled: 2015-12-21 (APPROVED :dancing: )

Green card received: 2015-12-21

N-400.319(b)

Spoiler

October 17, 2016 - case filed 

October 25, 2016 - NOA1

December 19, 2016 - Biometrics at GUZ field Office 

December 2, 2017 - Inquiry about the case being outside the processing time norms

January 2, 2018 - notification regarding the inquiry being outside processing time norms, the case has not assigned yet 

February 23, 2018 - scheduled for the Interview 

March 21, 2018 -  a response was sent to my inquiry about why your case is taking longer than our processing time

April 4, 2018 - Interview 

April 12, 2019 - in line for the Oath Ceremony

 

ROC

Spoiler

October 28, 2017 - filed I-751 case

November 6, 2017 - NOA1

November 20, 2017 - biometric at GUZ field office 

March 4, 2018 - status change: Your case was received by your local office 

 

 

Link to comment
Share on other sites

legal marriage in any country is legal here

legal divorce is the same so your friend does not have the proper paper supporting the divorce

if the country recognizes a union or dissolving the union, the US accepts it

for years americans have traveled to other countries like Mexico to get a quicky divorce

well, I agree with that marriage in any country is a legal marriage. But I'm afraid about divorces you are wrong. Because it is fixed in the law if both parties do not domicile in the country of divorce. Then the divorce is invalid.

K-1 Visa Timeline!
Service Center : California Service Center
Consulate : Guanzhou, China

 


I-129F Sent : 2015-01-14 I-129F NOA1 : 2015-01-16                     California SC received: 2015-01-21
I-129F NOA1 hardcopy: 2015-01-27 I-129F NOA2 : 2015-02-06   I-129F NOA2 hardcopy: 2015-02-18
NVC received: 2015-02-18 Consulate Received : 2015-02-27
Fiance received the hard mail from NVC with a new assinged number: 2015-3-3
received instructions (pkt 3): 2015-3-5 (hard mail)          
paid visa fee: 2015-3-12
received appointment letter (pkt 4): 2015-3-12 (email)    
Medical: 2015-04-03 Picked medical up: 2015-04-10
Interview Date : 2015-4-14 Interview Result :Approved   Visa Received :
2015-4-24
US Entry : 2015-5-19
Marriage : 2015-6-27

 
 

AOS:

Spoiler

filed for AOS: 2015-7-16 delivered to Chicago Lockbox: 2015-7-20

Electronic NOA1: 2015-7-23 Hard copies NOA1: 2015-7-28

Biometrics appointment letter: 2015-8-1 Biometrics appointment: 2015-8-12

RFE :( 2015-8-19 RFE hard copy: 2015-8-22

Finally sent RFE back:: 2015-10-02 RFE was delivered: 2015-10-05

USCIS updated status on "request for evidence was received": 2015-10-07

Combo card is being produced: 2015-10-26 (exactly three weeks after submitting RFE)

Case status update; card was mailed: 2015-10-28 Received EAD approval letter: 2015-10-29

Combo card received: 2015-11-2 Interview scheduled: 2015-12-21 (APPROVED :dancing: )

Green card received: 2015-12-21

N-400.319(b)

Spoiler

October 17, 2016 - case filed 

October 25, 2016 - NOA1

December 19, 2016 - Biometrics at GUZ field Office 

December 2, 2017 - Inquiry about the case being outside the processing time norms

January 2, 2018 - notification regarding the inquiry being outside processing time norms, the case has not assigned yet 

February 23, 2018 - scheduled for the Interview 

March 21, 2018 -  a response was sent to my inquiry about why your case is taking longer than our processing time

April 4, 2018 - Interview 

April 12, 2019 - in line for the Oath Ceremony

 

ROC

Spoiler

October 28, 2017 - filed I-751 case

November 6, 2017 - NOA1

November 20, 2017 - biometric at GUZ field office 

March 4, 2018 - status change: Your case was received by your local office 

 

 

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...