Jump to content

104 posts in this topic

Recommended Posts

Filed: AOS (pnd) Country: Azerbaijan
Timeline
Posted

All of the paperwork has been ready including medical examination. Will scan my latest pay stub tomorrow, to show that I am still employed :) few more translations of skype screens and that's it.

01/14/14 I -129F Petition sent
01/17/14 Petition received
01/22/14 NOA1 - TSC
06/23/14 Service Request created after congressional inquiry
07/03/14 Email from USCIS - our case is on processing hold due to pending security checks
08/04/14 No update from USCIS. Filed a case with CIS Ombudsman
08/05/14 Senators/Congresswoman cannot help with my case because security checks are pending
08/05/14 Another Service Request created by Tier 2 since no response from TSC.
08/18/14 Email from USCIS in response to second service request - still on processing hold due to pending security checks
08/21/14 NOA2 (finally after 7 months)

08/25/14 Email from USCIS - approved case shipped to NVC on 8/22/14

09/02/14 Case received by NVC

09/04/14 Case # assigned by NVC

09/05/14 In transit to the Embassy

09/09/14 Case received by Tbilisi Embassy - ready for interview

09/17/14 Interview!!! - APPROVED!!!!
09/24/14 POE :D

10/31/14 Married :devil:

11/05/14 Filed for Adjustment of Status

11/13/14 NOA1

12/04/14 Biometrics

01/21/15 AP/EAD approved

01/26/15 Card mailed

01/29/15 Combo card arrived in the mail

02/25/15 Notice of Potential Interview Waiver received in the mail

07/09/15 Green Card approved on USCIS site

07/13/15 Notice received in the mail

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline
Posted

Well, that's great. I am also an early planner - I already have the check list for the interview and work on the papers for it each day. Helps killing time awaiting.

CR-1 Visa

Service Center : California Service Center

Consulate : Georgia

Marriage: 2015-01-11

I-130 Sent : 2015-07-10 - sent from abroad, auto-expedite

I-130 NOA1 : 2015-07-14

I-130 Approved : 2015-08-13 (30 days)

:dancing::dancing::dancing::dancing::dancing::dancing:

Received by NVC: 2015-09-02 (in 20 days after the approval) - no email notification, info obtained over the phone

Case # assigned: 2015-09-10 (in 8 days after the case was received) - no email notification, info obtained over the phone

DS-261 filled: 2015-09-14

AoS fee paid: 2015-09-15

DS-261 reviewed over the phone:2015-09-17

Agent registration email: 2015-09-18

IV fee available: 2015-09-18

IV fee paid: 2015-09-22

IV fee showed paid: 2015-09-23 right before the end of the working day at NVC - at almost midnight EST.

AoS and IV package received: 2015-09-23

DS-260 filled out 2015-09-24

Scan date: 2015-09-24

Now let's get some patience for 3 weeks and hope CC will come without any delays :luv:

Case complete: 2015-10-21 (27 days)

Interview date issued: 2015-10-23

Received by the embassy: 2015-11-12

Interview date: 2015-12-02 (Request to reschedule for the earlier time denied.)

Approved!!!

Visa issued: 2015-12-07

Visa in hand: 2015-12-07

US entry: 2015-12-11

Social Security card arrived only after the visit to SS office, on 01/20

Green Card arrived: 2016-01-27

From NOA-1 to the interview - 141 days (4 months and 18 days)

Filed: AOS (pnd) Country: Azerbaijan
Timeline
Posted

YPAAAAAAAAAAAAAAA!!!! we got it!!!!!!

01/14/14 I -129F Petition sent
01/17/14 Petition received
01/22/14 NOA1 - TSC
06/23/14 Service Request created after congressional inquiry
07/03/14 Email from USCIS - our case is on processing hold due to pending security checks
08/04/14 No update from USCIS. Filed a case with CIS Ombudsman
08/05/14 Senators/Congresswoman cannot help with my case because security checks are pending
08/05/14 Another Service Request created by Tier 2 since no response from TSC.
08/18/14 Email from USCIS in response to second service request - still on processing hold due to pending security checks
08/21/14 NOA2 (finally after 7 months)

08/25/14 Email from USCIS - approved case shipped to NVC on 8/22/14

09/02/14 Case received by NVC

09/04/14 Case # assigned by NVC

09/05/14 In transit to the Embassy

09/09/14 Case received by Tbilisi Embassy - ready for interview

09/17/14 Interview!!! - APPROVED!!!!
09/24/14 POE :D

10/31/14 Married :devil:

11/05/14 Filed for Adjustment of Status

11/13/14 NOA1

12/04/14 Biometrics

01/21/15 AP/EAD approved

01/26/15 Card mailed

01/29/15 Combo card arrived in the mail

02/25/15 Notice of Potential Interview Waiver received in the mail

07/09/15 Green Card approved on USCIS site

07/13/15 Notice received in the mail

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline
Posted

Oh!!!!! Such a weight off my shoulders!!!! After Maxim''s denial I was worrying soo much!

Please, tell us more!!!

My main ? is - how about his document of no impediment to marriage? What was the date it was issued?

CR-1 Visa

Service Center : California Service Center

Consulate : Georgia

Marriage: 2015-01-11

I-130 Sent : 2015-07-10 - sent from abroad, auto-expedite

I-130 NOA1 : 2015-07-14

I-130 Approved : 2015-08-13 (30 days)

:dancing::dancing::dancing::dancing::dancing::dancing:

Received by NVC: 2015-09-02 (in 20 days after the approval) - no email notification, info obtained over the phone

Case # assigned: 2015-09-10 (in 8 days after the case was received) - no email notification, info obtained over the phone

DS-261 filled: 2015-09-14

AoS fee paid: 2015-09-15

DS-261 reviewed over the phone:2015-09-17

Agent registration email: 2015-09-18

IV fee available: 2015-09-18

IV fee paid: 2015-09-22

IV fee showed paid: 2015-09-23 right before the end of the working day at NVC - at almost midnight EST.

AoS and IV package received: 2015-09-23

DS-260 filled out 2015-09-24

Scan date: 2015-09-24

Now let's get some patience for 3 weeks and hope CC will come without any delays :luv:

Case complete: 2015-10-21 (27 days)

Interview date issued: 2015-10-23

Received by the embassy: 2015-11-12

Interview date: 2015-12-02 (Request to reschedule for the earlier time denied.)

Approved!!!

Visa issued: 2015-12-07

Visa in hand: 2015-12-07

US entry: 2015-12-11

Social Security card arrived only after the visit to SS office, on 01/20

Green Card arrived: 2016-01-27

From NOA-1 to the interview - 141 days (4 months and 18 days)

Filed: AOS (pnd) Country: Russia
Timeline
Posted

YPAAAAAAAAAAAAAAA!!!! we got it!!!!!!

Congrats!! :dancing:

02/28/2014 - I-129f Accepted and Routed to Texas Service Center / Я-129F Принято и направляется в сервисный центр Техаса

03/04/2014 - NOA1 Notice Date / NOA1 Уведомление Дата

03/05/2014 - NOA1 Received via Email & Text / NOA1 полученных через электронную почту и текст

03/05/2014 - Check Cashed by TSC / Чек обналичены TSC

03/06/2014 - Alien Registration Number Changed / Регистрационный номер иностранца Изменен

03/08/2014 - Received NOA1 Hard Copy / Поступило NOA1 Печатная

10/09/2014 - NOA2 Received via Email & Text / NOA2 редакцию по электронной почте и текста (219 DAYS!!)

10/14/2014 - Received NOA2 Hard Copy / Поступила NOA2 Жесткий диск

10/16/2014 - Case Shipped to NVC / Дело Отгружено NVC

10/23/2014 - Case Received by NVC / Дело Поступило NVC

10/24/2014 - Case Number Assigned by NVC / Номер дела, присвоенный NVC

10/27/2014 - Case Left NVC for Moscow Consulate / Дело Левый NVC для Москва консульства

10/29/2014 - Moscow Consulate Received Case and Changed Status to Ready / Москва Консульство получил случай и изменила статус Готов

11/24/2014 - Medical Exam / Медицинский экзамен

11/26/2014 - K-1 Interview (Approved!!) / K-1 Интервью (утвержденный!!)

event.png

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline
Posted

Wait4ever, when is your sweetheart coming here? :)

CR-1 Visa

Service Center : California Service Center

Consulate : Georgia

Marriage: 2015-01-11

I-130 Sent : 2015-07-10 - sent from abroad, auto-expedite

I-130 NOA1 : 2015-07-14

I-130 Approved : 2015-08-13 (30 days)

:dancing::dancing::dancing::dancing::dancing::dancing:

Received by NVC: 2015-09-02 (in 20 days after the approval) - no email notification, info obtained over the phone

Case # assigned: 2015-09-10 (in 8 days after the case was received) - no email notification, info obtained over the phone

DS-261 filled: 2015-09-14

AoS fee paid: 2015-09-15

DS-261 reviewed over the phone:2015-09-17

Agent registration email: 2015-09-18

IV fee available: 2015-09-18

IV fee paid: 2015-09-22

IV fee showed paid: 2015-09-23 right before the end of the working day at NVC - at almost midnight EST.

AoS and IV package received: 2015-09-23

DS-260 filled out 2015-09-24

Scan date: 2015-09-24

Now let's get some patience for 3 weeks and hope CC will come without any delays :luv:

Case complete: 2015-10-21 (27 days)

Interview date issued: 2015-10-23

Received by the embassy: 2015-11-12

Interview date: 2015-12-02 (Request to reschedule for the earlier time denied.)

Approved!!!

Visa issued: 2015-12-07

Visa in hand: 2015-12-07

US entry: 2015-12-11

Social Security card arrived only after the visit to SS office, on 01/20

Green Card arrived: 2016-01-27

From NOA-1 to the interview - 141 days (4 months and 18 days)

Filed: AOS (pnd) Country: Azerbaijan
Timeline
Posted

Oh!!!!! Such a weight off my shoulders!!!! After Maxim''s denial I was worrying soo much!

Please, tell us more!!!

My main ? is - how about his document of no impediment to marriage? What was the date it was issued?

I will post a review for the embassy later today. But in short, he was well prepared with all of the documents and didn't have any issues with the exception that he couldn't pay his visa fee at the embassy even though they told him a week ago that he can. So he had to leave to go to the bank and pay, and then come back for the rest of the interview.

He got his document in August and there were no issues with it at all.

Will write more later, I promise :)

Wait4ever, when is your sweetheart coming here? :)

He will be here on the 24th!!!!! I can't believe he will finally be here....

01/14/14 I -129F Petition sent
01/17/14 Petition received
01/22/14 NOA1 - TSC
06/23/14 Service Request created after congressional inquiry
07/03/14 Email from USCIS - our case is on processing hold due to pending security checks
08/04/14 No update from USCIS. Filed a case with CIS Ombudsman
08/05/14 Senators/Congresswoman cannot help with my case because security checks are pending
08/05/14 Another Service Request created by Tier 2 since no response from TSC.
08/18/14 Email from USCIS in response to second service request - still on processing hold due to pending security checks
08/21/14 NOA2 (finally after 7 months)

08/25/14 Email from USCIS - approved case shipped to NVC on 8/22/14

09/02/14 Case received by NVC

09/04/14 Case # assigned by NVC

09/05/14 In transit to the Embassy

09/09/14 Case received by Tbilisi Embassy - ready for interview

09/17/14 Interview!!! - APPROVED!!!!
09/24/14 POE :D

10/31/14 Married :devil:

11/05/14 Filed for Adjustment of Status

11/13/14 NOA1

12/04/14 Biometrics

01/21/15 AP/EAD approved

01/26/15 Card mailed

01/29/15 Combo card arrived in the mail

02/25/15 Notice of Potential Interview Waiver received in the mail

07/09/15 Green Card approved on USCIS site

07/13/15 Notice received in the mail

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline
Posted

He will be here on the 24th!!!!! I can't believe he will finally be here....

I am so, so happy for you both! :wub:

CR-1 Visa

Service Center : California Service Center

Consulate : Georgia

Marriage: 2015-01-11

I-130 Sent : 2015-07-10 - sent from abroad, auto-expedite

I-130 NOA1 : 2015-07-14

I-130 Approved : 2015-08-13 (30 days)

:dancing::dancing::dancing::dancing::dancing::dancing:

Received by NVC: 2015-09-02 (in 20 days after the approval) - no email notification, info obtained over the phone

Case # assigned: 2015-09-10 (in 8 days after the case was received) - no email notification, info obtained over the phone

DS-261 filled: 2015-09-14

AoS fee paid: 2015-09-15

DS-261 reviewed over the phone:2015-09-17

Agent registration email: 2015-09-18

IV fee available: 2015-09-18

IV fee paid: 2015-09-22

IV fee showed paid: 2015-09-23 right before the end of the working day at NVC - at almost midnight EST.

AoS and IV package received: 2015-09-23

DS-260 filled out 2015-09-24

Scan date: 2015-09-24

Now let's get some patience for 3 weeks and hope CC will come without any delays :luv:

Case complete: 2015-10-21 (27 days)

Interview date issued: 2015-10-23

Received by the embassy: 2015-11-12

Interview date: 2015-12-02 (Request to reschedule for the earlier time denied.)

Approved!!!

Visa issued: 2015-12-07

Visa in hand: 2015-12-07

US entry: 2015-12-11

Social Security card arrived only after the visit to SS office, on 01/20

Green Card arrived: 2016-01-27

From NOA-1 to the interview - 141 days (4 months and 18 days)

  • 2 weeks later...
Filed: K-1 Visa Country: Azerbaijan
Timeline
Posted

5/16/2014 - I-129f sent

5/21/2014 - NOA1 Notice Date CSC

5/22/2014 - NOA1 Received via Email

5/29/2014 - Received NOA1 Hard Copy

VJ Timeline estimated NOA2 approval date between June 16, 2014 and June 25, 2014

6/20/2014 - Txt and E-mail received that I-129f has been approved. BOOM :energy:
6/25/2014 - NOA2 Hard Copy

7/2/2014 - Received NVC Case Number via Phone(Called 3 days in a row. Between 6:30 and 7:30am CST. Got through with first attempt. On hold for 30 minutes all three times.)

7/8/2014 - US Embassy of Georgia has received the package

8/7/2014 - Medical Exam

8/20/2014 - Interview date - DENIED. :blink:

9/29/2014 - Mirracle :energy:

10/14/2014 - Visa Recevied.(Extra cost for shipping passport and package is approx $200 :secret:)

11/13/2014 - US Entry!!!! :girlwerewolf2xn:

======================================================

11/24/2014 - SSN Received

12/12/2014 - Getting Married (L)

12/27/2014 - AOS Package sent

1/2/2015 - NOA Received

1/26/2014 - Biometrics

3/10/2014 - EAD has been processed

:jest:

Filed: AOS (pnd) Country: Azerbaijan
Timeline
Posted

congrats!!!!!!!!!!!! you should buy lottery tickets :)

01/14/14 I -129F Petition sent
01/17/14 Petition received
01/22/14 NOA1 - TSC
06/23/14 Service Request created after congressional inquiry
07/03/14 Email from USCIS - our case is on processing hold due to pending security checks
08/04/14 No update from USCIS. Filed a case with CIS Ombudsman
08/05/14 Senators/Congresswoman cannot help with my case because security checks are pending
08/05/14 Another Service Request created by Tier 2 since no response from TSC.
08/18/14 Email from USCIS in response to second service request - still on processing hold due to pending security checks
08/21/14 NOA2 (finally after 7 months)

08/25/14 Email from USCIS - approved case shipped to NVC on 8/22/14

09/02/14 Case received by NVC

09/04/14 Case # assigned by NVC

09/05/14 In transit to the Embassy

09/09/14 Case received by Tbilisi Embassy - ready for interview

09/17/14 Interview!!! - APPROVED!!!!
09/24/14 POE :D

10/31/14 Married :devil:

11/05/14 Filed for Adjustment of Status

11/13/14 NOA1

12/04/14 Biometrics

01/21/15 AP/EAD approved

01/26/15 Card mailed

01/29/15 Combo card arrived in the mail

02/25/15 Notice of Potential Interview Waiver received in the mail

07/09/15 Green Card approved on USCIS site

07/13/15 Notice received in the mail

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline
Posted

I feel so lonely in this topic now... I don't believe anyone will join me here any time soon... You are so lucky, guys, you ar already with your sweethearts! Only God knows how soon I will be with mine... But God also knows how happy I am for you four!

CR-1 Visa

Service Center : California Service Center

Consulate : Georgia

Marriage: 2015-01-11

I-130 Sent : 2015-07-10 - sent from abroad, auto-expedite

I-130 NOA1 : 2015-07-14

I-130 Approved : 2015-08-13 (30 days)

:dancing::dancing::dancing::dancing::dancing::dancing:

Received by NVC: 2015-09-02 (in 20 days after the approval) - no email notification, info obtained over the phone

Case # assigned: 2015-09-10 (in 8 days after the case was received) - no email notification, info obtained over the phone

DS-261 filled: 2015-09-14

AoS fee paid: 2015-09-15

DS-261 reviewed over the phone:2015-09-17

Agent registration email: 2015-09-18

IV fee available: 2015-09-18

IV fee paid: 2015-09-22

IV fee showed paid: 2015-09-23 right before the end of the working day at NVC - at almost midnight EST.

AoS and IV package received: 2015-09-23

DS-260 filled out 2015-09-24

Scan date: 2015-09-24

Now let's get some patience for 3 weeks and hope CC will come without any delays :luv:

Case complete: 2015-10-21 (27 days)

Interview date issued: 2015-10-23

Received by the embassy: 2015-11-12

Interview date: 2015-12-02 (Request to reschedule for the earlier time denied.)

Approved!!!

Visa issued: 2015-12-07

Visa in hand: 2015-12-07

US entry: 2015-12-11

Social Security card arrived only after the visit to SS office, on 01/20

Green Card arrived: 2016-01-27

From NOA-1 to the interview - 141 days (4 months and 18 days)

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline
Posted

Max, let me ask you again - what was the date on Kristina's document of non-impediment to marriage, when she brought it to the interview?

CR-1 Visa

Service Center : California Service Center

Consulate : Georgia

Marriage: 2015-01-11

I-130 Sent : 2015-07-10 - sent from abroad, auto-expedite

I-130 NOA1 : 2015-07-14

I-130 Approved : 2015-08-13 (30 days)

:dancing::dancing::dancing::dancing::dancing::dancing:

Received by NVC: 2015-09-02 (in 20 days after the approval) - no email notification, info obtained over the phone

Case # assigned: 2015-09-10 (in 8 days after the case was received) - no email notification, info obtained over the phone

DS-261 filled: 2015-09-14

AoS fee paid: 2015-09-15

DS-261 reviewed over the phone:2015-09-17

Agent registration email: 2015-09-18

IV fee available: 2015-09-18

IV fee paid: 2015-09-22

IV fee showed paid: 2015-09-23 right before the end of the working day at NVC - at almost midnight EST.

AoS and IV package received: 2015-09-23

DS-260 filled out 2015-09-24

Scan date: 2015-09-24

Now let's get some patience for 3 weeks and hope CC will come without any delays :luv:

Case complete: 2015-10-21 (27 days)

Interview date issued: 2015-10-23

Received by the embassy: 2015-11-12

Interview date: 2015-12-02 (Request to reschedule for the earlier time denied.)

Approved!!!

Visa issued: 2015-12-07

Visa in hand: 2015-12-07

US entry: 2015-12-11

Social Security card arrived only after the visit to SS office, on 01/20

Green Card arrived: 2016-01-27

From NOA-1 to the interview - 141 days (4 months and 18 days)

Filed: AOS (pnd) Country: Azerbaijan
Timeline
Posted

I feel so lonely in this topic now... I don't believe anyone will join me here any time soon... You are so lucky, guys, you ar already with your sweethearts! Only God knows how soon I will be with mine... But God also knows how happy I am for you four!

We are still around :) and your time together will come very soon!

01/14/14 I -129F Petition sent
01/17/14 Petition received
01/22/14 NOA1 - TSC
06/23/14 Service Request created after congressional inquiry
07/03/14 Email from USCIS - our case is on processing hold due to pending security checks
08/04/14 No update from USCIS. Filed a case with CIS Ombudsman
08/05/14 Senators/Congresswoman cannot help with my case because security checks are pending
08/05/14 Another Service Request created by Tier 2 since no response from TSC.
08/18/14 Email from USCIS in response to second service request - still on processing hold due to pending security checks
08/21/14 NOA2 (finally after 7 months)

08/25/14 Email from USCIS - approved case shipped to NVC on 8/22/14

09/02/14 Case received by NVC

09/04/14 Case # assigned by NVC

09/05/14 In transit to the Embassy

09/09/14 Case received by Tbilisi Embassy - ready for interview

09/17/14 Interview!!! - APPROVED!!!!
09/24/14 POE :D

10/31/14 Married :devil:

11/05/14 Filed for Adjustment of Status

11/13/14 NOA1

12/04/14 Biometrics

01/21/15 AP/EAD approved

01/26/15 Card mailed

01/29/15 Combo card arrived in the mail

02/25/15 Notice of Potential Interview Waiver received in the mail

07/09/15 Green Card approved on USCIS site

07/13/15 Notice received in the mail

Filed: IR-1/CR-1 Visa Country: Georgia
Timeline
Posted

(F)

We are still around :) and your time together will come very soon!

(F) Thanks! That really makes me feel a little better!

CR-1 Visa

Service Center : California Service Center

Consulate : Georgia

Marriage: 2015-01-11

I-130 Sent : 2015-07-10 - sent from abroad, auto-expedite

I-130 NOA1 : 2015-07-14

I-130 Approved : 2015-08-13 (30 days)

:dancing::dancing::dancing::dancing::dancing::dancing:

Received by NVC: 2015-09-02 (in 20 days after the approval) - no email notification, info obtained over the phone

Case # assigned: 2015-09-10 (in 8 days after the case was received) - no email notification, info obtained over the phone

DS-261 filled: 2015-09-14

AoS fee paid: 2015-09-15

DS-261 reviewed over the phone:2015-09-17

Agent registration email: 2015-09-18

IV fee available: 2015-09-18

IV fee paid: 2015-09-22

IV fee showed paid: 2015-09-23 right before the end of the working day at NVC - at almost midnight EST.

AoS and IV package received: 2015-09-23

DS-260 filled out 2015-09-24

Scan date: 2015-09-24

Now let's get some patience for 3 weeks and hope CC will come without any delays :luv:

Case complete: 2015-10-21 (27 days)

Interview date issued: 2015-10-23

Received by the embassy: 2015-11-12

Interview date: 2015-12-02 (Request to reschedule for the earlier time denied.)

Approved!!!

Visa issued: 2015-12-07

Visa in hand: 2015-12-07

US entry: 2015-12-11

Social Security card arrived only after the visit to SS office, on 01/20

Green Card arrived: 2016-01-27

From NOA-1 to the interview - 141 days (4 months and 18 days)

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...