I didn't see a new thread for this started yet, so here goes. Let's make the front page again, since we're no longer allowed to make direct pleas in the monthly threads.

This letter is a request for action to the USCIS in bringing I-130 processing times back to reality. Everyone who was involved in our previous letter sending campaign knows it was a success in that we got a response from USCIS addressing our concerns the very next day. But it's not enough. A new letter has been drafted, and today is delivery day. Please review this thread for background on our second effort.

Today we're sending this letter via fax to the following contacts:

  • 1.The Honorable Bob Goodlatte - Chairman House Judiciary Committee
    Fax 202-225-9681
  • 2. Director USCIS: Alejandro Mayorkas
    Fax: 202-272-8118
  • 3. Deputy Director USCIS: Lori Scialabba
    Fax: 202-272-8118
  • 4. Maria M. Odom - Ombudsman USCIS
    Fax: 202-357-0042
  • 5. Brandi Blackburn, Assistant Center Director for NBC Division 8 in Overland Park, KS
    Fax: 816-350-5785
  • 6. Director: Nancy W. Guilliams - Office of Administration-USCIS
    Fax: 202-272-1553
  • 7. Secretary DHS: Mr. Rand Beers
    Fax: 202-282-8420
  • 8. Senator John Cornyn - Ranking Member U.S. Senate Judiciary Committee
    Fax: 202-228-2281 (committee office) OR 202-228-2856 (direct office)
  • 9. Senator Chuck Schumer - Chairman U.S. Senate Judiciary Committee
    Fax: 202-228-2281 (committee office) OR 202-228-3027 (direct office)

If you don't have access to a fax machine, use a free online service such as: myfax.com/free, gotfreefax.com, and faxzero.com.

Send it by email, too:

alejandro.mayorkas@dhs.gov; alejandro.mayorkas@hq.dhs.gov; uscisfrcomments@dhs.gov; Lori.Scialabba@dhs.gov; Lori.Scialabba@hq.dhs.gov; cisombudsman@dhs.gov; maria.m.odom@dhs.gov; maria.m.odom@hq.dhs.gov; brandi.blackburn@uscis.dhs.gov; rand.beers@hq.dhs.gov; letters@washpost.com; executive@aila.org; newsroom@aila.org
Please comment if you participate!
Edited by BOS_LHR

ROC Timeline

04/06/2016 - Mailed I-751

04/07/2016 - NOA1

04/13/2016 - Check cashed

04/14/2016 - NOA1 hardcopy

05/04/2016 - Received biometric notice

05/16/2016 - Biometrics appointment

05/17/2017 - Approved

05/22/2017 - Card in Production

05/25/2017 - Card Mailed

05/30/2017 - Card Received

Posted

I'm attempting to send this via email, but the pictures are not showing up in the email. Anyone have an idea of how to solve this?

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Posted

When I did a straight copy/paste of the whole letter into Gmail the images didn't show at first, there were just blank placeholders. Pasting them individually did the trick.

ROC Timeline

04/06/2016 - Mailed I-751

04/07/2016 - NOA1

04/13/2016 - Check cashed

04/14/2016 - NOA1 hardcopy

05/04/2016 - Received biometric notice

05/16/2016 - Biometrics appointment

05/17/2017 - Approved

05/22/2017 - Card in Production

05/25/2017 - Card Mailed

05/30/2017 - Card Received

Posted

Hmmm, Trying that.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Filed: IR-1/CR-1 Visa Country: England
Timeline
Posted

All you I-130 filers stuck in the USCIS CR1/IR1 backlog of doom lets get behind this. If both the petitioner and beneficiary send even better, the more emails they receive the more likely they are to pay attention to us.

My blog about my visa journey and adjusting to my new life in the US http://albiontoamerica.wordpress.com/

Posted

Ok, I had to reinsert the pictures after I saved them to my desk top, but it looks like we're all good now.

I also added "et al" after the honorable chairman's name. :)


I'm also getting my family and friends to send it out. They all miss my husband as well and think this is craziness.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Posted

Ok, everyone of those email addresses just bounced my email. Ideas?


I know that via email it will have much less impact not having the pictures, but do you think that we could possibly upload them somewhere and link them in the document to make it less heavy? I'm thinking that the large number of images is what's making it bounce.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Posted

Ok, everyone of those email addresses just bounced my email. Ideas?

Did you insert the pictures as saved objects? It might be that they automatically reject attachments from any unknown senders.

ROC Timeline

04/06/2016 - Mailed I-751

04/07/2016 - NOA1

04/13/2016 - Check cashed

04/14/2016 - NOA1 hardcopy

05/04/2016 - Received biometric notice

05/16/2016 - Biometrics appointment

05/17/2017 - Approved

05/22/2017 - Card in Production

05/25/2017 - Card Mailed

05/30/2017 - Card Received

Posted

I inserted them directly into the document, not attached at the end, as I thought that would be too confusing and people were not about to open attachments from a disgruntled USCIS customer.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Posted

I inserted them directly into the document, not attached at the end, as I thought that would be too confusing and people were not about to open attachments from a disgruntled USCIS customer.

I made a text only copy with the references removed for use on the senators websites. I will be faxing a copy of the full document with all the bells and whistles to their offices. The text can be found below:

Subject: DACA applications are getting priority at the expense of I-130 petitions of US Citizens – Processing of I-130 applications of US spouses beyond 5 months
Date: December 11, 2013
Mr. Insert name:
I appreciate that the House Judiciary Committee took swift action on my letter, sent on 11/19, regarding the needless backlog of pending I-130 Immediate Relative petitions. The USCIS issued a response to the stakeholders of I-130 petitions within 24 hours of my letter to you because your committee took keen interest in reuniting me with my spouse.
In their response, USCIS acknowledged the “…extended processing times for Form I-130, Petition for Alien Relative, filed by U.S. citizens for their eligible immediate relatives”. Unfortunately, their claim that “…USCIS has been focused on addressing delays in the processing of these Forms I-130 for several months” has no weight. The existing backlog began when USCIS shifted their focus to process Deferred Action for Childhood Arrivals (DACA) requests in August of 2012. A letter from the Committee on the Judiciary dated August 7, 2012 identified the risks inherent in USCIS’ approach to handling DACA requests, with specific emphasis on the harm it may cause for US citizens petitioning for immediate relatives. This confirms that USCIS was aware of the damage its actions would cause and chose not to take preemptive action that would have mitigated the current backlog.
During the 12 month period, from August 2012-July 2013; USCIS received 573,404 DACA requests and processed 430,236: a rate of 75%. By comparison, in the first two quarters of Fiscal Year 2013, USCIS
received 254,890 I-130 petitions at the National Benefits Center but processed only 2,755: a rate of only
1%. Ineffective balancing of workload among service centers and clear prioritization for other case types
resulted in the massive backlog in I-130s that USCIS is now acknowledging. I believe that reallocation of resources to more fairly balance priorities within USCIS would be of enormous benefit to I-130 petitioners and beneficiaries.
Furthermore, the USCIS claims that petitions are currently being adjudicated in an average of 7.4 months at each service center; however, another USCIS processing table shows that applications from February 2013 are being adjudicated.
The USCIS has blatantly manipulated its “Processing Timeframe” dates to avoid accountability. If the 7.4 month processing time in Figure-2 is accurate, the field office processing time in Figure-3 should reflect an April date rather than February. Due to this inconsistency in data from USCIS, it is unclear what qualifies as being outside of processing time, and petitioners from March and April of 2013 are unable to open inquiries on their cases. It should also be noted that the current processing figures were altered immediately after my previous letter, sent to you on November 19. The processing times as of September 30 originally were stated as 13 months and October 2, 2012, respectively, and altered to the above with the delivery of USCIS’ letter to stakeholders on November 20 – please see figure-4 on page-3. This demonstrates USCIS’ undeniable disregard towards the citizen of the US; it is nothing short of an insult to both their customers and to the elected representatives who should be overseeing their operation.
I deserve honesty and accountability, and seek to ensure that the I-130 petition of my spouse will not be further delayed due to the DACA (I-821D) plan. I request that processing data be evaluated and brought into alignment across USCIS so that my family may set expectations accordingly. In addition, I request that the House Judiciary Committee compels the USCIS to bring the processing timeline to 5 months or less by February 1, 2014; given that extended wait times at USCIS are only the beginning of a longer process which will keep families apart for substantially over a year. To meet the administration's goal of humanely reuniting families, these delays must be viewed in context of the broader visa application process, and the USCIS must be held accountable for its role in providing efficient, humane service for citizens and their immediate relatives.
Sincerely,
Name Name

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Posted

I emailed and faxed my letters - thanks to everyone for this joint effort.

CR-1 Timeline (USCIS)
NOA-1 (PD): 05/16/2013

NOA-2: 02/03/2014

CR-1 Timeline (NVC)

NVC Received: 02/14/2014

Case# and IIN# assigned: 03/20/2014

Case Completed: 05/15/2014

CR-1 Timeline (ISL Consulate)

Interview Scheduled: 05/28/2014

Day of Interview: 07/22/2014

Interview result: Approved

Visa Received 08/07/2014 :dancing:

Posted

I emailed and faxed my letters - thanks to everyone for this joint effort.

I emailed and will be faxing shortly. My husband will be sending them out. Shared with friends and family members to send out as well.

3/25/2006 - Got Married

3/20/2013 - I130 Priority Date
11/6/2013 - Transferred to Nebraska
1/3/2014 - NOA2
1/6/2014 - Petition shipped to NVC
1/21/2014 - NVC Received
2/24/2014 - Case # & IIN
3/3/2014 - DS-261 Available and Submitted
3/4/2014 - AOS Fee Available and Submitted
3/5/2014 - AOS Fee Paid
3/6/2014 - Received AOS Coversheet and Payment Receipt
3/7/2014 - AOS Package Sent
3/10/2014 - NVC Receives AOS package
3/12/2014 - NVC Acknowledges receipt of AOS package
3/21/2014 - Triangle of Doom appears for IV package
3/24/2014 - IV Fee Available and Submitted
3/25/2014 - IV package overnighted to the NVC
3/26/2014 - IV Fee shows PAID
3/26/2014 - DS260 available & submitted
3/26/2014 - IV package delivered to NVC
3/26/2014 - False checklist for IV fee.
3/26/2014 - AOS documents accepted w/no checklists!
3/28/2014 - IV & DS260 logged into NVC System
4/10/2014 - Case Complete!

Interview Date: June 17, 2014

Approved at Interview!

POE Newark on 6/28/2014! He's finally home!

Got a pending I-130? Tired of waiting for something to happen? Let's make something happen: http://www.visajourn...ners-committee/

We need more Twitter followers:@USCI130Cmte

Join our Facebook Group! https://www.facebook.com/groups/USGreencardpetitionerscommittee/

Filed: IR-1/CR-1 Visa Country: Poland
Timeline
Posted

Emailed and faxed! :)

4533828f9f.png

When two people are meant for each other, no time is too long, no distance is too far, no one can ever tear them apart.

USCIS: NVC:

6/21/2013 -Married in Stockholm, Sweden 4/16/2014- Case received at NVC

9/6/2013 -Priority Date 5/13 /2014- Case number and IIN assigned

2/25/2014 -Transferred to NSC 5/20/2014- DS-261 completed

3/31/2014 -Approved 5/21/2014- AOS fee invoiced and paid

5/22/2014- AOS package overnighted to NVC

5/28/2014- AOS scanned into the system

6/20/2014- IV invoice email (but fee still locked on CEAC )

6/23/2014- IV fee finally unlocked and paid.

IV package overnighted to NVC

6/30/2014- IV scanned in. DS260 completed.

7/1/2014- AOS accepted

7/2/2014- False checklist (AOS reviewed)

8/1/2014 False checklist (attorney's G28 reviewed)

8/2/2014 False checklist (NVC not sure why it was generated)

I am the beneficiary. 8/12/2014 CASE COMPLETE!

8/26/2014 Medical

9/2/2014 Interview... APPROVED!!!

9/5/2014 Visa in hand

Removal Of Conditions:

10/29- Package sent to VSC

11/1 - NOA1

11/17- Received biometrics appointment letter

11/30- Biometrics appointment

Filed: IR-1/CR-1 Visa Country: Greece
Timeline
Posted

Done too.. emails sent!

CR1 Visa

USCIS
08/13/2013 -- I130 Sent
08/14/2013 -- I130 NOA1 (email)

02/20/2014 -- I130 NOA2 (189 days - email)

NVC

02-28-2014 -- NVC received
04-03-2014 -- NVC case number assigned

05-22-2014 -- Case completed!!!!!!!
05-30-2014 -- Interview scheduled for July 16th 2014 08:30am

05-31-2014 -- Interview Letter received
Embassy
06-24-2014 -- Medical

07-16-2014 -- Interview Approved!!!!!
07-21-2014 -- Visa in hand
09-24-2014 -- POE

 

ROC
09-09-2016 -- I-751 sent
09-17-2016 -- NOA received

10-14-2016 -- Biometric appointment

08-07-2017 -- New card ordered
08-10-2017 -- New card mailed ( still no approval letter)

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

About to go on my lunch break. Can't wait to send 'em all out!

I-130 Sent: 11 November 2013

I-130 1st i-797(NOA-1): 12 November 2013, Vermont (Dis-)Service Center (1 day in transit)

I-130 2nd i-797(NOA-2): 30 May 2014, Vermont (Total Dis-)Service Center (199 days in USCIS hell)

I-30 Received at NVC: 11 June 2014 (11 days in transit)

NVC Case # Assigned: 27 June 2014 (15 days to case number assigned)

DS-261 Completed: 15 July 2014 (18 days to DS-261 available)

AOS Fee Bill Paid: 17 July 2014

AOS Fee Bill Shows "Paid": 22 July 2014

AOS Package Sent Out:23 July 2014

AOS Package Recieved: 28 July 2014

DS-260 Completed: ?

IV Fee Bill Paid: ?

November 2014 USCIS Spreadsheet: https://docs.google.com/spreadsheet/ccc?key=0Aqgp_fafY_R6dFI3cDREc2tNWV9qV09mMzN3WXR2dEE&usp=sharing#gid=3

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...