I'm not sure if this will upload or not, since I got an error the first time, but it seems to show it's attached now. I spent a few hours this morning making a spreadsheet around my case number (about 200 case numbers higher and lower than mine). You can see PD date for cases that are still in initial review and haven/t been transferred, approval dates for those that have been approved, and some other random info like if there was RFE or address change, the dates for those are included there as well. The 'y' in the transfer column means that the case says "has been transferred and is being processed." If the entire row of data is blank then those are cases that were not I-130 applications. I left those in just for spreadsheet integrity when entering the data originally. But you can ignore them.

This spreadsheet may or may not be helpful to anyone, but it was nice for me to at least see that there are approvals kind of all over the place. Some were approved much earlier, so those are probably expedites or extenuating circumstances other than a typical approval, or they were just lucky. But for those near my date, the number of non-approved transfers seems to be getting smaller.

**Just edited this post:**

I couldn't upload that file. Can someone tell me how to upload a google shared file like the other spreadsheet going around for members on the site? Thanks. Gracias. Danke. Salamat.

Edited by JWD531
Personal
July 3, 2011 - Met
July, 2012 - Proposed (Skype - Texas/Cavite, Philippines)
Nov, 2012 - Formal Proposal in Tagaytay, Philippines
Feb 3, 2013 - Married in Batangas, Philippines
Dec 22, 2013 thru Jan 4, 2014 - Spent Christmas and New Years holiday in Philippines (Cavite, Tagaytay, Marinduque, Rizal)
USCIS - Serviced by National Benefits Center / California Service Center
- called USCIS one to two times a week asking about status update, after about the third month
Mar 15, 2013 - I-130 Sent
Mar 18, 2013 - I-130 NOA1
Nov 5, 2013 - Transfer to local office according to USCIS web site, but customer service couldn't verify location (I'm assuming Houston)
Nov 5, 2013 - Set up infopass appointment for 11/13/13
Nov 8, 2013 - Received transfer letter, case at CSC
Nov 18, 2013 - Received initial approval by email/text
Nov 21, 2013 - Received hard copy approval (797C) in the mail
NVC
- called NVC every single day from November 18th to January 30th asking about status update
Dec 4, 2013 - Case received at NVC
Dec 19, 2013 - Received case number by calling NVC
Dec 21, 2013 - Submitted DS-261 online
Dec 25, 2013 - Paid AOS fee online (Merry Christmas!!!)
Dec 27, 2013 - AOS fee payment cleared bank, so mailed AOS package to NVC. Paid IV package fee online
Dec 30, 2013 - IV fee payment cleared bank, so mailed IV package to NVC
Dec 31, 2013 - AOS package arrived at NVC
Jan 6, 2014 - IV package arrived at NVC
Jan 7, 2014 - Submitted DS-260 online
Jan 24, 2014 - Received checklist via email (said reviewed DS-260 and instructed me to send in civil documents). I called NVC to verify I can ignore checklist and they said yes, to ignore it.
Jan 27, 2014 - Called NVC and was told that our case is complete and that we're just waiting for an interview appointment date.
Jan 29, 2014- Called NVC and was told that our interview was scheduled for March 10, 2014. Also registered for St Luke medical exam online.
Jan 30, 2014 - Received P4 letter in email.
US Embassy (Manila) / Medical (St. Luke's)
- called embassy every day after the interview, during AP status and after visa status changed to "Issued," asking about status update and visa delivery timeframe
Feb 4-5, 2014 - Wife went to medical exam (took two days), results mailed to US Embassy in Manila.
Feb 7, 2014, Package sent from NVC to US Embassy in Manila (according to NVC phone operator).
Feb 10, 2014 - CEAC website updated case as "In Transit."
Feb 11, 2014 - DHL website shows case as delivered to US Embassy in Manila.
Feb 12, 2014 - Called US Embassy in Manila and interview rescheduled for Feb 25th.
Feb 25, 2014 - "Approved," but we have to submit CENOMAR then wait for visa after it's processed, so I guess technically it's in Administrative Processing (AP).
Mar 17, 2014 - CEAC website, visa status changed to "Issued." Now we wait for pickup/delivery.
Mar 21, 2014 - Juvy picked up visa from 2GO location, got CFO stamp, and I booked her ticket.
Mar 22, 2014 - Juvy left Manila, through Japan and Detroit, and finally onto Houston!! :-)
THE REST OF MY LIFE CAN NOW OFFICIALLY BEGIN!!!
event.png
event.png

Link to comment
Share on other sites

I didn't want to quote my last post in order to save space, but I calculated 465 total cases (200 with case numbers higher than mine and 263 with case numbers lower than mine - that's just when I got tired of typing in case numbers lol). 62% are still awaiting approval, and 15% have been approved. The remaining 21% are in another status (RFE, address change, initial approval no transfer, re-affirmed/already approved case, etc). And that's just cases around 18 March (my PD), so like I said it may or may not be useful for others, but just wanted to get some sort of larger sample size of cases for people to see what "progress" is being made.

Personal
July 3, 2011 - Met
July, 2012 - Proposed (Skype - Texas/Cavite, Philippines)
Nov, 2012 - Formal Proposal in Tagaytay, Philippines
Feb 3, 2013 - Married in Batangas, Philippines
Dec 22, 2013 thru Jan 4, 2014 - Spent Christmas and New Years holiday in Philippines (Cavite, Tagaytay, Marinduque, Rizal)
USCIS - Serviced by National Benefits Center / California Service Center
- called USCIS one to two times a week asking about status update, after about the third month
Mar 15, 2013 - I-130 Sent
Mar 18, 2013 - I-130 NOA1
Nov 5, 2013 - Transfer to local office according to USCIS web site, but customer service couldn't verify location (I'm assuming Houston)
Nov 5, 2013 - Set up infopass appointment for 11/13/13
Nov 8, 2013 - Received transfer letter, case at CSC
Nov 18, 2013 - Received initial approval by email/text
Nov 21, 2013 - Received hard copy approval (797C) in the mail
NVC
- called NVC every single day from November 18th to January 30th asking about status update
Dec 4, 2013 - Case received at NVC
Dec 19, 2013 - Received case number by calling NVC
Dec 21, 2013 - Submitted DS-261 online
Dec 25, 2013 - Paid AOS fee online (Merry Christmas!!!)
Dec 27, 2013 - AOS fee payment cleared bank, so mailed AOS package to NVC. Paid IV package fee online
Dec 30, 2013 - IV fee payment cleared bank, so mailed IV package to NVC
Dec 31, 2013 - AOS package arrived at NVC
Jan 6, 2014 - IV package arrived at NVC
Jan 7, 2014 - Submitted DS-260 online
Jan 24, 2014 - Received checklist via email (said reviewed DS-260 and instructed me to send in civil documents). I called NVC to verify I can ignore checklist and they said yes, to ignore it.
Jan 27, 2014 - Called NVC and was told that our case is complete and that we're just waiting for an interview appointment date.
Jan 29, 2014- Called NVC and was told that our interview was scheduled for March 10, 2014. Also registered for St Luke medical exam online.
Jan 30, 2014 - Received P4 letter in email.
US Embassy (Manila) / Medical (St. Luke's)
- called embassy every day after the interview, during AP status and after visa status changed to "Issued," asking about status update and visa delivery timeframe
Feb 4-5, 2014 - Wife went to medical exam (took two days), results mailed to US Embassy in Manila.
Feb 7, 2014, Package sent from NVC to US Embassy in Manila (according to NVC phone operator).
Feb 10, 2014 - CEAC website updated case as "In Transit."
Feb 11, 2014 - DHL website shows case as delivered to US Embassy in Manila.
Feb 12, 2014 - Called US Embassy in Manila and interview rescheduled for Feb 25th.
Feb 25, 2014 - "Approved," but we have to submit CENOMAR then wait for visa after it's processed, so I guess technically it's in Administrative Processing (AP).
Mar 17, 2014 - CEAC website, visa status changed to "Issued." Now we wait for pickup/delivery.
Mar 21, 2014 - Juvy picked up visa from 2GO location, got CFO stamp, and I booked her ticket.
Mar 22, 2014 - Juvy left Manila, through Japan and Detroit, and finally onto Houston!! :-)
THE REST OF MY LIFE CAN NOW OFFICIALLY BEGIN!!!
event.png
event.png

Link to comment
Share on other sites

I didn't want to quote my last post in order to save space, but I calculated 465 total cases (200 with case numbers higher than mine and 263 with case numbers lower than mine - that's just when I got tired of typing in case numbers lol). 62% are still awaiting approval, and 15% have been approved. The remaining 21% are in another status (RFE, address change, initial approval no transfer, re-affirmed/already approved case, etc). And that's just cases around 18 March (my PD), so like I said it may or may not be useful for others, but just wanted to get some sort of larger sample size of cases for people to see what "progress" is being made.

https://drive.google.com/file/d/0B_obZzZKHMwbdWxMd01INUg2V1U/edit?usp=sharing

There's a link to the file. The "last three" column isn't the last three, that's just how I started the column originally. Also, most of the 'another status' cases as mentioned are above are in red - until towards the end when I forgot to change them.

Also, here's another good read. Nothing we don't already know, but still..

http://lawandborder.com/abysmal-uscis-processing-times-130-immediate-relative-immigrant-petitions/

Personal
July 3, 2011 - Met
July, 2012 - Proposed (Skype - Texas/Cavite, Philippines)
Nov, 2012 - Formal Proposal in Tagaytay, Philippines
Feb 3, 2013 - Married in Batangas, Philippines
Dec 22, 2013 thru Jan 4, 2014 - Spent Christmas and New Years holiday in Philippines (Cavite, Tagaytay, Marinduque, Rizal)
USCIS - Serviced by National Benefits Center / California Service Center
- called USCIS one to two times a week asking about status update, after about the third month
Mar 15, 2013 - I-130 Sent
Mar 18, 2013 - I-130 NOA1
Nov 5, 2013 - Transfer to local office according to USCIS web site, but customer service couldn't verify location (I'm assuming Houston)
Nov 5, 2013 - Set up infopass appointment for 11/13/13
Nov 8, 2013 - Received transfer letter, case at CSC
Nov 18, 2013 - Received initial approval by email/text
Nov 21, 2013 - Received hard copy approval (797C) in the mail
NVC
- called NVC every single day from November 18th to January 30th asking about status update
Dec 4, 2013 - Case received at NVC
Dec 19, 2013 - Received case number by calling NVC
Dec 21, 2013 - Submitted DS-261 online
Dec 25, 2013 - Paid AOS fee online (Merry Christmas!!!)
Dec 27, 2013 - AOS fee payment cleared bank, so mailed AOS package to NVC. Paid IV package fee online
Dec 30, 2013 - IV fee payment cleared bank, so mailed IV package to NVC
Dec 31, 2013 - AOS package arrived at NVC
Jan 6, 2014 - IV package arrived at NVC
Jan 7, 2014 - Submitted DS-260 online
Jan 24, 2014 - Received checklist via email (said reviewed DS-260 and instructed me to send in civil documents). I called NVC to verify I can ignore checklist and they said yes, to ignore it.
Jan 27, 2014 - Called NVC and was told that our case is complete and that we're just waiting for an interview appointment date.
Jan 29, 2014- Called NVC and was told that our interview was scheduled for March 10, 2014. Also registered for St Luke medical exam online.
Jan 30, 2014 - Received P4 letter in email.
US Embassy (Manila) / Medical (St. Luke's)
- called embassy every day after the interview, during AP status and after visa status changed to "Issued," asking about status update and visa delivery timeframe
Feb 4-5, 2014 - Wife went to medical exam (took two days), results mailed to US Embassy in Manila.
Feb 7, 2014, Package sent from NVC to US Embassy in Manila (according to NVC phone operator).
Feb 10, 2014 - CEAC website updated case as "In Transit."
Feb 11, 2014 - DHL website shows case as delivered to US Embassy in Manila.
Feb 12, 2014 - Called US Embassy in Manila and interview rescheduled for Feb 25th.
Feb 25, 2014 - "Approved," but we have to submit CENOMAR then wait for visa after it's processed, so I guess technically it's in Administrative Processing (AP).
Mar 17, 2014 - CEAC website, visa status changed to "Issued." Now we wait for pickup/delivery.
Mar 21, 2014 - Juvy picked up visa from 2GO location, got CFO stamp, and I booked her ticket.
Mar 22, 2014 - Juvy left Manila, through Japan and Detroit, and finally onto Houston!! :-)
THE REST OF MY LIFE CAN NOW OFFICIALLY BEGIN!!!
event.png
event.png

Link to comment
Share on other sites

In case you guys haven't stumbled upon this yet... someone has kindly created a general email (google doc) for all of us to copy and paste and send it to everyone on the email list (on pg 3 of google doc). The plan is that everyone will email/fax them THIS TUESDAY (11/19) in hopes to raise awareness of the issue of the long dreadful processing time. Please help take part in this issue and pass it along.

I truly believe if we all took part in this, we can make change!



USCIS:

09/06/13: Married

09/28/13: Filed I-130 and sent to Chicago Lockbox

09/30/13: Delivered

10/03/13: NOA 1 (I-130)

10/25/13: Filed I-129F

10/31/13: NOA 1 (I-129F)

03/21/14: I1-30 Approval

Link to comment
Share on other sites

I'm in... We all have to do this to see a change...please please please it's just a simple email!!! They will see that a change needs to be made.

Marriage: 2013-01-16

I-130 NOA1 : 2013-03-19

I-130 Approved : 2013-12-31

NVC Received : 2014-01-21

Case & IIN number Received: 2014-25-02

I864 bill: 2014-03-05

IV bill: 2014-03-05

I864 & IV packet sent: 2014-03-06

DS260: 2014-03-11

Case Complete: 2014-03-28

Interview date: 2014-05-13

Link to comment
Share on other sites

I would like to be in, I am a US citizen petitioning for my father.

Do you think I can use the same letter ? Should I change the subject line , please advise on the best approach

Thank you

I am USC

06-20-13 Dad's I 130 sent

06-25-13 NOA1 received

12-26-13 Notice Via Email and Texts petition transfered to Nebraska

01-20-14 Expedite with Nebraska

02-06-14 Text message NOA2 approved , waiting on hard copy

02-06-14 Email from USCIS , my file was transferred to NVC

02-10-14 NOA2 received

02-15-14 still waiting on case number from NVC

02-19-14 NVC received package from USCIS

02-19-14 I applied for expedite process with NVC

03-03-14 NVC assigned case and invoice number, but I am unable to log in

03-04-14 Able to log in. Completed father's DS 261

03-05-14 AOS fee available to be paid. I paid it online.

Link to comment
Share on other sites

On November 13, 2013, we transferred this case I130 IMMIGRANT PETITION FOR RELATIVE, FIANCE (E), OR ORPHAN to another office for processing and sent you a notice explaining this action. Please follow any instructions provided on the notice. We will notify you by mail when a decision is made.

On November 14, 2013, we transferred your I130, IMMIGRANT PETITION FOR RELATIVE, FIANCE (E), OR ORPHAN, to your local USCIS Office for further processing. The new office has jurisdiction over your case and will send you a decision as soon as processing is complete or you will be notified if further information or action is needed.

November 16,2013-The I130 IMMIGRANT PETITION FOR RELATIVE, FIANCE (E), OR ORPHAN was transferred and is now being processed at a USCIS office. You will be notified by mail when a decision is made, or if the office needs something from you.

These are the emails i got.

Edited by rinoa

ich_liebe_dich_103.jpg
March 29,2013-------Notice of Action "1st"
November 14,2013-------Notice of Action ( Notice of transferred NSC )
December 20,2013-------Notice of Action "Approval"
December 26,2013-------Case was Shipped to National Visa Center
January 13,2014 -------Case received at NVC
February 12, 2014-------NVC Assigned Case Number

February 25,2014------- Paid AOS & IV bill

February 27,2014------ -AOS & IV documents was submitted to NVC ( Completed DS-260 )

March 4, 2014 --------- NVC received AOS & IV documents

March 10 & 11,2014 -----( Done Advanced Medical at SLEC ) = Passed

March 21,2014---------- Case Completed

April 04,2014---------Received Interview Date ( P4)

May 5,2014-------- -Interview ( APPROVED )

event.png
event.png
event.png

Link to comment
Share on other sites

I would like to be in, I am a US citizen petitioning for my father.

Do you think I can use the same letter ? Should I change the subject line , please advise on the best approach

Thank you

Do what you must to make it fit for you. The important part is getting more numbers! Meanwhile, if you do not have access to a fax machine, just use a free online service, like this: http://faxzero.com/ or http://www.freepopfax.com/. Spread this around. E-mails are easily deleted or put directly into SPAM. Faxes are more effective!

07/29/2014 - NOA1

11/19/2014 - Transfer to TSC

12/19/2014 - NOA2

01/15/2014 - NVC Received (TSC held it for 3 weeks...)

02/19/2014 - Case no. and IIN assigned; requested embassy change

02/27/2014 - DS-261 available and submitted

02/28/2014 - AOS available and paid

03/19/2014 - AOS mailed

03/27/2014 - AOS entered into system

03/24/2014 - New case no. assigned

03/25/2014 - IV fee invoiced and paid

03/28/2014 - IV package sent via FedEx

04/26/2014 - case complete

06/01/2014 - passed interview

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

How many here are not approved yet, but have received this notice? how long ago?

The I130 IMMIGRANT PETITION FOR RELATIVE, FIANCE(E), OR ORPHAN was transferred and is now being processed at a USCIS office.

I received the "transferred and is now being processed" e-mail on Nov 8 (in India, which is 11.5 hours ahead of USCIS office, so most probably it was still Nov 7 in US when the e-mail was sent). I have not been approved yet, PD March 4.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: Lift. Cond. (pnd) Country: India
Timeline

I received the "transferred and is now being processed" e-mail on Nov 8 (in India, which is 11.5 hours ahead of USCIS office, so most probably it was still Nov 7 in US when the e-mail was sent). I have not been approved yet, PD March 4.

Well let's hope you get a good news next week. Here hoping for lots of approvals before holiday.

I will not let anyone walk through my mind with their dirty feet.

~ Mahatma Gandhi

Link to comment
Share on other sites

Looking at the spreadsheet, it appears that CSC is the center moving the fastest, by far. The 7 transfers having NOA2 took an average of 11 days. NSC has the same number of transfers (31) but only 3 approvals which took an average of 17 days (and there hasn't been an approval in 9 days). As for TSC, nothing yet.

Mine is in TSC :(

I'm from Indonesia (the beneficiary), and my husband is a USC.

USCIS

06/04/2011: Got married in Surabaya, Indonesia

03/10/2013: (Some time at these dates) Filed I-130 through a lawyer

03/25/2013: Priority date, NOA1

11/08/2013: Case was transferred to Texas Service Center

11/16/2013: Case update: "was transferred and is now being processed at a USCIS office."

11/25/2013: NOA2. Post Decision Activity: APPROVED (by Texas Service Center)

12/05/2013: Received NOA2 in the mail.

12/19/2013: "Shipped this approved or re-affirmed case to the Department of State for visa processing."

NVC

01/03/2014: NVC received our case work.

03/26/2014: Called NVC and they said that there's an error on the affidavit support and they didn't get copy of my passport. This case, I blame our lawyer.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Well let's hope you get a good news next week. Here hoping for lots of approvals before holiday.

Thank you, hoping for my approval two weeks after the transfer. NSC did look promising in the beginning, but seems like things have slowed down now.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-5 Country: United Kingdom
Timeline

Nebraska is showing 11 months to process. I'm calling tomorrow to ascertain if this means waiting an additional 11 months to the 8 we already have waited. I also think it's BS that people who filed later than March are getting approved faster. I've noticed one country that seems to be following this trend..

Any thoughts on the processing time if it truly will be another year to reach a decision?

I-130 for both parents

March 28th 2013 - Priority date/ NOA 1
November 14th 2013 - Transferred to Nebraska Service Center

January 7th 2014 - Case changed online to approved for both

January 8th 2014 - case changed to shipped to NVC

January 9th 2014 - case changed to NOA 2 mailed

January 10th 2014 - Received the hardcopy of the NOA 2 stating that NVC would issue a case number in 30 days approx.

January 21st 2014 - Case Received at NVC

February 26th 2014 - Case numbers and IIN number received - Wrong embassy code assigned...now waiting for new case numbers.

March 3rd 2014 - Filled in DS-261 for both parents

March 5th 2014- AOS available, paid and submitted AOS packet.

March 6th 2014 - USPS shows packet was delivered at NVC

March 10th 2014 - AOS shows as paid in the CEAC portal/AOS logged into system as being received by NVC.

March 11th 2014 - New case number assigned for my Dad.

March 20th 2014 - Paid IV fee for my Mum.

March 25th 2014 - AOS accepted by NVC with no checklist.

March 26th 2014 - Filled in and submitted DS-260 for my Mum

March 31st 2014 - AOS found in my Mum's file for my Dad - accepted and placed into his file/IV fee available for my Dad and Paid.

April 1st - Mailed all civil documents to NVC for both parents.

April 3rd: IV fee shows as paid in portal/submitted DS-260 for my Dad.

April 22nd: checklist issued for civil documents - NVC error ...

April 23rd: sent another certified copy of my marriage certificate

April 24th: Case complete! :)

April 30th 2014 - Medical scheduled for parents at Knightsbridge in London

June 11th: Interview at London Embassy - Approved :)

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...