Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Couple quick questions:

- How long is it appropriate to wait after NOA2 to call NVC to get the case # and IID?

- Can you request expedite of the case in NVC?

Thanks a lot!

When i called they said 20 days...some say 30 days. I have seen others receive their case# and IID number sooner. They can confirm whether or not they received the case within a week or so of NOA2. I never got an email letting me know that my mom's case was shipped after I received NOA2 on 03/17/2014 but when i called NVC the case was received on 03/25/2014.

USCIS Step
01/22/15 I130 sent via UPS to Chicago Lockbox
01/23/15 Delivered
01/26/15 NOA1 email and text received.. sent to VSC.
01/27/15 Check cleared.
02/02/15 NOA1 hardcopy received.. priority date 01/23/2015
02/12/15 Approved (17 days from NOA1)
02/17/15 NOA2 email and text received
02/18/15 NOA2 hardcopy received
NVC Step
03/02/15 NVC Received (18 days from NOA2)
03/05/15 Case number assigned (3 days from NVC receipt)
03/06/15 DS261 & AOS billed
03/09/15 Completed DS261
03/25/15 DS261 Reviewed and accepted over the phone
03/26/15 IV fee invoiced
04/08/15 Paid AOS and IV fee
04/09/15 Payment cleared and D260 available.
04/13/15 Documents sent via UPS overnight
04/14/15 Documents received at NVC and DS260 Completed
04/16/15 NVC scanned documents
05/11/15 Checklist over phone
05/13/15 Mailed out corrected AOS via UPS overnight
05/14/15 Checklist documents received at NVC
05/18/15 NVC scanned checklist documents
06/18/15 Flagged for Supervisor review (past 30days review timeframe)
06/29/15 Hubby's Case Complete :rolleyes: , daughter's still pending :(
07/07/15 Baby girl's Case Complete
09/30/15 Interview Scheduled for 11/05/2015
10/01/15 P4 Email received

ConsulateStep
10/14/15 Case shows "ready"
10/22/15 Medical Completed
11/05/15 Interview - APPROVED

11/06/15 Case shows "Administrative Processing"

11/09/15 Case shows "Issued"

11/11/15 Visa Ready for pick up...picked up on 11/13/15

11/19/15 US Entry (POE Atlanta GA)

<p>USCIS Step (for mom)//09/30/2013 I-130 sent via UPS to Chicago Lockbox/10/06/2013 NOA1 email received10/09/2013/ NOA1 hardcopy received with PD 10/02/2013/03/07/2014 Email received that case being transferred/03/10/2014 Hardcopy received, case transferred to VSC/03/17/2014 NOA2 received via email/03/21/2014 NOA2 hardcopy received. NVC Step ../03/25/2014 NVC received case/ 04/25/2014 Case number, IIN and Beneficiary ID# received (Entered in system on 04/24/2014)/05/01/2014 Checked CEAC website and DS-261 available...completed DS-261/05/01/2014 AOS fee invoiced and paid/05/02/2014 AOS documents sent via UPS/05/05/2014 AOS packet delivered and signed for AND AOS fee status shows as paid./05/07/2014 Called NVC and DS-261 accepted. AOS packet not yet showing in system/05/08/2014 IV fee invoiced and paid. IV documents sent via UPS/05/09/2014 IV packet delivered by UPS AND AOS documents entered into system/05/09/2014 IV fee shows paid AND DS-260 available/05/13/2014 Submitted DS-260/05/30/2014 AOS approved (no checklists)/06/05/2014 Case Complete and I did it with no checklists.....YAYYYYY/06/10/2014 Interview Scheduled for 7/15/2014/06/12/2014 P4 received via email.Consulate Step //06/16/2014 Case status shows "In Transit"/06/17/2014 Case status shows " Ready"/06/30/2014 Medical Complete/07/15/2014 Interview-Approved/07/16/2014 Case Status shows "Administrative Processing"/07/17/2014 Case Status shows "Issued" 07/21/2014 Passport ready for pickup/07/23/2014 Visa in Hand<p>

Link to comment
Share on other sites

Filed: IR-5 Country: Ukraine
Timeline

When i called they said 20 days...some say 30 days. I have seen others receive their case# and IID number sooner. They can confirm whether or not they received the case within a week or so of NOA2. I never got an email letting me know that my mom's case was shipped after I received NOA2 on 03/17/2014 but when i called NVC the case was received on 03/25/2014.

Thanks! I called today (waited a week) and a not very nice operator told me I called to early and should wait for at least 4 to 5 weeks. I didn't even have a chance to ask him if they received the case before he hang up. I think 5 weeks is quite long and will call next week lol.

Our case dates are very close! My Mom's case was approved on March 28 and my Dad's on March 30. Hopefully we will hear something soon

I-130 for Dad

19 Feb 2014-paperwork sent to Chicago

24 Feb 2014- NOA1 ( sent to NSC)

14 March 2014- expedite request

30 March 2014- case approved NOA2

4 Apr 2014-case sent to NVC

21 Apr 2014- case received by NVC

10 May 2014- expedite request

19 May 2014-case# and IIN received

21 May 2014- DS-261 filled out

22 MAY 2014- AOS ready

23 May 2014-AOS PAID, AOS paperwork sent out. Expedite request approved

30 May 2014- DS-261 checklist, DS-261 resubmitted

31 May 2014-AOS checklist response sent

5 June 2014-AOS accepted

23 June 2014-IV invoice

24 June 2014-IV paid, paperwork sent

30 June 2014-DS 260

2 July 2014- Case complete

21 July 2014-INTERVIEW

I-130 for Mom

3 March 2014- paperwork sent to Chicago

10 March 2014 NOA1 (sent to NSC)

14 March 2014-expedite request

28 March 2014- case approved NOA2

4 Apr 2014 -case sent to NVC

16 Apr 2014- case received by NVC

19 May 2014-case# and IIN received/wrong embassy

20 May 2014-embassy changed, DS-261 filled out, AOS ready

22 May 2014-AOS paid

23 May 2014-AOS PAID, AOS paperwork sent. Expedite approved

30 May 2014-DS-261 Checklist, DS-261 resubmitted

31 May 2014-AOS checklist sent

5 June 2014-AOS accepted

23 June 2014-IV fee invoice

24 June 2014-IV fee paid, paperwork sent

30 June 2014-DS 260

2 July 2014-Case complete

21 July 2014-INTERVIEW

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Thanks! I called today (waited a week) and a not very nice operator told me I called to early and should wait for at least 4 to 5 weeks. I didn't even have a chance to ask him if they received the case before he hang up. I think 5 weeks is quite long and will call next week lol.

Our case dates are very close! My Mom's case was approved on March 28 and my Dad's on March 30. Hopefully we will hear something soon

That was rude. He should have at least been able to tell you whether or not it was in the building. I'm calling again on Friday to see if by some stroke of luck they have assigned a case number. I've been lucky to talk to some fairly well mannered people when i call.

USCIS Step
01/22/15 I130 sent via UPS to Chicago Lockbox
01/23/15 Delivered
01/26/15 NOA1 email and text received.. sent to VSC.
01/27/15 Check cleared.
02/02/15 NOA1 hardcopy received.. priority date 01/23/2015
02/12/15 Approved (17 days from NOA1)
02/17/15 NOA2 email and text received
02/18/15 NOA2 hardcopy received
NVC Step
03/02/15 NVC Received (18 days from NOA2)
03/05/15 Case number assigned (3 days from NVC receipt)
03/06/15 DS261 & AOS billed
03/09/15 Completed DS261
03/25/15 DS261 Reviewed and accepted over the phone
03/26/15 IV fee invoiced
04/08/15 Paid AOS and IV fee
04/09/15 Payment cleared and D260 available.
04/13/15 Documents sent via UPS overnight
04/14/15 Documents received at NVC and DS260 Completed
04/16/15 NVC scanned documents
05/11/15 Checklist over phone
05/13/15 Mailed out corrected AOS via UPS overnight
05/14/15 Checklist documents received at NVC
05/18/15 NVC scanned checklist documents
06/18/15 Flagged for Supervisor review (past 30days review timeframe)
06/29/15 Hubby's Case Complete :rolleyes: , daughter's still pending :(
07/07/15 Baby girl's Case Complete
09/30/15 Interview Scheduled for 11/05/2015
10/01/15 P4 Email received

ConsulateStep
10/14/15 Case shows "ready"
10/22/15 Medical Completed
11/05/15 Interview - APPROVED

11/06/15 Case shows "Administrative Processing"

11/09/15 Case shows "Issued"

11/11/15 Visa Ready for pick up...picked up on 11/13/15

11/19/15 US Entry (POE Atlanta GA)

<p>USCIS Step (for mom)//09/30/2013 I-130 sent via UPS to Chicago Lockbox/10/06/2013 NOA1 email received10/09/2013/ NOA1 hardcopy received with PD 10/02/2013/03/07/2014 Email received that case being transferred/03/10/2014 Hardcopy received, case transferred to VSC/03/17/2014 NOA2 received via email/03/21/2014 NOA2 hardcopy received. NVC Step ../03/25/2014 NVC received case/ 04/25/2014 Case number, IIN and Beneficiary ID# received (Entered in system on 04/24/2014)/05/01/2014 Checked CEAC website and DS-261 available...completed DS-261/05/01/2014 AOS fee invoiced and paid/05/02/2014 AOS documents sent via UPS/05/05/2014 AOS packet delivered and signed for AND AOS fee status shows as paid./05/07/2014 Called NVC and DS-261 accepted. AOS packet not yet showing in system/05/08/2014 IV fee invoiced and paid. IV documents sent via UPS/05/09/2014 IV packet delivered by UPS AND AOS documents entered into system/05/09/2014 IV fee shows paid AND DS-260 available/05/13/2014 Submitted DS-260/05/30/2014 AOS approved (no checklists)/06/05/2014 Case Complete and I did it with no checklists.....YAYYYYY/06/10/2014 Interview Scheduled for 7/15/2014/06/12/2014 P4 received via email.Consulate Step //06/16/2014 Case status shows "In Transit"/06/17/2014 Case status shows " Ready"/06/30/2014 Medical Complete/07/15/2014 Interview-Approved/07/16/2014 Case Status shows "Administrative Processing"/07/17/2014 Case Status shows "Issued" 07/21/2014 Passport ready for pickup/07/23/2014 Visa in Hand<p>

Link to comment
Share on other sites

Filed: IR-5 Country: Philippines
Timeline

Can someone add my timeline for my parents please? The details are on my timeline for both my mom and dad. So far, they are both trending the same timestamps. I-130 approved in 3 weeks!!! This is the fastest one I have seen!!!

HAPPY DANCE!!!

ppe47ozqawgdn.png


HappyDancer is a proud wife to a country boy in KY.

I-130 for Parents (Mom and Dad)

3.15.2014: Mailed I-130 Packet for Mom and Dad

3.21.2014: Received email notification with case # for both petitions; case forwarded to NBC for processing

3.21.2014: Check cashed

3.22.2014: Hard copy NOA1 received

4.08.2014: Both I-130 approved (notification received via email) - It only took three weeks!!!

4.11.2014: Received NOA2 approval notice in the mail.

5.01.2014: Called NVC to ask for status of paperwork. Advised they received both application on 4.28. Advised to call in 30 business days for an update.

6.02.2014: Email notification received from NVC that shows parents' NVC case number and instructions to pay AOS Fee and fill out DS 261.

6.03.2014: Paid AOS fee ($88 for both petitions)

N400:
4.26.2013: Mailed N400 Packet

5.21.2013: Biometrics

7.18.2013: Testing and Interview

9.25.2013: Oath Ceremony

Medical at St. Lukes:
http://www.visajourney.com/forums/topic/183224-experience-medical-at-st-lukes-extension-clinic/

K1 with K2 Visa Interview:
http://www.visajourney.com/forums/topic/184246-usem-interview-on-march-10-at-7am-approved/page__p__2728465#entry2728465

CFO:Review, tips and advise:
http://www.visajourney.com/forums/topic/186123-cforeview-tips-and-advise/

Link to comment
Share on other sites

Filed: IR-5 Country: Ukraine
Timeline

That was rude. He should have at least been able to tell you whether or not it was in the building. I'm calling again on Friday to see if by some stroke of luck they have assigned a case number. I've been lucky to talk to some fairly well mannered people when i call.

Good luck! Keep me posted!

I-130 for Dad

19 Feb 2014-paperwork sent to Chicago

24 Feb 2014- NOA1 ( sent to NSC)

14 March 2014- expedite request

30 March 2014- case approved NOA2

4 Apr 2014-case sent to NVC

21 Apr 2014- case received by NVC

10 May 2014- expedite request

19 May 2014-case# and IIN received

21 May 2014- DS-261 filled out

22 MAY 2014- AOS ready

23 May 2014-AOS PAID, AOS paperwork sent out. Expedite request approved

30 May 2014- DS-261 checklist, DS-261 resubmitted

31 May 2014-AOS checklist response sent

5 June 2014-AOS accepted

23 June 2014-IV invoice

24 June 2014-IV paid, paperwork sent

30 June 2014-DS 260

2 July 2014- Case complete

21 July 2014-INTERVIEW

I-130 for Mom

3 March 2014- paperwork sent to Chicago

10 March 2014 NOA1 (sent to NSC)

14 March 2014-expedite request

28 March 2014- case approved NOA2

4 Apr 2014 -case sent to NVC

16 Apr 2014- case received by NVC

19 May 2014-case# and IIN received/wrong embassy

20 May 2014-embassy changed, DS-261 filled out, AOS ready

22 May 2014-AOS paid

23 May 2014-AOS PAID, AOS paperwork sent. Expedite approved

30 May 2014-DS-261 Checklist, DS-261 resubmitted

31 May 2014-AOS checklist sent

5 June 2014-AOS accepted

23 June 2014-IV fee invoice

24 June 2014-IV fee paid, paperwork sent

30 June 2014-DS 260

2 July 2014-Case complete

21 July 2014-INTERVIEW

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Ok all. I'm getting all my mom's IV documents together and I just wanted to make sure I'm good with this list

1. Copy of her passport biographic page

2. Police Certificate

3. Her Birth Certificate

4. My Birth Certificate

5. 2 passport pictures

Am I missing anything???

USCIS Step
01/22/15 I130 sent via UPS to Chicago Lockbox
01/23/15 Delivered
01/26/15 NOA1 email and text received.. sent to VSC.
01/27/15 Check cleared.
02/02/15 NOA1 hardcopy received.. priority date 01/23/2015
02/12/15 Approved (17 days from NOA1)
02/17/15 NOA2 email and text received
02/18/15 NOA2 hardcopy received
NVC Step
03/02/15 NVC Received (18 days from NOA2)
03/05/15 Case number assigned (3 days from NVC receipt)
03/06/15 DS261 & AOS billed
03/09/15 Completed DS261
03/25/15 DS261 Reviewed and accepted over the phone
03/26/15 IV fee invoiced
04/08/15 Paid AOS and IV fee
04/09/15 Payment cleared and D260 available.
04/13/15 Documents sent via UPS overnight
04/14/15 Documents received at NVC and DS260 Completed
04/16/15 NVC scanned documents
05/11/15 Checklist over phone
05/13/15 Mailed out corrected AOS via UPS overnight
05/14/15 Checklist documents received at NVC
05/18/15 NVC scanned checklist documents
06/18/15 Flagged for Supervisor review (past 30days review timeframe)
06/29/15 Hubby's Case Complete :rolleyes: , daughter's still pending :(
07/07/15 Baby girl's Case Complete
09/30/15 Interview Scheduled for 11/05/2015
10/01/15 P4 Email received

ConsulateStep
10/14/15 Case shows "ready"
10/22/15 Medical Completed
11/05/15 Interview - APPROVED

11/06/15 Case shows "Administrative Processing"

11/09/15 Case shows "Issued"

11/11/15 Visa Ready for pick up...picked up on 11/13/15

11/19/15 US Entry (POE Atlanta GA)

<p>USCIS Step (for mom)//09/30/2013 I-130 sent via UPS to Chicago Lockbox/10/06/2013 NOA1 email received10/09/2013/ NOA1 hardcopy received with PD 10/02/2013/03/07/2014 Email received that case being transferred/03/10/2014 Hardcopy received, case transferred to VSC/03/17/2014 NOA2 received via email/03/21/2014 NOA2 hardcopy received. NVC Step ../03/25/2014 NVC received case/ 04/25/2014 Case number, IIN and Beneficiary ID# received (Entered in system on 04/24/2014)/05/01/2014 Checked CEAC website and DS-261 available...completed DS-261/05/01/2014 AOS fee invoiced and paid/05/02/2014 AOS documents sent via UPS/05/05/2014 AOS packet delivered and signed for AND AOS fee status shows as paid./05/07/2014 Called NVC and DS-261 accepted. AOS packet not yet showing in system/05/08/2014 IV fee invoiced and paid. IV documents sent via UPS/05/09/2014 IV packet delivered by UPS AND AOS documents entered into system/05/09/2014 IV fee shows paid AND DS-260 available/05/13/2014 Submitted DS-260/05/30/2014 AOS approved (no checklists)/06/05/2014 Case Complete and I did it with no checklists.....YAYYYYY/06/10/2014 Interview Scheduled for 7/15/2014/06/12/2014 P4 received via email.Consulate Step //06/16/2014 Case status shows "In Transit"/06/17/2014 Case status shows " Ready"/06/30/2014 Medical Complete/07/15/2014 Interview-Approved/07/16/2014 Case Status shows "Administrative Processing"/07/17/2014 Case Status shows "Issued" 07/21/2014 Passport ready for pickup/07/23/2014 Visa in Hand<p>

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Ok all. I'm getting all my mom's IV documents together and I just wanted to make sure I'm good with this list

1. Copy of her passport biographic page

2. Police Certificate

3. Her Birth Certificate

4. My Birth Certificate

5. 2 passport pictures

Am I missing anything???

Marriage certificate for applicant and petitioner if applicable.

Copy of passport bio page and green card or naturalization cert of sponsor (if any was used. Going by my experience last week)

Mother and MIL

02-13-2013 - I-130
02-21-2013 - NOA1
10-21-2013 - Sent to another office
10-23-2013 - Sent to NSC (60 days the most to approval) (praying)
11-13-2013 - NOA2. Approved!!!!!!??????

11-19-2013 - NOA2 hardcopy receved

NVC
11-18-2013 - Shipped to NVC

12-09-2013 - Received by NVC

12-23-2013 - Entered in system

01-07-2014 - DS-261 completed online

01-08-2014 - AOS paid

01-16-2014 - Expedite service requested

01-19-2014 - Paid IV bill

01-23-2014 - NVC requested phone number for applicant to complete expedite request

01-23-2014 - IV paid

01-30-2014 - Expedite request approved (awaiting email instructions)

02-03-2014 - Expedite approval received in the mail

02-04-2014 - AOS and IV package sent to supervisor (MIL's sent for regular processing)

02-06-2014 - Package received and signed for at NVC

02-10-2014 - Called NVC and was told I-864A not signed by me

02-12-2014 - Signed I-864A sent

02-24-2014 - Case complete for mom per NVC rep

02-27-2014 - Case shipped to Kingston

03-01-2014 - Hard copy of transfer received

03-04-2014 - Interview scheduled over phone by consulate

03-06-2014 - Packet 4 shipped per consulate

03-21-2014 - Medical done

04-04-2014 - Interview passed

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Gazaslimaz876 this is the list I sent in for my mom.

post-61052-0-49902800-1397002766_thumb.png

Mother and MIL

02-13-2013 - I-130
02-21-2013 - NOA1
10-21-2013 - Sent to another office
10-23-2013 - Sent to NSC (60 days the most to approval) (praying)
11-13-2013 - NOA2. Approved!!!!!!??????

11-19-2013 - NOA2 hardcopy receved

NVC
11-18-2013 - Shipped to NVC

12-09-2013 - Received by NVC

12-23-2013 - Entered in system

01-07-2014 - DS-261 completed online

01-08-2014 - AOS paid

01-16-2014 - Expedite service requested

01-19-2014 - Paid IV bill

01-23-2014 - NVC requested phone number for applicant to complete expedite request

01-23-2014 - IV paid

01-30-2014 - Expedite request approved (awaiting email instructions)

02-03-2014 - Expedite approval received in the mail

02-04-2014 - AOS and IV package sent to supervisor (MIL's sent for regular processing)

02-06-2014 - Package received and signed for at NVC

02-10-2014 - Called NVC and was told I-864A not signed by me

02-12-2014 - Signed I-864A sent

02-24-2014 - Case complete for mom per NVC rep

02-27-2014 - Case shipped to Kingston

03-01-2014 - Hard copy of transfer received

03-04-2014 - Interview scheduled over phone by consulate

03-06-2014 - Packet 4 shipped per consulate

03-21-2014 - Medical done

04-04-2014 - Interview passed

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

For those whose parents had their interview last week.

What does the visa status say now when you check it?

Mother and MIL

02-13-2013 - I-130
02-21-2013 - NOA1
10-21-2013 - Sent to another office
10-23-2013 - Sent to NSC (60 days the most to approval) (praying)
11-13-2013 - NOA2. Approved!!!!!!??????

11-19-2013 - NOA2 hardcopy receved

NVC
11-18-2013 - Shipped to NVC

12-09-2013 - Received by NVC

12-23-2013 - Entered in system

01-07-2014 - DS-261 completed online

01-08-2014 - AOS paid

01-16-2014 - Expedite service requested

01-19-2014 - Paid IV bill

01-23-2014 - NVC requested phone number for applicant to complete expedite request

01-23-2014 - IV paid

01-30-2014 - Expedite request approved (awaiting email instructions)

02-03-2014 - Expedite approval received in the mail

02-04-2014 - AOS and IV package sent to supervisor (MIL's sent for regular processing)

02-06-2014 - Package received and signed for at NVC

02-10-2014 - Called NVC and was told I-864A not signed by me

02-12-2014 - Signed I-864A sent

02-24-2014 - Case complete for mom per NVC rep

02-27-2014 - Case shipped to Kingston

03-01-2014 - Hard copy of transfer received

03-04-2014 - Interview scheduled over phone by consulate

03-06-2014 - Packet 4 shipped per consulate

03-21-2014 - Medical done

04-04-2014 - Interview passed

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Gazaslimaz876 this is the list I sent in for my mom.

Marriage certificate for applicant and petitioner if applicable.

Copy of passport bio page and green card or naturalization cert of sponsor (if any was used. Going by my experience last week)

Thanks Kerran!! Neither I nor my mom is married so the marriage cert wouldn't apply. I don't think I sent a copy of my naturalization certificate in when I submitted I-130 but I will make sure to at least send a copy with the IV packet when the time comes. I'm having her send me all her docs from JA so I just want to make sure that I get all we need so as not to delay the process. I am hoping that everything will be finalized by early July.

USCIS Step
01/22/15 I130 sent via UPS to Chicago Lockbox
01/23/15 Delivered
01/26/15 NOA1 email and text received.. sent to VSC.
01/27/15 Check cleared.
02/02/15 NOA1 hardcopy received.. priority date 01/23/2015
02/12/15 Approved (17 days from NOA1)
02/17/15 NOA2 email and text received
02/18/15 NOA2 hardcopy received
NVC Step
03/02/15 NVC Received (18 days from NOA2)
03/05/15 Case number assigned (3 days from NVC receipt)
03/06/15 DS261 & AOS billed
03/09/15 Completed DS261
03/25/15 DS261 Reviewed and accepted over the phone
03/26/15 IV fee invoiced
04/08/15 Paid AOS and IV fee
04/09/15 Payment cleared and D260 available.
04/13/15 Documents sent via UPS overnight
04/14/15 Documents received at NVC and DS260 Completed
04/16/15 NVC scanned documents
05/11/15 Checklist over phone
05/13/15 Mailed out corrected AOS via UPS overnight
05/14/15 Checklist documents received at NVC
05/18/15 NVC scanned checklist documents
06/18/15 Flagged for Supervisor review (past 30days review timeframe)
06/29/15 Hubby's Case Complete :rolleyes: , daughter's still pending :(
07/07/15 Baby girl's Case Complete
09/30/15 Interview Scheduled for 11/05/2015
10/01/15 P4 Email received

ConsulateStep
10/14/15 Case shows "ready"
10/22/15 Medical Completed
11/05/15 Interview - APPROVED

11/06/15 Case shows "Administrative Processing"

11/09/15 Case shows "Issued"

11/11/15 Visa Ready for pick up...picked up on 11/13/15

11/19/15 US Entry (POE Atlanta GA)

<p>USCIS Step (for mom)//09/30/2013 I-130 sent via UPS to Chicago Lockbox/10/06/2013 NOA1 email received10/09/2013/ NOA1 hardcopy received with PD 10/02/2013/03/07/2014 Email received that case being transferred/03/10/2014 Hardcopy received, case transferred to VSC/03/17/2014 NOA2 received via email/03/21/2014 NOA2 hardcopy received. NVC Step ../03/25/2014 NVC received case/ 04/25/2014 Case number, IIN and Beneficiary ID# received (Entered in system on 04/24/2014)/05/01/2014 Checked CEAC website and DS-261 available...completed DS-261/05/01/2014 AOS fee invoiced and paid/05/02/2014 AOS documents sent via UPS/05/05/2014 AOS packet delivered and signed for AND AOS fee status shows as paid./05/07/2014 Called NVC and DS-261 accepted. AOS packet not yet showing in system/05/08/2014 IV fee invoiced and paid. IV documents sent via UPS/05/09/2014 IV packet delivered by UPS AND AOS documents entered into system/05/09/2014 IV fee shows paid AND DS-260 available/05/13/2014 Submitted DS-260/05/30/2014 AOS approved (no checklists)/06/05/2014 Case Complete and I did it with no checklists.....YAYYYYY/06/10/2014 Interview Scheduled for 7/15/2014/06/12/2014 P4 received via email.Consulate Step //06/16/2014 Case status shows "In Transit"/06/17/2014 Case status shows " Ready"/06/30/2014 Medical Complete/07/15/2014 Interview-Approved/07/16/2014 Case Status shows "Administrative Processing"/07/17/2014 Case Status shows "Issued" 07/21/2014 Passport ready for pickup/07/23/2014 Visa in Hand<p>

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Thanks Kerran!! Neither I nor my mom is married so the marriage cert wouldn't apply. I don't think I sent a copy of my naturalization certificate in when I submitted I-130 but I will make sure to at least send a copy with the IV packet when the time comes. I'm having her send me all her docs from JA so I just want to make sure that I get all we need so as not to delay the process. I am hoping that everything will be finalized by early July.

You're welcome.

The copy of petitioner's passport bio page and naturalization cert only applies if you used a joint sponsor or household member to meet the poverty guideline.

I'm still working on my MIL's papers too. Waiting for her police cert.

Edited by kerran

Mother and MIL

02-13-2013 - I-130
02-21-2013 - NOA1
10-21-2013 - Sent to another office
10-23-2013 - Sent to NSC (60 days the most to approval) (praying)
11-13-2013 - NOA2. Approved!!!!!!??????

11-19-2013 - NOA2 hardcopy receved

NVC
11-18-2013 - Shipped to NVC

12-09-2013 - Received by NVC

12-23-2013 - Entered in system

01-07-2014 - DS-261 completed online

01-08-2014 - AOS paid

01-16-2014 - Expedite service requested

01-19-2014 - Paid IV bill

01-23-2014 - NVC requested phone number for applicant to complete expedite request

01-23-2014 - IV paid

01-30-2014 - Expedite request approved (awaiting email instructions)

02-03-2014 - Expedite approval received in the mail

02-04-2014 - AOS and IV package sent to supervisor (MIL's sent for regular processing)

02-06-2014 - Package received and signed for at NVC

02-10-2014 - Called NVC and was told I-864A not signed by me

02-12-2014 - Signed I-864A sent

02-24-2014 - Case complete for mom per NVC rep

02-27-2014 - Case shipped to Kingston

03-01-2014 - Hard copy of transfer received

03-04-2014 - Interview scheduled over phone by consulate

03-06-2014 - Packet 4 shipped per consulate

03-21-2014 - Medical done

04-04-2014 - Interview passed

event.png

Link to comment
Share on other sites

Filed: Other Country: Philippines
Timeline

Thank you! Each consulate is different so you have to view the one for manila http://travel.state....NL - Manila.pdf

She didn't take the stuff they asked for that I already sent to NVC, like the police certificate, etc.

She brought her passport, passport size pictures, interview letter and medical packet.

OK The same thing for My Mom. NVC did not ask for some more documents and said on the letter that all the documents submitted to them will be forwarded to US Embassy. only thing it confused me is " photocopies of all civil documents " I thought that's included with all the documents I submitted to NVC and they will forward those? can you shed a light on this? Thanks.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

OK The same thing for My Mom. NVC did not ask for some more documents and said on the letter that all the documents submitted to them will be forwarded to US Embassy. only thing it confused me is " photocopies of all civil documents " I thought that's included with all the documents I submitted to NVC and they will forward those? can you shed a light on this? Thanks.

They ask for photocopies just in case they lose anything you sent them. So yes NVC will forward the documents you sent to the embassy but it's your responsibility to bring a copy also.

My mom didn't bring anything I already sent to NVC. We ran the risk of them asking for these documents but luckily they had all of them.

Mother and MIL

02-13-2013 - I-130
02-21-2013 - NOA1
10-21-2013 - Sent to another office
10-23-2013 - Sent to NSC (60 days the most to approval) (praying)
11-13-2013 - NOA2. Approved!!!!!!??????

11-19-2013 - NOA2 hardcopy receved

NVC
11-18-2013 - Shipped to NVC

12-09-2013 - Received by NVC

12-23-2013 - Entered in system

01-07-2014 - DS-261 completed online

01-08-2014 - AOS paid

01-16-2014 - Expedite service requested

01-19-2014 - Paid IV bill

01-23-2014 - NVC requested phone number for applicant to complete expedite request

01-23-2014 - IV paid

01-30-2014 - Expedite request approved (awaiting email instructions)

02-03-2014 - Expedite approval received in the mail

02-04-2014 - AOS and IV package sent to supervisor (MIL's sent for regular processing)

02-06-2014 - Package received and signed for at NVC

02-10-2014 - Called NVC and was told I-864A not signed by me

02-12-2014 - Signed I-864A sent

02-24-2014 - Case complete for mom per NVC rep

02-27-2014 - Case shipped to Kingston

03-01-2014 - Hard copy of transfer received

03-04-2014 - Interview scheduled over phone by consulate

03-06-2014 - Packet 4 shipped per consulate

03-21-2014 - Medical done

04-04-2014 - Interview passed

event.png

Link to comment
Share on other sites

Filed: Other Country: Philippines
Timeline

They ask for photocopies just in case they lose anything you sent them. So yes NVC will forward the documents you sent to the embassy but it's your responsibility to bring a copy also.

My mom didn't bring anything I already sent to NVC. We ran the risk of them asking for these documents but luckily they had all of them.

Thank you so much for the response. I'm clear now :idea: :idea: :idea: I'll keep y'all posted on what will be the outcome.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

You're welcome.

The copy of petitioner's passport bio page and naturalization cert only applies if you used a joint sponsor or household member to meet the poverty guideline.

I'm still working on my MIL's papers too. Waiting for her police cert.

Ok cool. I'm not using a joint sponsor so I guess that the I don't have to send my naturalization cert or passport.

The Police Cert takes 21 days unless you expedite...my mom is picking hers up on 04/22/2014 and will be using that new international EMS service that they have in JA now to send all the docs to me.

USCIS Step
01/22/15 I130 sent via UPS to Chicago Lockbox
01/23/15 Delivered
01/26/15 NOA1 email and text received.. sent to VSC.
01/27/15 Check cleared.
02/02/15 NOA1 hardcopy received.. priority date 01/23/2015
02/12/15 Approved (17 days from NOA1)
02/17/15 NOA2 email and text received
02/18/15 NOA2 hardcopy received
NVC Step
03/02/15 NVC Received (18 days from NOA2)
03/05/15 Case number assigned (3 days from NVC receipt)
03/06/15 DS261 & AOS billed
03/09/15 Completed DS261
03/25/15 DS261 Reviewed and accepted over the phone
03/26/15 IV fee invoiced
04/08/15 Paid AOS and IV fee
04/09/15 Payment cleared and D260 available.
04/13/15 Documents sent via UPS overnight
04/14/15 Documents received at NVC and DS260 Completed
04/16/15 NVC scanned documents
05/11/15 Checklist over phone
05/13/15 Mailed out corrected AOS via UPS overnight
05/14/15 Checklist documents received at NVC
05/18/15 NVC scanned checklist documents
06/18/15 Flagged for Supervisor review (past 30days review timeframe)
06/29/15 Hubby's Case Complete :rolleyes: , daughter's still pending :(
07/07/15 Baby girl's Case Complete
09/30/15 Interview Scheduled for 11/05/2015
10/01/15 P4 Email received

ConsulateStep
10/14/15 Case shows "ready"
10/22/15 Medical Completed
11/05/15 Interview - APPROVED

11/06/15 Case shows "Administrative Processing"

11/09/15 Case shows "Issued"

11/11/15 Visa Ready for pick up...picked up on 11/13/15

11/19/15 US Entry (POE Atlanta GA)

<p>USCIS Step (for mom)//09/30/2013 I-130 sent via UPS to Chicago Lockbox/10/06/2013 NOA1 email received10/09/2013/ NOA1 hardcopy received with PD 10/02/2013/03/07/2014 Email received that case being transferred/03/10/2014 Hardcopy received, case transferred to VSC/03/17/2014 NOA2 received via email/03/21/2014 NOA2 hardcopy received. NVC Step ../03/25/2014 NVC received case/ 04/25/2014 Case number, IIN and Beneficiary ID# received (Entered in system on 04/24/2014)/05/01/2014 Checked CEAC website and DS-261 available...completed DS-261/05/01/2014 AOS fee invoiced and paid/05/02/2014 AOS documents sent via UPS/05/05/2014 AOS packet delivered and signed for AND AOS fee status shows as paid./05/07/2014 Called NVC and DS-261 accepted. AOS packet not yet showing in system/05/08/2014 IV fee invoiced and paid. IV documents sent via UPS/05/09/2014 IV packet delivered by UPS AND AOS documents entered into system/05/09/2014 IV fee shows paid AND DS-260 available/05/13/2014 Submitted DS-260/05/30/2014 AOS approved (no checklists)/06/05/2014 Case Complete and I did it with no checklists.....YAYYYYY/06/10/2014 Interview Scheduled for 7/15/2014/06/12/2014 P4 received via email.Consulate Step //06/16/2014 Case status shows "In Transit"/06/17/2014 Case status shows " Ready"/06/30/2014 Medical Complete/07/15/2014 Interview-Approved/07/16/2014 Case Status shows "Administrative Processing"/07/17/2014 Case Status shows "Issued" 07/21/2014 Passport ready for pickup/07/23/2014 Visa in Hand<p>

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...