Jump to content

Nibake's US Immigration Timeline

blank avatar   Petitioner's Name: C
Beneficiary's Name: C
VJ Member: Nibake
Country: Brazil

Last Updated: 2021-03-29
Register or log in to follow this timeline

  

Immigration Checklist for C & C:

Dept of State J-1 Visa:    


J-1 Visa
Event Date
NVC Received : 2010-06-17
NVC Left :
Consulate Received :
Packet 3 Received : 2010-07-09
Packet 3 Sent :
Packet 4 Received : 2010-07-09
Interview Date : 2010-08-16
Interview Result : Approved
Second Interview
(If Required):
Second Interview Result:
Visa Received : 2010-08-19
US Entry : 2010-08-25
Comments : First visa had an error. Had to wait and pick up the corrected passport w/visa at the embassy.


Member Reviews: None Found

To enter a review please select one of the following:

--o Consulate Reviews
--o US Port of Entry Reviews
--o US CIS Local Office Reviews



Timeline Comments: 1

blank avatar Nibake on 2021-05-14 said:
Timeline 2.0 10/27/2020 - Mailed AOS package
Register or log in to comment on this timeline


*Notice about estimates: The estimates are based off averages of other members recent experiences
(documented in their timelines) for the same benefit/petition/application at the same filing location.
Individual results may vary as every case is not always 'average'. Past performance does not necessarily
predict future results. The 'as early as date' may change over time based on current reported processing
times from members. There have historically been cases where a benefit/petition/application processing
briefly slows down or stops and this can not be predicted. Use these dates as reference only and do not
rely on them for planning. As always you should check the USCIS processing times to see if your application
is past due.

** Not all cases are transfered

vjTimeline ver 5.0




×
×
  • Create New...