Guera30's US Immigration Timeline
|
Petitioner's Name: Rebecca Beneficiary's Name: Jose VJ Member: Guera30 Country: Mexico
Last Updated: 2010-11-05
|
|
|
Immigration Checklist for Rebecca & Jose:
USCIS I-129F Petition:
|
|
|
|
|
|
Dept of State K1 Visa:
|
|
|
|
|
|
USCIS I-485 Petition:
|
|
|
|
|
|
USCIS I-765 Petition:
|
|
|
|
|
|
USCIS I-131 Petition:
|
|
|
|
|
|
USCIS I-751 Petition:
|
|
|
|
|
|
USCIS N-400 Petition:
|
|
|
|
|
|
|
K1 Visa
|
Event |
Date |
Service Center : |
California Service Center |
Transferred? |
No |
Consulate : |
Juarez, Mexico |
I-129F Sent : |
2006-01-23 |
I-129F NOA1 : |
2006-01-27 |
I-129F RFE(s) : |
|
RFE Reply(s) : |
|
I-129F NOA2 : |
2006-04-26 |
NVC Received : |
|
Date Case #, IIN, and BIN assigned : |
|
NVC Left : |
2006-05-15 |
Consulate Received : |
2006-05-16 |
Packet 3 Received : |
2006-07-25 |
Packet 3 Sent : |
|
Packet 4 Received : |
|
Interview Date : |
2006-08-09 Submit Review |
Interview Result : |
|
Second Interview (If Required): |
|
Second Interview Result: |
|
Visa Received : |
2006-08-09 |
US Entry : |
2006-08-17 |
Marriage : |
2006-09-16 |
Comments : |
|
Processing Estimates/Stats : |
Your I-129f was approved in 89 days from your NOA1 date.
Your interview took 194 days from your I-129F NOA1 date. |
|
Port of Entry Review
|
Event |
Date |
Port of Entry : |
Houston |
POE Date : |
2006-08-17 Submit Review |
Got EAD Stamp : |
No |
Biometrics Taken : |
|
Harassment Level : |
5 |
Comments : |
My fiance speaks Spanish only. He was taken aside for an "interview" with an English-speaking official. This official spoke to him, appeared to get upset & then drew a line through my fiance's visa. He had thought that there was a date problem with the K1 visa that my fiance has (there was not).
The official then realized his mistake, re-wrote over an incorrect date that the official had already wrriten (scratching out the old one) in my fiance's passport & said he could go.
Now, there is a slashed line through the visa & a scribbled out date near the POE stamp. Somehow, I don't think this is what it is supposed to look like. |
|
Adjustment of Status
|
Event |
Date |
CIS Office : |
Atlanta GA |
Date Filed : |
2006-10-10 |
NOA Date : |
2006-10-17 |
RFE(s) : |
|
Bio. Appt. : |
2006-10-31 |
AOS Transfer** : |
2006-11-01 |
Interview Date : |
|
Approval / Denial Date : |
2006-01-31 |
Approved : |
Yes |
Got I551 Stamp : |
|
Greencard Received: |
|
Comments : |
11-1 xferred to CSC; 11-9 received at CSC; 1-20 touch; 1-31 approved w/out interview |
|
Employment Authorization
Document
|
Event |
Date |
CIS Office : |
Chicago National Office |
Filing Method : |
Mail |
Filing Instance : |
First |
Date Filed : |
2006-10-10 |
NOA Date : |
2006-10-17 |
RFE(s) : |
|
Bio. Appt. : |
2006-10-31 |
Approved Date : |
2007-01-05 |
Date Card Received : |
2007-01-09 |
Comments : |
|
Processing Estimates/Stats : |
Your EAD was approved in 87 days. |
|
Advance Parole
|
Event |
Date |
CIS Office : |
Chicago National Office |
Filing Method : |
|
Filing Instance : |
First |
Date Filed : |
2006-10-10 |
NOA Date : |
2006-10-17 |
RFE(s) : |
|
Date Received : |
2007-01-18 |
Comments : |
|
Processing Estimates/Stats : |
Your AP was approved in 97 days. |
|
Lifting Conditions
|
Event |
Date |
CIS Office : |
California Service Center |
Date Filed : |
2008-11-5 |
NOA Date : |
2008-11-12 |
RFE(s) : |
|
Bio. Appt. : |
2008-12-12 |
Interview Date : |
|
Approval / Denial Date : |
2009-02-17 |
Approved : |
Yes |
Got I551 Stamp : |
|
Green Card Received : |
2009-03-10 |
Comments : |
|
|
Citizenship
|
Event |
Date |
Service Center : |
Phoenix AZ Lockbox |
CIS Office : |
Seattle WA |
Date Filed : |
2010-09-13 |
NOA Date : |
|
Bio. Appt. : |
2010-10-22 |
Interview Date : |
|
Approved : |
|
Oath Ceremony : |
|
Comments : |
|
|
Member Reviews:
POE Review: Houston
|
Event |
Description |
Entry Date : |
2006-08-17 |
Embassy Review : |
My fiance speaks Spanish only. He was taken aside for an "interview" with an English-speaking official. This official spoke to him, appeared to get upset & then drew a line through my fiance's visa. He had thought that there was a date problem with the K1 visa that my fiance has (there was not).
The official then realized his mistake, re-wrote over an incorrect date that the official had already wrriten (scratching out the old one) in my fiance's passport & said he could go.
Now, there is a slashed line through the visa & a scribbled out date near the POE stamp. Somehow, I don't think this is what it is supposed to look like. |
Harassment Level : |
High |
|
Timeline Comments: None yet, be the first!
*Notice about estimates: The estimates are based off averages of other members recent experiences
(documented in their timelines) for the same benefit/petition/application at the same filing location.
Individual results may vary as every case is not always 'average'. Past performance does not necessarily
predict future results. The 'as early as date' may change over time based on current reported processing
times from members. There have historically been cases where a benefit/petition/application processing
briefly slows down or stops and this can not be predicted. Use these dates as reference only and do not
rely on them for planning. As always you should check the
USCIS processing times to see if your application
is past due.
** Not all cases are transfered
ver 5.0