Jump to content
kits_24_faith

ESTIMATED ADJUDICATED DATE QUESTION..PLS NEED YOUR INFO

 Share

12 posts in this topic

Recommended Posts

Filed: K-1 Visa Country: Philippines
Timeline

Hi guys..

I have a question regarding the estimate dates of adjudication here in VJ. All of us have our dates go up and down throughout our waiting periods. Today is July 23 and my adjudicated date here is July 22. Since I have passed that day already, will it still fluctuate (up or down)? Or it will stay that way? Because its sais at the bottom of that date to try and call USCIS if you haven't heard anything from them 10 days after the adjudicated date they have given. Thank you guys and I hope I'll get some answers. Tomorrow is our monthsary and it will be a great gift/blessing to get our NOA2. God bless guys and thank you again.

I-129F

Sent I-129F on March 19, 2007

NOA1 on April 12, 2007

Touched on August 8, 2007 (RFE NOTICE)

August 13, 2007 received RFE

August 13, 2007 sent RFE

Touched August 22: RFE received and case resumed

Touched October 2, 2007 (NOTICE OF APPROVAL)

THANK YOU THANK YOU JESUS!

November 13, 2007: NVC reiceved our case

November 14, 2007: MNL Case #

November 15, 2007: Sent to MNLA

November 20, 2007: Case arrive in USEM

November 24, 2007: Got medical and interview dates

November 29, 2007: She received packet 4

December 27, 2007: Medical

January 2, 2008: Went back for MMR & Results

January 2, 2008: Passed Medical!! THANK YOU GOD!

January 2, 2008: Sent documents via Fedex

January 5, 2008: Fiancee received documents

January 9, 2008: Interview! APPROVED! THANK YOU JESUS!

January 10, 2008: Received a call from USEM

January 11, 2008: Pick up Visa at 9AM

January 11, 2008: CFO (COMPLETED)

February 5, 2008: Me arriving in Philippines

February 12, 2008: TOGETHER FOREVER!

February 12, 2008: Arrival in the USA

April 12, 2008: WEDDING!

Link to comment
Share on other sites

Filed: K-1 Visa Country: United Kingdom
Timeline
Hi guys..

I have a question regarding the estimate dates of adjudication here in VJ. All of us have our dates go up and down throughout our waiting periods. Today is July 23 and my adjudicated date here is July 22. Since I have passed that day already, will it still fluctuate (up or down)? Or it will stay that way? Because its sais at the bottom of that date to try and call USCIS if you haven't heard anything from them 10 days after the adjudicated date they have given. Thank you guys and I hope I'll get some answers. Tomorrow is our monthsary and it will be a great gift/blessing to get our NOA2. God bless guys and thank you again.

It keeps changing!!

On the 18th mine said the 16th

On the 20th it said the 18th

On the 21st and 22nd it said the 19th

and today the 23rd it says the 23rd lol

However future hubby called uscis friday night and found out we had been assigned to an officer on Wednesday 18th.

Maybe you should call again and see if yours is too.

Good Luck

Sam xxx

K1 TIMELINE

03/29/2007 - sent petition I129F

04/02/2007 - recieved at TSC

04/06/2007 - NOA1 issued

04/12/2007 - check cashed

04/14/2007 - NOA1 letter recieved

04/14/2007 - touched

06/07/2007 - touched (change of address)

06/08/2007 - touched (change of address)

06/10/2007 - touched (change of address)

06/15/2007 - touched due to phonecalls to csc.

06/16/2007 - another touch due to phonecalls on 15th!!!

07/25/2007 - APPROVED!!!!!!

08/06/2007 - NVC recieved

08/11/2007 - letter received from NVC saying send to London within a week

08/13/2007 - London recieves petition and sends out Packet 3

08/16/2007 - recieved and sent back packet 3

09/06/2007 - medical!!

09/12/2007 - INTERVIEW

09/18/2007 - Additional papers collected by courier

09/26/2007 - Visas delivered by courier!!!!!!!!! YAY!!!!!!!!

Link to comment
Share on other sites

Filed: AOS (apr) Country: Romania
Timeline

The estimated adjuducated timeline is not a promise to when you will have your case adjudicated. it is within the time of others who were approved or denied. Again it is an ESTIMATE, not an actual time line.

everyones case is different, no ones timeline is going to be the same or even close, depending on the case situation.

dont let it drive you nuts. :)

vj2.jpgvj.jpg

"VJ Timelines are only an estimate, they are not actual approval dates! They only reflect VJ members. VJ Timelines do not include the thousands of applicants who do not use VJ"

IF YOU ARE NEW TO THE SITE, PLEASE READ THE GUIDES BEFORE ASKING ALOT OF QUESTIONS. THE GUIDES ARE VERY HELPFUL AND WILL SAVE YOU ALOT OF TIME!

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Colombia
Timeline

Bro,

You're at CSC....give it more time. Nothing at CSC is fast or on time.

Perhaps they are always on time, to be late.

Edited by lucho562

K1

1/22/07: I-129F sent to CSC

1/23/07: I-129F packet received and signed for at 9:45A.M.!!

1/29/07: NOA1

4/27/07: NOA2

5/01/07: NOA2 Hardcopy received

5/10/07: Approval arrives at NVC

5/14/07: Leaves NVC

5/17/07: Arrives at Bogota, Colombia

5/18/07: Packet 3 faxed to Embassy

5/22/07: Packet 3 sent via courier

5/30/07: Wendy receives packet 3 (Good thing we used the shortcut)

6/04/07: Packet 4 received

7/03/07: Medical appt. scheduled

7/05/07: Interview!!!! VISA APPROVED!!!!!!!

7/09/07: Visa in hand!!!

7/11/07: Point of Entry at LAX, complete success!!!!!!!!!!

7/24/07: Married!!!

AOS & EAD

07/27/07: Filed for AOS & EAD

08/02/07: Arrives at Chicago

09/10/07: NOA1

09/11/07: Social Security card in hand

10/12/07: Biometrics appointment

10/25/07: EAD Approved

01/23/08: Interview = APPROVED

02/02/08: Green Card received...10 day turn around, not bad!!!

Removing Conditions

11/12/09: Mailed to CSC!

11/13/09: Arrives at CSC!

11/16/09: NOA1

11/18/09: Check Cashed!

12/14/09: Biometrics

01/07/10: Card Production Ordered (APPROVED)

Link to comment
Share on other sites

Filed: K-1 Visa Country: Australia
Timeline

I don't think the OP was asking or even hoping that the date given was a promise of any type, just asking whether that date got put in the timeline and then stayed the same, or whether it kept changing as outside factors changed... something that I think has been answered already ;)

And that was news to me too, so thank you.

061017001as.thumb.jpg

The Very Secret Diary of Legolas Son of Weenus - by Cassandra Claire

Day One: Went to Council of Elrond. Was prettiest person there. Agreed to follow some tiny little man to Mordor to throw ring into volcano. Very important mission - gold ring so tacky.

Day Six: Far too dark in Mines of Moria to brush hair properly. Am very afraid I am developing a tangle.

Orcs so silly.

Still the prettiest.

Day 35: Boromir dead. Very messy death, most unnecessary. Did get kissed by Aragorn as he expired. Does a guy have to get shot full of arrows around here to get any action? Boromir definitely not prettier than me. Cannot understand it. Am feeling a pout coming on.

Frodo off to Mordor with Sam. Tiny little men caring about each other, rather cute really.

Am quite sure Gimli fancies me. So unfair. He is waist height, so can see advantages there, but chunky braids and big helmet most off-putting. Foresee dark times ahead, very dark times.

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline
Hi guys..

I have a question regarding the estimate dates of adjudication here in VJ. All of us have our dates go up and down throughout our waiting periods. Today is July 23 and my adjudicated date here is July 22. Since I have passed that day already, will it still fluctuate (up or down)? Or it will stay that way? Because its sais at the bottom of that date to try and call USCIS if you haven't heard anything from them 10 days after the adjudicated date they have given. Thank you guys and I hope I'll get some answers. Tomorrow is our monthsary and it will be a great gift/blessing to get our NOA2. God bless guys and thank you again.

It keeps changing!!

On the 18th mine said the 16th

On the 20th it said the 18th

On the 21st and 22nd it said the 19th

and today the 23rd it says the 23rd lol

However future hubby called uscis friday night and found out we had been assigned to an officer on Wednesday 18th.

Maybe you should call again and see if yours is too.

Good Luck

Sam xxx

Sam or anyone here.. what does that mean if you have been assigne to an officer? Thank you.

I-129F

Sent I-129F on March 19, 2007

NOA1 on April 12, 2007

Touched on August 8, 2007 (RFE NOTICE)

August 13, 2007 received RFE

August 13, 2007 sent RFE

Touched August 22: RFE received and case resumed

Touched October 2, 2007 (NOTICE OF APPROVAL)

THANK YOU THANK YOU JESUS!

November 13, 2007: NVC reiceved our case

November 14, 2007: MNL Case #

November 15, 2007: Sent to MNLA

November 20, 2007: Case arrive in USEM

November 24, 2007: Got medical and interview dates

November 29, 2007: She received packet 4

December 27, 2007: Medical

January 2, 2008: Went back for MMR & Results

January 2, 2008: Passed Medical!! THANK YOU GOD!

January 2, 2008: Sent documents via Fedex

January 5, 2008: Fiancee received documents

January 9, 2008: Interview! APPROVED! THANK YOU JESUS!

January 10, 2008: Received a call from USEM

January 11, 2008: Pick up Visa at 9AM

January 11, 2008: CFO (COMPLETED)

February 5, 2008: Me arriving in Philippines

February 12, 2008: TOGETHER FOREVER!

February 12, 2008: Arrival in the USA

April 12, 2008: WEDDING!

Link to comment
Share on other sites

Filed: K-1 Visa Country: United Kingdom
Timeline

The VJ adjudication predictions are only as good as VJ members.

If people don't update timelines, the system is thrown off. THat said, they are a good rule-of-thumb guide - but they're still just a guestimate at best.

You can start making calls whenever you want, but just manage your expectations. Most likely, you'll continue to have no news until you get the good news. I know it's frustrating, but as soon as you get to the State Department stage, things will get better - Promise!

It's been about 102 days for you now. I know how that feels. We waited 111. We also had a few touches - which at first made me happy and then drove me bat-poo crazy when nothing happened for another week or so. You're still within the realm of average - a bit on the longer side, but not crazy long yet. So call USCIS if you want, but be prepared to hear no news.

I-129F/K1

1-12-07 mailed to CSC

1-22-07 DHS cashes the I-129F check

1-23-07 NOA1 Notice Date

1-26-07 NOA1 arrives in the post

4-25-07 Touched!

4-26-07 Touched again!

5-3-07 NOA2!!! Two approval emails received at 11:36am

5-10-07 Arrived at NVC/5-14-07 Left NVC - London-bound!

5-17-07??? London receives?

5-20-07 Packet 3 mailed

5-26-07 Packet 3 received

5-29-07 Packet 3 returned, few days later than planned due to bank holiday weekend

6-06-07 Medical in London (called to schedule on May 29)

6-11-07 "Medical in file" at Embassy

6-14-07 Resent packet 3 to Embassy after hearing nothing about first try

6-22-07 DOS says "applicant now eligible for interview," ie: they enter p3 into their system

6-25-07 DOS says interview date is August 21

6-28-07 Help from our congressional representative gives us new interview date: July 6

7-06-07 Interview at 9:00 am at the London Embassy - Approved.

7-16-07 Visa delivered after 'security checks' completed

I-129F approved in 111 days; Interview 174 days from filing

Handy numbers:

NVC: (603) 334-0700 - press 1, 5; US State Department: (202) 663-1225 - press 1, 0

*Be afraid or be informed - the choice is yours.*

Link to comment
Share on other sites

Filed: AOS (apr) Country: Romania
Timeline
I don't think the OP was asking or even hoping that the date given was a promise of any type, just asking whether that date got put in the timeline and then stayed the same, or whether it kept changing as outside factors changed... something that I think has been answered already ;)

And that was news to me too, so thank you.

"Today is July 23 and my adjudicated date here is July 22. Since I have passed that day already, will it still fluctuate (up or down)? Or it will stay that way? Because its sais at the bottom of that date to try and call USCIS if you haven't heard anything from them 10 days after the adjudicated date they have given. "

In red is the reason i brought up PROMISED DATE. And i made my point and it was fully understood and accurate. thanks

vj2.jpgvj.jpg

"VJ Timelines are only an estimate, they are not actual approval dates! They only reflect VJ members. VJ Timelines do not include the thousands of applicants who do not use VJ"

IF YOU ARE NEW TO THE SITE, PLEASE READ THE GUIDES BEFORE ASKING ALOT OF QUESTIONS. THE GUIDES ARE VERY HELPFUL AND WILL SAVE YOU ALOT OF TIME!

Link to comment
Share on other sites

Filed: K-1 Visa Country: United Kingdom
Timeline
Hi guys..

I have a question regarding the estimate dates of adjudication here in VJ. All of us have our dates go up and down throughout our waiting periods. Today is July 23 and my adjudicated date here is July 22. Since I have passed that day already, will it still fluctuate (up or down)? Or it will stay that way? Because its sais at the bottom of that date to try and call USCIS if you haven't heard anything from them 10 days after the adjudicated date they have given. Thank you guys and I hope I'll get some answers. Tomorrow is our monthsary and it will be a great gift/blessing to get our NOA2. God bless guys and thank you again.

It keeps changing!!

On the 18th mine said the 16th

On the 20th it said the 18th

On the 21st and 22nd it said the 19th

and today the 23rd it says the 23rd lol

However future hubby called uscis friday night and found out we had been assigned to an officer on Wednesday 18th.

Maybe you should call again and see if yours is too.

Good Luck

Sam xxx

Sam or anyone here.. what does that mean if you have been assigne to an officer? Thank you.

It means that hopefully that we will be approved any day.

When you are assigned to an officer at uscis it means that someone has you petition ready to be looked at but i think they get quite a few like bout 30 assigned to them at a time. so can take a week or two if you near the end of the bundle they got!!!

K1 TIMELINE

03/29/2007 - sent petition I129F

04/02/2007 - recieved at TSC

04/06/2007 - NOA1 issued

04/12/2007 - check cashed

04/14/2007 - NOA1 letter recieved

04/14/2007 - touched

06/07/2007 - touched (change of address)

06/08/2007 - touched (change of address)

06/10/2007 - touched (change of address)

06/15/2007 - touched due to phonecalls to csc.

06/16/2007 - another touch due to phonecalls on 15th!!!

07/25/2007 - APPROVED!!!!!!

08/06/2007 - NVC recieved

08/11/2007 - letter received from NVC saying send to London within a week

08/13/2007 - London recieves petition and sends out Packet 3

08/16/2007 - recieved and sent back packet 3

09/06/2007 - medical!!

09/12/2007 - INTERVIEW

09/18/2007 - Additional papers collected by courier

09/26/2007 - Visas delivered by courier!!!!!!!!! YAY!!!!!!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline

thanks guys for all your help... I'll be waiting and praying..that's all I can do for now.. hehe.. and have a patience as big as an ocean..hehehe God bless

I-129F

Sent I-129F on March 19, 2007

NOA1 on April 12, 2007

Touched on August 8, 2007 (RFE NOTICE)

August 13, 2007 received RFE

August 13, 2007 sent RFE

Touched August 22: RFE received and case resumed

Touched October 2, 2007 (NOTICE OF APPROVAL)

THANK YOU THANK YOU JESUS!

November 13, 2007: NVC reiceved our case

November 14, 2007: MNL Case #

November 15, 2007: Sent to MNLA

November 20, 2007: Case arrive in USEM

November 24, 2007: Got medical and interview dates

November 29, 2007: She received packet 4

December 27, 2007: Medical

January 2, 2008: Went back for MMR & Results

January 2, 2008: Passed Medical!! THANK YOU GOD!

January 2, 2008: Sent documents via Fedex

January 5, 2008: Fiancee received documents

January 9, 2008: Interview! APPROVED! THANK YOU JESUS!

January 10, 2008: Received a call from USEM

January 11, 2008: Pick up Visa at 9AM

January 11, 2008: CFO (COMPLETED)

February 5, 2008: Me arriving in Philippines

February 12, 2008: TOGETHER FOREVER!

February 12, 2008: Arrival in the USA

April 12, 2008: WEDDING!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Philippines
Timeline

mine was july 28th a couple of days ago and now it's the 17th of July.. hmmm.. went down a lot.. waaa i want my NOA2 now pls pls

I-129F

Sent I-129F on March 19, 2007

NOA1 on April 12, 2007

Touched on August 8, 2007 (RFE NOTICE)

August 13, 2007 received RFE

August 13, 2007 sent RFE

Touched August 22: RFE received and case resumed

Touched October 2, 2007 (NOTICE OF APPROVAL)

THANK YOU THANK YOU JESUS!

November 13, 2007: NVC reiceved our case

November 14, 2007: MNL Case #

November 15, 2007: Sent to MNLA

November 20, 2007: Case arrive in USEM

November 24, 2007: Got medical and interview dates

November 29, 2007: She received packet 4

December 27, 2007: Medical

January 2, 2008: Went back for MMR & Results

January 2, 2008: Passed Medical!! THANK YOU GOD!

January 2, 2008: Sent documents via Fedex

January 5, 2008: Fiancee received documents

January 9, 2008: Interview! APPROVED! THANK YOU JESUS!

January 10, 2008: Received a call from USEM

January 11, 2008: Pick up Visa at 9AM

January 11, 2008: CFO (COMPLETED)

February 5, 2008: Me arriving in Philippines

February 12, 2008: TOGETHER FOREVER!

February 12, 2008: Arrival in the USA

April 12, 2008: WEDDING!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Czech Republic
Timeline

For us, the VJ prediction was the 25th. We got NOA2 on the 26th. Funny is that on the 26th our VJ prediction changed to the 28th. So at least for us it was plus or minus 2 days accuracy.

CM

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...