Jump to content
HOHOHO

VERMONT I30 Progress update

 Share

14 posts in this topic

Recommended Posts

After over 1 month without an update, they haven't even progressed ONE day beyond the last 5 week update.

Many other sites are CURRENT

Tell me again, should I NOT just mail in all new paperwork to another site????

VSC is obviously CLOSED for I130 processing. 2 months without budging one day???

Event Date

Service Center : Vermont Service Center

Consulate : Indonesia

Marriage : 2007-08-10

I-130 Sent : 2007-08-21

I-130 NOA1 : 2008-01-18

I-130 Approved : 2008-09-15

NVC Received : 2008-09-24

Received DS-3032 / I-864 Bill : 2008-09-27

Pay I-864 Bill 2008-09-28

Receive I-864 Package : 2008-09-28

Return Completed I-864 : 2008-10-02

Return Completed DS-3032 : 2008-10-17

Receive IV Bill : 2008-10-30

Pay IV Bill : 2008-10-31

Receive Instruction Package :

Case Completed at NVC : 2009-01-28

NVC Left : 2009-01-30

Consulate Received : 2009-02-20

Packet 3 Received : 2009-02-20

Packet 3 Sent : 2009-02-24

Packet 4 Received : 2009-02-26

Interview Date : 2010-03-18

Visa Received : 2009-03-23

US Entry :

Comments :

Processing

Estimates/Stats : Your I-130 was approved in 241 days from your NOA1 date.

Your interview took 792 days from your I-130 NOA1 date.

Link to comment
Share on other sites

VSC closed for I-130 processing? Huh? I don't get that..

IR-1 Visa for Wife

NVC Case Complete = January 2, 2008

Received Packet 4 here in the US (Interview Packet) = January 18, 2008

Case Left NVC Forwarded to USEM Manila = January 23, 2008

SLEC Medical = Jan 31 and Feb 1, 2008 (2 days)

USEM Manila Interview = February 20, 2008 @ 8:30am = DONE! (Status: 2 Months wait is over APPROVED)

CFO Guidance & Counseling = April 17, 2008

Visa in Hand = April 18, 2008 (Our Wedding Anniversary)

Arrival in the US and POE = April 23, 2008 JFK Intl. Airport New York City

Social Security Card = May 2, 2008

Green Card in Hand = August 18,2008

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Germany
Timeline

Why should VSC be closed??? CSC hasn't moved in the same time frame as VSC. And if you mail it to another SC they are just going to forward it to VSC which will only complicate things. So, just hang tight and wait. It's all we can do. We filed back in August and haven't heard anything yet.

CR-1 Timeline

07/06/2007: Got married in Jamestown, RI

VSC

08/03/2007: USCIS VSC received I-130 package

10/26/2007: Still no receipt notice (NOA1)

12/31/2007: Got NOA1 in mail (date 12/26/2007)

02/22/2008: Approval notice sent by VSC (NOA2)

NVC

03/02/2008: still waiting for a case number

03/05/2008: NVC case# assigned (FRN2008xxxxxx)

03/10/2008: NVC generated and 'sent out' the DS-3032 and I-864 bill

03/xx/2008: Sent in DS-3032 and I-864 bill

04/xx/2008: NVC generated and 'sent out' the IV-bill

04/xx/2008: NVC generated and 'sent out' the I-864

04/xx/2008: NVC received I-864

06/xx/2008: IV bill paid

08/xx/2008: NVC received DS-230

09/04/2008: RFE generated (stupid question 20)

09/29/2008: NVC received new DS-230

09/30/2008: Case completed at NVC

10/07/2008: Interview date assigned

10/09/2008: Case transferred to consulate

U.S. Consulate, Frankfurt

10/14/2008: Medical exam

11/13/2008: Interview Frankfurt, Ger 8:00am

11/13/2008: Visa granted at interview (no results on the fingerprints)

11/15/2008: Visa received

Home in the U.S.

03/27/2009: POE Boston, MA - Finally home with hubby!

04/16/2009: SSN received

04/24/2009: Received Greencard in mail

Received MA ID

.png

Link to comment
Share on other sites

I can understand being sad about delays. I can understand being frustrated that life has to be put on hold while there are delays. I can even understand getting a bit angry now and then. But the truth is that we have zero choice other than to wait _if_ we want our spice/SOs to come to the States. If all we want is to be together than there is always moving to their country as an option.

I don't find complaining very productive if it is just railing at the system. It changes nothing and often the things that are said only serve to confuse other people about what is really going on and what they should to to properly work through processing visa paperwork.

Maybe there should just be a RANT ABOUT THE SYSTEM board setup so people can rant, but not muddy the waters.

I have no idea when my husband and I will be living together. So this means we will continue to live mostly separate lives (economically) and that we can only work so far toward our future together. That's the life we've chosen. Did we choose to have the process delayed more than anticipated? No. But that's life. We are grownups and we know that sh*t happens. So you roll with it.

Sent I-130 to VT 25-Oct-2007

I-130 Moved to California 6-August-2008

My petition has been in 3 states (1, twice) in 9 months!

Rec'd by CSC 8/9, touched 8/11, 8/12, 8/15, 8/20, 8/25

Approved Tuesday, 25-August-2008

10 months since we mailed the petition

Rec'd NVC 9/3, Invoice Generated 9/10, DS-3032 emailed 9/11.

Rec'd AOS invoice 9/15, paid online 9/15, Accepted as Paid 9/18, mailed I-864EZ 9/19

IV Invoiced 9/18, paid online 9/19, Accepted as paid 9/22

DS-230 sent 10/2

Case complete @NVC 10/8 - 11 months, 1 week and 6 days

Interview in Montreal December 18, 2008 - scheduled 1 year, 1 week and 3 days after the start of our journey. Takes place 1 year, 1 month, 3 weeks and 2 days after the start...

[X] Passed [ ] Failed Interview

Thursday, April 2, 2009 Activated Visa - 1 year, 5 months, 1 week and 1 day

Link to comment
Share on other sites

I can understand being sad about delays. I can understand being frustrated that life has to be put on hold while there are delays. I can even understand getting a bit angry now and then. But the truth is that we have zero choice other than to wait _if_ we want our spice/SOs to come to the States. If all we want is to be together than there is always moving to their country as an option.

I don't find complaining very productive if it is just railing at the system. It changes nothing and often the things that are said only serve to confuse other people about what is really going on and what they should to to properly work through processing visa paperwork.

Maybe there should just be a RANT ABOUT THE SYSTEM board setup so people can rant, but not muddy the waters.

I have no idea when my husband and I will be living together. So this means we will continue to live mostly separate lives (economically) and that we can only work so far toward our future together. That's the life we've chosen. Did we choose to have the process delayed more than anticipated? No. But that's life. We are grownups and we know that sh*t happens. So you roll with it.

thank you mary poppins

I think at this point, no one knows anything. What was the way to work last year is all out the window now.

How can they NOT progress beyond ONE single day of apps in 6 weeks?

Maybe you are sittting pretty, but I have important decisions that need done based on knowing if the process will even begin within 1 , 2, 3 5 or 12 years.

Event Date

Service Center : Vermont Service Center

Consulate : Indonesia

Marriage : 2007-08-10

I-130 Sent : 2007-08-21

I-130 NOA1 : 2008-01-18

I-130 Approved : 2008-09-15

NVC Received : 2008-09-24

Received DS-3032 / I-864 Bill : 2008-09-27

Pay I-864 Bill 2008-09-28

Receive I-864 Package : 2008-09-28

Return Completed I-864 : 2008-10-02

Return Completed DS-3032 : 2008-10-17

Receive IV Bill : 2008-10-30

Pay IV Bill : 2008-10-31

Receive Instruction Package :

Case Completed at NVC : 2009-01-28

NVC Left : 2009-01-30

Consulate Received : 2009-02-20

Packet 3 Received : 2009-02-20

Packet 3 Sent : 2009-02-24

Packet 4 Received : 2009-02-26

Interview Date : 2010-03-18

Visa Received : 2009-03-23

US Entry :

Comments :

Processing

Estimates/Stats : Your I-130 was approved in 241 days from your NOA1 date.

Your interview took 792 days from your I-130 NOA1 date.

Link to comment
Share on other sites

I can understand being sad about delays. I can understand being frustrated that life has to be put on hold while there are delays. I can even understand getting a bit angry now and then. But the truth is that we have zero choice other than to wait _if_ we want our spice/SOs to come to the States. If all we want is to be together than there is always moving to their country as an option.

I don't find complaining very productive if it is just railing at the system. It changes nothing and often the things that are said only serve to confuse other people about what is really going on and what they should to to properly work through processing visa paperwork.

Maybe there should just be a RANT ABOUT THE SYSTEM board setup so people can rant, but not muddy the waters.

I have no idea when my husband and I will be living together. So this means we will continue to live mostly separate lives (economically) and that we can only work so far toward our future together. That's the life we've chosen. Did we choose to have the process delayed more than anticipated? No. But that's life. We are grownups and we know that sh*t happens. So you roll with it.

thank you mary poppins

I think at this point, no one knows anything. What was the way to work last year is all out the window now.

How can they NOT progress beyond ONE single day of apps in 6 weeks?

Maybe you are sittting pretty, but I have important decisions that need done based on knowing if the process will even begin within 1 , 2, 3 5 or 12 years.

Event Date

Service Center : Vermont Service Center

Consulate : Indonesia

Marriage : 2007-08-10

I-130 Sent : 2007-08-21

I-130 NOA1 : 2008-01-18

I-130 Approved : 2008-09-15

NVC Received : 2008-09-24

Received DS-3032 / I-864 Bill : 2008-09-27

Pay I-864 Bill 2008-09-28

Receive I-864 Package : 2008-09-28

Return Completed I-864 : 2008-10-02

Return Completed DS-3032 : 2008-10-17

Receive IV Bill : 2008-10-30

Pay IV Bill : 2008-10-31

Receive Instruction Package :

Case Completed at NVC : 2009-01-28

NVC Left : 2009-01-30

Consulate Received : 2009-02-20

Packet 3 Received : 2009-02-20

Packet 3 Sent : 2009-02-24

Packet 4 Received : 2009-02-26

Interview Date : 2010-03-18

Visa Received : 2009-03-23

US Entry :

Comments :

Processing

Estimates/Stats : Your I-130 was approved in 241 days from your NOA1 date.

Your interview took 792 days from your I-130 NOA1 date.

Link to comment
Share on other sites

I can understand being sad about delays. I can understand being frustrated that life has to be put on hold while there are delays. I can even understand getting a bit angry now and then. But the truth is that we have zero choice other than to wait _if_ we want our spice/SOs to come to the States. If all we want is to be together than there is always moving to their country as an option.

I don't find complaining very productive if it is just railing at the system. It changes nothing and often the things that are said only serve to confuse other people about what is really going on and what they should to to properly work through processing visa paperwork.

Maybe there should just be a RANT ABOUT THE SYSTEM board setup so people can rant, but not muddy the waters.

I have no idea when my husband and I will be living together. So this means we will continue to live mostly separate lives (economically) and that we can only work so far toward our future together. That's the life we've chosen. Did we choose to have the process delayed more than anticipated? No. But that's life. We are grownups and we know that sh*t happens. So you roll with it.

thank you mary poppins

I think at this point, no one knows anything. What was the way to work last year is all out the window now.

How can they NOT progress beyond ONE single day of apps in 6 weeks?

Maybe you are sittting pretty, but I have important decisions that need done based on knowing if the process will even begin within 1 , 2, 3 5 or 12 years.

Actually complaining and stating the facts will IN FACT MAKE A DIFFRENCE IF IT IS DIRECTED TO THE RIGHT AREAS. I for one will not sit back and wait while the upper gods decide if they are going to levie fees today or whatever little project keeps them busy for the time being. TO sit back and be silent besides this great forum, omg NO WAY.

FYI - when speaking to Immigration Officer yesterday at CSC she did inform me that California was working on September 3, 2007. So lets see one day progress in what - a month or so - ffs - come on peeps, write phone do what it takes, we are American's and we have that right. Hit your politican's the time is right, election era coming up next year, hit the reporter who wrote a story here, but dont ever ever give up trying. To sit back and wait, well may work for some, but not for me. THIS SYSTEM NEEDS A GOD DAMN OVERHAUL.

Cheers

p.s If you have just recently begun the waiting period then let me hear from you in three months about not getting any results - otherwise you can remain silent FOR I WILL NOT!!!

Edited by SusieK

When something goes wrong remember this saying "WHEN MAN PLANS, GOD LAUGHS"

www.orlando4obama.com

I-130 JOURNEY BEGINSSent August 28, 2007 to TSC for receipting in CSCReceived NOA1 from VSC December 21, 2007

Notes - earned USCIS skymiles for sure - postmarked from Chicago Lockbox

online finally 2/24/08

touchy feely 2/25/08

touched 2/27/2008 - great RFE requested - just wonderful news to see in your inbox early in the am

3/13 - RFE letter FINALLY received - and document that we sent NOW resent back to VSC grrrrowling

3/19 case resumed processing

3/20 touched

3./21 touched

3/23 Easter bunny touched again

4/01 - APPROVED I-130

4/02 - touched

4/07 - received hard copy approval

NVC JOURNEY BEGINS

4/07 NV Case number assigned

4/08 AOS, DS and all fees paid online

6/09 tax transcript for 2007 just became available -whoot

6/20 NVC receives everything nothing more to give them now just close eyes and pray

6/23 NVC enters into system

6/26 NVC - RFE uggh - wants all three years of Federal tax return listed and they lost originals or so they say - DING DING ROUND TWO

7/25 NVC Case completed whooottttttttt

8/7 Case forward to US EMBASSY LONDON OH YEAHHHHHHHH -

Embassy - case out for delivery to embassy via DHL sneaky us lol

08/10Received

08/19 Medical Exam completed - healthy oh yeah!!!!!!!!

9/26 @8am -Interview - approved VISA IN HAND OMG WHOOT!!! HELLO AMERICA MY LUV

POE- Atlanta then MCO - October 15th with the cat "GIT" on board lol - POE SUPER SWEET

Husband home finally - god what a journey....but after 400+ days we made it

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline
I can understand being sad about delays. I can understand being frustrated that life has to be put on hold while there are delays. I can even understand getting a bit angry now and then. But the truth is that we have zero choice other than to wait _if_ we want our spice/SOs to come to the States. If all we want is to be together than there is always moving to their country as an option.

I don't find complaining very productive if it is just railing at the system. It changes nothing and often the things that are said only serve to confuse other people about what is really going on and what they should to to properly work through processing visa paperwork.

Maybe there should just be a RANT ABOUT THE SYSTEM board setup so people can rant, but not muddy the waters.

I have no idea when my husband and I will be living together. So this means we will continue to live mostly separate lives (economically) and that we can only work so far toward our future together. That's the life we've chosen. Did we choose to have the process delayed more than anticipated? No. But that's life. We are grownups and we know that sh*t happens. So you roll with it.

thank you mary poppins

I think at this point, no one knows anything. What was the way to work last year is all out the window now.

How can they NOT progress beyond ONE single day of apps in 6 weeks?

Maybe you are sittting pretty, but I have important decisions that need done based on knowing if the process will even begin within 1 , 2, 3 5 or 12 years.

I agree with MsZ. If you are continously looking on the website for a new change then you are setting yourself up for disappointment. it has been said that the I-13o process is on an average of 6 MONTHS! Not 6 weeks! So stop looking for an update cause you won't get one. Just put it out of your head. I know easier said than done, but you have to look at the bigger goal not this short term website update goal.

There are people who got an NOA1 3-4 months after submission, but then the NOA2 rolled around maybe a month later, so in the end no time was really wasted. As long as you are ok with the idea that the ENTIRE process from application-POE will be around 10months to a year you shold be ok. Once things start pushing beyond a year thats when you should start ranting and raving and checking all the time. At the service center stage you are way to early in rants. I mean, you still have NVC and the Embassy to go through.

I'm sorry for your wait, but just look beyond and you'll start to feel some comfort in the situation.

PUSH!: Pray Until Something Happens!

Link to comment
Share on other sites

I can understand being sad about delays. I can understand being frustrated that life has to be put on hold while there are delays. I can even understand getting a bit angry now and then. But the truth is that we have zero choice other than to wait _if_ we want our spice/SOs to come to the States. If all we want is to be together than there is always moving to their country as an option.

I don't find complaining very productive if it is just railing at the system. It changes nothing and often the things that are said only serve to confuse other people about what is really going on and what they should to to properly work through processing visa paperwork.

Maybe there should just be a RANT ABOUT THE SYSTEM board setup so people can rant, but not muddy the waters.

I have no idea when my husband and I will be living together. So this means we will continue to live mostly separate lives (economically) and that we can only work so far toward our future together. That's the life we've chosen. Did we choose to have the process delayed more than anticipated? No. But that's life. We are grownups and we know that sh*t happens. So you roll with it.

thank you mary poppins

I think at this point, no one knows anything. What was the way to work last year is all out the window now.

How can they NOT progress beyond ONE single day of apps in 6 weeks?

Maybe you are sittting pretty, but I have important decisions that need done based on knowing if the process will even begin within 1 , 2, 3 5 or 12 years.

I agree with MsZ. If you are continously looking on the website for a new change then you are setting yourself up for disappointment. it has been said that the I-13o process is on an average of 6 MONTHS! Not 6 weeks! So stop looking for an update cause you won't get one. Just put it out of your head. I know easier said than done, but you have to look at the bigger goal not this short term website update goal.

There are people who got an NOA1 3-4 months after submission, but then the NOA2 rolled around maybe a month later, so in the end no time was really wasted. As long as you are ok with the idea that the ENTIRE process from application-POE will be around 10months to a year you shold be ok. Once things start pushing beyond a year thats when you should start ranting and raving and checking all the time. At the service center stage you are way to early in rants. I mean, you still have NVC and the Embassy to go through.

I'm sorry for your wait, but just look beyond and you'll start to feel some comfort in the situation.

Actually there is one case that comes to mind that he had sat by and waited he would be waiting until God knows when by the looks of things. Read up on GOGO and if he had not been on top of things calling and writing the WHITE HOUSE, his application would be sitting gathering dust somewhere for a long long time. TO EACH HIS OWN.

When something goes wrong remember this saying "WHEN MAN PLANS, GOD LAUGHS"

www.orlando4obama.com

I-130 JOURNEY BEGINSSent August 28, 2007 to TSC for receipting in CSCReceived NOA1 from VSC December 21, 2007

Notes - earned USCIS skymiles for sure - postmarked from Chicago Lockbox

online finally 2/24/08

touchy feely 2/25/08

touched 2/27/2008 - great RFE requested - just wonderful news to see in your inbox early in the am

3/13 - RFE letter FINALLY received - and document that we sent NOW resent back to VSC grrrrowling

3/19 case resumed processing

3/20 touched

3./21 touched

3/23 Easter bunny touched again

4/01 - APPROVED I-130

4/02 - touched

4/07 - received hard copy approval

NVC JOURNEY BEGINS

4/07 NV Case number assigned

4/08 AOS, DS and all fees paid online

6/09 tax transcript for 2007 just became available -whoot

6/20 NVC receives everything nothing more to give them now just close eyes and pray

6/23 NVC enters into system

6/26 NVC - RFE uggh - wants all three years of Federal tax return listed and they lost originals or so they say - DING DING ROUND TWO

7/25 NVC Case completed whooottttttttt

8/7 Case forward to US EMBASSY LONDON OH YEAHHHHHHHH -

Embassy - case out for delivery to embassy via DHL sneaky us lol

08/10Received

08/19 Medical Exam completed - healthy oh yeah!!!!!!!!

9/26 @8am -Interview - approved VISA IN HAND OMG WHOOT!!! HELLO AMERICA MY LUV

POE- Atlanta then MCO - October 15th with the cat "GIT" on board lol - POE SUPER SWEET

Husband home finally - god what a journey....but after 400+ days we made it

Link to comment
Share on other sites

yeah but he still had to wait at least 3 months before they would've found anything.

So did I and still nothing and I acted on it. And the OP has waited 3 months also and I think what we are looking for here is at least confirmation.

Cheers

Edited by SusieK

When something goes wrong remember this saying "WHEN MAN PLANS, GOD LAUGHS"

www.orlando4obama.com

I-130 JOURNEY BEGINSSent August 28, 2007 to TSC for receipting in CSCReceived NOA1 from VSC December 21, 2007

Notes - earned USCIS skymiles for sure - postmarked from Chicago Lockbox

online finally 2/24/08

touchy feely 2/25/08

touched 2/27/2008 - great RFE requested - just wonderful news to see in your inbox early in the am

3/13 - RFE letter FINALLY received - and document that we sent NOW resent back to VSC grrrrowling

3/19 case resumed processing

3/20 touched

3./21 touched

3/23 Easter bunny touched again

4/01 - APPROVED I-130

4/02 - touched

4/07 - received hard copy approval

NVC JOURNEY BEGINS

4/07 NV Case number assigned

4/08 AOS, DS and all fees paid online

6/09 tax transcript for 2007 just became available -whoot

6/20 NVC receives everything nothing more to give them now just close eyes and pray

6/23 NVC enters into system

6/26 NVC - RFE uggh - wants all three years of Federal tax return listed and they lost originals or so they say - DING DING ROUND TWO

7/25 NVC Case completed whooottttttttt

8/7 Case forward to US EMBASSY LONDON OH YEAHHHHHHHH -

Embassy - case out for delivery to embassy via DHL sneaky us lol

08/10Received

08/19 Medical Exam completed - healthy oh yeah!!!!!!!!

9/26 @8am -Interview - approved VISA IN HAND OMG WHOOT!!! HELLO AMERICA MY LUV

POE- Atlanta then MCO - October 15th with the cat "GIT" on board lol - POE SUPER SWEET

Husband home finally - god what a journey....but after 400+ days we made it

Link to comment
Share on other sites

We all have important decisions to make. We are both professionals with children and houses. We'd of course be happier financially if we were living under the same roof and he'd love to have some idea what his future in the US will look like -- we're going to sell both houses and buy a new one (need more bedrooms for one thing), and his career is important to him as well. His current company would like to know what he's going to be doing as well.

Nobody is saying that you shouldn't stay on top of your situation. But general griping is not going to help you or anyone else. Vermont is swamped. That much is very clear. We modified our expectations about timelines more than once already and I expect to do it many more times before the process is complete. All we can do is work the system. If you want to become politically active, by all means, go ahead. But preaching to the choir about how slow things are right now probably isn't going to change much.

Sent I-130 to VT 25-Oct-2007

I-130 Moved to California 6-August-2008

My petition has been in 3 states (1, twice) in 9 months!

Rec'd by CSC 8/9, touched 8/11, 8/12, 8/15, 8/20, 8/25

Approved Tuesday, 25-August-2008

10 months since we mailed the petition

Rec'd NVC 9/3, Invoice Generated 9/10, DS-3032 emailed 9/11.

Rec'd AOS invoice 9/15, paid online 9/15, Accepted as Paid 9/18, mailed I-864EZ 9/19

IV Invoiced 9/18, paid online 9/19, Accepted as paid 9/22

DS-230 sent 10/2

Case complete @NVC 10/8 - 11 months, 1 week and 6 days

Interview in Montreal December 18, 2008 - scheduled 1 year, 1 week and 3 days after the start of our journey. Takes place 1 year, 1 month, 3 weeks and 2 days after the start...

[X] Passed [ ] Failed Interview

Thursday, April 2, 2009 Activated Visa - 1 year, 5 months, 1 week and 1 day

Link to comment
Share on other sites

After over 1 month without an update, they haven't even progressed ONE day beyond the last 5 week update.

Many other sites are CURRENT

Tell me again, should I NOT just mail in all new paperwork to another site????

VSC is obviously CLOSED for I130 processing. 2 months without budging one day???

Here's a page on uscis site and on the right you can select processing times, then page will pop up where you can select the service center then scroll down to your application type and see what date they were processing as of the date at top. (its updated once a month)

http://www.uscis.gov/portal/site/uscis/men...0004718190aRCRD

First trip 01-17-07

Married 02-05-07

What Service Center was filed at? Nebraska transferred to California

Provide dates for the following:

I-130 sent (Mailed)..........................3-12-07

1st NOA (Receipt Notice) .................3-29-07

2nd NOA (Approval Notice) e-mail.....6-15-07

Bill for I-864 processing fee rcd and sent..7-24-07

I-864 Packet Received......................8-18-07

I-864 Mailed to NV............................8-20-07

Bill for DS-230 received....................8-29-07

Payment for DS-230 sent..................8-30-07

DS-230 Packet received..................10-25-07

DS-230 Packet sent to NVC..............10-29-07

Case Completed..............................11-16-07

Case Forwarded to Embassy.............11-30-07

Packet recieved from NVC................12-07-07

Medical complete...............................1-04-08

Leave for Manila................................1-19-08

Interview and approval......................1-22-08

Visa in Hand .....................................1-24-08

Arrived in USA...................................3-19-08

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×