Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Hey Steve?

I agree with Trailmix...

There is something amiss...

You're getting good advice here.

Best,

LGG

Trailmix, the NOA2 was December 4th, 2008. BUT, we waited about 3 months before sending stuff off to the NVC; partly because our lawyer said we had to wait for the forms to be sent to us (they didn't - as soon as we paid the fees we could download the forms - one wonders what we're paying her for . . .). And partly because I wanted my 2008 tax return in there. So it's not a realistic timeline. We originally filed the I130 in May 2008.

Wow these lawyers are bad.

But anyway, let's assume that they scheduled your interview for October 4th - that would be 122 days between completion at NVC and your interview. If you look at the timeline table you won't see anyone here that has waited that long.

In fact, that type of wait time hasn't been seen here since January of 2008.

If I were you I would call the NVC and ask to speak to a supervisor - as in put me through to one now please. The wait time is not normal and I would be concerned that you are being overlooked for some reason.

The wait certainly sucks. I've been waiting since June 19th for my interview. I called the NVC today and they said they're done scheduling for September. We filed the I-130 and everything in mid-June 2008, so I'm getting pissed off with the whole process! Not to mention that the whole case was delayed because the NVC said the AOS was all filled out wrong -- regardless of the fact we filled it and had our lawyer check it according to their own instructions. According to what they told my legal representation, they're changing the way they're getting the cases together for the consulates where everything gets submitted via NVC as opposed to the beneficiary bringing everything to the interview. So for everyone who actually calls up and gets told they have no interview, you never know -- they may just send you an email a week later telling you to haul it to the consulate!

All this is giving me sleepless nights and affecting my general mood in a big way. I just want it to be done with so I can be with my wife and newborn.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
The wait certainly sucks. I've been waiting since June 19th for my interview. I called the NVC today and they said they're done scheduling for September. We filed the I-130 and everything in mid-June 2008, so I'm getting pissed off with the whole process! Not to mention that the whole case was delayed because the NVC said the AOS was all filled out wrong -- regardless of the fact we filled it and had our lawyer check it according to their own instructions. According to what they told my legal representation, they're changing the way they're getting the cases together for the consulates where everything gets submitted via NVC as opposed to the beneficiary bringing everything to the interview. So for everyone who actually calls up and gets told they have no interview, you never know -- they may just send you an email a week later telling you to haul it to the consulate!

All this is giving me sleepless nights and affecting my general mood in a big way. I just want it to be done with so I can be with my wife and newborn.

Sorry you have been having all these frustrations - I'm sure the wait is maddening for you.

Just want to say - i'm not sure what your lawyer or NVC told you - but the documents for an IR1 or CR1 visa are always sent to NVC (that is normal and not at all new) - it's K visas where some documents are only presented at the interview.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Just thought I would bump this up for those us waiting....

happy_fairy.jpg

Member...........NOA2......Case# @NVC.....Mailed I-864....Mailed DS-230....RFE....Done @NVC....Interview...DTI

AnaGRicky.IR5..12/08/07.....--/--/--........06/20/08........--/--/--........N.....04/29/09.....08/11/09....104

to_hope........07/08/08.....--/--/--........--/--/--........--/--/--........-.....11/26/08.....03/15/09....109

thebradshaws...08/18/08.....08/22/08........09/08/08........09/26/08........-.....11/05/08.....01/13/09.... 72

Rexalite.......09/03/09.....--/--/--........--/--/--........--/--/--........-.....02/05/09.....05/07/09.... 91

Shiri..........09/12/08.....09/24/08........10/04/08........10/29/08........Y.....12/01/08.....03/24/09....113

sly_wolf.......09/17/08.....09/24/08........10/04/08........10/29/08........-.....10/30/08.....01/07/09.... 69

Shaesta........--/--/--.....--/--/--........--/--/--........--/--/--........-.....12/05/08.....03/26/09....111

ohmy...........11/07/08.....--/--/--........--/--/--........--/--/--........-.....02/20/09

Reeena..DCF....11/07/08.....--/--/--........--/--/--........01/04/09........N.....01/04/09.....04/24/09....110

Travis&Kim.....12/01/08.....12/04/08........12/27/08........12/27/08........Y.....01/14/09.....04/16/09.... 92

jonesg111......12/22/08.....--/--/--........--/--/--........--/--/--........-.....03/24/09.....06/17/09.... 85

carslo.........01/06/09.....01/12/09........03/21/09........03/21/09........N.....04/07/09.....06/22/09.... 76

Moosker........01/06/09.....01/13/09........01/28/09........02/12/09........Y.....02/25/09.....05/19/09.... 83

OBX............01/20/09.....01/26/09........02/07/09........02/07/09........N.....02/13/09.....05/12/09.... 88

A&M............01/21/09.....01/23/09........02/03/09........02/18/09........N.....02/26/09.....05/20/09.... 83

thedawghouse...02/--/09.....05/--/09........--/--/--........--/--/--........-.....06/19/09

Argent.........02/03/09.....--/--/--........--/--/--........--/--/--........-.....03/13/09.....05/26/09.... 74

elsoar..DCF....02/03/09..<-date filed I-130.--/--/--........03/17/09........N.....03/17/09.....06/18/09.... 93

pari_girl......02/19/09.....--/--/--........--/--/--........--/--/--........-.....04/29/09

svirac.........02/23/09.....02/26/09........03/05/09........03/24/09........N.....04/15/09.....06/02/09.... 48

Serendipity....03/05/09.....03/10/09........03/23/09........04/01/09........N.....04/23/09.....08/13/09....112

Holliday.......03/19/09.....04/03/09........04/10/09........04/27/09........N.....05/07/09.....08/19/09....104

ZansGirl.......03/09/09.....03/19/09

cmls...........03/20/09.....04/07/09........04/18/09........04/28/09........N.....05/08/09.....08/07/09.... 91

SomberCat......03/25/09.....04/10/09........04/17/09........04/21/09........Y.....05/20/09.....08/19/09.... 91

Dalene.........03/05/09.....03/19/09........05/06/09........05/06/09........Y.....06/22/09

Brocku00.......03/--/09.....--/--/--........--/--/--........--/--/--........-.....04/24/09.....08/12/09....110

BradnKim.......04/01/09.....04/20/09........04/29/09........05/01/09........Y.....06/24/09

bradleyboy.....04/15/09.....--/--/--........--/--/--........--/--/--........-.....05/11/09.....08/12/09.... 93

hisgirl........04/17/09.....--/--/--........--/--/--........--/--/--........-.....07/30/09

Avery..........05/05/09.....--/--/--........--/--/--........06/05/09

lgg............06/25/09.....07/08/09........--/--/--........--/--/--........-.....08/12/09

Malrothien.....07/15/09.....07/23/09

La Souris......07/30/09.....08/14/09

Timeline page for 2007 and 2008 interviews Montreal: link

CR1/IR1 interview letter: link

DTI - Days between completion at NVC and interview

USCIS

NOA #2: Approval June 25th, 2009 - 92 days

NVC

July 8, 2009 to August 10, 2009 - 28 days

Interview Assigned - December 3, 2009 - FINALLY!!

Medical - December 14, 2009 - Passed

Embassy/Interview - January 26, 2010 Montreal, Quebec Canada - 167 days PASSED!!!

Port of Entry - February 26, 2010 Baltimore International, Maryland

USCIS -- ROC package sent off

November 26, 2011 to Vermont station November 30, 2011 received NOA1December 16, 2011 received biometrics appointment.

January 04, 2012 Biometrics

September 2, 2012, RFE Received.

September 22, 2012 RFE responded to

October 15, 2012 ROC approved, 10 Green card on its way.

kermit_the_frog1237963302.jpg

"Here's some simple advice: Always be yourself. Never take yourself too seriously.

And beware of advice from experts, pigs, and members of Parliament."

Kermit the Frog

Visit my News Feed Page -- Good Reads for Everyone!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Good luck to Holliday and to Sombercat today!

Bring home the pink!

OR whatever colour they give good, solid approvals in...

USCIS

NOA #2: Approval June 25th, 2009 - 92 days

NVC

July 8, 2009 to August 10, 2009 - 28 days

Interview Assigned - December 3, 2009 - FINALLY!!

Medical - December 14, 2009 - Passed

Embassy/Interview - January 26, 2010 Montreal, Quebec Canada - 167 days PASSED!!!

Port of Entry - February 26, 2010 Baltimore International, Maryland

USCIS -- ROC package sent off

November 26, 2011 to Vermont station November 30, 2011 received NOA1December 16, 2011 received biometrics appointment.

January 04, 2012 Biometrics

September 2, 2012, RFE Received.

September 22, 2012 RFE responded to

October 15, 2012 ROC approved, 10 Green card on its way.

kermit_the_frog1237963302.jpg

"Here's some simple advice: Always be yourself. Never take yourself too seriously.

And beware of advice from experts, pigs, and members of Parliament."

Kermit the Frog

Visit my News Feed Page -- Good Reads for Everyone!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Good luck to Holliday and to Sombercat today!

Bring home the pink!

OR whatever colour they give good, solid approvals in...

Hey noob,

There is a thread about this - Holliday has already been approved! :lol:

http://www.visajourney.com/forums/index.php?showtopic=213546

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Oh brother.

Head/desk....

~sigh~

:blush:

Good luck to Holliday and to Sombercat today!

Bring home the pink!

OR whatever colour they give good, solid approvals in...

Hey noob,

There is a thread about this - Holliday has already been approved! :lol:

http://www.visajourney.com/forums/index.php?showtopic=213546

USCIS

NOA #2: Approval June 25th, 2009 - 92 days

NVC

July 8, 2009 to August 10, 2009 - 28 days

Interview Assigned - December 3, 2009 - FINALLY!!

Medical - December 14, 2009 - Passed

Embassy/Interview - January 26, 2010 Montreal, Quebec Canada - 167 days PASSED!!!

Port of Entry - February 26, 2010 Baltimore International, Maryland

USCIS -- ROC package sent off

November 26, 2011 to Vermont station November 30, 2011 received NOA1December 16, 2011 received biometrics appointment.

January 04, 2012 Biometrics

September 2, 2012, RFE Received.

September 22, 2012 RFE responded to

October 15, 2012 ROC approved, 10 Green card on its way.

kermit_the_frog1237963302.jpg

"Here's some simple advice: Always be yourself. Never take yourself too seriously.

And beware of advice from experts, pigs, and members of Parliament."

Kermit the Frog

Visit my News Feed Page -- Good Reads for Everyone!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Any heard from SomberCat? She must be busy celebrating her approval :)

Congrats Holliday!

*k3 Visa*

08-10-2008: NOA1

03-05-2009: NOA2

05-18-2009: K3 visa approved (Mumbai Consulate)

05-22-2009: POE LAX

*IR Visa*

07-10-2008: NOA1

03-05-2009: NOA2

08-13-2009: IR1 visa approved (Montreal, Canada)

08-15-2009: POE LAX

Link to comment
Share on other sites

Any heard from SomberCat? She must be busy celebrating her approval :)

Congrats Holliday!

Thanks! :) SomberCat sent me a text shortly after noon (YIKES! I was out of there around 9:00) saying that they just got out of there because someone messed up and they forgot about them! But... they were approved! (I hope she doesn't kill me for breaking the news!)

I wrote half a review before I left the hotel, but I can't write the other half yet. My brain is mush. Words don't make sense in my head right now. Hehe it is totally nap time.

02/13/09 -

:)

02/19/09 - I-130 mailed out

02/27/09 - NOA1

03/19/09 - NOA2

05/07/09 - NVC CASE COMPLETE!

06/23/09 - Received interview appointment letter via email! Yay!

08/19/09 -Interview! SUCCESS!! (Wanna read a ridiculously long interview review? Click the link!)

08/21/09 - Visa received!

09/11/09 - POE (Alexandria Bay, NY)

09/28/09 - Received Permanent Resident card

06/28/11 - Sent 1-751 to VSC

07/29/11 - Biometrics appointment (OKC)

01/20/12 - I-751 approved!

Link to comment
Share on other sites

Good luck to Holliday and to Sombercat today!

Bring home the pink!

OR whatever colour they give good, solid approvals in...

Heheh thanks! The man gave me a white piece of paper that says "Welcome to the United States of America!" It is neat.

02/13/09 -

:)

02/19/09 - I-130 mailed out

02/27/09 - NOA1

03/19/09 - NOA2

05/07/09 - NVC CASE COMPLETE!

06/23/09 - Received interview appointment letter via email! Yay!

08/19/09 -Interview! SUCCESS!! (Wanna read a ridiculously long interview review? Click the link!)

08/21/09 - Visa received!

09/11/09 - POE (Alexandria Bay, NY)

09/28/09 - Received Permanent Resident card

06/28/11 - Sent 1-751 to VSC

07/29/11 - Biometrics appointment (OKC)

01/20/12 - I-751 approved!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Seriously? A welcome to the United States note? AWwww, I think that would make me get all teary eyed.

COngratulations... that really rocks out!

:D

Good luck to Holliday and to Sombercat today!

Bring home the pink!

OR whatever colour they give good, solid approvals in...

Heheh thanks! The man gave me a white piece of paper that says "Welcome to the United States of America!" It is neat.

USCIS

NOA #2: Approval June 25th, 2009 - 92 days

NVC

July 8, 2009 to August 10, 2009 - 28 days

Interview Assigned - December 3, 2009 - FINALLY!!

Medical - December 14, 2009 - Passed

Embassy/Interview - January 26, 2010 Montreal, Quebec Canada - 167 days PASSED!!!

Port of Entry - February 26, 2010 Baltimore International, Maryland

USCIS -- ROC package sent off

November 26, 2011 to Vermont station November 30, 2011 received NOA1December 16, 2011 received biometrics appointment.

January 04, 2012 Biometrics

September 2, 2012, RFE Received.

September 22, 2012 RFE responded to

October 15, 2012 ROC approved, 10 Green card on its way.

kermit_the_frog1237963302.jpg

"Here's some simple advice: Always be yourself. Never take yourself too seriously.

And beware of advice from experts, pigs, and members of Parliament."

Kermit the Frog

Visit my News Feed Page -- Good Reads for Everyone!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
We can do it ourselves, Bern... just select all and copy into your post....

happy_fairy.jpg

Member...........NOA2......Case# @NVC.....Mailed I-864....Mailed DS-230....RFE....Done @NVC....Interview...DTI

AnaGRicky.IR5..12/08/07.....--/--/--........06/20/08........--/--/--........N.....04/29/09.....08/11/09....104

to_hope........07/08/08.....--/--/--........--/--/--........--/--/--........-.....11/26/08.....03/15/09....109

thebradshaws...08/18/08.....08/22/08........09/08/08........09/26/08........-.....11/05/08.....01/13/09.... 72

Rexalite.......09/03/09.....--/--/--........--/--/--........--/--/--........-.....02/05/09.....05/07/09.... 91

Shiri..........09/12/08.....09/24/08........10/04/08........10/29/08........Y.....12/01/08.....03/24/09....113

sly_wolf.......09/17/08.....09/24/08........10/04/08........10/29/08........-.....10/30/08.....01/07/09.... 69

Shaesta........--/--/--.....--/--/--........--/--/--........--/--/--........-.....12/05/08.....03/26/09....111

ohmy...........11/07/08.....--/--/--........--/--/--........--/--/--........-.....02/20/09

Reeena..DCF....11/07/08.....--/--/--........--/--/--........01/04/09........N.....01/04/09.....04/24/09....110

Travis&Kim.....12/01/08.....12/04/08........12/27/08........12/27/08........Y.....01/14/09.....04/16/09.... 92

jonesg111......12/22/08.....--/--/--........--/--/--........--/--/--........-.....03/24/09.....06/17/09.... 85

carslo.........01/06/09.....01/12/09........03/21/09........03/21/09........N.....04/07/09.....06/22/09.... 76

Moosker........01/06/09.....01/13/09........01/28/09........02/12/09........Y.....02/25/09.....05/19/09.... 83

OBX............01/20/09.....01/26/09........02/07/09........02/07/09........N.....02/13/09.....05/12/09.... 88

A&M............01/21/09.....01/23/09........02/03/09........02/18/09........N.....02/26/09.....05/20/09.... 83

thedawghouse...02/--/09.....05/--/09........--/--/--........--/--/--........-.....06/19/09

Argent.........02/03/09.....--/--/--........--/--/--........--/--/--........-.....03/13/09.....05/26/09.... 74

elsoar..DCF....02/03/09..<-date filed I-130.--/--/--........03/17/09........N.....03/17/09.....06/18/09.... 93

pari_girl......02/19/09.....--/--/--........--/--/--........--/--/--........-.....04/29/09

svirac.........02/23/09.....02/26/09........03/05/09........03/24/09........N.....04/15/09.....06/02/09.... 48

Serendipity....03/05/09.....03/10/09........03/23/09........04/01/09........N.....04/23/09.....08/13/09....112

Holliday.......03/19/09.....04/03/09........04/10/09........04/27/09........N.....05/07/09.....08/19/09....104

ZansGirl.......03/09/09.....03/19/09

cmls...........03/20/09.....04/07/09........04/18/09........04/28/09........N.....05/08/09.....08/07/09.... 91

SomberCat......03/25/09.....04/10/09........04/17/09........04/21/09........Y.....05/20/09.....08/19/09.... 91

Dalene.........03/05/09.....03/19/09........05/06/09........05/06/09........Y.....06/22/09

Brocku00.......03/--/09.....--/--/--........--/--/--........--/--/--........-.....04/24/09.....08/12/09....110

BradnKim.......04/01/09.....04/20/09........04/29/09........05/01/09........Y.....06/24/09

bradleyboy.....04/15/09.....--/--/--........--/--/--........--/--/--........-.....05/11/09.....08/12/09.... 93

hisgirl........04/17/09.....--/--/--........--/--/--........--/--/--........-.....07/30/09

Avery..........05/05/09.....--/--/--........--/--/--........06/05/09

lgg............06/25/09.....07/08/09........07/21/09........07/29/09........None...08/12/09

Malrothien.....07/15/09.....07/23/09

La Souris......07/30/09.....08/14/09

Bern. ..... .07/14/09.....08/14/09

Timeline page for 2007 and 2008 interviews Montreal: link

CR1/IR1 interview letter: link

DTI - Days between completion at NVC and interview

Edited by lgg

USCIS

NOA #2: Approval June 25th, 2009 - 92 days

NVC

July 8, 2009 to August 10, 2009 - 28 days

Interview Assigned - December 3, 2009 - FINALLY!!

Medical - December 14, 2009 - Passed

Embassy/Interview - January 26, 2010 Montreal, Quebec Canada - 167 days PASSED!!!

Port of Entry - February 26, 2010 Baltimore International, Maryland

USCIS -- ROC package sent off

November 26, 2011 to Vermont station November 30, 2011 received NOA1December 16, 2011 received biometrics appointment.

January 04, 2012 Biometrics

September 2, 2012, RFE Received.

September 22, 2012 RFE responded to

October 15, 2012 ROC approved, 10 Green card on its way.

kermit_the_frog1237963302.jpg

"Here's some simple advice: Always be yourself. Never take yourself too seriously.

And beware of advice from experts, pigs, and members of Parliament."

Kermit the Frog

Visit my News Feed Page -- Good Reads for Everyone!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
TrailMix? I hope you don't mind, but I cleaned it up a bit, made it so the people were waiting were easy to see..

I hope I have not stepped on any toes. You all know you can change/add/adjust it yourselves right?

Hope this is okay....

happy_fairy.jpg

Member...........NOA2......Case# @NVC.....Mailed I-864....Mailed DS-230....RFE....Done @NVC....Interview...DTI

ohmy...........11/07/08.....--/--/--........--/--/--........--/--/--........-.....02/20/09

pari_girl......02/19/09.....--/--/--........--/--/--........--/--/--........-.....04/29/09

thedawghouse...02/--/09.....05/--/09........--/--/--........--/--/--........-.....06/19/09

ZansGirl.......03/09/09.....03/19/09

Dalene.........03/05/09.....03/19/09........05/06/09........05/06/09........Y.....06/22/09

BradnKim.......04/01/09.....04/20/09........04/29/09........05/01/09........Y.....06/24/09

hisgirl........04/17/09.....--/--/--........--/--/--........--/--/--........-.....07/30/09

Avery..........05/05/09.....--/--/--........--/--/--........06/05/09

lgg............06/25/09.....07/08/09........07/21/09........07/29/09........N...08/12/09

Malrothien.....07/15/09.....07/23/09

La Souris......07/30/09.....08/14/09

Bern. ..... 07/14/09.....08/14/09

Member...........NOA2......Case# @NVC.....Mailed I-864....Mailed DS-230....RFE....Done @NVC....Interview...DTI

AnaGRicky.IR5..12/08/07.....--/--/--........06/20/08........--/--/--........N.....04/29/09.....08/11/09....104

to_hope........07/08/08.....--/--/--........--/--/--........--/--/--........-.....11/26/08.....03/15/09....109

thebradshaws...08/18/08.....08/22/08........09/08/08........09/26/08........-.....11/05/08.....01/13/09.... 72

Rexalite.......09/03/09.....--/--/--........--/--/--........--/--/--........-.....02/05/09.....05/07/09.... 91

Shiri..........09/12/08.....09/24/08........10/04/08........10/29/08........Y.....12/01/08.....03/24/09....113

sly_wolf.......09/17/08.....09/24/08........10/04/08........10/29/08........-.....10/30/08.....01/07/09.... 69

Shaesta........--/--/--.....--/--/--........--/--/--........--/--/--........-.....12/05/08.....03/26/09....111

Reeena..DCF....11/07/08.....--/--/--........--/--/--........01/04/09........N.....01/04/09.....04/24/09....110

Travis&Kim.....12/01/08.....12/04/08........12/27/08........12/27/08........Y.....01/14/09.....04/16/09.... 92

jonesg111......12/22/08.....--/--/--........--/--/--........--/--/--........-.....03/24/09.....06/17/09.... 85

carslo.........01/06/09.....01/12/09........03/21/09........03/21/09........N.....04/07/09.....06/22/09.... 76

Moosker........01/06/09.....01/13/09........01/28/09........02/12/09........Y.....02/25/09.....05/19/09.... 83

OBX............01/20/09.....01/26/09........02/07/09........02/07/09........N.....02/13/09.....05/12/09.... 88

A&M............01/21/09.....01/23/09........02/03/09........02/18/09........N.....02/26/09.....05/20/09.... 83

Argent.........02/03/09.....--/--/--........--/--/--........--/--/--........-.....03/13/09.....05/26/09.... 74

elsoar..DCF....02/03/09..<-date filed I-130.--/--/--........03/17/09........N.....03/17/09.....06/18/09.... 93

svirac.........02/23/09.....02/26/09........03/05/09........03/24/09........N.....04/15/09.....06/02/09.... 48

Serendipity....03/05/09.....03/10/09........03/23/09........04/01/09........N.....04/23/09.....08/13/09....112

Holliday.......03/19/09.....04/03/09........04/10/09........04/27/09........N.....05/07/09.....08/19/09....104

cmls...........03/20/09.....04/07/09........04/18/09........04/28/09........N.....05/08/09.....08/07/09.... 91

SomberCat......03/25/09.....04/10/09........04/17/09........04/21/09........Y.....05/20/09.....08/19/09.... 91

Brocku00.......03/--/09.....--/--/--........--/--/--........--/--/--........-.....04/24/09.....08/12/09....110

bradleyboy.....04/15/09.....--/--/--........--/--/--........--/--/--........-.....05/11/09.....08/12/09.... 93

Timeline page for 2007 and 2008 interviews Montreal: link

CR1/IR1 interview letter: link

DTI - Days between completion at NVC and interview

Edited by lgg

USCIS

NOA #2: Approval June 25th, 2009 - 92 days

NVC

July 8, 2009 to August 10, 2009 - 28 days

Interview Assigned - December 3, 2009 - FINALLY!!

Medical - December 14, 2009 - Passed

Embassy/Interview - January 26, 2010 Montreal, Quebec Canada - 167 days PASSED!!!

Port of Entry - February 26, 2010 Baltimore International, Maryland

USCIS -- ROC package sent off

November 26, 2011 to Vermont station November 30, 2011 received NOA1December 16, 2011 received biometrics appointment.

January 04, 2012 Biometrics

September 2, 2012, RFE Received.

September 22, 2012 RFE responded to

October 15, 2012 ROC approved, 10 Green card on its way.

kermit_the_frog1237963302.jpg

"Here's some simple advice: Always be yourself. Never take yourself too seriously.

And beware of advice from experts, pigs, and members of Parliament."

Kermit the Frog

Visit my News Feed Page -- Good Reads for Everyone!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

And... bump...

happy_fairy.jpg

Member...........NOA2......Case# @NVC.....Mailed I-864....Mailed DS-230....RFE....Done @NVC....Interview...DTI

ohmy...........11/07/08.....--/--/--........--/--/--........--/--/--........-.....02/20/09

pari_girl......02/19/09.....--/--/--........--/--/--........--/--/--........-.....04/29/09

thedawghouse...02/--/09.....05/--/09........--/--/--........--/--/--........-.....06/19/09

ZansGirl.......03/09/09.....03/19/09

Dalene.........03/05/09.....03/19/09........05/06/09........05/06/09........Y.....06/22/09

BradnKim.......04/01/09.....04/20/09........04/29/09........05/01/09........Y.....06/24/09

hisgirl........04/17/09.....--/--/--........--/--/--........--/--/--........-.....07/30/09

Avery..........05/05/09.....--/--/--........--/--/--........06/05/09

lgg............06/25/09.....07/08/09........07/21/09........07/29/09........N...08/12/09

Malrothien.....07/15/09.....07/23/09

La Souris......07/30/09.....08/14/09

Bern. ..... 07/14/09.....08/14/09

Member...........NOA2......Case# @NVC.....Mailed I-864....Mailed DS-230....RFE....Done @NVC....Interview...DTI

AnaGRicky.IR5..12/08/07.....--/--/--........06/20/08........--/--/--........N.....04/29/09.....08/11/09....104

to_hope........07/08/08.....--/--/--........--/--/--........--/--/--........-.....11/26/08.....03/15/09....109

thebradshaws...08/18/08.....08/22/08........09/08/08........09/26/08........-.....11/05/08.....01/13/09.... 72

Rexalite.......09/03/09.....--/--/--........--/--/--........--/--/--........-.....02/05/09.....05/07/09.... 91

Shiri..........09/12/08.....09/24/08........10/04/08........10/29/08........Y.....12/01/08.....03/24/09....113

sly_wolf.......09/17/08.....09/24/08........10/04/08........10/29/08........-.....10/30/08.....01/07/09.... 69

Shaesta........--/--/--.....--/--/--........--/--/--........--/--/--........-.....12/05/08.....03/26/09....111

Reeena..DCF....11/07/08.....--/--/--........--/--/--........01/04/09........N.....01/04/09.....04/24/09....110

Travis&Kim.....12/01/08.....12/04/08........12/27/08........12/27/08........Y.....01/14/09.....04/16/09.... 92

jonesg111......12/22/08.....--/--/--........--/--/--........--/--/--........-.....03/24/09.....06/17/09.... 85

carslo.........01/06/09.....01/12/09........03/21/09........03/21/09........N.....04/07/09.....06/22/09.... 76

Moosker........01/06/09.....01/13/09........01/28/09........02/12/09........Y.....02/25/09.....05/19/09.... 83

OBX............01/20/09.....01/26/09........02/07/09........02/07/09........N.....02/13/09.....05/12/09.... 88

A&M............01/21/09.....01/23/09........02/03/09........02/18/09........N.....02/26/09.....05/20/09.... 83

Argent.........02/03/09.....--/--/--........--/--/--........--/--/--........-.....03/13/09.....05/26/09.... 74

elsoar..DCF....02/03/09..<-date filed I-130.--/--/--........03/17/09........N.....03/17/09.....06/18/09.... 93

svirac.........02/23/09.....02/26/09........03/05/09........03/24/09........N.....04/15/09.....06/02/09.... 48

Serendipity....03/05/09.....03/10/09........03/23/09........04/01/09........N.....04/23/09.....08/13/09....112

Holliday.......03/19/09.....04/03/09........04/10/09........04/27/09........N.....05/07/09.....08/19/09....104

cmls...........03/20/09.....04/07/09........04/18/09........04/28/09........N.....05/08/09.....08/07/09.... 91

SomberCat......03/25/09.....04/10/09........04/17/09........04/21/09........Y.....05/20/09.....08/19/09.... 91

Brocku00.......03/--/09.....--/--/--........--/--/--........--/--/--........-.....04/24/09.....08/12/09....110

bradleyboy.....04/15/09.....--/--/--........--/--/--........--/--/--........-.....05/11/09.....08/12/09.... 93

Timeline page for 2007 and 2008 interviews Montreal: link

CR1/IR1 interview letter: link

DTI - Days between completion at NVC and interview

USCIS

NOA #2: Approval June 25th, 2009 - 92 days

NVC

July 8, 2009 to August 10, 2009 - 28 days

Interview Assigned - December 3, 2009 - FINALLY!!

Medical - December 14, 2009 - Passed

Embassy/Interview - January 26, 2010 Montreal, Quebec Canada - 167 days PASSED!!!

Port of Entry - February 26, 2010 Baltimore International, Maryland

USCIS -- ROC package sent off

November 26, 2011 to Vermont station November 30, 2011 received NOA1December 16, 2011 received biometrics appointment.

January 04, 2012 Biometrics

September 2, 2012, RFE Received.

September 22, 2012 RFE responded to

October 15, 2012 ROC approved, 10 Green card on its way.

kermit_the_frog1237963302.jpg

"Here's some simple advice: Always be yourself. Never take yourself too seriously.

And beware of advice from experts, pigs, and members of Parliament."

Kermit the Frog

Visit my News Feed Page -- Good Reads for Everyone!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

happy_fairy.jpg

Added Bern, welcome!

Member...........NOA2......Case# @NVC.....Mailed I-864....Mailed DS-230....RFE....Done @NVC....Interview...DTI

AnaGRicky.IR5..12/08/07.....--/--/--........06/20/08........--/--/--........N.....04/29/09.....08/11/09....104

to_hope........07/08/08.....--/--/--........--/--/--........--/--/--........-.....11/26/08.....03/15/09....109

thebradshaws...08/18/08.....08/22/08........09/08/08........09/26/08........-.....11/05/08.....01/13/09.... 72

Rexalite.......09/03/09.....--/--/--........--/--/--........--/--/--........-.....02/05/09.....05/07/09.... 91

Shiri..........09/12/08.....09/24/08........10/04/08........10/29/08........Y.....12/01/08.....03/24/09....113

sly_wolf.......09/17/08.....09/24/08........10/04/08........10/29/08........-.....10/30/08.....01/07/09.... 69

Shaesta........--/--/--.....--/--/--........--/--/--........--/--/--........-.....12/05/08.....03/26/09....111

ohmy...........11/07/08.....--/--/--........--/--/--........--/--/--........-.....02/20/09

Reeena..DCF....11/07/08.....--/--/--........--/--/--........01/04/09........N.....01/04/09.....04/24/09....110

Travis&Kim.....12/01/08.....12/04/08........12/27/08........12/27/08........Y.....01/14/09.....04/16/09.... 92

jonesg111......12/22/08.....--/--/--........--/--/--........--/--/--........-.....03/24/09.....06/17/09.... 85

carslo.........01/06/09.....01/12/09........03/21/09........03/21/09........N.....04/07/09.....06/22/09.... 76

Moosker........01/06/09.....01/13/09........01/28/09........02/12/09........Y.....02/25/09.....05/19/09.... 83

OBX............01/20/09.....01/26/09........02/07/09........02/07/09........N.....02/13/09.....05/12/09.... 88

A&M............01/21/09.....01/23/09........02/03/09........02/18/09........N.....02/26/09.....05/20/09.... 83

thedawghouse...02/--/09.....05/--/09........--/--/--........--/--/--........-.....06/19/09

Argent.........02/03/09.....--/--/--........--/--/--........--/--/--........-.....03/13/09.....05/26/09.... 74

elsoar..DCF....02/03/09..<-date filed I-130.--/--/--........03/17/09........N.....03/17/09.....06/18/09.... 93

pari_girl......02/19/09.....--/--/--........--/--/--........--/--/--........-.....04/29/09

svirac.........02/23/09.....02/26/09........03/05/09........03/24/09........N.....04/15/09.....06/02/09.... 48

Serendipity....03/05/09.....03/10/09........03/23/09........04/01/09........N.....04/23/09.....08/13/09....112

Holliday.......03/19/09.....04/03/09........04/10/09........04/27/09........N.....05/07/09.....08/19/09....104

ZansGirl.......03/09/09.....03/19/09

cmls...........03/20/09.....04/07/09........04/18/09........04/28/09........N.....05/08/09.....08/07/09.... 91

SomberCat......03/25/09.....04/10/09........04/17/09........04/21/09........Y.....05/20/09.....08/19/09.... 91

Dalene.........03/05/09.....03/19/09........05/06/09........05/06/09........Y.....06/22/09

Brocku00.......03/--/09.....--/--/--........--/--/--........--/--/--........-.....04/24/09.....08/12/09....110

BradnKim.......04/01/09.....04/20/09........04/29/09........05/01/09........Y.....06/24/09

bradleyboy.....04/15/09.....--/--/--........--/--/--........--/--/--........-.....05/11/09.....08/12/09.... 93

hisgirl........04/17/09.....--/--/--........--/--/--........--/--/--........-.....07/30/09

Avery..........05/05/09.....--/--/--........--/--/--........06/05/09

lgg............06/25/09.....07/08/09........--/--/--........--/--/--........-.....08/12/09

Bern...........07/14/09.....08/11/09

Malrothien.....07/15/09.....07/23/09

La Souris......07/30/09.....08/14/09

Timeline page for 2007 and 2008 interviews Montreal: link

CR1/IR1 interview letter: link

DTI - Days between completion at NVC and interview

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...