Member.........NOA2.....Case# @NVC..3032/AOS.....I-864......IV Bill......DS230......Done @NVC...Interview...DTI

inkypinky....06/17/08...06/25/08....06/30/08....07/11/08....07/25/08....08/06/08....09/11/08....11/06/08.... 56

to_hope......07/08/2008....--..........--..........--..........--..........--.......11/26/08

adibiase.....07/10/08...07/15/08....07/30/08....09/08/08....07/30/08....09/17/08....10/07/08....12/11/08.... 65

wowswift.....07/14/08...07/18/08....07/23/08....08/13/08....08/05/08....08/29/08....09/09/08....11/26/08.... 78

ruriburi.....07/17/08...07/24/08....07/28/08....09/23/08....08/13/08....08/18/08....10/03/08....12/09/08.... 67

jedinite.....08/11/08...08/14/08....08/15/08....09/18/08....09/10/08....09/18/08....09/29/08....12/03/08.... 65

CHD..........08/12/08...08/18/08....08/29/08....08/29/08....08/29/08....08/30/08....09/30/08....12/04/08.... 65

thebradshaws.08/18/08...08/22/08....09/02/08....09/08/08....09/12/08....09/26/08....11/05/08....01/13/09.... 72

MsZ..........08/25/08...09/03/08....09/15/08....09/19/08....09/18/08....09/11/08....10/08/08....12/18/08.... 71

Rachel Marie.09/03/08

FrazellThomas09/18/08......--..........--..........--..........--..........--.......10/30/08....12/18/08.... 52

Shiri........09/12/08...09/24/08....09/24/08....10/04/08....10/08/08....10/29/08....12/01/08

sly_wolf.....09/17/08......--..........--..........--..........--..........--.......10/30/08....01/07/09.... 69

Interviews to September 2008

Member.........NOA2.....Case# @NVC..3032/AOS.....I-864......IV Bill......DS230......Done @NVC...Interview...DTI

thermophile..03/01/05...06/05/05....06/05/05....11/28/06....08/15/06....11/15/06....04/03/07....08/09/07....128

samaci.......03/13/06......--..........--..........--..........--..........--.......03/30/07....10/05/07...*132

neiks........05/02/06...05/30/06....06/06/06....07/03/06....07/03/06....08/10/06....09/20/06....06/28/07....93R

djc..........09/09/06......--..........--..........--..........--.......03/26/07....04/16/07....11/30/07....228

kaftar.......09/21/06...10/04/06....10/24/06....11/01/06....11/04/06....11/20/06....04/26/07....11/16/07....204

pororoca.....10/31/06...11/27/06....11/27/06....12/17/06....12/26/06....01/16/07....04/27/07....11/16/07....203

midalake.....12/19/06...01/02/07....01/08/07....01/28/07.......--..........--.......05/15/07....11/23/07....192

Glady........01/28/07...03/11/07....03/14/07....04/23/07.......--.......04/23/07....05/29/07....11/27/07....182

C&C.............--.........--..........--.......05/01/07.......--.......05/01/07....06/08/07....11/30/07....175

Misty1979....03/06/07...03/26/07....04/02/07....04/23/07....04/23/07....06/06/07....06/18/07....12/06/07....171

Karina.......03/13/07...03/26/07....04/23/07....05/14/07....05/07/07....05/21/07....06/01/07....08/30/07.... 90

comelly......04/19/07...05/01/07....05/29/07....06/26/07....06/14/07....07/15/07....07/30/07....12/06/07....129

prg321.......04/27/07...05/15/07....06/19/07....06/25/07....07/21/07....--/--/--....12/17/07....03/28/08....102

kcmetzy......05/03/07...05/18/07....06/12/07....06/25/07....07/06/07....07/23/07....01/29/08....04/22/08.... 84

Knowledge....05/09/07...--/--/--....06/12/07....07/19/07....07/19/07....08/22/07....10/05/07....01/16/08....103

trailmix.....06/05/07...06/19/07....07/02/07....07/02/07....08/09/07....08/17/07....11/30/07....02/19/08.... 81

Schmelle.....06/06/07......--.......07/25/07....08/17/07....08/18/07.......--.......11/28/07....02/22/08.... 86

S & J........06/19/07...07/10/07....07/23/07....09/03/07....08/17/07....09/03/07....10/26/07....04/22/08.... 84

LadyJane.....07/02/07...07/20/07....08/06/07....09/05/07....09/06/07....09/24/07....11/08/07....01/18/08.... 71

lebtro.........--..........--..........--.........--...........--..........--.......11/15/07....02/22/08.... 99

bearmirus....07/13/07......--..........--.........--...........--.......11/29/07....12/14/07....03/17/08.... 94

maja.........07/19/07......--.......09/03/07....09/03/07....09/22/07....09/22/07....11/24/07....02/15/08.... 83

whitesnail...08/21/07...08/27/07....09/11/07....10/08/07....10/15/07....11/12/07....12/14/07....03/20/08.... 97

parinita.....08/22/07......--.......09/24/07....10/12/07....10/12/07....11/19/07....02/16/08....04/24/08.... 68

Buffalobound.09/29/07...10/15/07....10/22/07....10/30/07....11/17/07....12/01/07....12/14/07....03/25/08....102

Davin&Rachel....--.........--..........--.........--...........--..........--.......12/14/07....03/25/08...*102

Moos.........10/03/07...10/05/07....10/15/07....11/12/07....--/--/--....--/--/--....06/24/08....08/22/08.... 59

amberlynn....10/15/07...10/--/07....10/29/07....11/13/07....11/24/07....01/04/08....02/19/08....04/24/08.... 65

Toastburglar.10/17/07...11/05/07....11/07/07....12/09/07....12/09/07....02/25/08....03/26/08....06/13/08.... 79

SarahLiz.....12/14/07...01/02/08....01/28/08....02/16/08....02/27/08....04/24/08....06/04/08....08/20/08.... 77

LindaB.......12/19/07...01/04/08....01/23/08....01/25/08....02/12/08....02/27/08....04/23/08....07/21/08.... 89

jynxdragnfly.01/02/08...01/15/07....02/04/08....02/12/08....02/29/08....03/26/08....04/30/08....08/04/08.... 96

cattattude...02/15/08...02/18/08....03/10/08....04/30/08....04/29/08....05/30/08....06/18/08....08/28/08.... 71

badspellor...03/07/08...03/18/08....04/11/08....04/23/08....04/17/08....06/24/08....06/25/08....09/09/08.... 76

Molson.......03/13/08...04/07/08....05/21/08....06/12/08....06/

zachsmile2ym1.jpg

Married 3/15/07

USCIS:

NOA1: 5/23/2008

NOA2: 9/12/2008

NVC:

They received: 9/24/2008

Case Complete: 12/1/2008

Interview: 03/24/2009

Received approved visa (after RFE in interview): 04/21/2009

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
happy_fairy.jpg

Updated Shiri's completion at NVC date :)

Thank you! :)

Edited by shiri

zachsmile2ym1.jpg

Married 3/15/07

USCIS:

NOA1: 5/23/2008

NOA2: 9/12/2008

NVC:

They received: 9/24/2008

Case Complete: 12/1/2008

Interview: 03/24/2009

Received approved visa (after RFE in interview): 04/21/2009

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Good luck MsZ and FrazellThomas on your interviews this week. Safe travels to Montreal.

Kerri - any news on the medical yet? Good luck.

Thanks much. My husband is going tomorrow night for a bright and early start. We're both hoping he doesn't have to return in the afternoon to p/u his visa since he's planning on coming down to NY right after.

Part of this is almost unbelievable. Can the interview really be Thursday??!!! Wow!

Good luck, Kerri! You and my husband will be there about the same time.

I have noticed some filers report picking up their visa later the same day and others having it sent through Canada Post (expresspost). Anyone know what determines which way they do it?

Not at Montreal really. I haven't heard of one person in recent history where they have offered to let the person pick the visa up on the same day. Maybe you saw this in relation to Vancouver interviews?

What determines whether you can pick it up or not - well that is completely up to the CO doing the interview. When my Husband had his interview, the CO said that if he was still going to be in Montreal the next day, he could come by and pick it up (he wasn't going to be).

So, no way to tell - if you would like to pick it up it doesn't hurt to ask the CO at the interview.

Oops, I looked back and I was thinking of adibiase - they picked up the following day. By the time I get to Montreal I will be more than happy to wait for my Expresspost delivery!! Fingers crossed that I can get posted on your timeline by March. Thanks for all the work you do to keep us all updated (F)

I requested to pick it up on Friday, as I wanted to drive back to Michigan with my wife on Sunday. I did not want her to take Monday off just to wait for the VISA in the mail.

The interviewer was a very nice man, and had no issue with that. I think if you ask to pick it up the following day, you really should not have an issue.

Hope this helps!

Anthony

NVC Member Status for CR-1

CR-1 / IR-1 - Immigrant VISA

Service Center : California Service Center

Consulate : Montreal, Canada

Marriage : 2007-09-21

I-130 Sent : 2007-12-13

I-130 NOA1 : 2008-01-30

I-130 Approved : 2008-07-10

NVC Received : 2008-07-15

Received DS-3032 / I-864 Bill : Did not receive DS-3032 / Received Invoice # via phone call to NVC

Pay I-864 Bill: 2008-07-30

Receive I-864 Package : 2008-09-08

Return Completed I-864 / DS-230 : 2008-09-17

Receive IV Bill : 2008-07-30

Pay IV Bill : 2008-07-30

Case Completed at NVC : 2008-10-07

NVC Left : 2008-10-20

Consulate Received : 2008-10-21

Interview Date : 2008-12-11

Visa Received : 2008-12-12 - pick-up from conulate at 3:00pm

US Entry : 2008-12-14 via Sarnia-Bluewater Bridge

Green Card Received in Mail : 2009-01-02

Receive SSN Card in Mail: 2009-01-??

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

It looks like our interview will probably be in February, so I am hoping it is in the first week or the third or fourth week. My sister is getting married on Valentines and I am hoping my hubby and I can attend. I talked to him tonight and if everything goes smoothly, he will be driving out to visit us for Christmas. We live 2000 miles away, so if he leaves on Saturday then we should see him Monday or Tuesday. I was getting really bummed cuz I didn't know if it was going to work out and with the interview not being scheduled for January... let's just say this piece of news from him about visiting was absolutely wonderful and timely! What are you doing for Christmas? Will you be spending it together or apart?

zachsmile2ym1.jpg

Married 3/15/07

USCIS:

NOA1: 5/23/2008

NOA2: 9/12/2008

NVC:

They received: 9/24/2008

Case Complete: 12/1/2008

Interview: 03/24/2009

Received approved visa (after RFE in interview): 04/21/2009

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Good luck MsZ and FrazellThomas on your interviews this week. Safe travels to Montreal.

Kerri - any news on the medical yet? Good luck.

Thanks much. My husband is going tomorrow night for a bright and early start. We're both hoping he doesn't have to return in the afternoon to p/u his visa since he's planning on coming down to NY right after.

Part of this is almost unbelievable. Can the interview really be Thursday??!!! Wow!

Good luck, Kerri! You and my husband will be there about the same time.

I have noticed some filers report picking up their visa later the same day and others having it sent through Canada Post (expresspost). Anyone know what determines which way they do it?

Not at Montreal really. I haven't heard of one person in recent history where they have offered to let the person pick the visa up on the same day. Maybe you saw this in relation to Vancouver interviews?

What determines whether you can pick it up or not - well that is completely up to the CO doing the interview. When my Husband had his interview, the CO said that if he was still going to be in Montreal the next day, he could come by and pick it up (he wasn't going to be).

So, no way to tell - if you would like to pick it up it doesn't hurt to ask the CO at the interview.

Oops, I looked back and I was thinking of adibiase - they picked up the following day. By the time I get to Montreal I will be more than happy to wait for my Expresspost delivery!! Fingers crossed that I can get posted on your timeline by March. Thanks for all the work you do to keep us all updated (F)

I requested to pick it up on Friday, as I wanted to drive back to Michigan with my wife on Sunday. I did not want her to take Monday off just to wait for the VISA in the mail.

The interviewer was a very nice man, and had no issue with that. I think if you ask to pick it up the following day, you really should not have an issue.

Hope this helps!

Anthony

Yes, they requested and they had a friendly CO (or one that wasn't busy :lol: )

Regardless, if you get a really nice interviewer, they might do it anyway.

Edited by trailmix
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
It looks like our interview will probably be in February, so I am hoping it is in the first week or the third or fourth week. My sister is getting married on Valentines and I am hoping my hubby and I can attend. I talked to him tonight and if everything goes smoothly, he will be driving out to visit us for Christmas. We live 2000 miles away, so if he leaves on Saturday then we should see him Monday or Tuesday. I was getting really bummed cuz I didn't know if it was going to work out and with the interview not being scheduled for January... let's just say this piece of news from him about visiting was absolutely wonderful and timely! What are you doing for Christmas? Will you be spending it together or apart?

I'm so glad to hear that you will spend time with your husband for Christmas! My husband only live about 6-hours-driving-distance from where I am, so we see each other almost every-other weekend (fri-sun). I can't imagine being so far apart! You are so strong.

2004-09-03 : Met at college in USA and went on first date!

2008-01-02 : Married in Canada.

2008-01-07 : DH returns to USA.

2008-04-20 : Finally received marriage certificate from the province and filed 1-130 Petition.

2008-07-08 : I-130 Approved!

2008-09-15 : Received DS-230 and I-864.

2008-10-14: Mailed DS-230 and I-864

2008-10-30: DS-230 and I-864 received by NVC

2008-11-04: RFE

2008-11-18: Overnighted missing documents to NVC

2008-11-26: Case Complete at NVC!!

2008-03-02: Medical in Toronto

2009-03-23: Interview! Approved!

2009-04-04: The big move. POE: Blue Water Bridge. All went well.

2009-04-16: SSN arrives in the mail.

2009-04-24: PR card arrives in the mail.

Link to comment
Share on other sites

See http://www.visajourney.com/forums/index.php?showtopic=167660 to see where the person picked up their visa the same day in Montreal.

Well, my husband hasn't called yet but he's probably somewhere in the interview process. Talked to him this morning and he was only a little nervous. He had forgotten to buy the envelope so he neede to get his medical results from the doc and then get an envelope. Luckily everything is nearby.

I'm panicking because we may run into tax issues if his house doesn't sell before he activates the visa. I hope nobody forces him to activate it before he's ready. He has 6 months to activate, right?

Sent I-130 to VT 25-Oct-2007

I-130 Moved to California 6-August-2008

My petition has been in 3 states (1, twice) in 9 months!

Rec'd by CSC 8/9, touched 8/11, 8/12, 8/15, 8/20, 8/25

Approved Tuesday, 25-August-2008

10 months since we mailed the petition

Rec'd NVC 9/3, Invoice Generated 9/10, DS-3032 emailed 9/11.

Rec'd AOS invoice 9/15, paid online 9/15, Accepted as Paid 9/18, mailed I-864EZ 9/19

IV Invoiced 9/18, paid online 9/19, Accepted as paid 9/22

DS-230 sent 10/2

Case complete @NVC 10/8 - 11 months, 1 week and 6 days

Interview in Montreal December 18, 2008 - scheduled 1 year, 1 week and 3 days after the start of our journey. Takes place 1 year, 1 month, 3 weeks and 2 days after the start...

[X] Passed [ ] Failed Interview

Thursday, April 2, 2009 Activated Visa - 1 year, 5 months, 1 week and 1 day

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
See http://www.visajourney.com/forums/index.php?showtopic=167660 to see where the person picked up their visa the same day in Montreal.

Well, my husband hasn't called yet but he's probably somewhere in the interview process. Talked to him this morning and he was only a little nervous. He had forgotten to buy the envelope so he neede to get his medical results from the doc and then get an envelope. Luckily everything is nearby.

I'm panicking because we may run into tax issues if his house doesn't sell before he activates the visa. I hope nobody forces him to activate it before he's ready. He has 6 months to activate, right?

See http://www.visajourney.com/forums/index.php?showtopic=167660 to see where flames mentioned that the OP lives in the U.S. - different scenario.

Link to comment
Share on other sites

He answered that he lives in Canada, not the US in that thread.

" am reside in Canada not US, but i am also surprised when they offer me same day visa "

Edited by MsZ

Sent I-130 to VT 25-Oct-2007

I-130 Moved to California 6-August-2008

My petition has been in 3 states (1, twice) in 9 months!

Rec'd by CSC 8/9, touched 8/11, 8/12, 8/15, 8/20, 8/25

Approved Tuesday, 25-August-2008

10 months since we mailed the petition

Rec'd NVC 9/3, Invoice Generated 9/10, DS-3032 emailed 9/11.

Rec'd AOS invoice 9/15, paid online 9/15, Accepted as Paid 9/18, mailed I-864EZ 9/19

IV Invoiced 9/18, paid online 9/19, Accepted as paid 9/22

DS-230 sent 10/2

Case complete @NVC 10/8 - 11 months, 1 week and 6 days

Interview in Montreal December 18, 2008 - scheduled 1 year, 1 week and 3 days after the start of our journey. Takes place 1 year, 1 month, 3 weeks and 2 days after the start...

[X] Passed [ ] Failed Interview

Thursday, April 2, 2009 Activated Visa - 1 year, 5 months, 1 week and 1 day

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
He answered that he lives in Canada, not the US in that thread.

" am reside in Canada not US, but i am also surprised when they offer me same day visa "

Ah, didn't see that, good for him!

Link to comment
Share on other sites

Turns out, they're giving my husband his Visa after 3 PM today, too! He passed!

I like this "same day Visa service" Montreal's got going.

Sent I-130 to VT 25-Oct-2007

I-130 Moved to California 6-August-2008

My petition has been in 3 states (1, twice) in 9 months!

Rec'd by CSC 8/9, touched 8/11, 8/12, 8/15, 8/20, 8/25

Approved Tuesday, 25-August-2008

10 months since we mailed the petition

Rec'd NVC 9/3, Invoice Generated 9/10, DS-3032 emailed 9/11.

Rec'd AOS invoice 9/15, paid online 9/15, Accepted as Paid 9/18, mailed I-864EZ 9/19

IV Invoiced 9/18, paid online 9/19, Accepted as paid 9/22

DS-230 sent 10/2

Case complete @NVC 10/8 - 11 months, 1 week and 6 days

Interview in Montreal December 18, 2008 - scheduled 1 year, 1 week and 3 days after the start of our journey. Takes place 1 year, 1 month, 3 weeks and 2 days after the start...

[X] Passed [ ] Failed Interview

Thursday, April 2, 2009 Activated Visa - 1 year, 5 months, 1 week and 1 day

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

happy_fairy.jpg

Added Travis&Kim :) I'm just thinking, for the new year this table needs to be revamped, some of the information isn't really all that helpful and with online payments now accepted it changes the process a bit. Any suggestions as to what new information might be helpful to track?

Member.........NOA2.....Case# @NVC..3032/AOS.....I-864......IV Bill......DS230......Done @NVC...Interview...DTI

inkypinky....06/17/08...06/25/08....06/30/08....07/11/08....07/25/08....08/06/08....09/11/08....11/06/08.... 56

to_hope......07/08/2008....--..........--..........--..........--..........--.......11/26/08

adibiase.....07/10/08...07/15/08....07/30/08....09/08/08....07/30/08....09/17/08....10/07/08....12/11/08.... 65

wowswift.....07/14/08...07/18/08....07/23/08....08/13/08....08/05/08....08/29/08....09/09/08....11/26/08.... 78

ruriburi.....07/17/08...07/24/08....07/28/08....09/23/08....08/13/08....08/18/08....10/03/08....12/09/08.... 67

jedinite.....08/11/08...08/14/08....08/15/08....09/18/08....09/10/08....09/18/08....09/29/08....12/03/08.... 65

CHD..........08/12/08...08/18/08....08/29/08....08/29/08....08/29/08....08/30/08....09/30/08....12/04/08.... 65

thebradshaws.08/18/08...08/22/08....09/02/08....09/08/08....09/12/08....09/26/08....11/05/08....01/13/09.... 72

MsZ..........08/25/08...09/03/08....09/15/08....09/19/08....09/18/08....09/11/08....10/08/08....12/18/08.... 71

Rachel Marie.09/03/08

FrazellThomas09/18/08......--..........--..........--..........--..........--.......10/30/08....12/18/08.... 52

Shiri........09/12/08...09/24/08....09/24/08....10/04/08....10/08/08....10/29/08....12/01/08

sly_wolf.....09/17/08......--..........--..........--..........--..........--.......10/30/08....01/07/09.... 69

Travis&Kim...12/01/08...12/04/08....12/10/08....--/--/--....12/16/08

Interviews to September 2008

Member.........NOA2.....Case# @NVC..3032/AOS.....I-864......IV Bill......DS230......Done @NVC...Interview...DTI

thermophile..03/01/05...06/05/05....06/05/05....11/28/06....08/15/06....11/15/06....04/03/07....08/09/07....128

samaci.......03/13/06......--..........--..........--..........--..........--.......03/30/07....10/05/07...*132

neiks........05/02/06...05/30/06....06/06/06....07/03/06....07/03/06....08/10/06....09/20/06....06/28/07....93R

djc..........09/09/06......--..........--..........--..........--.......03/26/07....04/16/07....11/30/07....228

kaftar.......09/21/06...10/04/06....10/24/06....11/01/06....11/04/06....11/20/06....04/26/07....11/16/07....204

pororoca.....10/31/06...11/27/06....11/27/06....12/17/06....12/26/06....01/16/07....04/27/07....11/16/07....203

midalake.....12/19/06...01/02/07....01/08/07....01/28/07.......--..........--.......05/15/07....11/23/07....192

Glady........01/28/07...03/11/07....03/14/07....04/23/07.......--.......04/23/07....05/29/07....11/27/07....182

C&C.............--.........--..........--.......05/01/07.......--.......05/01/07....06/08/07....11/30/07....175

Misty1979....03/06/07...03/26/07....04/02/07....04/23/07....04/23/07....06/06/07....06/18/07....12/06/07....171

Karina.......03/13/07...03/26/07....04/23/07....05/14/07....05/07/07....05/21/07....06/01/07....08/30/07.... 90

comelly......04/19/07...05/01/07....05/29/07....06/26/07....06/14/07....07/15/07....07/30/07....12/06/07....129

prg321.......04/27/07...05/15/07....06/19/07....06/25/07....07/21/07....--/--/--....12/17/07....03/28/08....102

kcmetzy......05/03/07...05/18/07....06/12/07....06/25/07....07/06/07....07/23/07....01/29/08....04/22/08.... 84

Knowledge....05/09/07...--/--/--....06/12/07....07/19/07....07/19/07....08/22/07....10/05/07....01/16/08....103

trailmix.....06/05/07...06/19/07....07/02/07....07/02/07....08/09/07....08/17/07....11/30/07....02/19/08.... 81

Schmelle.....06/06/07......--.......07/25/07....08/17/07....08/18/07.......--.......11/28/07....02/22/08.... 86

S & J........06/19/07...07/10/07....07/23/07....09/03/07....08/17/07....09/03/07....10/26/07....04/22/08.... 84

LadyJane.....07/02/07...07/20/07....08/06/07....09/05/07....09/06/07....09/24/07....11/08/07....01/18/08.... 71

lebtro.........--..........--..........--.........--...........--..........--.......11/15/07....02/22/08.... 99

bearmirus....07/13/07......--..........--.........--...........--.......11/29/07....12/14/07....03/17/08.... 94

maja.........07/19/07......--.......09/03/07....09/03/07....09/22/07....09/22/07....11/24/07....02/15/08.... 83

whitesnail...08/21/07...08/27/07....09/11/07....10/08/07....10/15/07....11/12/07....12/14/07....03/20/08.... 97

parinita.....08/22/07......--.......09/24/07....10/12/07....10/12/07....11/19/07....02/16/08....04/24/08.... 68

Buffalobound.09/29/07...10/15/07....10/22/07....10/30/07....11/17/07....12/01/07....12/14/07....03/25/08....102

Davin&Rachel....--.........--..........--.........--...........--..........--.......12/14/07....03/25/08...*102

Moos.........10/03/07...10/05/07....10/15/07....11/12/07....--/--/--....--/--/--....06/24/08....08/22/08.... 59

amberlynn....10/15/07...10/--/07....10/29/07....11/13/07....11/24/07....01/04/08....02/19/08....04/24/08.... 65

Toastburglar.10/17/07...11/05/07....11/07/07....12/09/07....12/09/07....02/25/08....03/26/08....06/13/08.... 79

SarahLiz.....12/14/07...01/02/08....01/28/08....02/16/08....02/27/08....04/24/08....06/04/08....08/20/08.... 77

LindaB.......12/19/07...01/04/08....01/23/08....01/25/08....02/12/08....02/27/08....04/23/08....07/21/08.... 89

jynxdragnfly.01/02/08...01/15/07....02/04/08....02/12/08....02/29/08....03/26/08....04/30/08....08/04/08.... 96

cattattude...02/15/08...02/18/08....03/10/08....04/30/08....04/29/08....05/30/08....06/18/08....08/28/08.... 71

badspellor...03/07/08...03/18/08....04/11/08....04/23/08....04/17/08....06/24/08....06/25/08....09/09/08.... 76

Molson.......03/13/08...04/07/08....05/21/08....06/12/08....06/13/08....06/17/08....06/27/08....09/08/08.... 73

CR1/IR1 interview letter: link

R = neiks - days to interview calculated for original interview date Dec 22/06 (rescheduled for June 28/07)

* = samaci - days to interview calculated for original interview date Aug 9th (rescheduled for Oct. 5th)

* = Davin and Rachel - days to interview calculated for original interview date March 25th (rescheduled for May 7th)

DTI - Days between completion at NVC and interview

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Canada
Timeline
Turns out, they're giving my husband his Visa after 3 PM today, too! He passed!

I like this "same day Visa service" Montreal's got going.

Congratulations - great news! :dance::dance:

USCIS

NOA1 08/19/08

NOA2 01/20/09

NVC

Received 01/26/09

Completed 02/13/09 (19 Days)

Interview Assigned 03/27/09 (6 weeks after NVC completion)

Medical

04/14/09 (Toronto)

Interview

Montreal 05/12/09 (88 days after NVC completion) **APPROVED**

POE

06/16/09 Buffalo

07/02/09 Welcome Letter Received

07/07/09 Applied for SSN

07/10/09 "Card production ordered" email received

07/13/09 SSN received

07/14/09 "Approval notice sent" email received

07/17/09 GREEN CARD received

Removal of Conditions

03/21/11 I-751 mailed to VSC

03/23/11 I-751 received at VSC

03/29/11 Cheque Cashed

03/30/11 NOA1 received (3/24/11)

04/11/11 Biometrics appointment notice received

05/05/11 Biometric appointment

12/13/11 **Approval date** (5 days short of 9 months!)

12/19/11 Approval letter and green card received

Naturalization

05/16/2019 Filed online (estimated completion February 2020)

05/18/2019 Biometrics scheduled

05/21/2019 Receipt notice and biometrics notices posted to online account.05/23/2019 Hard copy of NOA1 received

05/24/2019 Hard copy of biometrics appointment received

06/07/2019 Biometrics appointment (estimated completion January 2020)

12/31/2019 Email received "Interview scheduled"

01/01/2020 Interview date notice posted to online account (02/19/2020)

01/05/2019 Hard copy of interview appointment received

02/19/2020 Interview (**Approved**) and same day Oath Ceremony. 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Turns out, they're giving my husband his Visa after 3 PM today, too! He passed!

I like this "same day Visa service" Montreal's got going.

Congratulations - great news! :dance::dance:

ohh! I hope they keep this up :)

I am almost done at the NVC - just waiting for my long form birthcertificate to send to my hubby

will be nice if i get my Visa same day as my interview :)

Date of I-751 = 03/05/2011

NOA Date = 3/08/2011

Biometrics = 04/11/2011

Approved = 09/08/2011

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...