Jump to content

15 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: China
Timeline
Posted

Hi Everyone,

Does it take 6 months to START PROCESSING the case or to give APPROVAL?? Either way, a few of us are over the 180 days by almost a month now.. :crying: :crying: sorry if I keep complaining everyday.. just a little unfair... March people can come already... congrats March people... I was hoping to at least get her here by Christmas.. that was already giving a month's extra time.. but like what pushbrk said to just hope for an April interview.. That is what I had planned originally.. At this rate, she won't even come by April of next year.. :crying: :crying: :crying:

I-130 STAGE 1 : 533 days - 1 year 6 months (4/16/2007 to 9/22/2008)

Priority Date I-130 : 4/16/2007 ( 533 days , APPROVED 9/22/2008)
Transferred to local office based on "security checks" : 11/27/2007
wrote hundreds of letters - received letter from FBI Records Management Chief stating no security checks
local office interview : 2/21/2008 - brought my parents too (result : you will get approval within 2-3 weeks)

5/2/2008 - (lawsuit) Writ of Mandamus - OFFICIAL DATE (7/29/2008)
9/22/2008 - CALL AND EMAIL COPY OF APPROVAL NOTICE FROM LAWYER

NVC STAGE 2 : 99 days - 3 months (9/30/2008 to 1/7/2009)

NVC Received : 9/30/2008
Received Packet 3 (I-864/DS-230) : 11/10/2008
NVC says "RFE sent out 12/9/08 for missing documents" : 12/10/2008
CASE COMPLETE - 1/7/2009

CONSULATE STAGE 3 : 96 days - 3 months (1/8/2009 to 4/14/2009)
CLEARED CUSTOMS - 3/10/2009
**APPOINTMENT DATE : 4/14/2009, 7:15AM**
** BLUE SLIP **

AP STAGE 4 : 97 days - 3 months (4/14/2009 to 7/20/2009)
DOS call to receive I-601 (Waiver of Grounds for Inadmissibility - basically denial) from Guangzhou : 6/24/2009

REMOVAL OF I-601 due to my letters to the USCIS Director, Michael Aytes: 6/29/2009
CALL-IN LETTER NOTIFIED : 7/8/2009
CALL-IN LETTER (APPROVAL)!! : 7/16/2009
ALL DONE!! (got both GREEN CARD & SSN CARD) : 10/1/2009

"http://www.visajourney.com/forums/topic/194075-feel-like-a-cr-1-csc-castaway/page-60" (pages 53-63) for more updates and letter I wrote to Director Michael Aytes and his replies and back and forth..

HER PARENTS - 10 months so far

I-130 Sent In : 1/7/2013

I-130 Approval : 3/28/2013

Transfer to NVC : 6/12/2013

Case Complete : 8/25/2013

"Ready for Interview" (Ready to wait for 1-3 Months, this is official NVC letter transfer date) : 9/9/2013

DHL Tracking : arrived 9/24/2013

P4 Letter : 11/21/2013

Interview Date : 12/9/2013, originally 12/3, stupid lawyer filled out her dad's passport number wrong..

Interview Passed : 12/9/2013

Visa "Issued" on CEAC : 12/10/2013

Filed: Other Country: China
Timeline
Posted
Hi Everyone,

Does it take 6 months to START PROCESSING the case or to give APPROVAL?? Either way, a few of us are over the 180 days by almost a month now.. :crying: :crying: sorry if I keep complaining everyday.. just a little unfair... March people can come already... congrats March people... I was hoping to at least get her here by Christmas.. that was already giving a month's extra time.. but like what pushbrk said to just hope for an April interview.. That is what I had planned originally.. At this rate, she won't even come by April of next year.. :crying: :crying: :crying:

Their target is to complete the petition adjudication process within six months. There is not target for starting.

Facts are cheap...knowing how to use them is precious...
Understanding the big picture is priceless. Anonymous

Google Who is Pushbrk?

A Warning to Green Card Holders About Voting

http://www.visajourney.com/forums/topic/606646-a-warning-to-green-card-holders-about-voting/

Filed: IR-1/CR-1 Visa Country: China
Timeline
Posted (edited)

thanks pushbrk.. so what you are saying is that they should have approved (or denied) my application already? :whistle: so I should have the right to start complaining now to them (not that it will make any difference though)... but at least for them to continue looking at my case... last touched was 10/25/2007.. :huh: still is this morning as of 10/30..

Edited by gogo

I-130 STAGE 1 : 533 days - 1 year 6 months (4/16/2007 to 9/22/2008)

Priority Date I-130 : 4/16/2007 ( 533 days , APPROVED 9/22/2008)
Transferred to local office based on "security checks" : 11/27/2007
wrote hundreds of letters - received letter from FBI Records Management Chief stating no security checks
local office interview : 2/21/2008 - brought my parents too (result : you will get approval within 2-3 weeks)

5/2/2008 - (lawsuit) Writ of Mandamus - OFFICIAL DATE (7/29/2008)
9/22/2008 - CALL AND EMAIL COPY OF APPROVAL NOTICE FROM LAWYER

NVC STAGE 2 : 99 days - 3 months (9/30/2008 to 1/7/2009)

NVC Received : 9/30/2008
Received Packet 3 (I-864/DS-230) : 11/10/2008
NVC says "RFE sent out 12/9/08 for missing documents" : 12/10/2008
CASE COMPLETE - 1/7/2009

CONSULATE STAGE 3 : 96 days - 3 months (1/8/2009 to 4/14/2009)
CLEARED CUSTOMS - 3/10/2009
**APPOINTMENT DATE : 4/14/2009, 7:15AM**
** BLUE SLIP **

AP STAGE 4 : 97 days - 3 months (4/14/2009 to 7/20/2009)
DOS call to receive I-601 (Waiver of Grounds for Inadmissibility - basically denial) from Guangzhou : 6/24/2009

REMOVAL OF I-601 due to my letters to the USCIS Director, Michael Aytes: 6/29/2009
CALL-IN LETTER NOTIFIED : 7/8/2009
CALL-IN LETTER (APPROVAL)!! : 7/16/2009
ALL DONE!! (got both GREEN CARD & SSN CARD) : 10/1/2009

"http://www.visajourney.com/forums/topic/194075-feel-like-a-cr-1-csc-castaway/page-60" (pages 53-63) for more updates and letter I wrote to Director Michael Aytes and his replies and back and forth..

HER PARENTS - 10 months so far

I-130 Sent In : 1/7/2013

I-130 Approval : 3/28/2013

Transfer to NVC : 6/12/2013

Case Complete : 8/25/2013

"Ready for Interview" (Ready to wait for 1-3 Months, this is official NVC letter transfer date) : 9/9/2013

DHL Tracking : arrived 9/24/2013

P4 Letter : 11/21/2013

Interview Date : 12/9/2013, originally 12/3, stupid lawyer filled out her dad's passport number wrong..

Interview Passed : 12/9/2013

Visa "Issued" on CEAC : 12/10/2013

Posted

Gogo,

I don't want to be the possible bearer of bad news but you should be aware that the 6 months starts from the notice date on the NOA1.

The official wording on the NOA1 is "it usually takes 60-180 days from the date of this receipt to process this type of case". And, according to your signature that date is the 21st May. That means you are still a few weeks short of the six month processing time :(

My I130 NOA1 date was 25th April and the NOA2 date was 25th October (dead on the 6 months). So we know they are processing end of April/beginning of May cases. I sincerely hope you will have an approval sooner, but you should prepare yourself in case it is 3 more weeks until you receive it.

Cheryl

06/2005 Met Josh online ~ 02/2006 My 1st visit to the US ~ 09/2006 2nd US visit (Josh proposed) ~ 02/2007 3rd US visit (married)

04/2007 K3 visa applied ~ 05/2007 Josh's 1st UK visit ~ 09/2007 4th US visit ~ 02/2008 K3 visa completed ~ 02/2008 US entry

~*~*~*~*~*~*~*~*~*~*~*~

04/2008 AOS/EAD filed ~ 05/2008 Biometrics ~ 06/2008 EAD recv'd ~ 08/2008 Conditional greencard

~*~*~*~*~*~*~*~*~*~*~*~

02/2010 3rd wedding anniversary ~ 06/04/2010 Apply for lifting conditions ~ 06/14 package delivered ~ 07/23 Biometrics

Filed: IR-1/CR-1 Visa Country: China
Timeline
Posted (edited)

ok, thanks C and J... I called in and they told me they are basing it on the "official received" date, when they first received your I-130... that is so messed up.. I sent it in on 4/13, and they received it on 4/16... it's not my fault that it got entered on 4/27... then I got my NOA1 on 5/29... and that's why I sent the I-129F so late.. sent it in 6/4... got a 6/11 NOA1 date for that..

5/29 + 6 months ==> 11/29... wow :crying: :crying:

Edited by gogo

I-130 STAGE 1 : 533 days - 1 year 6 months (4/16/2007 to 9/22/2008)

Priority Date I-130 : 4/16/2007 ( 533 days , APPROVED 9/22/2008)
Transferred to local office based on "security checks" : 11/27/2007
wrote hundreds of letters - received letter from FBI Records Management Chief stating no security checks
local office interview : 2/21/2008 - brought my parents too (result : you will get approval within 2-3 weeks)

5/2/2008 - (lawsuit) Writ of Mandamus - OFFICIAL DATE (7/29/2008)
9/22/2008 - CALL AND EMAIL COPY OF APPROVAL NOTICE FROM LAWYER

NVC STAGE 2 : 99 days - 3 months (9/30/2008 to 1/7/2009)

NVC Received : 9/30/2008
Received Packet 3 (I-864/DS-230) : 11/10/2008
NVC says "RFE sent out 12/9/08 for missing documents" : 12/10/2008
CASE COMPLETE - 1/7/2009

CONSULATE STAGE 3 : 96 days - 3 months (1/8/2009 to 4/14/2009)
CLEARED CUSTOMS - 3/10/2009
**APPOINTMENT DATE : 4/14/2009, 7:15AM**
** BLUE SLIP **

AP STAGE 4 : 97 days - 3 months (4/14/2009 to 7/20/2009)
DOS call to receive I-601 (Waiver of Grounds for Inadmissibility - basically denial) from Guangzhou : 6/24/2009

REMOVAL OF I-601 due to my letters to the USCIS Director, Michael Aytes: 6/29/2009
CALL-IN LETTER NOTIFIED : 7/8/2009
CALL-IN LETTER (APPROVAL)!! : 7/16/2009
ALL DONE!! (got both GREEN CARD & SSN CARD) : 10/1/2009

"http://www.visajourney.com/forums/topic/194075-feel-like-a-cr-1-csc-castaway/page-60" (pages 53-63) for more updates and letter I wrote to Director Michael Aytes and his replies and back and forth..

HER PARENTS - 10 months so far

I-130 Sent In : 1/7/2013

I-130 Approval : 3/28/2013

Transfer to NVC : 6/12/2013

Case Complete : 8/25/2013

"Ready for Interview" (Ready to wait for 1-3 Months, this is official NVC letter transfer date) : 9/9/2013

DHL Tracking : arrived 9/24/2013

P4 Letter : 11/21/2013

Interview Date : 12/9/2013, originally 12/3, stupid lawyer filled out her dad's passport number wrong..

Interview Passed : 12/9/2013

Visa "Issued" on CEAC : 12/10/2013

Posted
ok, thanks C and J... I called in and they told me they are basing it on the "official received" date, when they first received your I-130... that is so messed up.. I sent it in on 4/13, and they received it on 4/16... it's not my fault that it got entered on 4/27... then I got my NOA1 on 5/29... and that's why I sent the I-129F so late.. sent it in 6/4... got a 6/11 NOA1 date for that..

5/29 + 6 months ==> 11/29... wow :crying: :crying:

When Josh phoned the mis-information line after we "thought" our petition was over 6 months, we were told that it was still within normal processing times because our NOA1 date was April 25th (our received/priority date was 11th April, btw) . I'm sure the answer just varies depending on who you talk to at USCIS :wacko:

Don't get disheartened it may not be that long for you, I just mentioned it so that you can be prepared should it take a few more weeks. I don't want to see you becoming more distressed :( Just keep that end of November date in your mind and an earlier approval will seem like a bonus.

I know if it was me I would prefer to hope for an estimate in 3 weeks with a good possibility of it happening, than keep hoping each day that an approval will appear and getting let down each day :(

Cheryl

06/2005 Met Josh online ~ 02/2006 My 1st visit to the US ~ 09/2006 2nd US visit (Josh proposed) ~ 02/2007 3rd US visit (married)

04/2007 K3 visa applied ~ 05/2007 Josh's 1st UK visit ~ 09/2007 4th US visit ~ 02/2008 K3 visa completed ~ 02/2008 US entry

~*~*~*~*~*~*~*~*~*~*~*~

04/2008 AOS/EAD filed ~ 05/2008 Biometrics ~ 06/2008 EAD recv'd ~ 08/2008 Conditional greencard

~*~*~*~*~*~*~*~*~*~*~*~

02/2010 3rd wedding anniversary ~ 06/04/2010 Apply for lifting conditions ~ 06/14 package delivered ~ 07/23 Biometrics

Filed: Other Country: India
Timeline
Posted
I'm with you Gogo, this process is ridiculous and frustrating. :angry:

So am I. This process is really, really frustrating. Gogo, you're past your 180-day mark, and I am sure you'll have your approvals soon! good luck to you. I am in the same boat, check my timeline. I've applied a lot l8r.

Posted

gogo, I wouldn't worry too much about the date that they are counting the six months from. You got a bunch of touches in the last few days (not all from RFE trick calls I take it). It means that they are doing some work on your file. Didn't you post somewhere else that they said you had to wait another 30 days? I got the same thing. I called just as we hit 6 months for the received date (not the notice date) on the NOA1, a very nice gentlemen told me that my case was assigned to an adjudicator, but I had to wait 30 days to hear something (I asked if it could be sooner, but he said I had to wait 30 days). It took less than a week after that to get both approvals.

I was told too that I was within the normal processing times because they were using the notice date which was 3 weeks later and not the receipt date despite the USCIS website pronouncements otherwise. Good luck :thumbs:

ok, thanks C and J... I called in and they told me they are basing it on the "official received" date, when they first received your I-130... that is so messed up.. I sent it in on 4/13, and they received it on 4/16... it's not my fault that it got entered on 4/27... then I got my NOA1 on 5/29... and that's why I sent the I-129F so late.. sent it in 6/4... got a 6/11 NOA1 date for that..

5/29 + 6 months ==> 11/29... wow :crying: :crying:

03/12/2007 - Married to my beautiful wife

04/16/2007 - Sent I-130 to VSC via USPS Express Mail

05/12/2007 - NOA1 received by snail mail after a loooong wait

05/14/2007 - Sent I-129F for K3 to Chicago Lockbox via USPS Express Mail

10/22/2007 - I129F APPROVED (161 days), I130 APPROVED (188 days)

11/08/2007 - I129F received at NVC, embassy case number generated.

11/13/2007 - I129F forwarded to embassy.

11/18/2007 - 129F petition received at embassy

01/09/2008 - finally, DOS gives me the interview date, April 16, 2007 (ouch)

01/23/2008 - never got packet 4, emailed embassy

04/11/2008 - picked up packet 4, did medical

04/14/2008 - medical report pickup, no problems

04/16/2008 - interview date- APPROVED!!!!!

04/18/2008 - both of us are home at last, POE JFK!

05/21/2008 - sent AOS and EAD

05/27/2008 - received NOA1 for AOS and for EAD

06/02/2008 - received Biometrics appt letter

06/19/2008 - Biometrics appointment scheduled - DONE

06/19/2008 - both AOS and EAD touched because of biometrics

07/29/2008 - EAD approved.

05/13/2009 - AOS Interview - APPROVED!/ Card production ordered email

05/18/2009 - Welcome Letter received

06/12/2009 - Second card production ordered email

06/19/2009 - Approval notice send email

06/22/2009 - Green Card received

04/09/2012 - Applied for Citizenship by Express Mailing N400 to NBC

04/10/2012 - N400 received by USCIS

06/23/2012 - Biometrics appointment

07/27/2012 - Appointment scheduled for N400 interview

09/05/2012 - Interview passed, oath ceremony completed, and Naturalization certificate received.

Filed: IR-1/CR-1 Visa Country: China
Timeline
Posted

Thank you , Urge to Race!! I hope something does come up soon enough.. I can't believe it is just waiting so long (I keep talking about the April vs March people)... 1 month later apply cost you additional 4-6 months time.. Again, congratulations on your approval!!! YAY!!!! :dance: :dance: ... at least you are out of USCIS... going into the world of NVC, but at least they are nicer... :thumbs:

I-130 STAGE 1 : 533 days - 1 year 6 months (4/16/2007 to 9/22/2008)

Priority Date I-130 : 4/16/2007 ( 533 days , APPROVED 9/22/2008)
Transferred to local office based on "security checks" : 11/27/2007
wrote hundreds of letters - received letter from FBI Records Management Chief stating no security checks
local office interview : 2/21/2008 - brought my parents too (result : you will get approval within 2-3 weeks)

5/2/2008 - (lawsuit) Writ of Mandamus - OFFICIAL DATE (7/29/2008)
9/22/2008 - CALL AND EMAIL COPY OF APPROVAL NOTICE FROM LAWYER

NVC STAGE 2 : 99 days - 3 months (9/30/2008 to 1/7/2009)

NVC Received : 9/30/2008
Received Packet 3 (I-864/DS-230) : 11/10/2008
NVC says "RFE sent out 12/9/08 for missing documents" : 12/10/2008
CASE COMPLETE - 1/7/2009

CONSULATE STAGE 3 : 96 days - 3 months (1/8/2009 to 4/14/2009)
CLEARED CUSTOMS - 3/10/2009
**APPOINTMENT DATE : 4/14/2009, 7:15AM**
** BLUE SLIP **

AP STAGE 4 : 97 days - 3 months (4/14/2009 to 7/20/2009)
DOS call to receive I-601 (Waiver of Grounds for Inadmissibility - basically denial) from Guangzhou : 6/24/2009

REMOVAL OF I-601 due to my letters to the USCIS Director, Michael Aytes: 6/29/2009
CALL-IN LETTER NOTIFIED : 7/8/2009
CALL-IN LETTER (APPROVAL)!! : 7/16/2009
ALL DONE!! (got both GREEN CARD & SSN CARD) : 10/1/2009

"http://www.visajourney.com/forums/topic/194075-feel-like-a-cr-1-csc-castaway/page-60" (pages 53-63) for more updates and letter I wrote to Director Michael Aytes and his replies and back and forth..

HER PARENTS - 10 months so far

I-130 Sent In : 1/7/2013

I-130 Approval : 3/28/2013

Transfer to NVC : 6/12/2013

Case Complete : 8/25/2013

"Ready for Interview" (Ready to wait for 1-3 Months, this is official NVC letter transfer date) : 9/9/2013

DHL Tracking : arrived 9/24/2013

P4 Letter : 11/21/2013

Interview Date : 12/9/2013, originally 12/3, stupid lawyer filled out her dad's passport number wrong..

Interview Passed : 12/9/2013

Visa "Issued" on CEAC : 12/10/2013

Filed: K-3 Visa Country: Peru
Timeline
Posted
Hi Everyone,

Does it take 6 months to START PROCESSING the case or to give APPROVAL?? Either way, a few of us are over the 180 days by almost a month now.. :crying::crying: sorry if I keep complaining everyday.. just a little unfair... March people can come already... congrats March people... I was hoping to at least get her here by Christmas.. that was already giving a month's extra time.. but like what pushbrk said to just hope for an April interview.. That is what I had planned originally.. At this rate, she won't even come by April of next year.. :crying::crying::crying:

Gogo,

To answer your question here is what I found on the USCIS website:

Date Received in Mailroom – USCIS will honor the actual date that an application was received in our mailroom; this date will be indicated on the receipt (in the Received Date box) when Form I-797, Notice of Action, is mailed. You can see a sample Form I-797 under "Related Links" on this page. If your case is affected by the receipt delay, arrival of your receipt may take up to 12 weeks for adjustment-of-status applications and 15 weeks for naturalization and other applications.

thumb_Picture_003.jpg

Te amo mucho mi gran amor!!!

I-130 Application: (Filed 222 days ago) Reached 7 MONTHS

04/12/2007 Filed at VSC

05/09/2007 recieved NOA I from CSC (Reached 6 MONTHS 195 days from NOA I)

05/18/2007 Filed I-129F at Chicago Office ( Filed 186 days ago) 6 MONTHS!!

05/20/2007 rec'd NOA (184 days ago for NOA I ) REACHED THE 6 MONTH MARK!!

BOTH APPLICATIONS APPROVED 11/20/2007 THANK YOU MY GOD!!

11/20/2007 Date of NOA 2 email

11/26/2007 Date of hard copy of NOA 2

12/12/07 Date NVC receives paperwork

12/14/07 K3 is sent to Lima Peru, received case number from NVC.

12/17/07 Lima Peru Embassey receives K3

01/04/08 My Honey's Medical

**** I leave today to reunite with MY HONEY!!!! ****....

01/15/08 LEAVING FOR LIMA PERU!!!

01/17/08 8:15 AM Date of Interview in Lima, Peru with my honey!

INTERVIEW WAS APPROVED!!!!

***2008 is with My Honey***********

Posted

Yep, they say it on the website, but my experience, and that of other Vjers (C and J and a few others) indicates that they are still going by the Notice date. For April, that is only a 2-3 week difference, but gets bigger further down. So June, July, August, September filers may benefit if they start going by the receipt date as they state.

Hi Everyone,

Does it take 6 months to START PROCESSING the case or to give APPROVAL?? Either way, a few of us are over the 180 days by almost a month now.. :crying::crying: sorry if I keep complaining everyday.. just a little unfair... March people can come already... congrats March people... I was hoping to at least get her here by Christmas.. that was already giving a month's extra time.. but like what pushbrk said to just hope for an April interview.. That is what I had planned originally.. At this rate, she won't even come by April of next year.. :crying::crying::crying:

Gogo,

To answer your question here is what I found on the USCIS website:

Date Received in Mailroom – USCIS will honor the actual date that an application was received in our mailroom; this date will be indicated on the receipt (in the Received Date box) when Form I-797, Notice of Action, is mailed. You can see a sample Form I-797 under "Related Links" on this page. If your case is affected by the receipt delay, arrival of your receipt may take up to 12 weeks for adjustment-of-status applications and 15 weeks for naturalization and other applications.

03/12/2007 - Married to my beautiful wife

04/16/2007 - Sent I-130 to VSC via USPS Express Mail

05/12/2007 - NOA1 received by snail mail after a loooong wait

05/14/2007 - Sent I-129F for K3 to Chicago Lockbox via USPS Express Mail

10/22/2007 - I129F APPROVED (161 days), I130 APPROVED (188 days)

11/08/2007 - I129F received at NVC, embassy case number generated.

11/13/2007 - I129F forwarded to embassy.

11/18/2007 - 129F petition received at embassy

01/09/2008 - finally, DOS gives me the interview date, April 16, 2007 (ouch)

01/23/2008 - never got packet 4, emailed embassy

04/11/2008 - picked up packet 4, did medical

04/14/2008 - medical report pickup, no problems

04/16/2008 - interview date- APPROVED!!!!!

04/18/2008 - both of us are home at last, POE JFK!

05/21/2008 - sent AOS and EAD

05/27/2008 - received NOA1 for AOS and for EAD

06/02/2008 - received Biometrics appt letter

06/19/2008 - Biometrics appointment scheduled - DONE

06/19/2008 - both AOS and EAD touched because of biometrics

07/29/2008 - EAD approved.

05/13/2009 - AOS Interview - APPROVED!/ Card production ordered email

05/18/2009 - Welcome Letter received

06/12/2009 - Second card production ordered email

06/19/2009 - Approval notice send email

06/22/2009 - Green Card received

04/09/2012 - Applied for Citizenship by Express Mailing N400 to NBC

04/10/2012 - N400 received by USCIS

06/23/2012 - Biometrics appointment

07/27/2012 - Appointment scheduled for N400 interview

09/05/2012 - Interview passed, oath ceremony completed, and Naturalization certificate received.

Filed: K-3 Visa Country: Peru
Timeline
Posted
Yep, they say it on the website, but my experience, and that of other Vjers (C and J and a few others) indicates that they are still going by the Notice date. For April, that is only a 2-3 week difference, but gets bigger further down. So June, July, August, September filers may benefit if they start going by the receipt date as they state.

Hi Everyone,

Does it take 6 months to START PROCESSING the case or to give APPROVAL?? Either way, a few of us are over the 180 days by almost a month now.. :crying::crying: sorry if I keep complaining everyday.. just a little unfair... March people can come already... congrats March people... I was hoping to at least get her here by Christmas.. that was already giving a month's extra time.. but like what pushbrk said to just hope for an April interview.. That is what I had planned originally.. At this rate, she won't even come by April of next year.. :crying::crying::crying:

Gogo,

To answer your question here is what I found on the USCIS website:

Date Received in Mailroom – USCIS will honor the actual date that an application was received in our mailroom; this date will be indicated on the receipt (in the Received Date box) when Form I-797, Notice of Action, is mailed. You can see a sample Form I-797 under "Related Links" on this page. If your case is affected by the receipt delay, arrival of your receipt may take up to 12 weeks for adjustment-of-status applications and 15 weeks for naturalization and other applications.

Urge,

Gogo and mine our I-130 NOA 1 took about 1

thumb_Picture_003.jpg

Te amo mucho mi gran amor!!!

I-130 Application: (Filed 222 days ago) Reached 7 MONTHS

04/12/2007 Filed at VSC

05/09/2007 recieved NOA I from CSC (Reached 6 MONTHS 195 days from NOA I)

05/18/2007 Filed I-129F at Chicago Office ( Filed 186 days ago) 6 MONTHS!!

05/20/2007 rec'd NOA (184 days ago for NOA I ) REACHED THE 6 MONTH MARK!!

BOTH APPLICATIONS APPROVED 11/20/2007 THANK YOU MY GOD!!

11/20/2007 Date of NOA 2 email

11/26/2007 Date of hard copy of NOA 2

12/12/07 Date NVC receives paperwork

12/14/07 K3 is sent to Lima Peru, received case number from NVC.

12/17/07 Lima Peru Embassey receives K3

01/04/08 My Honey's Medical

**** I leave today to reunite with MY HONEY!!!! ****....

01/15/08 LEAVING FOR LIMA PERU!!!

01/17/08 8:15 AM Date of Interview in Lima, Peru with my honey!

INTERVIEW WAS APPROVED!!!!

***2008 is with My Honey***********

Filed: K-3 Visa Country: Peru
Timeline
Posted
Yep, they say it on the website, but my experience, and that of other Vjers (C and J and a few others) indicates that they are still going by the Notice date. For April, that is only a 2-3 week difference, but gets bigger further down. So June, July, August, September filers may benefit if they start going by the receipt date as they state.

Hi Everyone,

Does it take 6 months to START PROCESSING the case or to give APPROVAL?? Either way, a few of us are over the 180 days by almost a month now.. :crying::crying: sorry if I keep complaining everyday.. just a little unfair... March people can come already... congrats March people... I was hoping to at least get her here by Christmas.. that was already giving a month's extra time.. but like what pushbrk said to just hope for an April interview.. That is what I had planned originally.. At this rate, she won't even come by April of next year.. :crying::crying::crying:

Gogo,

To answer your question here is what I found on the USCIS website:

Date Received in Mailroom – USCIS will honor the actual date that an application was received in our mailroom; this date will be indicated on the receipt (in the Received Date box) when Form I-797, Notice of Action, is mailed. You can see a sample Form I-797 under "Related Links" on this page. If your case is affected by the receipt delay, arrival of your receipt may take up to 12 weeks for adjustment-of-status applications and 15 weeks for naturalization and other applications.

Urge,

Gogo and our I-130 NOA 1 took about 1 month to receive. Many other people received there NOA I in the 2 to 3 week time frame but, our applications were delayed because of the HUGE response for HBI work applications. Then computer problems and etc. etc.... You feel every turn there has been many delays.... :crying::crying:

thumb_Picture_003.jpg

Te amo mucho mi gran amor!!!

I-130 Application: (Filed 222 days ago) Reached 7 MONTHS

04/12/2007 Filed at VSC

05/09/2007 recieved NOA I from CSC (Reached 6 MONTHS 195 days from NOA I)

05/18/2007 Filed I-129F at Chicago Office ( Filed 186 days ago) 6 MONTHS!!

05/20/2007 rec'd NOA (184 days ago for NOA I ) REACHED THE 6 MONTH MARK!!

BOTH APPLICATIONS APPROVED 11/20/2007 THANK YOU MY GOD!!

11/20/2007 Date of NOA 2 email

11/26/2007 Date of hard copy of NOA 2

12/12/07 Date NVC receives paperwork

12/14/07 K3 is sent to Lima Peru, received case number from NVC.

12/17/07 Lima Peru Embassey receives K3

01/04/08 My Honey's Medical

**** I leave today to reunite with MY HONEY!!!! ****....

01/15/08 LEAVING FOR LIMA PERU!!!

01/17/08 8:15 AM Date of Interview in Lima, Peru with my honey!

INTERVIEW WAS APPROVED!!!!

***2008 is with My Honey***********

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...