Thanks Hafiz for answering this question.

k3 visa is valid for 2 years, you should enter US within 6 months,

Good luck to them.

Mary, thanks for your response. My co-worker's wife will be flying to Pakistan to attend her IR interview which is scheduled for December. She already reunited with her husband in the U.S. on a K3 Visa a few months after their marriage (this was a few years ago). After her K3 interview, she received her passport via courier within a weeks time.

What troubles me is that instead of doing an AOS, they decided to follow through on the I-130 (when it got approved) at the Islamabad Embassy, which is why she is going to Pakistan. Hopefully, and this is what I told him, she will not be on AP after her December interview since she already was cleared before on the K3. But you never know.

Thanks again.

Everything I respond to is from personal knowledge, research or experience and I am in no means a lawyer or do I claim to be one. Everyone should read, research and be responsible for your own journey.

Link to comment
Share on other sites

  • Replies 6.9k
  • Created
  • Last Reply

Top Posters In This Topic

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Hello,

I called NVC on Monday and was informed DS230 was generated week of July 30th. NVC couldn't tell me the exact date of DS230 generation. I am in Pakistan visiting family, and planned to send DS230 from Pak using Jame's shortcut. Now I can't find the exact generation date and thinking about delaying mailing DS230 back to NVC until I get back to US, third week of Aug. It will delay the process by 2 weeks, Oh well !!!! what else can you do.

Congratulations to Sufi and all who got approval and Visa in hand recently.

IR1 Visa

Event Date

Service Center : California Service Center

Consulate : Islamabad, Pakistan

I-130 Sent : 2004-04-13

I-130 NOA1 : 2004-04-30

I-130 Approved : 2005-05-31

NVC Received : 2005-06-15

Naturalized Citizenship: 2007-05-24

Sent letters to NVC and USCIS to upgrade my wife and kids petitions: 2007-05-24

Petition upgraded from F2A to IR1: 2007-06-12

Received DS-3032 / I-864 Bill : 2007-06-18

Return Completed DS-3032 : 2007-06-19 (email)

Pay I-864 Bill: 2007-06-19 (Jame's Shortcut)

1-864 Bill Delivered in St. Louis: 2007-06-21

NVC Accepts DS-3032: 2007-06-26 (email from NVC)

IV Bill & I-864 Generated: 2007-07-02

Return Completed I-864: 2007-07/09 (Jame's Shortcut)

Received & Paid IV Bill : 2007-07-16

IV Bill entered in NVC system: 2007-07-24

DS230 Generated: 2007-07-30

Return Completed DS-230 : 2007-08-09 (Jame's Shortcut)

NVC Receives DS-230: 2007-08-13

DS-230 entered in NVC system: 2007-08-16

Case Completed at NVC: 2007-08-24

NVC Left : 2007-08-29

Consulate Received : 2007-09-12

Packet 3 Received : 2007-09-17

Packet 3 Sent : 2007-09-22

Packet 4 Received : 2007-10-05

Original Interview Date : 2008-04-08

New Interview Date : 2008-01-25

Visa Issued: 2008-01-25

Passport Received : 2008-01-30

US Entry : 2008-02-26

POE: JFK

Comments : I filed as a GC holder. Upgraded the same petition to IR1 in June 07.

Processing

Estimates/Stats : My I-130 was approved in 413 days.

Link to comment
Share on other sites

Filed: Country: Pakistan
Timeline
Hello,

I called NVC on Monday and was informed DS230 was generated week of July 30th. NVC couldn't tell me the exact date of DS230 generation. I am in Pakistan visiting family, and planned to send DS230 from Pak using Jame's shortcut. Now I can't find the exact generation date and thinking about delaying mailing DS230 back to NVC until I get back to US, third week of Aug. It will delay the process by 2 weeks, Oh well !!!! what else can you do.

Look at the bright side, you are with your Family right now

***I-130***

2006-12-14 I-130 Sent to Vermont Service Center

2007-01-12 I-130 NOA1

2007-04-06 Approved!

***I-129F (new form)***

2007-01-31 I-129F Sent to Chicago

2007-02-07 I-129F NOA1

2007-04-06 Approved!

***US Embassy Islamabad***

2007-04-25 Packet Received by my wife

2007-05-15 Medical Exam

2007-05-29 Interview Approved!

2007-05-29 AP starts

2007-11-01 Wife got call to pickup her Visa from American Express

2008-01-12 POE at JFK

***I-485***

2008-11-10 I-485 Sent to Chicago

2008-11-20 Payment accepted

2008-11-22 I-485 NOA1

2009-01-09 Biometric

2009-03-08 Interview Letter

2009-04-08 Interview Approved!

2009-04-08 Welcome letter received

2009-04-18 Green Card Received

USA_b.gifpakistan_b.gif

Disclaimer: I'm not a lawyer and anything posted is just my own opinion

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Well, after having 2dn, 3rd, 4th and 5th thought, I decided to mail DS320 from Lahore, PK. NVC usually generate letters on Monday, so I dated the cover page July 30th.

Does NVC really pay attention to date on cover letter vs. the date it generates letter in case my July 30th guess is wrong? Whats the worst can happen?

Fingers crossed........ Wish me, specially my wife, luck.

IR1 Visa

Event Date

Service Center : California Service Center

Consulate : Islamabad, Pakistan

I-130 Sent : 2004-04-13

I-130 NOA1 : 2004-04-30

I-130 Approved : 2005-05-31

NVC Received : 2005-06-15

Naturalized Citizenship: 2007-05-24

Sent letters to NVC and USCIS to upgrade my wife and kids petitions: 2007-05-24

Petition upgraded from F2A to IR1: 2007-06-12

Received DS-3032 / I-864 Bill : 2007-06-18

Return Completed DS-3032 : 2007-06-19 (email)

Pay I-864 Bill: 2007-06-19 (Jame's Shortcut)

1-864 Bill Delivered in St. Louis: 2007-06-21

NVC Accepts DS-3032: 2007-06-26 (email from NVC)

IV Bill & I-864 Generated: 2007-07-02

Return Completed I-864: 2007-07/09 (Jame's Shortcut)

Received & Paid IV Bill : 2007-07-16

IV Bill entered in NVC system: 2007-07-24

DS230 Generated: 2007-07-30

Return Completed DS-230 : 2007-08-09 (Jame's Shortcut)

NVC Receives DS-230: 2007-08-13

DS-230 entered in NVC system: 2007-08-16

Case Completed at NVC: 2007-08-24

NVC Left : 2007-08-29

Consulate Received : 2007-09-12

Packet 3 Received : 2007-09-17

Packet 3 Sent : 2007-09-22

Packet 4 Received : 2007-10-05

Original Interview Date : 2008-04-08

New Interview Date : 2008-01-25

Visa Issued: 2008-01-25

Passport Received : 2008-01-30

US Entry : 2008-02-26

POE: JFK

Comments : I filed as a GC holder. Upgraded the same petition to IR1 in June 07.

Processing

Estimates/Stats : My I-130 was approved in 413 days.

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Pakistan
Timeline

Good luck.

Well, after having 2dn, 3rd, 4th and 5th thought, I decided to mail DS320 from Lahore, PK. NVC usually generate letters on Monday, so I dated the cover page July 30th.

Does NVC really pay attention to date on cover letter vs. the date it generates letter in case my July 30th guess is wrong? Whats the worst can happen?

Fingers crossed........ Wish me, specially my wife, luck.

Everything I respond to is from personal knowledge, research or experience and I am in no means a lawyer or do I claim to be one. Everyone should read, research and be responsible for your own journey.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Good luck to you and your wife, Insha'Allah, Ameen!

`Ayk shaam ati hai teri yaad le kar, Ayk sham jati hai teri yaad le kar, Muje us sham ka intezar hai jo aye tumain apne sath le kar ...`(Insha'Allah, Ameen)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Salam,

Just wanted to share something in case someone might need the info... since my husbands inerview(july 25,2007) I have moved, He ison AP now. I wasnt sure if I had to update the info with the consulate.. I e-mailed them and got a response the second day.. They told me to fax them to request change of address...

~Stranger

`Ayk shaam ati hai teri yaad le kar, Ayk sham jati hai teri yaad le kar, Muje us sham ka intezar hai jo aye tumain apne sath le kar ...`(Insha'Allah, Ameen)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Good luck to you and your wife, Insha'Allah, Ameen!

Thanks Mary and XStrangerX2007

IR1 Visa

Event Date

Service Center : California Service Center

Consulate : Islamabad, Pakistan

I-130 Sent : 2004-04-13

I-130 NOA1 : 2004-04-30

I-130 Approved : 2005-05-31

NVC Received : 2005-06-15

Naturalized Citizenship: 2007-05-24

Sent letters to NVC and USCIS to upgrade my wife and kids petitions: 2007-05-24

Petition upgraded from F2A to IR1: 2007-06-12

Received DS-3032 / I-864 Bill : 2007-06-18

Return Completed DS-3032 : 2007-06-19 (email)

Pay I-864 Bill: 2007-06-19 (Jame's Shortcut)

1-864 Bill Delivered in St. Louis: 2007-06-21

NVC Accepts DS-3032: 2007-06-26 (email from NVC)

IV Bill & I-864 Generated: 2007-07-02

Return Completed I-864: 2007-07/09 (Jame's Shortcut)

Received & Paid IV Bill : 2007-07-16

IV Bill entered in NVC system: 2007-07-24

DS230 Generated: 2007-07-30

Return Completed DS-230 : 2007-08-09 (Jame's Shortcut)

NVC Receives DS-230: 2007-08-13

DS-230 entered in NVC system: 2007-08-16

Case Completed at NVC: 2007-08-24

NVC Left : 2007-08-29

Consulate Received : 2007-09-12

Packet 3 Received : 2007-09-17

Packet 3 Sent : 2007-09-22

Packet 4 Received : 2007-10-05

Original Interview Date : 2008-04-08

New Interview Date : 2008-01-25

Visa Issued: 2008-01-25

Passport Received : 2008-01-30

US Entry : 2008-02-26

POE: JFK

Comments : I filed as a GC holder. Upgraded the same petition to IR1 in June 07.

Processing

Estimates/Stats : My I-130 was approved in 413 days.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Hello,

I called NVC on Monday and was informed DS230 was generated week of July 30th. NVC couldn't tell me the exact date of DS230 generation. I am in Pakistan visiting family, and planned to send DS230 from Pak using Jame's shortcut. Now I can't find the exact generation date and thinking about delaying mailing DS230 back to NVC until I get back to US, third week of Aug. It will delay the process by 2 weeks, Oh well !!!! what else can you do.

Lucky you! Spending time with your family and during mango season. I am jealous :P

I had similar issue with my daughter's DS230. I created a cover page using James' shortcuts and wrote by hand on it that it's not an original document (small print on the side to cover myself). It was accepted at NVC and so far I haven't seen any issues.

Good Luck Buddy!

-Irfan

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Hello,

I called NVC on Monday and was informed DS230 was generated week of July 30th. NVC couldn't tell me the exact date of DS230 generation. I am in Pakistan visiting family, and planned to send DS230 from Pak using Jame's shortcut. Now I can't find the exact generation date and thinking about delaying mailing DS230 back to NVC until I get back to US, third week of Aug. It will delay the process by 2 weeks, Oh well !!!! what else can you do.

Lucky you! Spending time with your family and during mango season. I am jealous :P

I had similar issue with my daughter's DS230. I created a cover page using James' shortcuts and wrote by hand on it that it's not an original document (small print on the side to cover myself). It was accepted at NVC and so far I haven't seen any issues.

Good Luck Buddy!

-Irfan

Thank you Irfan. Gives me more reason to believe now that NVC will accept my DS230.

Mangoes was the main reason I decided to visit family this time of the year. Weather is hot and muggy and loadshedding makes it worse even though its only 2 times a day 30 mins each........worth getting these tasty Mangoes....... :devil:

IR1 Visa

Event Date

Service Center : California Service Center

Consulate : Islamabad, Pakistan

I-130 Sent : 2004-04-13

I-130 NOA1 : 2004-04-30

I-130 Approved : 2005-05-31

NVC Received : 2005-06-15

Naturalized Citizenship: 2007-05-24

Sent letters to NVC and USCIS to upgrade my wife and kids petitions: 2007-05-24

Petition upgraded from F2A to IR1: 2007-06-12

Received DS-3032 / I-864 Bill : 2007-06-18

Return Completed DS-3032 : 2007-06-19 (email)

Pay I-864 Bill: 2007-06-19 (Jame's Shortcut)

1-864 Bill Delivered in St. Louis: 2007-06-21

NVC Accepts DS-3032: 2007-06-26 (email from NVC)

IV Bill & I-864 Generated: 2007-07-02

Return Completed I-864: 2007-07/09 (Jame's Shortcut)

Received & Paid IV Bill : 2007-07-16

IV Bill entered in NVC system: 2007-07-24

DS230 Generated: 2007-07-30

Return Completed DS-230 : 2007-08-09 (Jame's Shortcut)

NVC Receives DS-230: 2007-08-13

DS-230 entered in NVC system: 2007-08-16

Case Completed at NVC: 2007-08-24

NVC Left : 2007-08-29

Consulate Received : 2007-09-12

Packet 3 Received : 2007-09-17

Packet 3 Sent : 2007-09-22

Packet 4 Received : 2007-10-05

Original Interview Date : 2008-04-08

New Interview Date : 2008-01-25

Visa Issued: 2008-01-25

Passport Received : 2008-01-30

US Entry : 2008-02-26

POE: JFK

Comments : I filed as a GC holder. Upgraded the same petition to IR1 in June 07.

Processing

Estimates/Stats : My I-130 was approved in 413 days.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
....

Thank you Irfan. Gives me more reason to believe now that NVC will accept my DS230.

Mangoes was the main reason I decided to visit family this time of the year. Weather is hot and muggy and loadshedding makes it worse even though its only 2 times a day 30 mins each........worth getting these tasty Mangoes....... :devil:

Just be sure you use the new template. Last I checked the shortcuts had two listed in the thread, I started to use the first one listed to later realize there is another one towards the end.

Link to comment
Share on other sites

lol heat for mangoes, i dont know about that.

anyways here is some good stuff

http://www.youtube.com/watch?v=r111ayP194c

Aapki Nazroan Ne Samjha, Pyaar Ke Kabil Mujhe

Dil Ki Ai Dharkan Thaher Ja, Mil Gayee Manzil Mujhe

I-130 Process

01-29-2006 | Marriage

02-13-2006 | Mailed to NSC

02-27-2006 | NOA1

06-15-2006 | I-130 Approved

I-129F Process

03-08-2006 | Mailed to CHICAGO LOCKBOX

03-13-2006 | NOA1

07-31-2006 | I-129F Approved

09-01-2006 | K3 Interview, Visa Approved

09-14-2006 | Passport recieved from Consulate

01-23-2007 | POE at Chicago

AOS process

07-25-2007 | Mailed to CHICAGO LOCKBOX

08-30-2007 | NOA1

09-07-2007 | Biometrics Appointment

01-28-2008 | AOS interview-More evidence requested

02-07-2008 | AOS approved

02-19-2008 | Recieved Green Card in mail

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
....

Thank you Irfan. Gives me more reason to believe now that NVC will accept my DS230.

Mangoes was the main reason I decided to visit family this time of the year. Weather is hot and muggy and loadshedding makes it worse even though its only 2 times a day 30 mins each........worth getting these tasty Mangoes....... :devil:

Just be sure you use the new template. Last I checked the shortcuts had two listed in the thread, I started to use the first one listed to later realize there is another one towards the end.

Yes, I did use the latest version 2.2 of JSC. Thanks

IR1 Visa

Event Date

Service Center : California Service Center

Consulate : Islamabad, Pakistan

I-130 Sent : 2004-04-13

I-130 NOA1 : 2004-04-30

I-130 Approved : 2005-05-31

NVC Received : 2005-06-15

Naturalized Citizenship: 2007-05-24

Sent letters to NVC and USCIS to upgrade my wife and kids petitions: 2007-05-24

Petition upgraded from F2A to IR1: 2007-06-12

Received DS-3032 / I-864 Bill : 2007-06-18

Return Completed DS-3032 : 2007-06-19 (email)

Pay I-864 Bill: 2007-06-19 (Jame's Shortcut)

1-864 Bill Delivered in St. Louis: 2007-06-21

NVC Accepts DS-3032: 2007-06-26 (email from NVC)

IV Bill & I-864 Generated: 2007-07-02

Return Completed I-864: 2007-07/09 (Jame's Shortcut)

Received & Paid IV Bill : 2007-07-16

IV Bill entered in NVC system: 2007-07-24

DS230 Generated: 2007-07-30

Return Completed DS-230 : 2007-08-09 (Jame's Shortcut)

NVC Receives DS-230: 2007-08-13

DS-230 entered in NVC system: 2007-08-16

Case Completed at NVC: 2007-08-24

NVC Left : 2007-08-29

Consulate Received : 2007-09-12

Packet 3 Received : 2007-09-17

Packet 3 Sent : 2007-09-22

Packet 4 Received : 2007-10-05

Original Interview Date : 2008-04-08

New Interview Date : 2008-01-25

Visa Issued: 2008-01-25

Passport Received : 2008-01-30

US Entry : 2008-02-26

POE: JFK

Comments : I filed as a GC holder. Upgraded the same petition to IR1 in June 07.

Processing

Estimates/Stats : My I-130 was approved in 413 days.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
lol heat for mangoes, i dont know about that.

anyways here is some good stuff

http://www.youtube.com/watch?v=r111ayP194c

Its worth it.... The stuff we get in US, "the so called Mangoes", is not even 10% of this Pakistani stuff, they are the best....

I am going to have couple right now.........mmmmmmm.........yummmmmy :yes:

IR1 Visa

Event Date

Service Center : California Service Center

Consulate : Islamabad, Pakistan

I-130 Sent : 2004-04-13

I-130 NOA1 : 2004-04-30

I-130 Approved : 2005-05-31

NVC Received : 2005-06-15

Naturalized Citizenship: 2007-05-24

Sent letters to NVC and USCIS to upgrade my wife and kids petitions: 2007-05-24

Petition upgraded from F2A to IR1: 2007-06-12

Received DS-3032 / I-864 Bill : 2007-06-18

Return Completed DS-3032 : 2007-06-19 (email)

Pay I-864 Bill: 2007-06-19 (Jame's Shortcut)

1-864 Bill Delivered in St. Louis: 2007-06-21

NVC Accepts DS-3032: 2007-06-26 (email from NVC)

IV Bill & I-864 Generated: 2007-07-02

Return Completed I-864: 2007-07/09 (Jame's Shortcut)

Received & Paid IV Bill : 2007-07-16

IV Bill entered in NVC system: 2007-07-24

DS230 Generated: 2007-07-30

Return Completed DS-230 : 2007-08-09 (Jame's Shortcut)

NVC Receives DS-230: 2007-08-13

DS-230 entered in NVC system: 2007-08-16

Case Completed at NVC: 2007-08-24

NVC Left : 2007-08-29

Consulate Received : 2007-09-12

Packet 3 Received : 2007-09-17

Packet 3 Sent : 2007-09-22

Packet 4 Received : 2007-10-05

Original Interview Date : 2008-04-08

New Interview Date : 2008-01-25

Visa Issued: 2008-01-25

Passport Received : 2008-01-30

US Entry : 2008-02-26

POE: JFK

Comments : I filed as a GC holder. Upgraded the same petition to IR1 in June 07.

Processing

Estimates/Stats : My I-130 was approved in 413 days.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...