Stll waiting!

I-129F NOA1 : 7/9/07

I-129F RFE : 7/13/07

Touched : 7/14/07

Touched : 7/16/07

Touched : 7/17/07

RFE Response Mailed to CSC : 7/31/07

Touched : 8/8/07 CSC Update (RFE received and case is resumed)

Touched : 8/9/07

Touched : 8/10/07

Touched : 8/20/07

Approved: 8/20/07

NVC Recieved Approved Case: 9/17/07

NVC Mailed Approved Case to Consulate: 10/28/07

Packet Picked-up from consulate 11/10/07

Interview date : Feb 25. 2008

Visa Approved: March 3, 2008

Visa Picked-up: March 4, 2008

Cuban Exit Visa Pick-up April 7, 2008

3744.gif

Link to comment
Share on other sites

  • Replies 1.3k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Posted Images

Filed: AOS (pnd) Country: Japan
Timeline

I finally got a touch! Yea! I hope it's good news that the NOA2 will be on it's way soon. I never seem to make it on the timeline lists even though I update my timeline. Is it because I never received the NOA1 hard copy? Although my I129f was mailed on 5/31/07, I consider myself a June filer since that's when it was received and the check was cashed.

Let's all hope we get good news soon! :thumbs:

K-1 Timeline:

May 31, 2007 - Mailed I-129F to Nebraska

Oct. 22, 2007 - NOA2 Hard Copy received!! No email/website update.

Nov. 16, 2007 - Paperwork found & received by NVC!

Jan. 7, 2008 - Finally got the interview date

Jan. 28, 2008 - Interview!! Approved!!!

Feb. 12, 2008 - Arrives in USA!!!

Feb. 18, 2008 - Wedding Day!!!!!!

Feb. 19, 2008 - Apply for SSN

AOS Timeline:

Mar. 12, 2008 - Packet mailed (AOS, EAD, & AP)

Mar. 12, 2008 - Husband's SSN arrives

Mar. 14, 2008 - AOS pkt was delivered at 7:52 AM & signed for by V BUSTAMANTE.

Mar. 18, 2008 - Check cashed!!

Mar. 21, 2008 - NOA's for AOS, EAD & I-131!! (Dated 3-18-08)

Mar. 31, 2008 - Can finally see AP & EAD online!!

Apr. 10, 2008 - Biometrics finished! Can finally see AOS online & EAD touch!

May 12, 2008 - Email: AP approved!!

May 14, 2008 - Email: EAD approved!!

May 16, 2008 - EAD card & AP in hand!!

Sept 19, 2008 - Interview letter - Oct. 24th - Seattle??

Oct. 21, 2008 - A Touch..WOW!! The interviewer must've put it on his/her desk!

Oct. 24, 2008 - Interview..now back to waiting!

Nov 13, 2008 - Approved! Card Production Ordered...finally!!

Nov 24, 2008 - Card arrives!!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Thailand
Timeline
I finally got a touch! Yea! I hope it's good news that the NOA2 will be on it's way soon. I never seem to make it on the timeline lists even though I update my timeline. Is it because I never received the NOA1 hard copy? Although my I129f was mailed on 5/31/07, I consider myself a June filer since that's when it was received and the check was cashed.

Let's all hope we get good news soon! :thumbs:

August 6th may be a bit too early for the NOA2, but if that was the case, it would be good news for everyone.

3dflags_usa0001-0003a.gif3dflags_tha0001-0003a.gif

I-129F

Petition mailed to Nebraska Service Center 06/04/2007

Petition received by CSC 06/19/2007...NOA1

I love my Siamese kitten...

Link to comment
Share on other sites

Filed: K-1 Visa Country: Argentina
Timeline

Got a touch today. Didn''t call or anything. Come on NOA2s!!!

*** Met in 2002 sometime online Yahoo messenger

*** Continued with scarce letters but many online conversations from 2002-2006

***June 2006: Went to meet mi amor in Buenos Aires and confirmed we wanted to marry (Stayed for a month)

***Nov 2006: Engagement formally announced

***March 2007: Returned to Argentina to visit for a week

***05-18-2007 I-129f Sent to NSC

***06-07-2007 NOA1 Transferred to CSC (Website)

***06-17-2006 NOA1 (Hardcopy)

***07-07-2007 Touched (Wasn't watching for prior touches...and maybe this one due to my phone call)

***Waiting...waiting...waiting

***08-03-2007 Touched (PhoneCall)

***08-06-2007 Touched

***08-23-2007 Touched

***09-13-2007 Touched (PhoneCall)

***09-14-2007 Touched

***10-08-2007 NOA2 APPROVED

***10-09-2007 Touched

***10-10-2007 Touched NICE!!!! :)

***11-07-2007 Left NVC

Link to comment
Share on other sites

Filed: K-1 Visa Country: Russia
Timeline
Got a touch today. Didn''t call or anything. Come on NOA2s!!!

Hey: Our dates are very close----keep in touch!!

9/5/2004 met

7/4/2006 visited for 1 week in Russia (Independence Day!)

12/26/06 three week visit in the U.S.

4/6/07 He came to US for 6 glorious weeks

5/20/07 He returned to Ufa, RU

5/24/07 Mailed I-129F to NSC!!!!!

5/25/07 Received and signed for by F Heinauer, NSC

6/11/07 NOA1 (NEVER received hard copy)

8/23/07 Ramzis comes to America for another visit

10/02/07 Ramzis returns to Russia

11/06/07 NOA2 at LAST!!!

12/17/07 Received at NVC (at last!)

12/18/07 Sent to Moscow Embassy & New NVC Case Number

12/21/07 Received at 11:08 a.m. Moscow Embassy

1/25/08 Received packet from Embassy

03/07/08 Interview 8:00 a.m. Moscow Embassy! VISA APPROVED!!!

03/13/08 Visa in Hand

03/14/08 Flying to U.S. - Detroit POE

03/15/08 Our Wedding Day!

AOS Timeline

3/21/08 - Packet sent to Chicago Lockbox

3/24/08 - Packet received and signed for

3/28/08 - NOA1 received in the mail - EAD & AOS - check cashed

4/15/08 - Biometrics

5/5/08 - AOS interview notice received in the mail (will be in Detroit, June 12, 2008)

6/2/08 - EAD card ordered (CRIS email)

6/5/08 - EAD RECEIVED IN THE MAIL

6/12/08 - Permanent Resident APPROVAL! Green Card on the Way!

6/23/08 - Green Card Received!!!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ecuador
Timeline
Got a touch today. Didn''t call or anything. Come on NOA2s!!!

Hey: Our dates are very close----keep in touch!!

---

Nothing new had appeared on the overwhelmingly informative USCIS "Case Status Online" site, so I called USCIS again. After the usual 30 minutes of phone-mail purgatory and the screening-questions from the arrogant associate, I explained that I had never received anything in the mail; the associate "escalated" me to an immigration officer. THIS officer told me information that conflicted with what the PREVIOUS officer had told me: that I would receive an acknowledgment in the mail 45 days after July 20 (when I had first called about it), and NOT 45 days after the CSC had received my package from the TSC (June 11). I was beyond anger. This second officer said that the usual wait is "4 to 6 months." I told him that if the CSC were so disorganized as to never send me a mailed acknowledgment, I didn't believe him. He responded with the usual "Sorry, sir."

I then contacted my Congressman's office. The aide stated that the USCIS is their -- and THE -- very worst agency with which to deal. USCIS has informed congressional offices that USCIS will no longer accept faxes from the congressional offices. USCIS can take two days or longer to respond to inquiries from congressional offices. I observed to the aide that it seemed that the tail was wagging the dog, and the aide agreed, saying, "It will literally take an act of Congress for anything to be done." He agreed with me that only one example of the convoluted process was my having been told to file at the TSC only for the package to be sent to the CSC, thus losing more days. He observed that the CSC is extremely backed up. He did say that FBI name-checks are a part of the hold-ups.

He will try to call the CSC to learn the status of my petition. He had no pretense that he would be able to pull strings or talk with anyone of genuine influence, but he said that we could at least learn what they tell him.

Does anyone have anything significant or meaningful to add? This is all beyond "maddening." -- TBoneTX

06-04-2007 = TSC stamps postal return-receipt for I-129f.

06-11-2007 = NOA1 date (unknown to me).

07-20-2007 = Phoned Immigration Officer; got WAC#; where's NOA1?

09-25-2007 = Touch (first-ever).

09-28-2007 = NOA1, 23 days after their 45-day promise to send it (grrrr).

10-20 & 11-14-2007 = Phoned ImmOffs; "still pending."

12-11-2007 = 180 days; file is "between workstations, may be early Jan."; touches 12/11 & 12/12.

12-18-2007 = Call; file is with Division 9 ofcr. (bckgrnd check); e-prompt to shake it; touch.

12-19-2007 = NOA2 by e-mail & web, dated 12-18-07 (187 days; 201 per VJ); in mail 12/24/07.

01-09-2008 = File from USCIS to NVC, 1-4-08; NVC creates file, 1/15/08; to consulate 1/16/08.

01-23-2008 = Consulate gets file; outdated Packet 4 mailed to fiancee 1/27/08; rec'd 3/3/08.

04-29-2008 = Fiancee's 4-min. consular interview, 8:30 a.m.; much evidence brought but not allowed to be presented (consul: "More proof! Second interview! Bring your fiance!").

05-05-2008 = Infuriating $12 call to non-English-speaking consulate appointment-setter.

05-06-2008 = Better $12 call to English-speaker; "joint" interview date 6/30/08 (my selection).

06-30-2008 = Stokes Interrogations w/Ecuadorian (not USC); "wait 2 weeks; we'll mail her."

07-2008 = Daily calls to DOS: "currently processing"; 8/05 = Phoned consulate, got Section Chief; wrote him.

08-07-08 = E-mail from consulate, promising to issue visa "as soon as we get her passport" (on 8/12, per DHL).

08-27-08 = Phoned consulate (they "couldn't find" our file); visa DHL'd 8/28; in hand 9/1; through POE on 10/9 with NO hassles(!).

Link to comment
Share on other sites

Filed: AOS (apr) Country: Philippines
Timeline

waiting is the most frustating thing that was ever created in the world in this process... ssssiigggggghhhhhh..

i hope CSC will move faster and faster and faster and faster and faster and faster and faster....

K-1 Visa Timeline

04/03/07 - Engagement Day

06/05/07 - NOA1 according to USCIS Website

10/16/07 - NOA2 according to CRIS - THANK YOU OH LORD!

01/08/08 - Embassy Interview - Thank God! Thanks VJs!

02/23/08 - POE = LAX >>> Goodbye my beloved Pinas!

03/13/08 - Civil Wedding in 90210

04/19/08 - Church wedding in Azusa

AOS Timeline

05/24/08 - NOA1 dates for I-485/AOS and I-765/EAD

07/22/08 - Biometrics Appointment at South El Monte, CA for I-485 only; Application Touched!

08/13/08 - RFE letter received in the mail

08/22/08 - Reply to RFE sent...Oh Lord, please guide us!

08/27/08 - RFE response received; Case resumed

09/13/08 - EAD card received

12/10/08 - AOS Interview in Los Angeles - APPROVED!!! PRAISE GOD FOREVER!

12/22/08 - Green Card Received - THANKS GOD!!! Thanks our VJ FAMILY!!!

Removal of Conditions Timeline

09/13/10 - Form I-751 Packet Sent thru USPS

09/14/10 - NOA1 Date (09/15/10 on the uscis website)

09/15/10 - $545 Check Cashed

09/18/10 - Received NOA1

11/04/10 - Biometrics Appointment

01/06/11 - ROC Approval Date/Card Production Ordered

Link to comment
Share on other sites

Filed: K-1 Visa Country: Brazil
Timeline
Got a touch today. Didn''t call or anything. Come on NOA2s!!!

Hey: Our dates are very close----keep in touch!!

---

Nothing new had appeared on the overwhelmingly informative USCIS "Case Status Online" site, so I called USCIS again. After the usual 30 minutes of phone-mail purgatory and the screening-questions from the arrogant associate, I explained that I had never received anything in the mail; the associate "escalated" me to an immigration officer. THIS officer told me information that conflicted with what the PREVIOUS officer had told me: that I would receive an acknowledgment in the mail 45 days after July 20 (when I had first called about it), and NOT 45 days after the CSC had received my package from the TSC (June 11). I was beyond anger. This second officer said that the usual wait is "4 to 6 months." I told him that if the CSC were so disorganized as to never send me a mailed acknowledgment, I didn't believe him. He responded with the usual "Sorry, sir."

I then contacted my Congressman's office. The aide stated that the USCIS is their -- and THE -- very worst agency with which to deal. USCIS has informed congressional offices that USCIS will no longer accept faxes from the congressional offices. USCIS can take two days or longer to respond to inquiries from congressional offices. I observed to the aide that it seemed that the tail was wagging the dog, and the aide agreed, saying, "It will literally take an act of Congress for anything to be done." He agreed with me that only one example of the convoluted process was my having been told to file at the TSC only for the package to be sent to the CSC, thus losing more days. He observed that the CSC is extremely backed up. He did say that FBI name-checks are a part of the hold-ups.

He will try to call the CSC to learn the status of my petition. He had no pretense that he would be able to pull strings or talk with anyone of genuine influence, but he said that we could at least learn what they tell him.

Does anyone have anything significant or meaningful to add? This is all beyond "maddening." -- TBoneTX

I can certainly validate your experience by referencing my own. This is what I wrote here a few pages back in case you missed it.

Well, here is a hard piece of fat to chew. I called the USCIS and talked to a lady there for a good 5 min and drilled her with questions from A-Z, even asking if it would speed things up if I went to Brasil and got my fiance pregnant. Anyway, with all the congestion with consolidating service centers and the 30,000 apps a month they are getting in, not to mention the spike in apps by those trying to beat the new fee increase, she said it would realisticly take 6 mos to get my NOA2 (approval). I about shot blood from my eyes hearing that. Then I reminded her I filed for the k1 in mid June and asked about their holiday schedule due to the tri-fecta holidays in the latter part of the year. She said that will have an effect for sure even at embassy's abroad with people traveling home for the holidays. Oh, I suspected such a thing and I was real happy hearing that.... So finally, I told her that I guess what your saying is that my fiance wont be getting her gyno exam anytime soon....

Charles

June 8 they revieved it

June 18 '07 check cashed got WAC#

No NOA1, touches, or progress given

NOA2 approved Oct 17

NOA2 card copy in mail Oct 20 (Surprise to us)

Package sent from USCIS to NVC Nov 7. (called USCIS to get this)

Nov 15, I got email at 6:57pm that our package was sent to Rio from NVC.

DON"T WAIT FOR THEM TO SEND ANYTHING, CALL AND MAKE SURE THEY GOT IT.

IF THEY DO, GO AHEAD AND SEND IN ds230,ds2001, the pics, and copy of passport

USE SEDEX AND GET THE TRACKING NUMBER.

Interview Set: Jan 29. Found this out on the embassy website under VISA's. It shows a list of visa types including K1 and shows the interview dates.

Visa granted but they mailed it using their own package delivery service. Took a week. Have money when you go to the appointment. They may also make you go and get more photos taken if they dont like the pics you bring. Just relax and dress wark because they keep the place really cold. Make sure your financials mmet the criteria or they will eat you alive.

MARRIED March 22. Sent in $1,010 in fees to Chicago to get change of status, apply for advanced parole, and ability to work documentation. Things work faster now.

May 22'08: Biometrics appointment in Santa Barbara.

See Adriana's fashion designs at Myspace.com/byAdri

Link to comment
Share on other sites

Filed: K-1 Visa Country: Argentina
Timeline

I'm shooting for our NOA2 approval between now and end of September. If I had to choose a guess date I would say August 31-Sept 7. I know my timeline says Sept 28th but I mailed my app on May 17th. So maybe they go by that date for processing???

*** Met in 2002 sometime online Yahoo messenger

*** Continued with scarce letters but many online conversations from 2002-2006

***June 2006: Went to meet mi amor in Buenos Aires and confirmed we wanted to marry (Stayed for a month)

***Nov 2006: Engagement formally announced

***March 2007: Returned to Argentina to visit for a week

***05-18-2007 I-129f Sent to NSC

***06-07-2007 NOA1 Transferred to CSC (Website)

***06-17-2006 NOA1 (Hardcopy)

***07-07-2007 Touched (Wasn't watching for prior touches...and maybe this one due to my phone call)

***Waiting...waiting...waiting

***08-03-2007 Touched (PhoneCall)

***08-06-2007 Touched

***08-23-2007 Touched

***09-13-2007 Touched (PhoneCall)

***09-14-2007 Touched

***10-08-2007 NOA2 APPROVED

***10-09-2007 Touched

***10-10-2007 Touched NICE!!!! :)

***11-07-2007 Left NVC

Link to comment
Share on other sites

Filed: K-1 Visa Country: Laos
Timeline
anyone from this site who filed their I-129F this June? ours were mailed june 10. we have received our noa1 already and now waiting for the noa2.

june filers this is our thread. :)

Guys,

good luck to all of you! :)

yes, I filed June 22, and NOA1 on June 25... i'm awaiting NOA2, and very anxious to know when???

Link to comment
Share on other sites

Filed: K-1 Visa Country: Laos
Timeline

Hello June filers,

First off I wish the best for everyone's process.

I am a little concerned that reading everyone elses timelines that it seems that your forms have been "touched" in the last month. As for mine, I got the NOA1 on 06/15/07, via checking it at the USCIS website. Apparently, it hasn't been touched since 06/20/07. That's about a month and a half since any activity. Should I be concerned of how slow my process is going?

It's is currently at the CSC.

I'm sorry for the question, and please excuse me this is my first post.

06/11/2007 - Sent I-29F

06/15/2007 - NOA1

06/20/2007 - Touched

09/07/2007 - Touched

09/10/2007 - Touched

10/26/2007 - Touched

10/28/2007 - Touched

10/29/2007 - Touched

10/30/2007 - Touched

10/31/2007 - Touched

11/01/2007 - Touched

11/02/2007 - Touched

11/07/2007 - RFE (notified via website)

11/08/2007 - Touched

12/02/2007 - Touched

12/18/2007 - Notified RFE received

12/19/2007 - Touched

01/02/2008 - Approved (notified via website)

Link to comment
Share on other sites

Filed: K-1 Visa Country: Thailand
Timeline
Hello June filers,

First off I wish the best for everyone's process.

I am a little concerned that reading everyone elses timelines that it seems that your forms have been "touched" in the last month. As for mine, I got the NOA1 on 06/15/07, via checking it at the USCIS website. Apparently, it hasn't been touched since 06/20/07. That's about a month and a half since any activity. Should I be concerned of how slow my process is going?

It's is currently at the CSC.

I'm sorry for the question, and please excuse me this is my first post.

Don't worry. I haven't gotten a touch since 6/22. Probably when they filed it away until it's time to look at it. A lot of people don't get touches at all early on. I think I would be a bit more worried if I did get a touch early on IMO.

3dflags_usa0001-0003a.gif3dflags_tha0001-0003a.gif

I-129F

Petition mailed to Nebraska Service Center 06/04/2007

Petition received by CSC 06/19/2007...NOA1

I love my Siamese kitten...

Link to comment
Share on other sites

Filed: K-1 Visa Country: Argentina
Timeline
Hello June filers,

First off I wish the best for everyone's process.

I am a little concerned that reading everyone elses timelines that it seems that your forms have been "touched" in the last month. As for mine, I got the NOA1 on 06/15/07, via checking it at the USCIS website. Apparently, it hasn't been touched since 06/20/07. That's about a month and a half since any activity. Should I be concerned of how slow my process is going?

It's is currently at the CSC.

I'm sorry for the question, and please excuse me this is my first post.

No, I would say don't worry. I've read from many other people that some people get "touches" and some people never get any at all and the notice magically appears in the mail one day. We all still have a ways to go. From what I understand the website of USCIS isn't exactly accurate. Some people I read their status is still "Pending" even after they have already been scheduled for the interview.

*** Met in 2002 sometime online Yahoo messenger

*** Continued with scarce letters but many online conversations from 2002-2006

***June 2006: Went to meet mi amor in Buenos Aires and confirmed we wanted to marry (Stayed for a month)

***Nov 2006: Engagement formally announced

***March 2007: Returned to Argentina to visit for a week

***05-18-2007 I-129f Sent to NSC

***06-07-2007 NOA1 Transferred to CSC (Website)

***06-17-2006 NOA1 (Hardcopy)

***07-07-2007 Touched (Wasn't watching for prior touches...and maybe this one due to my phone call)

***Waiting...waiting...waiting

***08-03-2007 Touched (PhoneCall)

***08-06-2007 Touched

***08-23-2007 Touched

***09-13-2007 Touched (PhoneCall)

***09-14-2007 Touched

***10-08-2007 NOA2 APPROVED

***10-09-2007 Touched

***10-10-2007 Touched NICE!!!! :)

***11-07-2007 Left NVC

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Philippines
Timeline

We are June Filers too..still waiting for NOA2 ...oh wait meekly wait and murmur not..

AOS -
08-08-08 - Filed AOS with EAD and AP
08-18-08 - NOA for EAD,AP and AOS
08-21-08 - Received Biometrics Appointment Letter
09-09-08 - Biometrics Appointment 10am Kansas City
09-18-08 - I-485 transferred to CSC (got an email from USCIS)
10-07-08 - EAD Touched
10-19-08 - My birthday / Found out I am Pregnant!
10-22-08 - Grief, Pain, Sadness
11-06-08 - EAD card ordered; AP approved (USCIS website)
01-16-09 - AOS Touched
02-23-09 - Green Card (conditional) and welcome letter received in the mail
02-24-09 - Got the job in boyce and bynum lab



"When I bring my worries b4 d throne of Grace, I am at peace bcos I know my God is in full control"

My Website

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...