I'm a newbie here at VJ. I just wanted to know if any March filers for the I130 were approved yet. I filed early March and received my NOA1 around March 11. When I registered there was a message that stated the my application should be adjudicated around September 13. I have seen people's timelines and they have been approved in about 3 months. Just wanted to know if the time process for the I130 is 6 months or does it depend on the case. I"m a USC.

PW

CR1

March 5, 2007 - VSC received I130

March 11 - NOA1

May 21 - Case transferred to CSC

May 30 - Case pending at CSC

June 13 - touched (called CSC via RFE trick)

July 11 - touched (called CSC via RFE trick)

August 14 - touched (called CSC via RFE trick)

August 15 - touched

August 24, 2007 - APPROVAL (rcvd email on Sunday 8/26)

October 2007 - Billed for DS230 and I864 fees

November 2007 - Forms generated as per NVC

January 2008 - Received DS230 and I864 forms

Link to comment
Share on other sites

  • Replies 32
  • Created
  • Last Reply

Top Posters In This Topic

Filed: K-3 Visa Country: India
Timeline
Hi everyone,

I'm a newbie here at VJ. I just wanted to know if any March filers for the I130 were approved yet. I filed early March and received my NOA1 around March 11. When I registered there was a message that stated the my application should be adjudicated around September 13. I have seen people's timelines and they have been approved in about 3 months. Just wanted to know if the time process for the I130 is 6 months or does it depend on the case. I"m a USC.

i am an early march filer... and i haven't been approved. :crying:

I-130

Sent:03/02/07

NOA1:03/06/07

Touched:03/09/2007

APPROVED: 07/31/2007 (151 Days)

I-129

Sent:03/14/2007

NOA1:03/20/07

Transfered CSC:04/05/07

Touched:04/06/07

Touched:04/09/07

Touched:04/25/07(received pending email)

Touched:04/26/07

Touched:04/27/07

APPROVED:07/31/2007

NVC received: 08/30/07

Consulate forward: 08/31/07

Consulate received: 09/10/2007

Submitted DS-230: 09/18/2007

Interview: 11/06/2007

Visa received: 12/14/2007

AOS

Mailed packet: 01/17/2008

Delivered: 01/21/2008

Check cashed: 02/05/2008

NOA1: 02/04/2008

Biometrics appt: 02/20/2008

Request for initial evidence: 02/25/2008 (yikesssss)

RFE mailed: 03/03/2008

RFE received: 03/12/2008 (case processing resumed)

EAD ordered: 3/19/2008 (Thank God)

EAD received: 3/28/2008

Interview: 07/23/2008 (AHHHHHH- they request full medical)

07/25/2008 (medical submitted)

08/08/2008 (CRIS email- card production ordered)

08/19/2008: Green Card Received.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline
Hi everyone,

I'm a newbie here at VJ. I just wanted to know if any March filers for the I130 were approved yet. I filed early March and received my NOA1 around March 11. When I registered there was a message that stated the my application should be adjudicated around September 13. I have seen people's timelines and they have been approved in about 3 months. Just wanted to know if the time process for the I130 is 6 months or does it depend on the case. I"m a USC.

your touch on June 13th could have been something.... try the "RFE trick" and talk to a CSC operator.

-------------------------CR-1-------------------------

02/23/2007 ----- I-130 sent to CSC

03/01/2007 ----- NOA-1 date

06/07/2007 ----- Touched ! (Please... not an RFE)

06/11/2007 ----- UPDATE (Received RFE today...sent evidence back same day)

06/12/2007 ----- Touched ! (come on... I sent the info. already. What now?)

06/13/2007 ----- RFE accepted in Laguna Niguel; signed by V. Semegi

06/21/2007 ----- UPDATE - Response to RFE received; Case processing resumed

07/09/2007 ----- APPROVAL NOTICE SENT !!!

07/23/2007 ----- NVC starts case processing

------------------- Jame's Shortcuts in Progress ;)

10/16/2007 ----- CASE COMPLETE !!! ...Finally

10/25/2007 ----- CASE FORWARDED TO MUMBAI !!!

12/04/2007 ----- INTERVIEW PACKET !!!

01/24/2008 ----- VISA GRANTED!!!............PASSPORT IN HAND !!! :)

01/30/2008 ----- ARRIVAL TO U.S !!! :)

12/30/2009 ----- I-751 sent

THANK YOU to all the wonderful VJ'rs for their help and concern... It would have been difficult without you...

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ukraine
Timeline
Hi everyone,

I'm a newbie here at VJ. I just wanted to know if any March filers for the I130 were approved yet. I filed early March and received my NOA1 around March 11. When I registered there was a message that stated the my application should be adjudicated around September 13. I have seen people's timelines and they have been approved in about 3 months. Just wanted to know if the time process for the I130 is 6 months or does it depend on the case. I"m a USC.

your touch on June 13th could have been something.... try the "RFE trick" and talk to a CSC operator.

I filed my I-130 in early March and then my I-129F a couple weeks later. No approvals on either one yet. I have seen many other people with I-130s approved who filed in March also, though. Just depends on the case I guess.

Wife's visa journey:

03/19/07: Initial mailing of I-129F.

07/07/11: U.S. Citizenship approved and Oath Ceremony!

MIL's visa journey:

07/26/11: Initial mailing of I-130.

05/22/12: Interview passed!

Link to comment
Share on other sites

Thanks everyone. I guess I"m getting a little anxious. This process is such a long one and I'm only at the beginning so I get fustrated at times.

PW

CR1

March 5, 2007 - VSC received I130

March 11 - NOA1

May 21 - Case transferred to CSC

May 30 - Case pending at CSC

June 13 - touched (called CSC via RFE trick)

July 11 - touched (called CSC via RFE trick)

August 14 - touched (called CSC via RFE trick)

August 15 - touched

August 24, 2007 - APPROVAL (rcvd email on Sunday 8/26)

October 2007 - Billed for DS230 and I864 fees

November 2007 - Forms generated as per NVC

January 2008 - Received DS230 and I864 forms

Link to comment
Share on other sites

Greenclipse,

On June 12 I called via the RFE trick. All they said was that no RFE had been requested and that my case was still pending. I called again on Wednesday and I was told that USCIS is making alot of changes so it may take about 6 months and that they are currently working on December applications. So I've been a little confused about it since I've seen other approvals.

PW

CR1

March 5, 2007 - VSC received I130

March 11 - NOA1

May 21 - Case transferred to CSC

May 30 - Case pending at CSC

June 13 - touched (called CSC via RFE trick)

July 11 - touched (called CSC via RFE trick)

August 14 - touched (called CSC via RFE trick)

August 15 - touched

August 24, 2007 - APPROVAL (rcvd email on Sunday 8/26)

October 2007 - Billed for DS230 and I864 fees

November 2007 - Forms generated as per NVC

January 2008 - Received DS230 and I864 forms

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Germany
Timeline
Thanks everyone. I guess I"m getting a little anxious. This process is such a long one and I'm only at the beginning so I get fustrated at times.

What does is mean the file had touched, how do you find it out. Thanks

USCIS

03.21.07 I-130send to CSC

03.29.07 NOA 1

07.11.07 NOA 2

NVC

08.07.07 received case number

08.18.07 I-864 fee bill generated

08.31.07 I-864 payment send

09.11.07 NVC accepted I-864 payment

09.17.07 IV fee bill and I-864 generated

11.12.07 lawyer send out documents to NVC

12.22.07 NVC issued RFE on 230

01.02.07 requested paper back to NVC

01.14.07 RFE in system

01.24.08 case complet

Embassy

03.18.08 Interview in Frankfurt (submitted I-601 and I-212 )

06.17.08 received e-mail that case has been approved

06.24.08 Passport with Visa in Mailbox

06.25.08 Enter USA --LA

07.20.08 Permanent Resident Card in Mailbox

Link to comment
Share on other sites

Filed: K-3 Visa Country: Japan
Timeline

Yes, that's the "official" time scale, but as you can see, it doesn't mean much. I contacted my congressman and they checked on my file and game me the same line. I've read that that date represents the *oldest* file they're working on, so it's a kind of worst-case scenerio. There isn't really much to do. They seem to have over extended themselves, or who knows, maybe they took agents away from Immigration to work on Passports, which is an even bigger mess and can cost more votes. I feel like one of those alien toys on Toy Story who wait to be selected by some kid - they think it's some sort of magical process, but it's really just a stupid kid putting a quarter in and the machine selecting them over some other toy.

I-130

2007-03-04 I-130 NOA1

2007-06-08 Touched

2007-06-26 My congressman spoke with CSC who reported our new offical receipt date is May 1st

2007-06-08 Touched!

2007-08-01 Faxed Expedite Request to USCIS

2007-08-01 Touch - did they get it? Is it the Request, or is it my time?

2007-08-02 Touch

2007-08-06 Touch

2007-09-04 Touch - call from My congressman's office. It's in "extended review"

2007-09-17 Touch - My congressman Called

2007-09-18 Touch

2007-09-19 Now we're the last of the march filers!

2007-09-25 Touch - So what?

2007-10-01 Touch

2007-10-02 APPROVED!!!

I-129F

2007-03-30 I-129F NOA1

2007-04-17 I-129F transfered to California Service Center

2007-04-23 Congressman wrote to CSC

2007-06-01 Congressman reports application normal

2007-06-08 Touched

2007-06-12 Called USCIS. Clerk said it's being processed and gave standard response times

2007-06-26 My congressman spoke with the CSC who reported our new offical receipt date is now May 1st

2007-06-08 Touch

2007-07-05 Touch

2007-07-06 Touch

2007-08-01 Touch

2007-08-02 Touch

2007-08-06 Touch

2007-08-12 Touch (on a sunday?)

2007-08-13 Touch - is something really happening? It's about time

2007-08-19 Touch - from my call on 08-17

2007-09-04 Touch - call from My congressman's office. It's in "extended review"

2007-10-01 Touch

2007-10-02 APPROVED!!!

2007-12-19 Wife and Kids Arrived!

2008-12-08 Green Card Interview - Finally we're done.

Link to comment
Share on other sites

Lili, I found a thourough definition on this site re being "touched."

You need to register here: https://egov.immigration.gov/cris/jsps/index.jsp

Create/Edit customer portfolio account

Any time your application is handled by someone at a Service Center, the barcode is scanned, which results in an update to the "last date" for your case on the USCIS website. When the date changes, this mean that someone has physically handled or "touched" your case. There are many reasons your application may be "touched" - from simply being moved from one desk to another, to RFE's, to being approved.

There are 2 kinds of touches. There are the ones that show some kind of update, there are the ones that don't bring a new message. By logging into the account, take a look at the date that shows next to your case number. If it's changed, you've been touched.

By clicking on the case number, you get to check whether it was an update touch or not. The ones that don't show updates are connected with some kind of work done with regard to your case - it merely shows that they've taken a look at it somehow.

PW

CR1

March 5, 2007 - VSC received I130

March 11 - NOA1

May 21 - Case transferred to CSC

May 30 - Case pending at CSC

June 13 - touched (called CSC via RFE trick)

July 11 - touched (called CSC via RFE trick)

August 14 - touched (called CSC via RFE trick)

August 15 - touched

August 24, 2007 - APPROVAL (rcvd email on Sunday 8/26)

October 2007 - Billed for DS230 and I864 fees

November 2007 - Forms generated as per NVC

January 2008 - Received DS230 and I864 forms

Link to comment
Share on other sites

Alan01,

I know how you feel. I hope the system gets better. It is really fustrating. I miss my other half. My process is just beginning but I'm anxious and fustrated. I guess I need alot of patience. It's not easy. :wacko:

PW

CR1

March 5, 2007 - VSC received I130

March 11 - NOA1

May 21 - Case transferred to CSC

May 30 - Case pending at CSC

June 13 - touched (called CSC via RFE trick)

July 11 - touched (called CSC via RFE trick)

August 14 - touched (called CSC via RFE trick)

August 15 - touched

August 24, 2007 - APPROVAL (rcvd email on Sunday 8/26)

October 2007 - Billed for DS230 and I864 fees

November 2007 - Forms generated as per NVC

January 2008 - Received DS230 and I864 forms

Link to comment
Share on other sites

Filed: K-3 Visa Country: Germany
Timeline

We are March filers, although it took 3 weeks to get our receipt, So I guess technically we are april. Since then we havent had one touch.

october 2004 - marla and alex met in Spain

january 2005 - alex came to texas with marla

april 6, 2005 - alex returned to germany

jan 20, 2006 - married in Texas

jan 23, 2006 - marla moved to ireland with alex

march 28, 2007 - mailed I-130

may 1, 2007 - NOA1 I-130

may 5, 2007 - mailed I-129F to Texas Service Center

may 28, 2007 - NOA1 I-129F

june 5, 2007 - I-129F transferred to California Service Center

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

I don't see "Last Update" section when I check status online. Do I have to create an account online to see it.

Where exactly 'Last Update" show up online. Can someone post an example, please. Thanks

IR1 Visa

Event Date

Service Center : California Service Center

Consulate : Islamabad, Pakistan

I-130 Sent : 2004-04-13

I-130 NOA1 : 2004-04-30

I-130 Approved : 2005-05-31

NVC Received : 2005-06-15

Naturalized Citizenship: 2007-05-24

Sent letters to NVC and USCIS to upgrade my wife and kids petitions: 2007-05-24

Petition upgraded from F2A to IR1: 2007-06-12

Received DS-3032 / I-864 Bill : 2007-06-18

Return Completed DS-3032 : 2007-06-19 (email)

Pay I-864 Bill: 2007-06-19 (Jame's Shortcut)

1-864 Bill Delivered in St. Louis: 2007-06-21

NVC Accepts DS-3032: 2007-06-26 (email from NVC)

IV Bill & I-864 Generated: 2007-07-02

Return Completed I-864: 2007-07/09 (Jame's Shortcut)

Received & Paid IV Bill : 2007-07-16

IV Bill entered in NVC system: 2007-07-24

DS230 Generated: 2007-07-30

Return Completed DS-230 : 2007-08-09 (Jame's Shortcut)

NVC Receives DS-230: 2007-08-13

DS-230 entered in NVC system: 2007-08-16

Case Completed at NVC: 2007-08-24

NVC Left : 2007-08-29

Consulate Received : 2007-09-12

Packet 3 Received : 2007-09-17

Packet 3 Sent : 2007-09-22

Packet 4 Received : 2007-10-05

Original Interview Date : 2008-04-08

New Interview Date : 2008-01-25

Visa Issued: 2008-01-25

Passport Received : 2008-01-30

US Entry : 2008-02-26

POE: JFK

Comments : I filed as a GC holder. Upgraded the same petition to IR1 in June 07.

Processing

Estimates/Stats : My I-130 was approved in 413 days.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Germany
Timeline
We are March filers, although it took 3 weeks to get our receipt, So I guess technically we are april. Since then we havent had one touch.

We filed also in March, but recieved NOA 1 already couple days later. The day where it starts ,you can see it when you check your case via online. Hang in there....

USCIS

03.21.07 I-130send to CSC

03.29.07 NOA 1

07.11.07 NOA 2

NVC

08.07.07 received case number

08.18.07 I-864 fee bill generated

08.31.07 I-864 payment send

09.11.07 NVC accepted I-864 payment

09.17.07 IV fee bill and I-864 generated

11.12.07 lawyer send out documents to NVC

12.22.07 NVC issued RFE on 230

01.02.07 requested paper back to NVC

01.14.07 RFE in system

01.24.08 case complet

Embassy

03.18.08 Interview in Frankfurt (submitted I-601 and I-212 )

06.17.08 received e-mail that case has been approved

06.24.08 Passport with Visa in Mailbox

06.25.08 Enter USA --LA

07.20.08 Permanent Resident Card in Mailbox

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
I don't see "Last Update" section when I check status online. Do I have to create an account online to see it.

Where exactly 'Last Update" show up online. Can someone post an example, please. Thanks

Someone please reply. I don't see "Last Update" section online. Thanks

IR1 Visa

Event Date

Service Center : California Service Center

Consulate : Islamabad, Pakistan

I-130 Sent : 2004-04-13

I-130 NOA1 : 2004-04-30

I-130 Approved : 2005-05-31

NVC Received : 2005-06-15

Naturalized Citizenship: 2007-05-24

Sent letters to NVC and USCIS to upgrade my wife and kids petitions: 2007-05-24

Petition upgraded from F2A to IR1: 2007-06-12

Received DS-3032 / I-864 Bill : 2007-06-18

Return Completed DS-3032 : 2007-06-19 (email)

Pay I-864 Bill: 2007-06-19 (Jame's Shortcut)

1-864 Bill Delivered in St. Louis: 2007-06-21

NVC Accepts DS-3032: 2007-06-26 (email from NVC)

IV Bill & I-864 Generated: 2007-07-02

Return Completed I-864: 2007-07/09 (Jame's Shortcut)

Received & Paid IV Bill : 2007-07-16

IV Bill entered in NVC system: 2007-07-24

DS230 Generated: 2007-07-30

Return Completed DS-230 : 2007-08-09 (Jame's Shortcut)

NVC Receives DS-230: 2007-08-13

DS-230 entered in NVC system: 2007-08-16

Case Completed at NVC: 2007-08-24

NVC Left : 2007-08-29

Consulate Received : 2007-09-12

Packet 3 Received : 2007-09-17

Packet 3 Sent : 2007-09-22

Packet 4 Received : 2007-10-05

Original Interview Date : 2008-04-08

New Interview Date : 2008-01-25

Visa Issued: 2008-01-25

Passport Received : 2008-01-30

US Entry : 2008-02-26

POE: JFK

Comments : I filed as a GC holder. Upgraded the same petition to IR1 in June 07.

Processing

Estimates/Stats : My I-130 was approved in 413 days.

Link to comment
Share on other sites

I don't see "Last Update" section when I check status online. Do I have to create an account online to see it.

Where exactly 'Last Update" show up online. Can someone post an example, please. Thanks

Yes, you need an account. https://egov.uscis.gov/cris/jsps/index.jsp

See Post #9 for details

CR1 – I-130

Sent to NSC: 2/27/2007

Transfer to CSC - NOA 1: 3/5/2007

Touch: 3/12/2007

Touch: 4/17/2007

Touch: 4/18/2007

Approved: 8/27/2007 (181 days after filling)

Touch: 8/28/2007

Hardcopy date NOA2: 9/5/2007, received 9/10/2007

NVC received: 10/26/2007 (61 days after Approval!)

K 3 – I-129F

Sent to Chicago: 3/20/2007

NOA 1: 3/26/2007

Transfer to MSC (National Benefits Centre)

Touch: 3/28/2007

Touch: 3/29/2007

Touch: 4/11/2007

Transfer to CSC: 4/17/2007

Touch: 4/18/2007

Touch: 4/19/2007

Touch: 5/3/2007

Touch: 5/4/2007

Touch: 5/7/2007

Touch: 8/28/2007

RFE: 8/27/2007 (phone), 9/5/2007 (email), 9/15/2007 (received letter)

*** 129F still pending ***

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...