Jump to content
Stabu

NVC timeline on IR-1/CR1 visas

 Share

956 posts in this topic

Recommended Posts

Hey guys,

if the NVC hotline says that they've received the DS-230... Does that mean that they've reviewed and accepted it already, too?

It takes about 7-10 days for NVC to review it.

IR-1

Immigration Process

2007-02-22 **I-130 Sent to VSC

2007-07-02 **I-130 APPROVED at USCIS- CSC

2007-10-10 **CASE COMPLETED at NVC

2007-11-15 **INTERVIEW DATE. APPROVED at USEM!!!

USA

2007-12-02 **Arrival from MNL to JFK (NYC)

2007-12-10 **Visit to SSA

.png

Link to comment
Share on other sites

  • Replies 955
  • Created
  • Last Reply

Top Posters In This Topic

Filed: Citizen (apr) Country: Australia
Timeline

Hi folks,

Just to add to the data...

CASE COMPLETE achieved on August 27th! :dance:

Now only if APEC in Sydney doesn't slow down our final consulate interview stage too much I'll be happy.

-Alex

I-130

02/17/2007 - I-130 Express Mailed to VSC via USPS. (ETA 2/19/2007)

02/22/2007 - I-130 received by VSC.

06/12/2007 - NOA2 approval email received!!!

06/15/2007 - NOA2 letter received in the mail.

NVC

06/19/2007 - NVC receives case and assigns a case number!

08/27/2007 - CASE COMPLETE!!!!

09/06/2007 - Case forwarded to Sydney

09/14/2007 - Wife receives Packet 3. Received NVC letter confirming case forward to Sydney.

10/26/2007 - Interview - VISA GRANTED!!!!! WOOO WOOO!!!!!!

11/18/2007 - Enter the US via LAX (POE). No issues thankfully. 20 minutes of processing.

11/30/2007 - Welcome letter (two of them) received.

12/19/2007 - CR-1 Green Card received.

USCIS - I-751

09/23/2009 - Express Mailed Removal of Conditions application

09/24/2009 - USPS confirmed delivery to VSC

09/29/2009 - Check cashed by USCIS

10/01/2009 - Received NOA I-797C dated 09/25/2009

10/10/2009 - Received Biometric appt letter for 10/29/2009

10/29/2009 - Biometrics taken. Whole process took about 40 min including the wait

12/22/2009 - Approved for ROC!

01/08/2010 - Received text and email: Card production ordered

01/15/2010 - Received Green Card in the mail!

USCIS - N-400

04/22/2011 - Express Mailed Application for Naturalization

04/27/2011 - Check cashed by USCIS

04/28/2011 - Received NOA I-797C dated 04/26/2011

05/27/2011 - Biometrics taken. Process took approx 35 min with wait

07/29/2011 - Received Interview Appt letter scheduled for 09/01/2011 dated 07/26/2011

09/01/2011 - Interview and Oath. Now a USC! The VJ is over!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

hi,

back from weekend... just checked the automated voice service hopign they will change the status message... i am freaked ourt really .. i feel to kick NVC ### now.. i am so mad... are still my friends around whose fees still aint encahsed.. are you guys around... I Dont know what to say; how could these idiots loose out fee payment...

Jigi

Feb 1,2007 - I-130 Reached USCIS.

Feb 4,2007 - I-130 accepted > Get USCIS case Number NOA1.

May 8 ,2007- GET NVC Case Number > NOA2.

June 16 ,2007- Get Order from NVC to pay 70$.

July 2 ,2007- Get DS-3032 in India.

July 7,2007 - DS-3032 choice of address agent entered in NVC.

July 14 ,2007- Get I-864.

July 18 ,2007- I-864 Enters NVC.

July 29 ,2007- Get Order to Pay 380$ fee.

Aug 3 ,2007- 380$ Fee Reached St Louis.

Aug 25,2007 - NVC & St Louis People receive photocopy of my payment with USPS receipt.

After WAITING for 37 days.

Sept 10,2007 - 380$ fee encashed.

Sept 24,2007 - Receive DS-230 in Mail.

Sept 25,2007 - DS-230 despatched.

Sept 26,2007- DS-230 Delivered.

Oct 1,2007 - NVC has DS-230.

Oct 12, 2007 - DS-230 Reviewed. Case Complete

Oct 16, 2007 - Case at Embassy.

Oct 25, 2007- Interview Letter Despatched from Embassy.

Nov 3, 2007 - Recieved Interview Letter.

Dec 1, 2007 - Medical Exam .

I GOT IT

Jan 16 - I am in USA

April 15 2008 - Get my Drivers License.

I-751 Lifting Conditions at California Service Center

November 12, 2009 - I-751 Sent via USPS Express Mail

November 13, 2009 - Receipt of I-1751 Fee

November 20, 2009 - Arrested on Domestic Battery(Had argument with wife)

December 18, 2009 - Biometrics Completed at 9 am.

January 13, 2010 - Receive I-797E Notice for more evidence

February 16, 2010 - Mail reaches Californa Service Center( Next day of Preseidents Day)

February 19, 2010 - Card Production Ordered. Status now IR1

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Updated vylex, congrats!

Member Name--------------NOA2-------DS-3032/I-864---Received IV----DS-230------NVC Complete---JSC---Days

jaxguy ----------------- 05/31/05 ---- 06/19/07 ---- 07/16/07 ---- 07/30/07 ---- 08/24/05 --- Yes - 815

kimmykashi-------------- 08/25/06 ---- xx/xx/06 ---- xx/xx/06 ---- 12/11/06 ---- 02/28/07 --- Yes - 187

w1n78 ------------------ 09/05/06 ---- 10/10/06 ---- 10/20/06 ---- 11/08/06 ---- 11/16/06 --- Yes - 72

Michael and Milahjean -- 09/07/06 ---- 10/10/06 ---- 10/19/06 ---- 11/09/06 ---- 11/15/06 --- Yes - 69

Amarceau --------------- 09/07/06 ---- 10/03/06 ---- 10/20/06 ---- 11/19/06 ---- 01/11/07 --- Yes - 126

tomrein ---------------- 09/11/06 ---- 10/10/06 ---- 10/30/06 ---- 11/xx/06 ---- 12/21/06 --- Yes - 101

dims1 ------------------ 09/20/06 ---- 10/24/06 ---- 10/26/06 ---- 11/xx/06 ---- 12/01/06 --- Yes - 72

randynrose ------------- 09/29/06 ---- 11/01/06 ---- 11/21/06 ---- 12/20/06 ---- 02/06/07 --- Yes - 130

BelwinMills ------------ 10/12/06 ---- 10/30/06 ---- 11/20/06 ---- 12/11/06 ---- 01/17/07 --- Yes - 97

Florida-Photo ---------- 11/02/06 ---- 11/28/06 ---- 12/11/06 ---- 01/12/07 ---- 02/01/07 --- Yes - 91

dougyceci -------------- 11/22/06 ---- 12/11/06 ---- 01/05/07 ---- 01/17/07 ---- 02/15/07 --- Yes - 85

Arpita & Deven --------- 11/27/06 ---- 12/18/06 ---- 01/06/07 ---- 01/15/07 ---- 02/20/07 --- N/A - 85

Our Mao ---------------- 12/01/06 ---- 12/18/06 ---- 01/15/07 ---- 01/29/07 ---- 02/13/07 --- Yes - 73

Bosnia ----------------- 12/05/06 ---- 01/06/07 ---- 01/29/07 ---- 02/20/07 ---- 03/14/07 --- No -- 99

donquijote ------------- 12/06/06 ---- xx/xx/xx ---- xx/xx/xx ---- xx/xx/xx ---- 03/14/07 --- No -- 98

riblet ----------------- 12/06/06 ---- 01/10/07 ---- 01/22/07 ---- 02/10/07 ---- 02/20/07 --- Yes - 76

Justo/Sheyla ----------- 12/27/06 ---- 01/22/07 ---- 02/05/07 ---- xx/xx/07 ---- 03/13/07 --- Yes - 76

StarProg --------------- 12/28/06 ---- 01/20/07 ---- 02/23/07 ---- 03/31/07 ---- 05/10/07 --- Yes - 130

Exodus2006 ------------- 01/16/07 ---- 02/07/07 ---- 03/09/07 ---- 04/10/07 ---- 07/09/07 --- No -- 174

Dennis & Ezgi ---------- 01/18/07 ---- 02/09/07 ---- 02/21/07 ---- 03/20/07 ---- 04/10/07 --- No -- 81

Radu & Mari ------------ 02/12/07 ---- 03/07/07 ---- 03/26/07 ---- 04/06/07 ---- 04/17/07 --- Yes - 64

ErnestoyAlexis --------- 02/16/07 ---- xx/xx/07 ---- xx/xx/07 ---- xx/xx/07 ---- 05/08/07 --- N/A - 81

jediknight ------------- 03/11/07 ---- 03/27/07 ---- 04/12/07 ---- 05/02/07 ---- 05/15/07 --- Yes - 65

Karina ----------------- 03/13/07 ---- 04/23/07 ---- 05/07/07 ---- 05/21/07 ---- 06/01/07 --- Yes - 80

severinep -------------- 03/13/07 ---- 04/19/07 ---- 07/02/07 ---- 07/16/07 ---- Pending

jacob88 ---------------- 03/14/07 ---- 04/23/07 ---- 05/22/07 ---- 06/18/07 ---- 07/03/07 --- No -- 111

hcheun02 --------------- 03/22/07 ---- 04/05/07 ---- 05/09/07 ---- 05/26/07 ---- 06/01/07 --- Yes - 71

Miriam n Alain --------- 03/22/07 ---- 04/24/07 ---- 04/30/07 ---- 05/17/07 ---- 05/21/07 --- N/A - 60

NYC__girl -------------- 04/03/07 ---- 04/16/07 ---- 05/20/07 ---- 06/30/07 ---- Pending

John & Erica ----------- 04/06/07 ---- 05/14/07 ---- 05/31/07 ---- 06/11/07 ---- 06/22/07 --- Yes - 77

slbois ----------------- 04/09/07 ---- 05/22/07 ---- 06/07/07 ---- 06/28/07 ---- 07/16/07 --- Yes - 98

Kathy & Prabh ---------- 04/10/07 ---- 05/14/07 ---- 05/31/07 ---- 06/xx/07 ---- 06/14/07 --- Yes - 65

misfitsbalzac ---------- 04/11/07 ---- 05/22/07 ---- 07/05/07 ---- 08/01/07 ---- Pending

mike & elena ----------- 04/16/07 ---- 05/23/07 ---- 06/29/07 ---- 07/16/07 ---- 08/11/07 --- Yes - 117

Singh77 ---------------- 04/17/07 ---- 05/27/07 ---- 06/25/07 ---- 07/xx/07 ---- Pending

Comelly ---------------- 04/19/07 ---- 05/21/07 ---- 06/14/07 ---- 06/25/07 ---- 07/30/07 --- No -- 102

sjmartins -------------- 04/25/07 ---- 06/18/07 ---- 07/20/07 ---- Pending

Yocasta ---------------- 04/27/07 ---- 05/14/07 ---- 05/29/07 ---- Pending

Mononoke28 ------------- 05/03/07 ---- 06/02/07 ---- 06/22/07 ---- 07/23/07 ---- 08/08/07 --- Yes - 97

jigi ------------------- 05/08/07 ---- 06/16/07 ---- 07/29/07 ---- Pending

knowledge -------------- 05/09/07 ---- 06/04/07 ---- 07/xx/07 ---- 08/08/07 ---- Pending

Heina ------------------ 05/15/07 ---- 06/23/07 ---- 07/28/07 ---- Pending

nyseness --------------- 05/16/07 ---- 06/18/07 ---- 08/11/07 ---- Pending

alongjourney ----------- 05/16/07 ---- 06/25/07 ---- 08/13/07 ---- Pending

Brian & Elena ---------- 05/21/07 ---- Pending

mikeandlani ------------ 05/21/07 ---- 07/02/07 ---- 08/04/07 ---- Pending

khanshahid ------------- 05/24/07 ---- 06/25/07 ---- 07/27/07 ---- 08/24/07 ---- Pending

KayArt ----------------- 05/24/07 ---- 07/03/07 ---- 07/27/07 ---- 08/13/07 ---- 08/30/07 --- Yes - 98

MegDan ----------------- 05/31/07 ---- 07/02/07 ---- 07/28/07 ---- 08/20/07 ---- Pending

hhk3 ------------------- 05/31/07 ---- 06/25/07 ---- 07/21/07 ---- 07/30/07 ---- 08/14/07 --- Yes - 75

Jasmin ----------------- 06/01/07 ---- 06/18/07 ---- 07/20/07 ---- 07/30/07 ---- Pending

Singha ----------------- 06/01/07 ---- 06/25/07 ---- 07/19/07 ---- 08/13/07 ---- 08/28/07 --- No -- 89

Trailmix --------------- 06/05/07 ---- 07/02/07 ---- 08/02/07 ---- 08/21/07 ---- Pending

micky-sabry ------------ 06/05/07 ---- 07/09/07 ---- 08/03/07 ---- Pending

CHERRI1 ---------------- 06/06/07 ---- 07/02/07 ---- 08/02/07 ---- 08/27/07 ---- Pending

virt ------------------- 06/07/07 ---- Pending

Geist & Stabu ---------- 06/07/07 ---- 07/09/07 ---- 08/02/07 ---- Pending

vylex ------------------ 06/12/07 ---- 07/02/07 ---- 07/27/07 ---- 08/13/07 ---- 08/27/05 --- N/A - 76

Nilz07 ----------------- 06/12/07 ---- 07/16/07 ---- Pending

vonicks ---------------- 06/13/07 ---- 07/16/07 ---- Pending

dillydally ------------- 06/14/07 ---- 07/16/07 ---- 08/10/07 ---- Pending

rika60607 -------------- 06/14/07 ---- 07/16/07 ---- 08/18/07 ---- Pending

Abrar & Huma ----------- 06/15/07 ---- 07/16/07 ---- 08/15/07 ---- Pending

endless ---------------- 06/18/07 ---- 07/24/07 ---- Pending

S & J ------------------ 06/19/07 ---- 07/16/07 ---- 08/17/07 ---- Pending

flicki ----------------- 06/25/07 ---- 06/27/07 ---- Pending

vutapson --------------- 06/28/07 ---- 07/16/07 ---- 08/25/07 ---- Pending

samrodriguez226 -------- 06/29/07 ---- 08/19/07 ---- Pending

RandyandRina ----------- 07/02/07 ---- 08/06/07 ---- 08/29/07 ---- Pending

LadyJane --------------- 07/03/07 ---- 08/06/07 ---- Pending

Olechka ---------------- 07/04/07 ---- 08/02/07 ---- 08/20/07 ---- Pending

zellda ----------------- 07/09/07 ---- Pending

michael_nc ------------- 07/12/07 ---- 08/27/07 ---- Pending

Divine Mercy ----------- 07/16/07 ---- Pending

Z & S ------------------ 07/16/07 ---- 07/30/07 ---- Pending

PC_Whisperer ----------- 07/27/07 ---- 08/20/07 ---- Pending

Ereshkigal ------------- 08/17/07 ---- Pending

natashenika ------------ 08/23/07 ---- Pending

Nine month moving average of "Days" counted from "NOA2" between 12/01/06 and 09/01/07: 90 days

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
hi,

back from weekend... just checked the automated voice service hopign they will change the status message... i am freaked ourt really .. i feel to kick NVC ### now.. i am so mad... are still my friends around whose fees still aint encahsed.. are you guys around... I Dont know what to say; how could these idiots loose out fee payment...

Jigi

Hi Jigi,

Do they even work on the weekend? Anyway, the payments which haven't been processed are being tracked here:

IV bill payment, Did you pay by cashier's check or money order? - NVC Forum

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Finland
Timeline

they go 24 hours, I think, but they only stick around to let us pester them monday through friday :P

For detailed timeline, see member timeline data.

You have rights antecedent to all earthly governments: rights that cannot be repealed or restrained by human laws; rights derived from the Great Legislator of the universe.

--John Adams

j.jpg

Setting a good example is a far better way to spread ideals than through force of arms.

--Ron Paul

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

hi

I dont think they dont work 24 hours..... when we call NVC number they are available from mon to friday from 7.30 am to 12 midnight...... and have off on weekends and public federal holidays... i think thats the way it goes

Jigi

Feb 1,2007 - I-130 Reached USCIS.

Feb 4,2007 - I-130 accepted > Get USCIS case Number NOA1.

May 8 ,2007- GET NVC Case Number > NOA2.

June 16 ,2007- Get Order from NVC to pay 70$.

July 2 ,2007- Get DS-3032 in India.

July 7,2007 - DS-3032 choice of address agent entered in NVC.

July 14 ,2007- Get I-864.

July 18 ,2007- I-864 Enters NVC.

July 29 ,2007- Get Order to Pay 380$ fee.

Aug 3 ,2007- 380$ Fee Reached St Louis.

Aug 25,2007 - NVC & St Louis People receive photocopy of my payment with USPS receipt.

After WAITING for 37 days.

Sept 10,2007 - 380$ fee encashed.

Sept 24,2007 - Receive DS-230 in Mail.

Sept 25,2007 - DS-230 despatched.

Sept 26,2007- DS-230 Delivered.

Oct 1,2007 - NVC has DS-230.

Oct 12, 2007 - DS-230 Reviewed. Case Complete

Oct 16, 2007 - Case at Embassy.

Oct 25, 2007- Interview Letter Despatched from Embassy.

Nov 3, 2007 - Recieved Interview Letter.

Dec 1, 2007 - Medical Exam .

I GOT IT

Jan 16 - I am in USA

April 15 2008 - Get my Drivers License.

I-751 Lifting Conditions at California Service Center

November 12, 2009 - I-751 Sent via USPS Express Mail

November 13, 2009 - Receipt of I-1751 Fee

November 20, 2009 - Arrested on Domestic Battery(Had argument with wife)

December 18, 2009 - Biometrics Completed at 9 am.

January 13, 2010 - Receive I-797E Notice for more evidence

February 16, 2010 - Mail reaches Californa Service Center( Next day of Preseidents Day)

February 19, 2010 - Card Production Ordered. Status now IR1

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Japan
Timeline

Thank you for updating. Yes, used JSC twice.

KayArt

(Kay I'm not sure if you used the shortcuts or not?)

This is actually a good quesiton that I ponder myself almost everytime I update the list and someone has gotten their case completed. Some members have used one shortcut and they thus say that they've used none. Others used one shortcut and say that they've used shortcuts. In most cases people use one to three shortcuts but rarely all four of those. The shortcut collumn seems to be less useful than I originally thought it would be; it won't give you good information about how much days you win by using shortcuts.

USCIS

02-28-2007 I-130 sent to TSC forwarded to CSC

03-06-2007 NOA1

05-24-2007 NOA2

NVC

06-25-2007 DS3032 and AOS Fee Bill generated

07-02-2007 IV Fee Bill and I-864 generated

08-13-2007 DS230 generated

08-30-2007 CASE COMPLETE

12-10-2007 TOKYO INTERVIEW

12-25-2007 US ENTRY (CHICAGO)

01-08-2008 SSN received

02-08-2008 GC received

04-30-2008 NC DL in hand

12-25-2009 GC & NC DL expiration

ROC

10-07-2009 I-751 sent to VSC overnight

10-17-2009 NOA received

11-20-2009 Biometrics sched

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Japan
Timeline

Update. Misfitsbalzac case complete on 8/29. No shortcuts. Don't follow my timeline though. They had us going to Naha instead of Tokyo embassy. I had to call for them to get the correct embassy. I think this added the additional time,for them to change all the paperwork and give us a new case number. Inept idiots!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

You can add me if you like, my timeline is in my sig. Used JSC twice, and will be getting a CR1 visa.

Edited by Misty1979

Sept.09/06 Married!!!

Dec.21/06 Sent I-130

Jan.04/04 Received NOA1

Feb.23/06 Sent I-129F

March06/06 USCIS Website States: "Approval Notice Sent."

March15/07 Approval notice arrives in snail mail

March 18/07 NOA1 for I-129F

April 10/07 DS-3032+ AOS fee arrive

April 17/07 Sent back DS-3032 + AOS fee via overnight delivery

May 05/07 AOS arrives in mail

May 07/07 IV bill arrives in mail

May 08/08 Sent back IV bill

May 21 NVC generates DS-230

June 4/07 Mailed DS-230 via overnight delivery.

June 7/07 DS-230 entered into the system

June 18/07 Case Complete!

July 25/07 Medical

September 4/07 Contacted State Senator Re: MTL backlog

Dec.6/07 INTERVIEW..... APPROVED!!!! (After being kept awake all night in dirty clothes standing outside my hotel because Air Canada lost my luggage and my hotel started on fire. Meh, sleep is highly over-rated anyways.)

Dec.18/07 Moved to the US

Oct. 29/09 Citizenship Oath Ceremony

"We come to love not by finding the perfect person, but by learning to see an imperfect person perfectly"

Link to comment
Share on other sites

Our DS-3032 & AOS fee bill were generated on Sept. 3rd. I called the NVC hotline yesterday and asked an operator if they had been sent out yet and was told they would be sent out this week. I called the hotline again this morning and the message said they were generated the 3rd. Go figure right. I'm off to mail them this morning. We are using JSC.

3dflagsdotcom_roman_2faws.gifaheart2.gif3dflagsdotcom_usa_2faws.gif

Our CR-1 Timeline

Feb 20, 2010 ~ We will file to remove conditions

Link to comment
Share on other sites

I'm really sorry that I haven't updated this for a while, it's just that I feel rather depressed updating everyone's timelines when our own case is stuck at the NVC because of their mistake :(. I'm glad that trailmix has done such a good job in the meantime :thumbs:. Anyway, here's the updates!

Updates:

Updated misfitsbalzac (NVC Complete :))

Added Misty1979

Updated & corrected Singh77 (DS-230 & NVC Complete :))

Updated Rika60607 (DS-230)

Updated Ereshkigal (DS-3032/I-864)

Corrected vylex

(Note to self: don't leave this unupdated for a long time or you're going to end up making a lot of updates on one go :P)

Member Name--------------NOA2-------DS-3032/I-864---Received IV----DS-230------NVC Complete---JSC---Days

jaxguy ----------------- 05/31/05 ---- 06/19/07 ---- 07/16/07 ---- 07/30/07 ---- 08/24/05 --- Yes - 815

kimmykashi-------------- 08/25/06 ---- xx/xx/06 ---- xx/xx/06 ---- 12/11/06 ---- 02/28/07 --- Yes - 187

w1n78 ------------------ 09/05/06 ---- 10/10/06 ---- 10/20/06 ---- 11/08/06 ---- 11/16/06 --- Yes - 72

Michael and Milahjean -- 09/07/06 ---- 10/10/06 ---- 10/19/06 ---- 11/09/06 ---- 11/15/06 --- Yes - 69

Amarceau --------------- 09/07/06 ---- 10/03/06 ---- 10/20/06 ---- 11/19/06 ---- 01/11/07 --- Yes - 126

tomrein ---------------- 09/11/06 ---- 10/10/06 ---- 10/30/06 ---- 11/xx/06 ---- 12/21/06 --- Yes - 101

dims1 ------------------ 09/20/06 ---- 10/24/06 ---- 10/26/06 ---- 11/xx/06 ---- 12/01/06 --- Yes - 72

randynrose ------------- 09/29/06 ---- 11/01/06 ---- 11/21/06 ---- 12/20/06 ---- 02/06/07 --- Yes - 130

BelwinMills ------------ 10/12/06 ---- 10/30/06 ---- 11/20/06 ---- 12/11/06 ---- 01/17/07 --- Yes - 97

Florida-Photo ---------- 11/02/06 ---- 11/28/06 ---- 12/11/06 ---- 01/12/07 ---- 02/01/07 --- Yes - 91

dougyceci -------------- 11/22/06 ---- 12/11/06 ---- 01/05/07 ---- 01/17/07 ---- 02/15/07 --- Yes - 85

Arpita & Deven --------- 11/27/06 ---- 12/18/06 ---- 01/06/07 ---- 01/15/07 ---- 02/20/07 --- N/A - 85

Our Mao ---------------- 12/01/06 ---- 12/18/06 ---- 01/15/07 ---- 01/29/07 ---- 02/13/07 --- Yes - 73

Bosnia ----------------- 12/05/06 ---- 01/06/07 ---- 01/29/07 ---- 02/20/07 ---- 03/14/07 --- No -- 99

donquijote ------------- 12/06/06 ---- xx/xx/xx ---- xx/xx/xx ---- xx/xx/xx ---- 03/14/07 --- No -- 98

riblet ----------------- 12/06/06 ---- 01/10/07 ---- 01/22/07 ---- 02/10/07 ---- 02/20/07 --- Yes - 76

Justo/Sheyla ----------- 12/27/06 ---- 01/22/07 ---- 02/05/07 ---- xx/xx/07 ---- 03/13/07 --- Yes - 76

StarProg --------------- 12/28/06 ---- 01/20/07 ---- 02/23/07 ---- 03/31/07 ---- 05/10/07 --- Yes - 130

Exodus2006 ------------- 01/16/07 ---- 02/07/07 ---- 03/09/07 ---- 04/10/07 ---- 07/09/07 --- No -- 174

Dennis & Ezgi ---------- 01/18/07 ---- 02/09/07 ---- 02/21/07 ---- 03/20/07 ---- 04/10/07 --- No -- 81

Radu & Mari ------------ 02/12/07 ---- 03/07/07 ---- 03/26/07 ---- 04/06/07 ---- 04/17/07 --- Yes - 64

ErnestoyAlexis --------- 02/16/07 ---- xx/xx/07 ---- xx/xx/07 ---- xx/xx/07 ---- 05/08/07 --- N/A - 81

Misty1979 -------------- 03/06/07 ---- 04/09/07 ---- 05/07/07 ---- 06/06/07 ---- 06/18/07 --- Yes - 104

jediknight ------------- 03/11/07 ---- 03/27/07 ---- 04/12/07 ---- 05/02/07 ---- 05/15/07 --- Yes - 65

Karina ----------------- 03/13/07 ---- 04/23/07 ---- 05/07/07 ---- 05/21/07 ---- 06/01/07 --- Yes - 80

severinep -------------- 03/13/07 ---- 04/19/07 ---- 07/02/07 ---- 07/16/07 ---- Pending

jacob88 ---------------- 03/14/07 ---- 04/23/07 ---- 05/22/07 ---- 06/18/07 ---- 07/03/07 --- No -- 111

hcheun02 --------------- 03/22/07 ---- 04/05/07 ---- 05/09/07 ---- 05/26/07 ---- 06/01/07 --- Yes - 71

Miriam n Alain --------- 03/22/07 ---- 04/24/07 ---- 04/30/07 ---- 05/17/07 ---- 05/21/07 --- N/A - 60

NYC__girl -------------- 04/03/07 ---- 04/16/07 ---- 05/20/07 ---- 06/30/07 ---- Pending

John & Erica ----------- 04/06/07 ---- 05/14/07 ---- 05/31/07 ---- 06/11/07 ---- 06/22/07 --- Yes - 77

slbois ----------------- 04/09/07 ---- 05/22/07 ---- 06/07/07 ---- 06/28/07 ---- 07/16/07 --- Yes - 98

Kathy & Prabh ---------- 04/10/07 ---- 05/14/07 ---- 05/31/07 ---- 06/xx/07 ---- 06/14/07 --- Yes - 65

misfitsbalzac ---------- 04/11/07 ---- 05/22/07 ---- 07/05/07 ---- 08/01/07 ---- 08/29/07 --- No -- 140

mike & elena ----------- 04/16/07 ---- 05/23/07 ---- 06/29/07 ---- 07/16/07 ---- 08/11/07 --- Yes - 117

Singh77 ---------------- 04/17/07 ---- 05/27/07 ---- 06/25/07 ---- 08/05/07 ---- 08/17/07 --- Yes - 122

Comelly ---------------- 04/19/07 ---- 05/21/07 ---- 06/14/07 ---- 06/25/07 ---- 07/30/07 --- No -- 102

sjmartins -------------- 04/25/07 ---- 06/18/07 ---- 07/20/07 ---- Pending

Yocasta ---------------- 04/27/07 ---- 05/14/07 ---- 05/29/07 ---- Pending

Mononoke28 ------------- 05/03/07 ---- 06/02/07 ---- 06/22/07 ---- 07/23/07 ---- 08/08/07 --- Yes - 97

jigi ------------------- 05/08/07 ---- 06/16/07 ---- 07/29/07 ---- Pending

knowledge -------------- 05/09/07 ---- 06/04/07 ---- 07/xx/07 ---- 08/08/07 ---- Pending

Heina ------------------ 05/15/07 ---- 06/23/07 ---- 07/28/07 ---- Pending

nyseness --------------- 05/16/07 ---- 06/18/07 ---- 08/11/07 ---- Pending

alongjourney ----------- 05/16/07 ---- 06/25/07 ---- 08/13/07 ---- Pending

Brian & Elena ---------- 05/21/07 ---- Pending

mikeandlani ------------ 05/21/07 ---- 07/02/07 ---- 08/04/07 ---- Pending

khanshahid ------------- 05/24/07 ---- 06/25/07 ---- 07/27/07 ---- 08/24/07 ---- Pending

KayArt ----------------- 05/24/07 ---- 07/03/07 ---- 07/27/07 ---- 08/13/07 ---- 08/30/07 --- Yes - 98

MegDan ----------------- 05/31/07 ---- 07/02/07 ---- 07/28/07 ---- 08/20/07 ---- Pending

hhk3 ------------------- 05/31/07 ---- 06/25/07 ---- 07/21/07 ---- 07/30/07 ---- 08/14/07 --- Yes - 75

Jasmin ----------------- 06/01/07 ---- 06/18/07 ---- 07/20/07 ---- 07/30/07 ---- Pending

Singha ----------------- 06/01/07 ---- 06/25/07 ---- 07/19/07 ---- 08/13/07 ---- 08/28/07 --- No -- 89

Trailmix --------------- 06/05/07 ---- 07/02/07 ---- 08/02/07 ---- 08/21/07 ---- Pending

micky-sabry ------------ 06/05/07 ---- 07/09/07 ---- 08/03/07 ---- Pending

CHERRI1 ---------------- 06/06/07 ---- 07/02/07 ---- 08/02/07 ---- 08/27/07 ---- Pending

virt ------------------- 06/07/07 ---- Pending

Geist & Stabu ---------- 06/07/07 ---- 07/09/07 ---- 08/02/07 ---- Pending

vylex ------------------ 06/12/07 ---- 07/02/07 ---- 07/27/07 ---- 08/13/07 ---- 08/27/05 --- Yes - 76

Nilz07 ----------------- 06/12/07 ---- 07/16/07 ---- Pending

vonicks ---------------- 06/13/07 ---- 07/16/07 ---- Pending

dillydally ------------- 06/14/07 ---- 07/16/07 ---- 08/10/07 ---- Pending

rika60607 -------------- 06/14/07 ---- 07/16/07 ---- 08/18/07 ---- 08/28/07 ---- Pending

Abrar & Huma ----------- 06/15/07 ---- 07/16/07 ---- 08/15/07 ---- Pending

endless ---------------- 06/18/07 ---- 07/24/07 ---- Pending

S & J ------------------ 06/19/07 ---- 07/16/07 ---- 08/17/07 ---- Pending

flicki ----------------- 06/25/07 ---- 06/27/07 ---- Pending

vutapson --------------- 06/28/07 ---- 07/16/07 ---- 08/25/07 ---- Pending

samrodriguez226 -------- 06/29/07 ---- 08/19/07 ---- Pending

RandyandRina ----------- 07/02/07 ---- 08/06/07 ---- 08/29/07 ---- Pending

LadyJane --------------- 07/03/07 ---- 08/06/07 ---- Pending

Olechka ---------------- 07/04/07 ---- 08/02/07 ---- 08/20/07 ---- Pending

zellda ----------------- 07/09/07 ---- Pending

michael_nc ------------- 07/12/07 ---- 08/27/07 ---- Pending

Divine Mercy ----------- 07/16/07 ---- Pending

Z & S ------------------ 07/16/07 ---- 07/30/07 ---- Pending

PC_Whisperer ----------- 07/27/07 ---- 08/20/07 ---- Pending

Ereshkigal ------------- 08/17/07 ---- 09/03/07 ---- Pending

natashenika ------------ 08/23/07 ---- Pending

Nine month moving average of "Days" counted from "NOA2" between 12/05/06 and 09/05/07: 94 days

fi1.gif L & R nh1.gif

10/15/04 Met online

03/15/05 Met IRL

12/25/05 Got engaged

06/06/06 Got married

USCIS: I-130 Process

02/16/07 I-130 sent to VSC

02/21/07 NOA1 from VSC

02/24/07 Touched, check cashed

05/11/07 Touched, transferred from VSC to CSC

05/14/07 Touched

05/15/07 Touched

05/22/07 Touched, pending at CSC

05/23/07 Touched

06/07/07 NOA2 from CSC

06/08/07 Touched, approval notice sent

NVC: CR-1 Process (used James' NVC Shortcuts v2.0)

06/22/07 NVC received and case number HLS2007****** assigned

07/09/07 DS-3023 and I-864 fee bill generated

07/10/07 DS-3023 e-mail and I-864 payment sent

07/20/07 DS-3023 e-mail and I-864 payment accepted

07/23/07 IV fee bill and I-864 package generated

08/02/07 IV fee bill and I-864 package (08/01) received

08/02/07 IV payment and I-864 package sent

09/09/07 IV payment and I-864 package (08/14) accepted

09/10/07 DS-230 generated

09/12/07 DS-230 sent

09/17/07 DS-230 accepted

09/25/07 NVC complete

10/01/07 NVC forwards case to Helsinki

Embassy: CR-1 Process

10/08/07 Embassy received

10/10/07 Packet 3 received

10/11/07 Packet 3 sent

10/16/07 Packet 4 received

10/18/07 Medical

10/31/07 Interview date (rescheduled from 10/22)

11/03/07 Visa received

11/28/07 US Entry (POE: Boston)

01/19/08 Wellcome letter received

01/22/08 Green card received

USCIS: I-751 Process

08/30/09 Ninety day window opens

09/29/09 I-751 sent

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

I'm really sorry that I haven't updated this for a while, it's just that I feel rather depressed updating everyone's timelines when our own case is stuck at the NVC because of their mistake :(. I'm glad that trailmix has done such a good job in the meantime :thumbs:. Anyway, here's the updates!

Updates:

Updated misfitsbalzac (NVC Complete :))

Added Misty1979

Updated & corrected Singh77 (DS-230 & NVC Complete :))

Updated Rika60607 (DS-230)

Updated Ereshkigal (DS-3032/I-864)

Corrected vylex

(Note to self: don't leave this unupdated for a long time or you're going to end up making a lot of updates on one go :P)

Hi Stabu, i think this is the best work i ever seen on VJ :thumbs: and thank you of taking care of my timeframe also...though...Pls correct, i send the ds-230 August 22; and just knew today that NVC received it the August 24. The automated line said also that it will take 2-4 weeks to next step ...Is this normal time of waiting the case to be completed? Thanks...and Fingers crossed with your case also to hurry up! (F)

CR-1, VT- Canada

I-130:

25 Aug 06 - Sent I-130 (a Friday)

28 Aug 06 - NOA1 & Certif. receipt returned ( a Monday) Day 1

29 Aug 06 - USCIS cashes check

30 Aug 06 - check cleared & 1ST TOUCH.

01 Sept 06 - NOA1 recvd by Mail

09 Sept 06 - 2ND TOUCH (a Saturday)

09 Mai 07 - NOA2 (2 e-mails)

Note: were told the long delay due to huge backlog and internal changes in VT

NVC :

04-June-07 - NVC generates DS-3032 & AOS bill

12-June-07 - AOS Bill payment sent/ alien receives DS-3032 form (by mail, dated 4th June)

13-June-07 - Alien sends back completed DS-3032 (by mail)/ rcvd 19th of June approx.

To mid July-07 - I-864 form sent completed and IV fee bill

19-July-07 NVC rcv I-864 form; mail signature rcvd.

22-Aug-07 Ds-230 with documents sent to NVC.

20-Sep - 07 Alien sends NVC Missing document. NVC receives it the 25th.

05-Oct - 07 NVC completed.

16-Jan - 08 Interview, 3 questions asked, visa approved same day, received 1week later approx.

Note: delay due to internal delay, missing document (not rfe) and self procrastination of understanding some abstract terms. C Post not at all reliable (delivery duration, delivery with signature (did not deliver personnaly), and delivery of interview letter rcvd after the interview).

In USA:

01-03-08 POE Entry in USA

...-03-08 2 Welcome in America letters and green card received.

"What I know is that I know nothing"

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

hey

ANy UPDATE from my friends are distraught and waiting like me... Has any one got respite from the injustice done by NVC on us... Please do post sooon

Jigi

Feb 1,2007 - I-130 Reached USCIS.

Feb 4,2007 - I-130 accepted > Get USCIS case Number NOA1.

May 8 ,2007- GET NVC Case Number > NOA2.

June 16 ,2007- Get Order from NVC to pay 70$.

July 2 ,2007- Get DS-3032 in India.

July 7,2007 - DS-3032 choice of address agent entered in NVC.

July 14 ,2007- Get I-864.

July 18 ,2007- I-864 Enters NVC.

July 29 ,2007- Get Order to Pay 380$ fee.

Aug 3 ,2007- 380$ Fee Reached St Louis.

Aug 25,2007 - NVC & St Louis People receive photocopy of my payment with USPS receipt.

After WAITING for 37 days.

Sept 10,2007 - 380$ fee encashed.

Sept 24,2007 - Receive DS-230 in Mail.

Sept 25,2007 - DS-230 despatched.

Sept 26,2007- DS-230 Delivered.

Oct 1,2007 - NVC has DS-230.

Oct 12, 2007 - DS-230 Reviewed. Case Complete

Oct 16, 2007 - Case at Embassy.

Oct 25, 2007- Interview Letter Despatched from Embassy.

Nov 3, 2007 - Recieved Interview Letter.

Dec 1, 2007 - Medical Exam .

I GOT IT

Jan 16 - I am in USA

April 15 2008 - Get my Drivers License.

I-751 Lifting Conditions at California Service Center

November 12, 2009 - I-751 Sent via USPS Express Mail

November 13, 2009 - Receipt of I-1751 Fee

November 20, 2009 - Arrested on Domestic Battery(Had argument with wife)

December 18, 2009 - Biometrics Completed at 9 am.

January 13, 2010 - Receive I-797E Notice for more evidence

February 16, 2010 - Mail reaches Californa Service Center( Next day of Preseidents Day)

February 19, 2010 - Card Production Ordered. Status now IR1

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...