Hi everyone! Just a question...

Does anyone know what happens if you are not at home when they try to deliver the visa? My fiance works all day and most likely will not be there when they deliver it. I just don't want a major delay on things because he won't be there during the times they try to deliver it. Anyone know? Thank you!

And congrats on the happy wedding news and all the other approved visas/interviews/etc!

Jennifer :)

That depends on which delivery company or mail service the embassy uses. They should've said at the interview approx. how long it would take and if he'd get it by mail or courier. Try contacting the embassy and let them know the situation and maybe they can help.

K-1 Timeline:

May 31, 2007 - Mailed I-129F to Nebraska

Oct. 22, 2007 - NOA2 Hard Copy received!! No email/website update.

Nov. 16, 2007 - Paperwork found & received by NVC!

Jan. 7, 2008 - Finally got the interview date

Jan. 28, 2008 - Interview!! Approved!!!

Feb. 12, 2008 - Arrives in USA!!!

Feb. 18, 2008 - Wedding Day!!!!!!

Feb. 19, 2008 - Apply for SSN

AOS Timeline:

Mar. 12, 2008 - Packet mailed (AOS, EAD, & AP)

Mar. 12, 2008 - Husband's SSN arrives

Mar. 14, 2008 - AOS pkt was delivered at 7:52 AM & signed for by V BUSTAMANTE.

Mar. 18, 2008 - Check cashed!!

Mar. 21, 2008 - NOA's for AOS, EAD & I-131!! (Dated 3-18-08)

Mar. 31, 2008 - Can finally see AP & EAD online!!

Apr. 10, 2008 - Biometrics finished! Can finally see AOS online & EAD touch!

May 12, 2008 - Email: AP approved!!

May 14, 2008 - Email: EAD approved!!

May 16, 2008 - EAD card & AP in hand!!

Sept 19, 2008 - Interview letter - Oct. 24th - Seattle??

Oct. 21, 2008 - A Touch..WOW!! The interviewer must've put it on his/her desk!

Oct. 24, 2008 - Interview..now back to waiting!

Nov 13, 2008 - Approved! Card Production Ordered...finally!!

Nov 24, 2008 - Card arrives!!!!

Link to comment
Share on other sites

  • Replies 4.1k
  • Created
  • Last Reply

Top Posters In This Topic

Filed: K-1 Visa Country: Sweden
Timeline
Hi everyone! Just a question...

Does anyone know what happens if you are not at home when they try to deliver the visa? My fiance works all day and most likely will not be there when they deliver it. I just don't want a major delay on things because he won't be there during the times they try to deliver it. Anyone know? Thank you!

And congrats on the happy wedding news and all the other approved visas/interviews/etc!

Jennifer :)

That depends on which delivery company or mail service the embassy uses. They should've said at the interview approx. how long it would take and if he'd get it by mail or courier. Try contacting the embassy and let them know the situation and maybe they can help.

Hi there! They said it would take around 11 days and I do not know if they said if it would be by courier or by mail. It is hard to contact the embassy because their phone hours are 1-3 PM Mon thru Thurs which is 4-6 AM MY time. I'd have to get up in the middle of the night to call. Oh well, its just me finding a way to worry again, most likely needlessly, but I guess I won't be 100% satisfied until he HAS that visa IN his hands. Thanks!! :)

Jennifer (the worry-wart)

OUR VISA JOURNEY

12/16/05 My honey and I met online

04/27/06 to 5/14/07 We met for the first time in person

10/16/06 to 1/15/07 He visits for a second time

04/04/07 We get engaged!

05/29/07 K1 Application arrived at CSC

07/21/07 to 9/15/07 He visits for a third time

09/19/07 APPROVAL from CSC

11/16/07 NVC received petition

Petition is put under Administrative Processing

12/28/07 AP DONE! YAY! Off to the Consulate!

01/02/08 Consulate received and packet 3 sent

01/04/08 My honey gets packet 3

01/09/08 Medical Appointment *PASSED*

01/09/08 Packet 3 Returned

01/23/08 8:30 AM INTERVIEW DATE!!!!!!!!!

01/23/08 Placed BACK on Administrative Processing (221g)

02/01/08 WE WERE APPROVED!!!!!! THANK YOU THANK YOU!!!!!!!

02/06/08 VISA arrives!!!!!!!

04/01/08 My honey arrives in the US!

WEDDING DATE: 04/27/08!

AOS:

05/22/08 Package sent

06/02/08 Got all 3 NOA's

6/21/08 Biometrics

7/12/08 RFE: want 12 months of bank statements

7/16/08 mailed statements

7/22/08 statements received

10/10/08 AP received

10/15/08 Work Permit received

1/24/09 Green Card Received

Link to comment
Share on other sites

Filed: K-1 Visa Country: Russia
Timeline
Hi everyone! Just a question...

Does anyone know what happens if you are not at home when they try to deliver the visa? My fiance works all day and most likely will not be there when they deliver it. I just don't want a major delay on things because he won't be there during the times they try to deliver it. Anyone know? Thank you!

And congrats on the happy wedding news and all the other approved visas/interviews/etc!

Jennifer :)

Have it delivered to the dhl office and let him pick it up there.

9/5/2004 met

7/4/2006 visited for 1 week in Russia (Independence Day!)

12/26/06 three week visit in the U.S.

4/6/07 He came to US for 6 glorious weeks

5/20/07 He returned to Ufa, RU

5/24/07 Mailed I-129F to NSC!!!!!

5/25/07 Received and signed for by F Heinauer, NSC

6/11/07 NOA1 (NEVER received hard copy)

8/23/07 Ramzis comes to America for another visit

10/02/07 Ramzis returns to Russia

11/06/07 NOA2 at LAST!!!

12/17/07 Received at NVC (at last!)

12/18/07 Sent to Moscow Embassy & New NVC Case Number

12/21/07 Received at 11:08 a.m. Moscow Embassy

1/25/08 Received packet from Embassy

03/07/08 Interview 8:00 a.m. Moscow Embassy! VISA APPROVED!!!

03/13/08 Visa in Hand

03/14/08 Flying to U.S. - Detroit POE

03/15/08 Our Wedding Day!

AOS Timeline

3/21/08 - Packet sent to Chicago Lockbox

3/24/08 - Packet received and signed for

3/28/08 - NOA1 received in the mail - EAD & AOS - check cashed

4/15/08 - Biometrics

5/5/08 - AOS interview notice received in the mail (will be in Detroit, June 12, 2008)

6/2/08 - EAD card ordered (CRIS email)

6/5/08 - EAD RECEIVED IN THE MAIL

6/12/08 - Permanent Resident APPROVAL! Green Card on the Way!

6/23/08 - Green Card Received!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Sweden
Timeline

Hi all!

He got his visa today :) It is in his hands!!!!! YAY! Such a sense of relief... now to plan the wedding!

Jennifer :)

OUR VISA JOURNEY

12/16/05 My honey and I met online

04/27/06 to 5/14/07 We met for the first time in person

10/16/06 to 1/15/07 He visits for a second time

04/04/07 We get engaged!

05/29/07 K1 Application arrived at CSC

07/21/07 to 9/15/07 He visits for a third time

09/19/07 APPROVAL from CSC

11/16/07 NVC received petition

Petition is put under Administrative Processing

12/28/07 AP DONE! YAY! Off to the Consulate!

01/02/08 Consulate received and packet 3 sent

01/04/08 My honey gets packet 3

01/09/08 Medical Appointment *PASSED*

01/09/08 Packet 3 Returned

01/23/08 8:30 AM INTERVIEW DATE!!!!!!!!!

01/23/08 Placed BACK on Administrative Processing (221g)

02/01/08 WE WERE APPROVED!!!!!! THANK YOU THANK YOU!!!!!!!

02/06/08 VISA arrives!!!!!!!

04/01/08 My honey arrives in the US!

WEDDING DATE: 04/27/08!

AOS:

05/22/08 Package sent

06/02/08 Got all 3 NOA's

6/21/08 Biometrics

7/12/08 RFE: want 12 months of bank statements

7/16/08 mailed statements

7/22/08 statements received

10/10/08 AP received

10/15/08 Work Permit received

1/24/09 Green Card Received

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ghana
Timeline
Hi all!

He got his visa today :) It is in his hands!!!!! YAY! Such a sense of relief... now to plan the wedding!

Jennifer :)

Congratulations!!!

Mama to 2 beautiful boys (August 2011 and January 2015)

Click for full timeline

Link to comment
Share on other sites

Filed: K-1 Visa Country: Russia
Timeline
Hi all!

He got his visa today :) It is in his hands!!!!! YAY! Such a sense of relief... now to plan the wedding!

Jennifer :)

We are all very happy for you!!! Congratulations

9/5/2004 met

7/4/2006 visited for 1 week in Russia (Independence Day!)

12/26/06 three week visit in the U.S.

4/6/07 He came to US for 6 glorious weeks

5/20/07 He returned to Ufa, RU

5/24/07 Mailed I-129F to NSC!!!!!

5/25/07 Received and signed for by F Heinauer, NSC

6/11/07 NOA1 (NEVER received hard copy)

8/23/07 Ramzis comes to America for another visit

10/02/07 Ramzis returns to Russia

11/06/07 NOA2 at LAST!!!

12/17/07 Received at NVC (at last!)

12/18/07 Sent to Moscow Embassy & New NVC Case Number

12/21/07 Received at 11:08 a.m. Moscow Embassy

1/25/08 Received packet from Embassy

03/07/08 Interview 8:00 a.m. Moscow Embassy! VISA APPROVED!!!

03/13/08 Visa in Hand

03/14/08 Flying to U.S. - Detroit POE

03/15/08 Our Wedding Day!

AOS Timeline

3/21/08 - Packet sent to Chicago Lockbox

3/24/08 - Packet received and signed for

3/28/08 - NOA1 received in the mail - EAD & AOS - check cashed

4/15/08 - Biometrics

5/5/08 - AOS interview notice received in the mail (will be in Detroit, June 12, 2008)

6/2/08 - EAD card ordered (CRIS email)

6/5/08 - EAD RECEIVED IN THE MAIL

6/12/08 - Permanent Resident APPROVAL! Green Card on the Way!

6/23/08 - Green Card Received!!!

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Japan
Timeline
Hi all!

He got his visa today :) It is in his hands!!!!! YAY! Such a sense of relief... now to plan the wedding!

Jennifer :)

YEA!! Congrats Jen!! And it didn't even take 11 days!! They told my fiance that it'd be a week, but we knew better...only took 2 days. Congrats again! :thumbs:

K-1 Timeline:

May 31, 2007 - Mailed I-129F to Nebraska

Oct. 22, 2007 - NOA2 Hard Copy received!! No email/website update.

Nov. 16, 2007 - Paperwork found & received by NVC!

Jan. 7, 2008 - Finally got the interview date

Jan. 28, 2008 - Interview!! Approved!!!

Feb. 12, 2008 - Arrives in USA!!!

Feb. 18, 2008 - Wedding Day!!!!!!

Feb. 19, 2008 - Apply for SSN

AOS Timeline:

Mar. 12, 2008 - Packet mailed (AOS, EAD, & AP)

Mar. 12, 2008 - Husband's SSN arrives

Mar. 14, 2008 - AOS pkt was delivered at 7:52 AM & signed for by V BUSTAMANTE.

Mar. 18, 2008 - Check cashed!!

Mar. 21, 2008 - NOA's for AOS, EAD & I-131!! (Dated 3-18-08)

Mar. 31, 2008 - Can finally see AP & EAD online!!

Apr. 10, 2008 - Biometrics finished! Can finally see AOS online & EAD touch!

May 12, 2008 - Email: AP approved!!

May 14, 2008 - Email: EAD approved!!

May 16, 2008 - EAD card & AP in hand!!

Sept 19, 2008 - Interview letter - Oct. 24th - Seattle??

Oct. 21, 2008 - A Touch..WOW!! The interviewer must've put it on his/her desk!

Oct. 24, 2008 - Interview..now back to waiting!

Nov 13, 2008 - Approved! Card Production Ordered...finally!!

Nov 24, 2008 - Card arrives!!!!

Link to comment
Share on other sites

Filed: K-1 Visa Country: Thailand
Timeline

Congrats Jen! :thumbs:

animated%20usa%20flag1.gifanimated%20thailand%20flag.gif

Thai Style USA

----------------------------------------------------------------------------------------------

Our Links:

http://www.facebook.com/profile.php?id=106...amp;ref=profile

https://www.facebook.com/groups/223365857736847/

https://www.facebook.com/groups/411770628885582/

http://www.thaiworldnetwork.com

Link to comment
Share on other sites

Filed: K-1 Visa Country: Sweden
Timeline

Thank you everyone! Have a WONDERFUL weekend!

Jennifer :)

OUR VISA JOURNEY

12/16/05 My honey and I met online

04/27/06 to 5/14/07 We met for the first time in person

10/16/06 to 1/15/07 He visits for a second time

04/04/07 We get engaged!

05/29/07 K1 Application arrived at CSC

07/21/07 to 9/15/07 He visits for a third time

09/19/07 APPROVAL from CSC

11/16/07 NVC received petition

Petition is put under Administrative Processing

12/28/07 AP DONE! YAY! Off to the Consulate!

01/02/08 Consulate received and packet 3 sent

01/04/08 My honey gets packet 3

01/09/08 Medical Appointment *PASSED*

01/09/08 Packet 3 Returned

01/23/08 8:30 AM INTERVIEW DATE!!!!!!!!!

01/23/08 Placed BACK on Administrative Processing (221g)

02/01/08 WE WERE APPROVED!!!!!! THANK YOU THANK YOU!!!!!!!

02/06/08 VISA arrives!!!!!!!

04/01/08 My honey arrives in the US!

WEDDING DATE: 04/27/08!

AOS:

05/22/08 Package sent

06/02/08 Got all 3 NOA's

6/21/08 Biometrics

7/12/08 RFE: want 12 months of bank statements

7/16/08 mailed statements

7/22/08 statements received

10/10/08 AP received

10/15/08 Work Permit received

1/24/09 Green Card Received

Link to comment
Share on other sites

Filed: K-1 Visa Country: Thailand
Timeline

Congrats LoVe! :thumbs:

animated%20usa%20flag1.gifanimated%20thailand%20flag.gif

Thai Style USA

----------------------------------------------------------------------------------------------

Our Links:

http://www.facebook.com/profile.php?id=106...amp;ref=profile

https://www.facebook.com/groups/223365857736847/

https://www.facebook.com/groups/411770628885582/

http://www.thaiworldnetwork.com

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Japan
Timeline
Just wanted to say WE GOT APPROVED YESTERDAY! WOOT WOOT!

Congratulations!! :dance::dance::dance:

K-1 Timeline:

May 31, 2007 - Mailed I-129F to Nebraska

Oct. 22, 2007 - NOA2 Hard Copy received!! No email/website update.

Nov. 16, 2007 - Paperwork found & received by NVC!

Jan. 7, 2008 - Finally got the interview date

Jan. 28, 2008 - Interview!! Approved!!!

Feb. 12, 2008 - Arrives in USA!!!

Feb. 18, 2008 - Wedding Day!!!!!!

Feb. 19, 2008 - Apply for SSN

AOS Timeline:

Mar. 12, 2008 - Packet mailed (AOS, EAD, & AP)

Mar. 12, 2008 - Husband's SSN arrives

Mar. 14, 2008 - AOS pkt was delivered at 7:52 AM & signed for by V BUSTAMANTE.

Mar. 18, 2008 - Check cashed!!

Mar. 21, 2008 - NOA's for AOS, EAD & I-131!! (Dated 3-18-08)

Mar. 31, 2008 - Can finally see AP & EAD online!!

Apr. 10, 2008 - Biometrics finished! Can finally see AOS online & EAD touch!

May 12, 2008 - Email: AP approved!!

May 14, 2008 - Email: EAD approved!!

May 16, 2008 - EAD card & AP in hand!!

Sept 19, 2008 - Interview letter - Oct. 24th - Seattle??

Oct. 21, 2008 - A Touch..WOW!! The interviewer must've put it on his/her desk!

Oct. 24, 2008 - Interview..now back to waiting!

Nov 13, 2008 - Approved! Card Production Ordered...finally!!

Nov 24, 2008 - Card arrives!!!!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ghana
Timeline
Just wanted to say WE GOT APPROVED YESTERDAY! WOOT WOOT!

Congratulations!!!

Mama to 2 beautiful boys (August 2011 and January 2015)

Click for full timeline

Link to comment
Share on other sites

I had my interview on tuesday 12th and I am Approved I should get the visa in 3-5 days

Im so happy good luck to everyone else

K-1 Visa

Event...................................Date

Service Center : .............Vermont Service Center

Consulate :.....................London, United Kingdom

I-129F Sent :....................2007-05-17

I-129F NOA1 :..................2007-05-21

I-129F NOA2 :..................2007-08-17

NVC Received :................2007-08-24

Packet 3 Received :...... ..2007-09-10

Packet 3 Sent :............... .2007-11-15

Medical :...........................2007-11-23

Packet 4 Received :.........2008-01-28

Interview Date :................2008-02-12

Visa Received :.................2008-02-15

US Entry : .........................2008-02-16

Marriage : ........................2008-04-19

AOS

AOS I-485 : ......................2008-05-09

EAD I-765 : ......................2008-05-09

Biometrics : ....................2008-06-10

Transferred :.....................2008-08-08

Card production ordered:..2008-09-04

EAD arrived :....................2008-09-12

RFE Notice :....................2008-10-08

Got VISA :........................2008-11-09

ROC

ROC I-751 : .....................2010-08-17

NOA 1.....: .......................2010-08-20

BIO.......: ..........................2010-11-

Approved..: .....................2010-12-03

N-400

Date Filed: ......................2019-07-09

Biometrics:.....................2019-08-01

Link to comment
Share on other sites

Filed: K-1 Visa Country: Russia
Timeline
I had my interview on tuesday 12th and I am Approved I should get the visa in 3-5 days

Im so happy good luck to everyone else

Congrats!!!!!! It is great to see the May filers having their dreams become reality. Zee we are up next!!!!

9/5/2004 met

7/4/2006 visited for 1 week in Russia (Independence Day!)

12/26/06 three week visit in the U.S.

4/6/07 He came to US for 6 glorious weeks

5/20/07 He returned to Ufa, RU

5/24/07 Mailed I-129F to NSC!!!!!

5/25/07 Received and signed for by F Heinauer, NSC

6/11/07 NOA1 (NEVER received hard copy)

8/23/07 Ramzis comes to America for another visit

10/02/07 Ramzis returns to Russia

11/06/07 NOA2 at LAST!!!

12/17/07 Received at NVC (at last!)

12/18/07 Sent to Moscow Embassy & New NVC Case Number

12/21/07 Received at 11:08 a.m. Moscow Embassy

1/25/08 Received packet from Embassy

03/07/08 Interview 8:00 a.m. Moscow Embassy! VISA APPROVED!!!

03/13/08 Visa in Hand

03/14/08 Flying to U.S. - Detroit POE

03/15/08 Our Wedding Day!

AOS Timeline

3/21/08 - Packet sent to Chicago Lockbox

3/24/08 - Packet received and signed for

3/28/08 - NOA1 received in the mail - EAD & AOS - check cashed

4/15/08 - Biometrics

5/5/08 - AOS interview notice received in the mail (will be in Detroit, June 12, 2008)

6/2/08 - EAD card ordered (CRIS email)

6/5/08 - EAD RECEIVED IN THE MAIL

6/12/08 - Permanent Resident APPROVAL! Green Card on the Way!

6/23/08 - Green Card Received!!!

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ghana
Timeline
I had my interview on tuesday 12th and I am Approved I should get the visa in 3-5 days

Im so happy good luck to everyone else

Congrats!!!!!! It is great to see the May filers having their dreams become reality. Zee we are up next!!!!

You know it :)

Mama to 2 beautiful boys (August 2011 and January 2015)

Click for full timeline

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...