8 hours ago, Fmert001 said:

I just did a check a receipt number of a person who filed after me and it shows case was received and placed in NSC. What is going on?? I’m going to call in the morning because someone needs to explain this to me. I know I have long time before I get NOA2 but still I would like some sort of assurance.....😡😡😡😡😡

Part of the reply I got, forwarded to me from the congresswoman's office, goes like this. Somehow, I have a feeling the issue will never be resolved. 

 

U.S. Citizenship and Immigration Services (USCIS) records confirm that your constituent’s I-130 petition was receipted on August 24, 2017, and is currently still pending adjudication.  I have notified our IT Department of the search error your constituent is experiencing with My Case Status Online. The issue should be resolved shortly.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
7 hours ago, Fmert001 said:

I just did a check a receipt number of a person who filed after me and it shows case was received and placed in NSC. What is going on?? I’m going to call in the morning because someone needs to explain this to me. I know I have long time before I get NOA2 but still I would like some sort of assurance.....😡😡😡😡😡

Yes and the normal thing is that the number works, I started checking it 2 months from NOA1 and without results.

Today NOW is:  155 Days 10 Hours 01 Minutes  since my NOA 1, and yes, I have an online counter to know how long have been passed since NOA1, 5 months guys, half road in NSC.

 

 

 

 

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Haiti
Timeline
3 hours ago, ms_bobdog said:

Part of the reply I got, forwarded to me from the congresswoman's office, goes like this. Somehow, I have a feeling the issue will never be resolved. 

 

U.S. Citizenship and Immigration Services (USCIS) records confirm that your constituent’s I-130 petition was receipted on August 24, 2017, and is currently still pending adjudication.  I have notified our IT Department of the search error your constituent is experiencing with My Case Status Online. The issue should be resolved shortly.

I’m starting to think the same thing it just it should be some disclaimer saying it may not work that’s all I’m saying but thank you for answering me....... At least I have VJ to keep my nerves calm 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Haiti
Timeline
1 hour ago, Jhonny said:

Yes and the normal thing is that the number works, I started checking it 2 months from NOA1 and without results.

Today NOW is:  155 Days 10 Hours 01 Minutes  since my NOA 1, and yes, I have an online counter to know how long have been passed since NOA1, 5 months guys, half road in NSC.

 

 

 

 

Soon all of this will be over..... Thank you again

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
19 hours ago, Fmert001 said:

Soon all of this will be over..... Thank you again

It will, this will end too, this ong journey, NVC stage is big shorter and dynamic, you see and FEEL the progress, stage by stage!

Lets just wait and see!

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Haiti
Timeline
On 1/27/2018 at 7:17 AM, Jhonny said:

It will, this will end too, this ong journey, NVC stage is big shorter and dynamic, you see and FEEL the progress, stage by stage!

Lets just wait and see!

Yes that's all we can do now just wait 

Link to comment
Share on other sites

  • 2 weeks later...
Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

I just write to NSC e mail asking for what´s going on with the case number, on Feb 24 is going to be 6 months and the case number isn´t working.

I will update you about the answer, when I receive it!

Have a great day you all !

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

I filled to replace my green card back in May 2017 and the number doesn't work, I called them 4 times or more through out the months and all they tell me is wait, I called them again today and they are gonna give me a call back 3-5 business days. I'm really worried about that because the social security office doesn't accept my extension letter, I'm having huge problems because of this delay! It's crazy. Well, I'm thinking about now filing for my naturalization/citizenship here, for real! This is taking too long! 

- Las Vegas

Edited by Natalia Norris
Link to comment
Share on other sites

Hello all! I just got my NOA2 dated 12 February 2018. My NOA1 PD was 24 August 2017 at Potomac, and my receipt number never worked! Even when the hardcopy NOA2 came in the receipt number didn't work, but I just checked again and now it's updated to say it's been sent to NVC. My guess is that if the receipt number didn't work from the beginning, it will not work until someone gets the file and either sends an RFE or approval notice before they finally key it into the system. At least that seems to be how it worked for me!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
2 hours ago, ms_bobdog said:

Hello all! I just got my NOA2 dated 12 February 2018. My NOA1 PD was 24 August 2017 at Potomac, and my receipt number never worked! Even when the hardcopy NOA2 came in the receipt number didn't work, but I just checked again and now it's updated to say it's been sent to NVC. My guess is that if the receipt number didn't work from the beginning, it will not work until someone gets the file and either sends an RFE or approval notice before they finally key it into the system. At least that seems to be how it worked for me!

Yes  it seems to be like is going to work when I get the approval or ,pray God to not this, a RFE!!!

I'm still pending of a response from NSC about my case number, but,as you say, I think that is not going to work until they reviewed the case and update it in their database. 

But still happy 4 your noa2 

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

8th business day since I sended the Inquiry to USCIS and no response from them untill this date.

I am still on a reasonable date to receive an answer from them!

Let´s keep waiting and see what happens!

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

  • 1 month later...
Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
5 hours ago, annied said:

how is everything? I havent heard any update from you guys

Oh, sorry, hi @annied our trending topic is August 2017 filers, in my case I received RFE on March 13 and answered them last Monday, they officially received it yesterday and changed my status to RFE response received!

Thanks for asking! Have a pleasant day!

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Haiti
Timeline
7 hours ago, annied said:

how is everything? I havent heard any update from you guys

My case number still doesn’t work🙄🙄🙄

1 hour ago, Jhonny said:

Oh, sorry, hi @annied our trending topic is August 2017 filers, in my case I received RFE on March 13 and answered them last Monday, they officially received it yesterday and changed my status to RFE response received!

Thanks for asking! Have a pleasant day!

Congrats 🎉🎊🍾🎈I’m so happy for you!!!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
3 hours ago, Fmert001 said:

My case number still doesn’t work🙄🙄🙄

Congrats 🎉🎊🍾🎈I’m so happy for you!!!!!

Thank you...a lot! I´m closer to my NOA2!

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...