12 hours ago, Jhonny said:

 

Unfortunatelly Texas Center Still closed due to Harvey's still near land affecting it :

 

Office Status
USCIS Field Office in Houston, Texas Closed August 28, 2017 and August 29, 2017
USCIS Asylum Office in Houston, Texas Closed August 28, 2017 and August 29, 2017
USCIS Application Support Centers in Houston, Texas

Closed August 28, 2017 and August 29, 2017

 

USCIS official information, what I reccomend, to register in the website and get the updates via e-mail!

Good luck in your Journey!

I think that the USCIS TEXAS SERVICE CENTER is actually in Dallas, no? 

event.png
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

I  would be lying  if I said yes, I don't know  really ...

The thing is that until next Monday are going to be closed! 

I hope they run process fast knowing that they are slowest than the other centers.

 

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

11 hours ago, natasha-mehdito said:

Thats awesome!!! Congrats!!!!

Thank you! The distance is really stressing me out tho....moreso since finding out im pregnant.....sighhh

Link to comment
Share on other sites

Filed: K-1 Visa Country: Iran
Timeline
On August 29, 2017 at 9:59 AM, star6 said:

Thank you! The distance is really stressing me out tho....moreso since finding out im pregnant.....sighhh

Of course! Thats understandable. Mehdi & I are actually more relaxed once we married. We feel more calm somehow. I try really hard to not think about the length of time we need to wait. Instead we focus on the "now". It helps! 

Its a joyous thing that you are pregnant!! How wonderful! put your focus thee and watch how the time flies by!!!

 

event.png
Link to comment
Share on other sites

On 8/30/2017 at 8:03 PM, natasha-mehdito said:

Of course! Thats understandable. Mehdi & I are actually more relaxed once we married. We feel more calm somehow. I try really hard to not think about the length of time we need to wait. Instead we focus on the "now". It helps! 

Its a joyous thing that you are pregnant!! How wonderful! put your focus thee and watch how the time flies by!!!

 

Thank u .....ive been gettin so much conflicting info on whether i can go to the states to visit now....but i have a 10 ur visitors visa and have been vacationing there past 4 years...always been given 6 mths to stay by immigration there but never stayed more than a month....have any of u travelled there since starting this process? Can u advise on this? 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
10 minutes ago, star6 said:

Thank u .....ive been gettin so much conflicting info on whether i can go to the states to visit now....but i have a 10 ur visitors visa and have been vacationing there past 4 years...always been given 6 mths to stay by immigration there but never stayed more than a month....have any of u travelled there since starting this process? Can u advise on this? 

Well, if you have a Tourist Visa, but, you are in the process, they know it, so you have to enforce that you are going to return, buying a round trip ticket, proving in some way that you are going to go back and be aware at Border Officer questions, because you are going to be red flagged in attemp to stay and if they don't see you in intention to go back, they can deny you the entry and have faculties to do that! 

Edited by Jhonny

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

On 9/2/2017 at 8:59 AM, Jhonny said:

Well, if you have a Tourist Visa, but, you are in the process, they know it, so you have to enforce that you are going to return, buying a round trip ticket, proving in some way that you are going to go back and be aware at Border Officer questions, because you are going to be red flagged in attemp to stay and if they don't see you in intention to go back, they can deny you the entry and have faculties to do that! 

Thank you.....i plan to go on a return ticket and take a job letter with me.....hope that would suffice!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
1 minute ago, star6 said:

Thank you.....i plan to go on a return ticket and take a job letter with me.....hope that would suffice!

Yes , that should be enough, try to let clear that you have family back there in Trinidad and Tobago also! Just to be sure of that...

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Guyana
Timeline

Good afternoon,  how is our August filers doing. It's almost 1 month already or so for others. We are getting closer yeah!!! Just being enthusiastic😊. However I'm getting excited to see that service centers ( Potomac and Texas) are working nicely along. The wait has become bearable or somewhat. I try to think of it like we are still dating ...we video chat and hussy comes to visit once or thrice a year and the time flies by. So keep the faith our time will be here before we know it. Have a great day guys

Link to comment
Share on other sites

Hi everyone,

 

UK beneficiary and U.S petitioner living in Australia.

i-130 sent to Chicago Lockbox on August 16th. 

NOA1 date August 21st. Our petition was sent to Nebraska. 

Excited to finally be moving forward with this process. Good luck to you all! :) 

Link to comment
Share on other sites

Dear all,

 

Been reading for a few days and decided to join in!

 

I am a Singapore Citizen beneficiary, U.S. petitioner living in the United States.

i-130 and i-130a sent to Chicago Lockbox.

NOA1 Date August 24 2017. Petition sent to Potomac Service Centre

 

We have known each other online for 17 years now. Met in person in March 2014, and did a courthouse marriage in June this year when I visited him. All in, I have visited him 5 times (difficult to travel as a school teacher, and all that distance-- over 20 hours by flight!) and he is coming to Singapore end November to see me as I am not comfortable visiting him with a pending case. Definitely not looking forward to coming off over 20 hours of flying and being put on the next flight back. We are hoping that it would be a straightforward case that won't take too long, as we are planning a wedding reception in August 2018 in Illinois. I know it sounds weird, but it is pretty common in Singapore for people to be legally married and holding a reception only much later. Needless to say, trying to plan for a reception living so far away and on completely opposite time zones has been rather interesting.

 

For proof of marriage, we submitted the following:

Marriage certificate

Copies of my insurance policies with him as beneficiary

Nomination of him as beneficiary of my retirement account savings here in Singapore

Notarised letter from his mother

Copy of my divorce certificate

 

We have lots of photographs together, as well as all my plane tickets, chat logs etc. but we didn't think they were necessary to submit at this stage and were planning to take them at the interview stage. I hope this won't slow things down!

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Guyana
Timeline
8 hours ago, ms_bobdog said:

Dear all,

 

Been reading for a few days and decided to join in!

 

I am a Singapore Citizen beneficiary, U.S. petitioner living in the United States.

i-130 and i-130a sent to Chicago Lockbox.

NOA1 Date August 24 2017. Petition sent to Potomac Service Centre

 

We have known each other online for 17 years now. Met in person in March 2014, and did a courthouse marriage in June this year when I visited him. All in, I have visited him 5 times (difficult to travel as a school teacher, and all that distance-- over 20 hours by flight!) and he is coming to Singapore end November to see me as I am not comfortable visiting him with a pending case. Definitely not looking forward to coming off over 20 hours of flying and being put on the next flight back. We are hoping that it would be a straightforward case that won't take too long, as we are planning a wedding reception in August 2018 in Illinois. I know it sounds weird, but it is pretty common in Singapore for people to be legally married and holding a reception only much later. Needless to say, trying to plan for a reception living so far away and on completely opposite time zones has been rather interesting.

 

For proof of marriage, we submitted the following:

Marriage certificate

Copies of my insurance policies with him as beneficiary

Nomination of him as beneficiary of my retirement account savings here in Singapore

Notarised letter from his mother

Copy of my divorce certificate

 

We have lots of photographs together, as well as all my plane tickets, chat logs etc. but we didn't think they were necessary to submit at this stage and were planning to take them at the interview stage. I hope this won't slow things down!

 

 

Welcome!! You're at a great time center they work faster than the other centers. With your husband being ble to visit the time will fly fast. 😊

Link to comment
Share on other sites

Welcome to Everyone! :)

       IR-1 - Nebraska Service Center - Embassy - Riyadh, Saudi Arabia

  • 08/08/2017 - Sent I-130 Application
  • 08/11/2017 - I-130 Accepted
  • 08/11/2017 -  NOA-1 via Email
  • 02/28/2018 - I-130 Approved
  • 03/06/2018 - Case Sent to NVC
  • 03/14/2018 - Package Received By NVC
  • 04/21/2018 - Case Assigned & Invoice ID
  • 04/24/2018 - Filed DS 261
  • 04/26/2018 - Welcome Letter Received
  • 04/30/2018 - AOS fee status - PAID
  • 05/01/2018 - IV fee status - PAID
  • 05/02/2018 - Completed DS-260
  • 05/07/2018 - Documents Mailed to NVC
  • 05/10/2018 - NVC Received Documents ( SD )
  • 05/15/2018 - Case Completed - ( CC )
  • 06/01/2018 - Interview Schedule For 07/08/2018
  • 07/08/2018 - VISA APPROVED

___________________________________________________________________________________

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
1 hour ago, sunil1 said:

Hi all. August filer here with priority date of Aug 4.

Welcome to our group, the good news are that we are not the latest one...

February 2016: We met in our jobs.

May 31 2016: We became a couple. :dancing:

August 16 2016: Engaged.

October 20 2016: ¡OUR WEDDING! Wooohooooo !!!!:dancing::dancing::dancing::wub:  :wub: :wub: 

CR-1 Visa Journey ... Service Center: Nebraska. Embassy: Bogotá , Colombia.

(I - 130 USCIS stage) :

Monday, August 21 2017 (Day 1) :  I - 130 sent. 

Monday, August 28 2017 (Day 7) : NOA(Received via e-mail and SMS).  :dance:

Tuesday, September 05 2017 (Day 15) NOA(hard copy I-797 received thru post mail) (PD Aug 24 2017).

Tuesday, March 13 2018 (Day 201) : USCIS issues RFE to our case . (Case opended at least) .:dance: 

Saturday, March 17 2018 (Day 205) : USCIS RFE  arrived via post mail.

Monday, March 19 2018 (Day 207) : USCIS RFE ´s answer was sent via post mail to NSC .

Thursday, March 22 2018 (Day 210) : Online Case Status changed to RFE´s answer was received .

Monday, April 2 2018 (Day 221) : ¡Approved! Online Case Status now shows Case was sent to Department of State.:dance::dancing:

 

(NVC Stage) :

Wednesday, April 4 2018 (Day 223) : Case Received.

Tuesday, June 5 2018 (Day 285): Case Number assigned, welcome letter received,invoice number received, DS261 filed.

Thursday, June 7 2018 (Day 287): AOS fee paid, waiting IV package fee to be unlocked to pay it.   

Thursday, June 14 2018 (Day 294): DS-261 checked and received letter, IV package fee now unlocked. 

Friday, June 15 2018 (Day 295) : IV fee paid, waiting DS-260 to be unlocked to fill it online. 

Monday, June 18 2018 (Day 298) : Full Package sent to NVC via post mail

Tuesday, June 19 2018 (Day 299): DS-260 unlocked to fill it online.

Wednesday, June 20 2018 (Day 300): DS-260 filled online.

Thursday, June 21 2018 (Day 301): Scan Date.

Monday, July 2 2018 (Day 312):  Case Completed and ready for an Interview.

Friday, July 13 2018 (Day 323): Interview Letter Received.:dancing::dance:

Monday, July 23 2018 (Day 333): Case Left NVC.

 

(U.S Colombian Embassy Stage) :

Monday, August 6 2018 (Day 347): Blood Test and chest X rays. (Done)

Wednesday, August 8 2018 (Day 349): Medical Exam. (Done)

Wednesday, August 15 2018 (Day 356): Biometrics in the Solicitant Atention Center. (Done)

Wednesday, August 22 2018 (Day 363): Interview... Approved! :dancing::dance:

Wednesday, September 19 2018 (Day 393): P.O.E thru Miami International Airport!!! :dancing::dance:

... "Nobody said it was easy" ... Coldplay: The Scientist Single.

 

 

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...