Jump to content
JessieABC

NVC - May 2017 Scan Dates - Method 4: Mail processing

 Share

892 posts in this topic

Recommended Posts

 

for incomplete AOS form. I dont even remember what we forgot to fill out 

Did you leave anything blank? I was freaking out about that because when you complete on line it does not give you the option to type N/A. 

Link to comment
Share on other sites

 

Did you leave anything blank? I was freaking out about that because when you complete on line it does not give you the option to type N/A. 

the only pages i left blank were the ones for interpreter and attorney as it didn't apply to my case. 

Link to comment
Share on other sites

So scary hearing about all these RFEs :(  

 

P.S. Made ourselves a little tracking sheet so you can get an idea of your expected Case Complete and average days to Complete for May mail filers:

 

May Scan Date to CC Spreadsheet

 

 

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Link to comment
Share on other sites

Mailed to N.V.C. April 21, 2017 (Friday) Certified.

N.V.C. Recived Date: April 24, 2017

 Scan Date: April 25, 2017 (Confirm with N.V.C. May 03, 2017.)

Embassy: Ho Chi Minh City, Saigon, Vietnam

Expected CC: July 11, 2017, or sooner. 😉

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline
 

for incomplete AOS form. I dont even remember what we forgot to fill out 

 

The checklist letter NVC send you will have all the information that they requested, and since everyone fill out I864 should have a pdf file which saved on their computer. You can trace back to the check list email to let members know what the ideal of that check list.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country:
Timeline

hey all, 

 

I have just completed DS 260 (could have done so a week ago already, but I was waiting for my parents-in-law to move so I could put the new address as the one where they should send my green card)  and as many of us, I had previously looked up the ds260 sample and filled it out for myself to save some time. I had looked up ALL of my previous employers/ supervisor's names, addresses of the companies etc and the same for my higher education institutions.... I submitted the form already and then realized that I did not fill in any of such information, yet the IV application was complete! 

I am hoping this is not some kind of a glitch (I did do a search of VJ already and it seems like it may be that it isn't required because of the country I am from?) Please tell me if you or your spouse  did or did not have to submit that info??? I am a bit concerned

TIMELINE

31 May 2016 - legally married in Estonia, just the 2 of us
27 July 2016 - wedding ceremony & reception

 

USCIS Phase

08 September 2016 - I-130 sent to USCIS Chicago Lockbox (FILED FROM ABROAD)

14 September - I-130 received at Nebraska Service Center

16 September - NOA1 via e-mail

29 September - notice returned to USCIS because the Post Office could not deliver it

22 November - NOA1 finally received in the mail (in the US)

31 March 2017 - NOA 2 via e-mail, app and USCIS website

3 April - NOA 2 received in the mail (in the US)

11 April - Case Was Sent to Department of State 

 

NVC Phase

17 April - Case received by NVC

20 April - NVC case number assigned

21 April -  DS-261 Completed Online
25 April - Welcome e-mail received, AOS fee paid
27 April - IV fee Invoiced, IV fee paid
6 May - DS-260 Completed
10 May - AOS and IV package sent

15 May - Scan date

12 July - Case complete 😀
14 July - P4 Interview Letter

08 August - Medical

17 August - INTERVIEW - approved!
18 August - VISA ISSUED
23 August - Picked up the PASSPORT with the VISA inside

26 August - Immigrant Fee paid
18 September, 2017 - POE 

Removal Of Conditions


25 June, 2019 - ROC packet sent 
27 June - ROC packet delivered

 

 

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
 

Started a thread for those who have or will be submitting documents in May :)

 

Scan Date: May 4, 2017

Embassy: London

Expected CC: July 20, 2017

Congrats! you're way ahead of me !!

I'm waiting for my police certificate to arrive (which should have been done ages ago :( ) 

Best of luck!!

09-Jul-2016 ✳ Married in Canada !  ♥ ❣ 💒

USCIS   

 

06-Sep-2016  I-130 sent to Arizona Lockbox

13-Sep-2016  Email "USCIS Acceptance Confirmation" , Check cashed

18-Sep-2016  NOA1, hardcopy received [PD 08-Sep-2016]

Case accepted, routed to USCIS Nebraska Service Center
20-Sep-2016
  USCIS shows "Case Was Received"

22-Mar-2017  USCIS shows "Case Approved"

30-Mar-2017  NOA2, hardcopy received [193 days from NOA1 to NOA 2] 

30-Mar-2017  USCIS shows ''Case sent to Department of State

NVC & Embassy

 

01-Apr-2017  NVC rec'd case

06-Apr-2017  NVC case # assigned, email added  [7 days from NOA2 to Case Number assigned] 

10-Apr-2017 ✳ NVC IIN assigned, DS-261 & AOS Unlocked, DS-261 submitted & AOS Fee paid online

12-Apr-2017 ✳ NVC Welcome email received

18-Apr-2017 ✳ IV Fee Unlocked, Fee paid online

20-Apr-2017 ✳ DS-260 Unlocked   

30-Apr-2017  DS-260 submitted

11-May-2017  AOS & IV Pkg Submitted via email

👍 N/A  Scan Date     👍 N/A  Case completed

16-May-2017  Called to inquire, informed Case Completed! [40 days from Case Number assigned to Case Complete] 

18-May-2017  Official Interview Appointment letter received via email for June 27, 2017     

282 Days from NOA1 to Interview (9 months 9 days) 

18-May-2017  CEAC shows case at NVC   19-May-2017  CEAC shows case in TRANSIT   23-May-2017  CEAC shows case is READY

23-Aug-2017  Y  웃유  G I R L  ヅ 👶 👧 🚺 

28-Nov-2017 ✳ New interview date

Embassy

20-Nov-2017  Medical at Surrey, BC

28-Nov-2017 ✳ Interview at Montreal Consulate  APPROVED:dancing:

07-Dec-2017  CEAC case update to AP   CEAC Case Last updated:  11-Dec-2017 ; 26-Jan-2018 ; 31-Jan-2018

05-Feb-2018  Visa in hand   63 Days in AP

06-Feb-2018  Immigration fee paid online
27-Feb-2018 ✳ POE

07-Mar-2018  SSN received

13-Apr-2018 ✳ Green Card in hand

00-???-201? ✳ Adjustment of Status

 Wiki on NVC Process     -     Wiki for Canadian Spouses for NVC

Personal Checklist - MTL-NVC to Interview Process  - Thx JessieABC for sharing!

Link to comment
Share on other sites

 

hey all, 

 

I have just completed DS 260 (could have done so a week ago already, but I was waiting for my parents-in-law to move so I could put the new address as the one where they should send my green card)  and as many of us, I had previously looked up the ds260 sample and filled it out for myself to save some time. I had looked up ALL of my previous employers/ supervisor's names, addresses of the companies etc and the same for my higher education institutions.... I submitted the form already and then realized that I did not fill in any of such information, yet the IV application was complete! 

I am hoping this is not some kind of a glitch (I did do a search of VJ already and it seems like it may be that it isn't required because of the country I am from?) Please tell me if you or your spouse  did or did not have to submit that info??? I am a bit concerned

The DS 260 Sample has details on the page showing who would have to fill it out.  I believe for women from certain countries, some of the historical stuff to be filled out doesn't show.

As long as you filled out the pages that did display for you, you're fine :)

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Link to comment
Share on other sites

 

Mailed to N.V.C. April 21, 2017 (Friday) Certified.

N.V.C. Recived Date: April 24, 2017

 Scan Date: April 25, 2017 (Confirm with N.V.C. May 03, 2017.)

Embassy: Ho Chi Minh City, Saigon, Vietnam

Expected CC: July 11, 2017, or sooner. 😉

 

 

 

The checklist letter NVC send you will have all the information that they requested, and since everyone fill out I864 should have a pdf file which saved on their computer. You can trace back to the check list email to let members know what the ideal of that check list.

Updated in the tracker for both :)

 

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Link to comment
Share on other sites

23 minutes ago, NBA16 said:

I just called NVC and they confirmed our scan date is May 5th, so CC would be July 21st

We've all got similar dates :) only ten weeks and change left to go! Hope we get approvals in early July or we might not make August interviews.

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...