7 hours ago, Zaib212 said:

that's sad to hear. this was my 3rd checklist. I submitted everything in one package then they asked for marriage certificate then ask again to submit 1-864a with original sig which took almost 10 weeks to completed. wish you all the best.

Oh dear... 3rd checklist. . . I'm sorry it took so long. But you made it through! Good work.

I would really like to know if our case is going to the back of the line again once they get our checklist documents.

The agent said yes, 11 weeks more (after receipt of documents... which should take another few weeks...)

I can't believe we started this process one year ago. :(

October 2011: Met in Spain

2012-2014: Video chat + visas + visits and vacations = we made it through!

June 2014: Moved to Spain, got engaged 

December 31, 2015: got married

April 20, 2016: sent I130 package

May 2, 2016: package received in Chicago Lockbox - - - 12 days for delivery!! Don't use TNT couriers!! 

May 2nd or 5th, 2016: email NOA1... accepted and sent to.... NEBRASKA 

And now.... breeeeeeathe..... be like water my friend....

October 26th, 2016: NOA2 [We had waited almost 6 months. Received notification from the phone app, never got an email.]

November 9th 2016: USCIS sent the petition to NVC (app notification) [waited 2 weeks after approval for this]

November 25th 2016: NVC received and created account for our petition [waited 16 days after USCIS sent it, for NVC to acknowledge receipt]

Dec 1st 2016: Chose agent online DS261 [a few days later than it could've been since the above NVC email went to SPAM!]

Dec 6th 2016: Case available for paying fees. That was fast, I think! 5 days!

Took a long time to get package out because... life... and husband's family in Morocco had to travel to get police document.

Feb 20th 2017: Scan date at NVC, received weird email.

April 28th 2017: CHECKLIST. Moroccans are required to send a Court Report regardless of Police Record status. My husband had to go back to Morocco to get it in person. Also, NVC wants a 2016 tax return now that is 2017. My bad.

September 15th 2017: 2nd Scan Date at NVC. Sent for document review October 20th.

Nov 10th 2017: Email requesting document be brought to interview. Will schedule interview.

Case complete date??: TBD :clock:.... November 8th!!

Interview date : January 18, 2018!!           Result: Administrative Processing      :mellow:

Embassy called for new medical last week of August. New Medical Sept 10.

Visa ISSUED September 14, 2018. :blink:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: France
Timeline
 

NVC confirmed that our case has been  completed!! Waiting for the email from nvc..:wub: Thank you! 

Yay!!! Glad to hear. Congrats. :-) Thank you for the update. Almost there.. 

 

 

Link to comment
Share on other sites

Filed: Lift. Cond. (pnd) Country: India
Timeline
 

NVC confirmed that our case has been  completed!! Waiting for the email from nvc..:wub: Thank you! 

Congrats!!

USCIS
08/15/2016: I-130 sent to USCIS
08/18/2016: NOA1, I-130 received at USCIS Nebraska Service Center
02/17/2017: NOA2, I-130 approved 

02/24/2017: Notification received on App (I130 Approved)
02/26/2017: Approved I-130 sent to NVC

02/28/2017: (NOA2) Notification received via snail mail.
 
NVC
03/06/2017: Case number assigned
03/11/2017: Received email with case number and invoice number
03/11/2017: DS 261 Completed

03/11/2017: AOS fees paid

03/17/2017:IV Fees Paid

03/23/2017: DS 260 Submitted

03/23/2017: AOS & IV Package sent

03/27/2017: Scan date

05/30/2017: Case Complete

06/02/2017: Received Interview date over Phone(scheduled to Jul 17th)

06/03/2017: Received P4 letter over email confirming the Interview date

06/08/2017: Medical done

07/16/2017: Biometrics scheduled

07/17/2017: Interview in Mumbai

07/17/2017: Visa Approved

07/19/2017: Passport received at VAC, Intimation received.

07/20/2017: Passport in Hand

 

Link to comment
Share on other sites

I just started a post for May Scan Dates for those who are using Mail processing so we can track each others' progress.

Feel free to join in!

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: India
Timeline
 

my case is still in review, picked up on April 29, do you know how long it takes in the review dept?

It varies from 2 days to 2 weeks. It actually depends on the person reviewing it.

Timeline Info below:

Spoiler

04/21/16 -- Marriage

----- CR1 Process -----

USCIS Stage [222 days from NOA1]

06/08/16 -- Sent I-130

01/31/17 -- I-130 petition sent to NVC [Received Email notification and MyUscis status update]

NVC Stage [105 days from NOA2]

Embassy/Consulate (Interview) Stage [43 days from Case Complete to Visa in Hand]

05/18/17 -- Consulate Received. CEAC Case status changed to "Ready"

06/01/17 -- Medical Examination [Complete. It took around 2 hours. Total Cost INR 11650 for Surat City Apollo Clinic]

06/12/17 -- Biometric (OFC) Appointment

06/13/17 -- Interview [7:30 AM at Mumbai, India]. Visa Approved

06/15/17 -- Visa in hand

06/21/17 -- POE at DFW (Dallas, Texas)

----- Removal of Condition -----

Removal of Condition (I-751) [Approved]

06/18/2019 -- Sent the package (3 Days before GC expires, cutting it close). Sent to Lewisville, TX via FedEx Ground

06/19/2019 -- Package received at around 9:30 AM (Hoping I don't get rejected for missing deadline)

06/24/2019 -- Card was charged with $680 fees. Text Message received confirming Receipt. Case routed to NBC (Case Number starts with 'MSC')

06/28/2019 -- NOA Hard Copy & 18 Months Extension Letter Received in Mail with NOA Date as 06/19/2019

07/12/2019 -- Biomentrics Appointment Letter received. The Letter is Dated 7/5/2019. Appointment is on 7/22/2019

07/22/2019 -- Biometrics Appointment Complete

02/01/2022 -- Interview Scheduled for 3/3/2022 (combo interview)

03/03/2022 -- Interview Complete. No new Green Card will be produced as my Naturalization was also approved.

03/04/2022 -- USCIS status changed to approved.

----- Naturalization -----

Naturalization (N-400) [Approved]

03/26/2022 -- N-400 online application complete. NOA Date.

01/15/2021 -- Biometric Complete.

02/28/2022 -- Interview scheduled for 3/3/2022 (combo interview)

03/03/2022 -- Interview Passed. Status changed to 'we recommended that your application be approved...' and then to 'Oath Ceremony Will Be Scheduled'.

03/09/2022 -- Oath Ceremony was scheduled for 3/25/2022.

 

Link to comment
Share on other sites

Filed: F-2A Visa Country: Italy
Timeline
 

It varies from 2 days to 2 weeks. It actually depends on the person reviewing it.

my usual luck....i am sure that i got the worst person in the NVC.,......also, do you know if NVC works on saturday as well? 

Link to comment
Share on other sites

 

my usual luck....i am sure that i got the worst person in the NVC.,......also, do you know if NVC works on saturday as well? 

No

 

Hours:
7am - 12am EST, M-F

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: India
Timeline
 

my usual luck....i am sure that i got the worst person in the NVC.,......also, do you know if NVC works on saturday as well? 

I wouldn't say that. It just might be the case where they have to check a little more for some reason. You will get your CC real soon.

Timeline Info below:

Spoiler

04/21/16 -- Marriage

----- CR1 Process -----

USCIS Stage [222 days from NOA1]

06/08/16 -- Sent I-130

01/31/17 -- I-130 petition sent to NVC [Received Email notification and MyUscis status update]

NVC Stage [105 days from NOA2]

Embassy/Consulate (Interview) Stage [43 days from Case Complete to Visa in Hand]

05/18/17 -- Consulate Received. CEAC Case status changed to "Ready"

06/01/17 -- Medical Examination [Complete. It took around 2 hours. Total Cost INR 11650 for Surat City Apollo Clinic]

06/12/17 -- Biometric (OFC) Appointment

06/13/17 -- Interview [7:30 AM at Mumbai, India]. Visa Approved

06/15/17 -- Visa in hand

06/21/17 -- POE at DFW (Dallas, Texas)

----- Removal of Condition -----

Removal of Condition (I-751) [Approved]

06/18/2019 -- Sent the package (3 Days before GC expires, cutting it close). Sent to Lewisville, TX via FedEx Ground

06/19/2019 -- Package received at around 9:30 AM (Hoping I don't get rejected for missing deadline)

06/24/2019 -- Card was charged with $680 fees. Text Message received confirming Receipt. Case routed to NBC (Case Number starts with 'MSC')

06/28/2019 -- NOA Hard Copy & 18 Months Extension Letter Received in Mail with NOA Date as 06/19/2019

07/12/2019 -- Biomentrics Appointment Letter received. The Letter is Dated 7/5/2019. Appointment is on 7/22/2019

07/22/2019 -- Biometrics Appointment Complete

02/01/2022 -- Interview Scheduled for 3/3/2022 (combo interview)

03/03/2022 -- Interview Complete. No new Green Card will be produced as my Naturalization was also approved.

03/04/2022 -- USCIS status changed to approved.

----- Naturalization -----

Naturalization (N-400) [Approved]

03/26/2022 -- N-400 online application complete. NOA Date.

01/15/2021 -- Biometric Complete.

02/28/2022 -- Interview scheduled for 3/3/2022 (combo interview)

03/03/2022 -- Interview Passed. Status changed to 'we recommended that your application be approved...' and then to 'Oath Ceremony Will Be Scheduled'.

03/09/2022 -- Oath Ceremony was scheduled for 3/25/2022.

 

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...