Filed: Lift. Cond. (apr) Country: Cuba
Timeline

Nothing yet :(

 

Just obsessively checking the mail since so many people have said the website didn't update for them.

CR-1 Visa

Service Center: Texas

Consulate: Cuba  Colombia. Thanks, Trump!

Marriage: 12/31/2016

I-130 Sent: 3/2/2017

I-130 NOA1: 3/8/2017

USCIS Approval Date: 8/29/17

NOA2 hardcopy received: 9/5/2017

NOA2 issued date: 8/26/2017

Notice from USCIS Sent to NVC: 9/11/2017

NVC Received: 9/21/2017

Case Number and Invoice Number Available: 9/22/2017

Welcome Letter: 9/27/17

Received Invoices for AOS and IV and Paid Both (No DS-261 as I have a lawyer): 9/27/2017 

DS-260 Unlocked: 9/29/2017

DS-260 Submitted: 10/5/17

IV & AOS Packages Mailed: 10/5/17

Packages Physically Arrived at NVC10/10/17

Scan Date: 10/11/17

Case Complete: 11/20/17

Case Complete Email: 11/28/17

Interview Date Received: 1/31/18

Interview: 3/27/18- Approved!

POE: 4/5/18, LAX

SSN Card Received: 4/16/18

2-Year Green Card Received: 4/21/18

 

ROC

Package Sent: 1/13/20

NOA1 (MSC): 1/16/20

Biometrics Notice: 1/31/20

Biometrics Appt: 2/12/20 (walked in early 2/6)

Interview Ready to Be Scheduled: 10/21/20

Interview Scheduled: 5/12/21

Interview Date: 6/17/21 - Approved!

New Card is Being Produced: 6/17/21

Card Was Mailed to You: 6/21/21

Case Was Approved: 6/22/21

Card Was Picked Up by USPS: 6/23/21

Card in Hand: 6/24/21

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Tunisia
Timeline
1 minute ago, DiamondEyes490 said:

Nothing yet :(

 

Just obsessively checking the mail since so many people have said the website didn't update for them.

I better go check mine too i haven't checked it since wed! But i check the website daily

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ireland
Timeline
4 minutes ago, DiamondEyes490 said:

Nothing yet :(

 

Just obsessively checking the mail since so many people have said the website didn't update for them.

Wife says I am going nuts and gets annoyed when I want to keep talking about it :rolleyes:

 

But I spend my days in the current events and hot social topics section of the forum. It's very political and quite fun getting to know what others think of the Presidency and a few other topics.  

Mar-15-2017 - I-130 Mailed to Chicago Lockbox

Mar-21-2017 - NOA1 Priority date & Case assigned to Nebraska Service Center 

Dec-15-2017 - NOA2 I-130 approved

Jan-08-2018 -  NVC received

Jan-17-2018 - Received DS-261 AOS bill

Jan-17-2018 - Paid DS-261 AOS bill & submit 

Jan-26-2018 - Received IV bill

Jan-27-2018 - Paid IV bill

Feb-10-2018 - Send IV package

Feb-13-2018 - Scan Date

Feb-27-2018 - NVC Case Complete

Mar-17-2018   Receive interview date for April, St Patrick's Day good day to be Irish

Apr-17-2018    Interview at Dublin Embassy 

Apr-17-2018    Interview completed now in AP pending submitting other paperwork

Apr-25-2018    Additional information provided as requested 

May-09-2018   Visa approved, CEAC status changed to "Issued"

May-11-2018   Passport returned along with envelope for border control. 

Sep-18-2018    Entry through US Precleance Dublin, no problems at all.

 

Aug-27-2021   N400 for citizenship based on 3 year rule filed electronically

Aug-27-2021   NOA1 application received

Oct-02-2021    Notification of biometrics date

Oct-26-2021    Biometrics 

Jul-27-2022     Interview Raleigh NC, passed and same day oath

 

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Cuba
Timeline
2 minutes ago, Mr&Mrs G. said:

Wife says I am going nuts and gets annoyed when I want to keep talking about it :rolleyes:

 

But I spend my days in the current events and hot social topics section of the forum. It's very political and quite fun getting to know what others think of the Presidency and a few other topics.  

I hear you. I tell my husband I'm just not getting back on the plane every time I go visit or that I'll just buy a one way ticket for tomorrow (since I could get PR in Cuba no problem) because the waiting is making me crazy. He thinks I'm nuts :)

 

I'll have to check out that part of the forum. Anything to distract myself at this point.

CR-1 Visa

Service Center: Texas

Consulate: Cuba  Colombia. Thanks, Trump!

Marriage: 12/31/2016

I-130 Sent: 3/2/2017

I-130 NOA1: 3/8/2017

USCIS Approval Date: 8/29/17

NOA2 hardcopy received: 9/5/2017

NOA2 issued date: 8/26/2017

Notice from USCIS Sent to NVC: 9/11/2017

NVC Received: 9/21/2017

Case Number and Invoice Number Available: 9/22/2017

Welcome Letter: 9/27/17

Received Invoices for AOS and IV and Paid Both (No DS-261 as I have a lawyer): 9/27/2017 

DS-260 Unlocked: 9/29/2017

DS-260 Submitted: 10/5/17

IV & AOS Packages Mailed: 10/5/17

Packages Physically Arrived at NVC10/10/17

Scan Date: 10/11/17

Case Complete: 11/20/17

Case Complete Email: 11/28/17

Interview Date Received: 1/31/18

Interview: 3/27/18- Approved!

POE: 4/5/18, LAX

SSN Card Received: 4/16/18

2-Year Green Card Received: 4/21/18

 

ROC

Package Sent: 1/13/20

NOA1 (MSC): 1/16/20

Biometrics Notice: 1/31/20

Biometrics Appt: 2/12/20 (walked in early 2/6)

Interview Ready to Be Scheduled: 10/21/20

Interview Scheduled: 5/12/21

Interview Date: 6/17/21 - Approved!

New Card is Being Produced: 6/17/21

Card Was Mailed to You: 6/21/21

Case Was Approved: 6/22/21

Card Was Picked Up by USPS: 6/23/21

Card in Hand: 6/24/21

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ireland
Timeline
Just now, DiamondEyes490 said:

I hear you. I tell my husband I'm just not getting back on the plane every time I go visit or that I'll just buy a one way ticket for tomorrow (since I could get PR in Cuba no problem) because the waiting is making me crazy. He thinks I'm nuts :)

 

I'll have to check out that part of the forum. Anything to distract myself at this point.

My wife and I are lucky that both of us are together in Ireland until the process finishes. I wouldn't like to be separated the way some members are that would drive me totally nutty. We will head to the US for 3 or 4 weeks in September or October for a holiday with her parents which should break up some of the waiting. 

 

We will be married 10 years next March and it would be nice to celebrate it in the US, fingers crossed the timing will be close.    

Mar-15-2017 - I-130 Mailed to Chicago Lockbox

Mar-21-2017 - NOA1 Priority date & Case assigned to Nebraska Service Center 

Dec-15-2017 - NOA2 I-130 approved

Jan-08-2018 -  NVC received

Jan-17-2018 - Received DS-261 AOS bill

Jan-17-2018 - Paid DS-261 AOS bill & submit 

Jan-26-2018 - Received IV bill

Jan-27-2018 - Paid IV bill

Feb-10-2018 - Send IV package

Feb-13-2018 - Scan Date

Feb-27-2018 - NVC Case Complete

Mar-17-2018   Receive interview date for April, St Patrick's Day good day to be Irish

Apr-17-2018    Interview at Dublin Embassy 

Apr-17-2018    Interview completed now in AP pending submitting other paperwork

Apr-25-2018    Additional information provided as requested 

May-09-2018   Visa approved, CEAC status changed to "Issued"

May-11-2018   Passport returned along with envelope for border control. 

Sep-18-2018    Entry through US Precleance Dublin, no problems at all.

 

Aug-27-2021   N400 for citizenship based on 3 year rule filed electronically

Aug-27-2021   NOA1 application received

Oct-02-2021    Notification of biometrics date

Oct-26-2021    Biometrics 

Jul-27-2022     Interview Raleigh NC, passed and same day oath

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Tunisia
Timeline
8 minutes ago, DiamondEyes490 said:

I hear you. I tell my husband I'm just not getting back on the plane every time I go visit or that I'll just buy a one way ticket for tomorrow (since I could get PR in Cuba no problem) because the waiting is making me crazy. He thinks I'm nuts :)

 

I'll have to check out that part of the forum. Anything to distract myself at this point.

I feel the same way! My husband has been waiting so long he is more on the doubtful it will happen phase!

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Cuba
Timeline
13 minutes ago, Mr&Mrs G. said:

My wife and I are lucky that both of us are together in Ireland until the process finishes. I wouldn't like to be separated the way some members are that would drive me totally nutty. We will head to the US for 3 or 4 weeks in September or October for a holiday with her parents which should break up some of the waiting. 

 

We will be married 10 years next March and it would be nice to celebrate it in the US, fingers crossed the timing will be close.    

You are very lucky :)

I unfortunately had to fall in love in one of the few countries in the world where internet is still very inaccessible, so I can't work from Cuba (I mean, I could try, but I'd probably be fired within a week for failing to respond to emails). Otherwise I'd head down there to just wait it out.

CR-1 Visa

Service Center: Texas

Consulate: Cuba  Colombia. Thanks, Trump!

Marriage: 12/31/2016

I-130 Sent: 3/2/2017

I-130 NOA1: 3/8/2017

USCIS Approval Date: 8/29/17

NOA2 hardcopy received: 9/5/2017

NOA2 issued date: 8/26/2017

Notice from USCIS Sent to NVC: 9/11/2017

NVC Received: 9/21/2017

Case Number and Invoice Number Available: 9/22/2017

Welcome Letter: 9/27/17

Received Invoices for AOS and IV and Paid Both (No DS-261 as I have a lawyer): 9/27/2017 

DS-260 Unlocked: 9/29/2017

DS-260 Submitted: 10/5/17

IV & AOS Packages Mailed: 10/5/17

Packages Physically Arrived at NVC10/10/17

Scan Date: 10/11/17

Case Complete: 11/20/17

Case Complete Email: 11/28/17

Interview Date Received: 1/31/18

Interview: 3/27/18- Approved!

POE: 4/5/18, LAX

SSN Card Received: 4/16/18

2-Year Green Card Received: 4/21/18

 

ROC

Package Sent: 1/13/20

NOA1 (MSC): 1/16/20

Biometrics Notice: 1/31/20

Biometrics Appt: 2/12/20 (walked in early 2/6)

Interview Ready to Be Scheduled: 10/21/20

Interview Scheduled: 5/12/21

Interview Date: 6/17/21 - Approved!

New Card is Being Produced: 6/17/21

Card Was Mailed to You: 6/21/21

Case Was Approved: 6/22/21

Card Was Picked Up by USPS: 6/23/21

Card in Hand: 6/24/21

Link to comment
Share on other sites

Hello all,

just thought I would share my timeline.

Sent application on March 3rd. Was received on March 6th. 

i 765 card was ordered on may 17th. i 131 still no update on the website but when I called they told me it will be sent at the same time as i 765.

Good luck to everyone

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ireland
Timeline

Just wondering what number you guys are on Igor's list? 

 

http://www.visajourney.com/timeline/monthly_filers.php?form=2&visa=3&scenter=5&option=3&sortby=2

 

For some reason it is not registering my timeline on the list.

 

Mar-15-2017 - I-130 Mailed to Chicago Lockbox

Mar-21-2017 - NOA1 Priority date & Case assigned to Nebraska Service Center 

Dec-15-2017 - NOA2 I-130 approved

Jan-08-2018 -  NVC received

Jan-17-2018 - Received DS-261 AOS bill

Jan-17-2018 - Paid DS-261 AOS bill & submit 

Jan-26-2018 - Received IV bill

Jan-27-2018 - Paid IV bill

Feb-10-2018 - Send IV package

Feb-13-2018 - Scan Date

Feb-27-2018 - NVC Case Complete

Mar-17-2018   Receive interview date for April, St Patrick's Day good day to be Irish

Apr-17-2018    Interview at Dublin Embassy 

Apr-17-2018    Interview completed now in AP pending submitting other paperwork

Apr-25-2018    Additional information provided as requested 

May-09-2018   Visa approved, CEAC status changed to "Issued"

May-11-2018   Passport returned along with envelope for border control. 

Sep-18-2018    Entry through US Precleance Dublin, no problems at all.

 

Aug-27-2021   N400 for citizenship based on 3 year rule filed electronically

Aug-27-2021   NOA1 application received

Oct-02-2021    Notification of biometrics date

Oct-26-2021    Biometrics 

Jul-27-2022     Interview Raleigh NC, passed and same day oath

 

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Cuba
Timeline
39 minutes ago, Mr&Mrs G. said:

Just wondering what number you guys are on Igor's list? 

 

http://www.visajourney.com/timeline/monthly_filers.php?form=2&visa=3&scenter=5&option=3&sortby=2

 

For some reason it is not registering my timeline on the list.

 

Are you filtering by Unapproved Petitions? I'm #122.

CR-1 Visa

Service Center: Texas

Consulate: Cuba  Colombia. Thanks, Trump!

Marriage: 12/31/2016

I-130 Sent: 3/2/2017

I-130 NOA1: 3/8/2017

USCIS Approval Date: 8/29/17

NOA2 hardcopy received: 9/5/2017

NOA2 issued date: 8/26/2017

Notice from USCIS Sent to NVC: 9/11/2017

NVC Received: 9/21/2017

Case Number and Invoice Number Available: 9/22/2017

Welcome Letter: 9/27/17

Received Invoices for AOS and IV and Paid Both (No DS-261 as I have a lawyer): 9/27/2017 

DS-260 Unlocked: 9/29/2017

DS-260 Submitted: 10/5/17

IV & AOS Packages Mailed: 10/5/17

Packages Physically Arrived at NVC10/10/17

Scan Date: 10/11/17

Case Complete: 11/20/17

Case Complete Email: 11/28/17

Interview Date Received: 1/31/18

Interview: 3/27/18- Approved!

POE: 4/5/18, LAX

SSN Card Received: 4/16/18

2-Year Green Card Received: 4/21/18

 

ROC

Package Sent: 1/13/20

NOA1 (MSC): 1/16/20

Biometrics Notice: 1/31/20

Biometrics Appt: 2/12/20 (walked in early 2/6)

Interview Ready to Be Scheduled: 10/21/20

Interview Scheduled: 5/12/21

Interview Date: 6/17/21 - Approved!

New Card is Being Produced: 6/17/21

Card Was Mailed to You: 6/21/21

Case Was Approved: 6/22/21

Card Was Picked Up by USPS: 6/23/21

Card in Hand: 6/24/21

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ireland
Timeline
8 minutes ago, DiamondEyes490 said:

Are you filtering by Unapproved Petitions? I'm #122.

I tried that and then tried all petitions.

 

This is the filers list for March, which one are you?

 

Capture2_zpsglbtdmte.jpg

Mar-15-2017 - I-130 Mailed to Chicago Lockbox

Mar-21-2017 - NOA1 Priority date & Case assigned to Nebraska Service Center 

Dec-15-2017 - NOA2 I-130 approved

Jan-08-2018 -  NVC received

Jan-17-2018 - Received DS-261 AOS bill

Jan-17-2018 - Paid DS-261 AOS bill & submit 

Jan-26-2018 - Received IV bill

Jan-27-2018 - Paid IV bill

Feb-10-2018 - Send IV package

Feb-13-2018 - Scan Date

Feb-27-2018 - NVC Case Complete

Mar-17-2018   Receive interview date for April, St Patrick's Day good day to be Irish

Apr-17-2018    Interview at Dublin Embassy 

Apr-17-2018    Interview completed now in AP pending submitting other paperwork

Apr-25-2018    Additional information provided as requested 

May-09-2018   Visa approved, CEAC status changed to "Issued"

May-11-2018   Passport returned along with envelope for border control. 

Sep-18-2018    Entry through US Precleance Dublin, no problems at all.

 

Aug-27-2021   N400 for citizenship based on 3 year rule filed electronically

Aug-27-2021   NOA1 application received

Oct-02-2021    Notification of biometrics date

Oct-26-2021    Biometrics 

Jul-27-2022     Interview Raleigh NC, passed and same day oath

 

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Cuba
Timeline
45 minutes ago, Mr&Mrs G. said:

I tried that and then tried all petitions.

 

This is the filers list for March, which one are you?

 

Capture2_zpsglbtdmte.jpg

It's by Service Center. If you filter by Texas, I am Lauren and Juan Carlos (122).

CR-1 Visa

Service Center: Texas

Consulate: Cuba  Colombia. Thanks, Trump!

Marriage: 12/31/2016

I-130 Sent: 3/2/2017

I-130 NOA1: 3/8/2017

USCIS Approval Date: 8/29/17

NOA2 hardcopy received: 9/5/2017

NOA2 issued date: 8/26/2017

Notice from USCIS Sent to NVC: 9/11/2017

NVC Received: 9/21/2017

Case Number and Invoice Number Available: 9/22/2017

Welcome Letter: 9/27/17

Received Invoices for AOS and IV and Paid Both (No DS-261 as I have a lawyer): 9/27/2017 

DS-260 Unlocked: 9/29/2017

DS-260 Submitted: 10/5/17

IV & AOS Packages Mailed: 10/5/17

Packages Physically Arrived at NVC10/10/17

Scan Date: 10/11/17

Case Complete: 11/20/17

Case Complete Email: 11/28/17

Interview Date Received: 1/31/18

Interview: 3/27/18- Approved!

POE: 4/5/18, LAX

SSN Card Received: 4/16/18

2-Year Green Card Received: 4/21/18

 

ROC

Package Sent: 1/13/20

NOA1 (MSC): 1/16/20

Biometrics Notice: 1/31/20

Biometrics Appt: 2/12/20 (walked in early 2/6)

Interview Ready to Be Scheduled: 10/21/20

Interview Scheduled: 5/12/21

Interview Date: 6/17/21 - Approved!

New Card is Being Produced: 6/17/21

Card Was Mailed to You: 6/21/21

Case Was Approved: 6/22/21

Card Was Picked Up by USPS: 6/23/21

Card in Hand: 6/24/21

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ireland
Timeline
7 minutes ago, DiamondEyes490 said:

It's by Service Center. If you filter by Texas, I am Lauren and Juan Carlos (122).

Yep I see you in Texas Center but for some reason I don't show up in the Nebraska list, should be Andrea and Richard

Mar-15-2017 - I-130 Mailed to Chicago Lockbox

Mar-21-2017 - NOA1 Priority date & Case assigned to Nebraska Service Center 

Dec-15-2017 - NOA2 I-130 approved

Jan-08-2018 -  NVC received

Jan-17-2018 - Received DS-261 AOS bill

Jan-17-2018 - Paid DS-261 AOS bill & submit 

Jan-26-2018 - Received IV bill

Jan-27-2018 - Paid IV bill

Feb-10-2018 - Send IV package

Feb-13-2018 - Scan Date

Feb-27-2018 - NVC Case Complete

Mar-17-2018   Receive interview date for April, St Patrick's Day good day to be Irish

Apr-17-2018    Interview at Dublin Embassy 

Apr-17-2018    Interview completed now in AP pending submitting other paperwork

Apr-25-2018    Additional information provided as requested 

May-09-2018   Visa approved, CEAC status changed to "Issued"

May-11-2018   Passport returned along with envelope for border control. 

Sep-18-2018    Entry through US Precleance Dublin, no problems at all.

 

Aug-27-2021   N400 for citizenship based on 3 year rule filed electronically

Aug-27-2021   NOA1 application received

Oct-02-2021    Notification of biometrics date

Oct-26-2021    Biometrics 

Jul-27-2022     Interview Raleigh NC, passed and same day oath

 

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...