Jump to content

1,681 posts in this topic

Recommended Posts

Posted
Just now, alicia98981 said:

Exactly. We sent our documents in on December 12 and they were received on the 13th. We pay the IV bill and completed the DS-260 on the 30th but due to a glitch on their website, though our DS-260 said completed and we got the confirmation, our scan was officially January 19th when I called to inquire about the status of our case and a rep manually submitted it for us informing us of the glitch.

:cry: Ours was i dunno how, but maybe because too much backlogs

we completedd ds-260 Nov 1, 2016

sent our documents nov 13, received nov 14 

but scan date January 13 :clock:

 

 

may we get our cases completed very very very very soon

ROC

March 3, 2019    90 days window open

March 12, 2019. Package sent via USPS Priority Mail

March 15, 2019  12:08PM Delivered as per USPS Tracking / USCIS website too

March 21, 2019  Text message from USCIS - MSC****

March 21, 2019  cashed check

March 25, 2019 received NOA I-797,  extension letter, notice date 03/20/2019

April 5, 2019 received biometrics schedule 

April 19, 2019 biometric schedule

June 5, 2019 Case is ready to be scheduled for an Interview

Sept 29, 2020 received letter of appointment for interview]

Oct 7, 2020 interview - approved (uscis tracker saya new card is being produced)

Oct 8 , 2020 - uscis updated to Case Completed

Oct 12, 2020 - received hardcopy - NOA case completed
Oct 13 2020 - card was mailed to me expected delivery Oct 19

Oct 16, 2020 - received 10yr Expiration - GC 
 

N-400 Honolulu Office

April 04, 2021 - filed online paid using CC

April 05, 2021 - online says notice was emailed, biometric reuse 

April 12, 2021 - received the hard copy of notice and biometric reuse

May 21, 2021 - online update, interview scheduled

June 28, 2021 - interview and ceremony Approved

 

 

 

 

Filed: IR-1/CR-1 Visa Country: Vietnam
Timeline
Posted
8 minutes ago, R and KJ said:

Lucky you, but that is not always the case unfortunately. 

Two factors for having your scan date as i read if am not mistaken from SJLOVE

 

Scenario 1

1. Submission or finishing your DS-260 on say,  january 1

2. Sending the packet on january 1, delivered on january 3, they scanned the document and entered it to their system on january 14

scandate would be january 14

 

scenario 2 

 

1. Sending the packet on january 1, delivered on january 3, they scanned the document and entered it to their system on january 3

 

2. Submission or finishing your DS-260 on say,  january 19

 

scandate would be January 19

Oh, ic, i submitted my ds-260 on March 22

Posted
6 minutes ago, R and KJ said:

Congratulations, that was fast :) good luck on upcoming interview

Thank you! I'm getting my interview date at the same times as the people who got CCs on late Feb. and early to mid Mar. They really do wait until the end of the month and give everyone dates pretty much all at the same time. :)

09/24 - Sent out I-130 to Phoenix, AZ

09/26 - Received at Phoenix (somewhere in between, the I-797 was mailed and marked back to sender due to post office error)

10/24 - Finally got the I-797 NOA-1 resent to me - forwarded my case to NSC

11/04 - Status changed to RFE

11/12 - Got the RFE letter in the mail (certified copy of marriage certificate)

11/18 - Mailed in RFE response

11/21 - RFE received at USCIS

11/21 - RFE status changed to response review

11/29 - Case approved at USCIS

12/03 - Received NOA-2 in the mail

12/09 - Case sent to NVC

12/15 - Case received by NVC

12/20 - NVC case number and IIN assigned

12/21 - DS-261 submitted online & gave email addresses

12/22 - Had NVC review DS-261 over the phone, paid AOS fee

12/24 - Paid IV fee

12/28 - Submitted DS-260

12/29 - Submitted packet to NVC via FedEx

01/03 - Packet delivered to NVC

01/04 - NVC scan date

03/02 - NVC Supervisor Review

03/16 - Case Complete at NVC

03/30 - Interview date confirmed over phone (and P4 email?)

03/30 - P4 letter received via email

05/02 - Interview at Manila Embassy

Filed: Lift. Cond. (pnd) Country: India
Timeline
Posted
3 hours ago, R and KJ said:

am so sorry to know that you are experiencing it as well,

just want to let you know, my document was sent november 10 and received at portsmouth november 14

and yet my scan date is January 13, and no CC yet as well. we are on the same boat.

please hang on.

Oh My God!! My sympathies....I really hope you get your CC soon

USCIS
08/15/2016: I-130 sent to USCIS
08/18/2016: NOA1, I-130 received at USCIS Nebraska Service Center
02/17/2017: NOA2, I-130 approved 

02/24/2017: Notification received on App (I130 Approved)
02/26/2017: Approved I-130 sent to NVC

02/28/2017: (NOA2) Notification received via snail mail.
 
NVC
03/06/2017: Case number assigned
03/11/2017: Received email with case number and invoice number
03/11/2017: DS 261 Completed

03/11/2017: AOS fees paid

03/17/2017:IV Fees Paid

03/23/2017: DS 260 Submitted

03/23/2017: AOS & IV Package sent

03/27/2017: Scan date

05/30/2017: Case Complete

06/02/2017: Received Interview date over Phone(scheduled to Jul 17th)

06/03/2017: Received P4 letter over email confirming the Interview date

06/08/2017: Medical done

07/16/2017: Biometrics scheduled

07/17/2017: Interview in Mumbai

07/17/2017: Visa Approved

07/19/2017: Passport received at VAC, Intimation received.

07/20/2017: Passport in Hand

 

Filed: Citizen (apr) Country: India
Timeline
Posted
21 hours ago, amul said:

Thank you for weighing in Tanish, very very helpful! In this case, I will probably file MFS and then amend it once we get his ITIN. I do not want to be hit with any penalties for filing late at this point. Already being hammered with enough taxes as a microenterprise owner and with the loss of my Head of Household status. :bonk:

 

 

That's got be tough. You don't need ITIN to amend the returns. Once your spouse arrives and has SSN, you can use that to amend your returns. [Just in case you didn't know, I thought to bring to your notice that you don't need to go through all the hassle of applying for ITIN]

Timeline Info below:

Spoiler

04/21/16 -- Marriage

----- CR1 Process -----

USCIS Stage [222 days from NOA1]

06/08/16 -- Sent I-130

01/31/17 -- I-130 petition sent to NVC [Received Email notification and MyUscis status update]

NVC Stage [105 days from NOA2]

Embassy/Consulate (Interview) Stage [43 days from Case Complete to Visa in Hand]

05/18/17 -- Consulate Received. CEAC Case status changed to "Ready"

06/01/17 -- Medical Examination [Complete. It took around 2 hours. Total Cost INR 11650 for Surat City Apollo Clinic]

06/12/17 -- Biometric (OFC) Appointment

06/13/17 -- Interview [7:30 AM at Mumbai, India]. Visa Approved

06/15/17 -- Visa in hand

06/21/17 -- POE at DFW (Dallas, Texas)

----- Removal of Condition -----

Removal of Condition (I-751) [Approved]

06/18/2019 -- Sent the package (3 Days before GC expires, cutting it close). Sent to Lewisville, TX via FedEx Ground

06/19/2019 -- Package received at around 9:30 AM (Hoping I don't get rejected for missing deadline)

06/24/2019 -- Card was charged with $680 fees. Text Message received confirming Receipt. Case routed to NBC (Case Number starts with 'MSC')

06/28/2019 -- NOA Hard Copy & 18 Months Extension Letter Received in Mail with NOA Date as 06/19/2019

07/12/2019 -- Biomentrics Appointment Letter received. The Letter is Dated 7/5/2019. Appointment is on 7/22/2019

07/22/2019 -- Biometrics Appointment Complete

02/01/2022 -- Interview Scheduled for 3/3/2022 (combo interview)

03/03/2022 -- Interview Complete. No new Green Card will be produced as my Naturalization was also approved.

03/04/2022 -- USCIS status changed to approved.

----- Naturalization -----

Naturalization (N-400) [Approved]

03/26/2022 -- N-400 online application complete. NOA Date.

01/15/2021 -- Biometric Complete.

02/28/2022 -- Interview scheduled for 3/3/2022 (combo interview)

03/03/2022 -- Interview Passed. Status changed to 'we recommended that your application be approved...' and then to 'Oath Ceremony Will Be Scheduled'.

03/09/2022 -- Oath Ceremony was scheduled for 3/25/2022.

 

Filed: Citizen (apr) Country: India
Timeline
Posted
5 hours ago, chamma said:

Has anybody been in this situation?

 

Petitioner changing jobs after submitting IV & AOS package to NVC? Can this be done?

 

We have not been in this situation, but just take the employment letter from new job with you for interview. Also prepare updated I-864 with new employer information in it and take that for interview as well. If the income has not decreased, I don't think there should be any issue.

Timeline Info below:

Spoiler

04/21/16 -- Marriage

----- CR1 Process -----

USCIS Stage [222 days from NOA1]

06/08/16 -- Sent I-130

01/31/17 -- I-130 petition sent to NVC [Received Email notification and MyUscis status update]

NVC Stage [105 days from NOA2]

Embassy/Consulate (Interview) Stage [43 days from Case Complete to Visa in Hand]

05/18/17 -- Consulate Received. CEAC Case status changed to "Ready"

06/01/17 -- Medical Examination [Complete. It took around 2 hours. Total Cost INR 11650 for Surat City Apollo Clinic]

06/12/17 -- Biometric (OFC) Appointment

06/13/17 -- Interview [7:30 AM at Mumbai, India]. Visa Approved

06/15/17 -- Visa in hand

06/21/17 -- POE at DFW (Dallas, Texas)

----- Removal of Condition -----

Removal of Condition (I-751) [Approved]

06/18/2019 -- Sent the package (3 Days before GC expires, cutting it close). Sent to Lewisville, TX via FedEx Ground

06/19/2019 -- Package received at around 9:30 AM (Hoping I don't get rejected for missing deadline)

06/24/2019 -- Card was charged with $680 fees. Text Message received confirming Receipt. Case routed to NBC (Case Number starts with 'MSC')

06/28/2019 -- NOA Hard Copy & 18 Months Extension Letter Received in Mail with NOA Date as 06/19/2019

07/12/2019 -- Biomentrics Appointment Letter received. The Letter is Dated 7/5/2019. Appointment is on 7/22/2019

07/22/2019 -- Biometrics Appointment Complete

02/01/2022 -- Interview Scheduled for 3/3/2022 (combo interview)

03/03/2022 -- Interview Complete. No new Green Card will be produced as my Naturalization was also approved.

03/04/2022 -- USCIS status changed to approved.

----- Naturalization -----

Naturalization (N-400) [Approved]

03/26/2022 -- N-400 online application complete. NOA Date.

01/15/2021 -- Biometric Complete.

02/28/2022 -- Interview scheduled for 3/3/2022 (combo interview)

03/03/2022 -- Interview Passed. Status changed to 'we recommended that your application be approved...' and then to 'Oath Ceremony Will Be Scheduled'.

03/09/2022 -- Oath Ceremony was scheduled for 3/25/2022.

 

Filed: Lift. Cond. (pnd) Country: India
Timeline
Posted
7 minutes ago, Tanish said:

We have not been in this situation, but just take the employment letter from new job with you for interview. Also prepare updated I-864 with new employer information in it and take that for interview as well. If the income has not decreased, I don't think there should be any issue.

Really, I think I am the only one here with tricky queries most of the time....

 

Does it work, actually? I was against my husband switching jobs until the entire process is complete just to avoid hiccups!

USCIS
08/15/2016: I-130 sent to USCIS
08/18/2016: NOA1, I-130 received at USCIS Nebraska Service Center
02/17/2017: NOA2, I-130 approved 

02/24/2017: Notification received on App (I130 Approved)
02/26/2017: Approved I-130 sent to NVC

02/28/2017: (NOA2) Notification received via snail mail.
 
NVC
03/06/2017: Case number assigned
03/11/2017: Received email with case number and invoice number
03/11/2017: DS 261 Completed

03/11/2017: AOS fees paid

03/17/2017:IV Fees Paid

03/23/2017: DS 260 Submitted

03/23/2017: AOS & IV Package sent

03/27/2017: Scan date

05/30/2017: Case Complete

06/02/2017: Received Interview date over Phone(scheduled to Jul 17th)

06/03/2017: Received P4 letter over email confirming the Interview date

06/08/2017: Medical done

07/16/2017: Biometrics scheduled

07/17/2017: Interview in Mumbai

07/17/2017: Visa Approved

07/19/2017: Passport received at VAC, Intimation received.

07/20/2017: Passport in Hand

 

Filed: Citizen (apr) Country: India
Timeline
Posted
Just now, chamma said:

Really, I think I am the only one here with tricky queries most of the time....

 

Does it work, actually? I was against my husband switching jobs until the entire process is complete just to avoid hiccups!

I can not answer for certain, but technically there is no such requirement as not changing jobs for Affidavit of Support. You should be fine. Just make sure to prepare the forms and evidences as I mentioned earlier and take them with you for interview. Just remember, don't mention the change of job unless asked to you. If they ask when does your husband work, mention that "he currently works at the said location. He recently changed the job. We do have employment letter and updated I-864, should you require it."

 

Go to India portal, I think I have seen some case like this there in past.

Timeline Info below:

Spoiler

04/21/16 -- Marriage

----- CR1 Process -----

USCIS Stage [222 days from NOA1]

06/08/16 -- Sent I-130

01/31/17 -- I-130 petition sent to NVC [Received Email notification and MyUscis status update]

NVC Stage [105 days from NOA2]

Embassy/Consulate (Interview) Stage [43 days from Case Complete to Visa in Hand]

05/18/17 -- Consulate Received. CEAC Case status changed to "Ready"

06/01/17 -- Medical Examination [Complete. It took around 2 hours. Total Cost INR 11650 for Surat City Apollo Clinic]

06/12/17 -- Biometric (OFC) Appointment

06/13/17 -- Interview [7:30 AM at Mumbai, India]. Visa Approved

06/15/17 -- Visa in hand

06/21/17 -- POE at DFW (Dallas, Texas)

----- Removal of Condition -----

Removal of Condition (I-751) [Approved]

06/18/2019 -- Sent the package (3 Days before GC expires, cutting it close). Sent to Lewisville, TX via FedEx Ground

06/19/2019 -- Package received at around 9:30 AM (Hoping I don't get rejected for missing deadline)

06/24/2019 -- Card was charged with $680 fees. Text Message received confirming Receipt. Case routed to NBC (Case Number starts with 'MSC')

06/28/2019 -- NOA Hard Copy & 18 Months Extension Letter Received in Mail with NOA Date as 06/19/2019

07/12/2019 -- Biomentrics Appointment Letter received. The Letter is Dated 7/5/2019. Appointment is on 7/22/2019

07/22/2019 -- Biometrics Appointment Complete

02/01/2022 -- Interview Scheduled for 3/3/2022 (combo interview)

03/03/2022 -- Interview Complete. No new Green Card will be produced as my Naturalization was also approved.

03/04/2022 -- USCIS status changed to approved.

----- Naturalization -----

Naturalization (N-400) [Approved]

03/26/2022 -- N-400 online application complete. NOA Date.

01/15/2021 -- Biometric Complete.

02/28/2022 -- Interview scheduled for 3/3/2022 (combo interview)

03/03/2022 -- Interview Passed. Status changed to 'we recommended that your application be approved...' and then to 'Oath Ceremony Will Be Scheduled'.

03/09/2022 -- Oath Ceremony was scheduled for 3/25/2022.

 

Posted
2 hours ago, Johnny385 said:

Oh, ic, i submitted my ds-260 on March 22

I see, i wish you'll have speedy and worry-free journey :) Good luck 

 

 

2 hours ago, zaiddiaz said:

Thank you! I'm getting my interview date at the same times as the people who got CCs on late Feb. and early to mid Mar. They really do wait until the end of the month and give everyone dates pretty much all at the same time. :)

It really looks like it, that they wait end of the month :) 

 

1 hour ago, chamma said:

Oh My God!! My sympathies....I really hope you get your CC soon

Thank you chamma, it means a lot :) good luck to your case

 

28 minutes ago, beppenyc said:

Congrats to everyone, regarding me it is still 4 weeks to the sunrise (as we say in Italy). @R and KJ your case is taken too long, did you ask some senator or representative to intervine?

We did ask for a senator 2 weeks ago, we sent them privacy release form, and we have followed up as well, and havent received feedback again from them.. good luck on your case, wish you all the best

ROC

March 3, 2019    90 days window open

March 12, 2019. Package sent via USPS Priority Mail

March 15, 2019  12:08PM Delivered as per USPS Tracking / USCIS website too

March 21, 2019  Text message from USCIS - MSC****

March 21, 2019  cashed check

March 25, 2019 received NOA I-797,  extension letter, notice date 03/20/2019

April 5, 2019 received biometrics schedule 

April 19, 2019 biometric schedule

June 5, 2019 Case is ready to be scheduled for an Interview

Sept 29, 2020 received letter of appointment for interview]

Oct 7, 2020 interview - approved (uscis tracker saya new card is being produced)

Oct 8 , 2020 - uscis updated to Case Completed

Oct 12, 2020 - received hardcopy - NOA case completed
Oct 13 2020 - card was mailed to me expected delivery Oct 19

Oct 16, 2020 - received 10yr Expiration - GC 
 

N-400 Honolulu Office

April 04, 2021 - filed online paid using CC

April 05, 2021 - online says notice was emailed, biometric reuse 

April 12, 2021 - received the hard copy of notice and biometric reuse

May 21, 2021 - online update, interview scheduled

June 28, 2021 - interview and ceremony Approved

 

 

 

 

Posted

Is there anyone else who is doing email processing with NVC? We are going on 2 weeks now since our documents were sent in.

CR-1 Visa Timeline

 

USCIS

7/27/2016: I-130 mailed.

8/02/2016: NOA1.

2/17/2017: NOA2.

2/24/2017: I-130 sent to NVC.

 

NVC

3/03/2017:  I-130 received.

3/09/2017: Case # and invoice # received, AOS and IV fees paid.

3/16/2017: DS-260 submitted; AOS and IV packets sent with EP.

4/06/2017: Case complete.

 

Consulate

4/15/2017: Interview email (P4).

5/09/2017: Medical.

5/15/2017: Interview.

5/19/2017: Visa in hand.

 

------------------------------------------------------------------------------------------------------------------

USA

5/20/2017: POE.

6/10/2017: Green card received.

7/05/2017: SSN card received (had to apply in person).  

------------------------------------------------------------------------------------------------------------------

Lifting Conditions

4/19/2019: Filed I-751

5/01/2019: NOA (CSC)

7/22/2019: Case transferred to National Benefits Center

12/20/2019: Biometrics Appointment

2/12/2020: Interview Date

Filed: Lift. Cond. (apr) Country: India
Timeline
Posted
2 hours ago, Tanish said:

That's got be tough. You don't need ITIN to amend the returns. Once your spouse arrives and has SSN, you can use that to amend your returns. [Just in case you didn't know, I thought to bring to your notice that you don't need to go through all the hassle of applying for ITIN]

Ugh, we went to the US Embassy in New Delhi and got the certificate copy of hubby's passport. There goes our $50 bucks and time :whistle:

 

Also, figured out that I cannot amend the filing status, hence I will be overpaying (as usual). C'est la vie... :rolleyes:

 “Rivers know this: there is no hurry. We shall get there someday.” - WTP 

Spoiler

USCIS
09/07/16: I-130 mailed
09/12/16: NOA1 email
01/11/17: Received an RFE
02/20/17 RFE Response
03/01/17: NOA2 / I-130 Approved (letter)

NVC 

03/17/17: NVC received

03/21/17: Submitted DS-261 (Online Choice of Address and Agent)

03/22/17: Received DS-261+ AOS Bill
03/22/17: AOS Bill Paid
03/27/17: Received + Paid IV Bill

04/20/17: PCC + New Birth Certificate received (took 4+ weeks)
04/25/17: Sent AOS + IV Package
06/27/17: CC confirmed on the phone (NVC)
06/28/17: Interview date confirmed on the phone (NVC)
06/30/17: P4 Letter received (via email)
07/06/17: Second identical P4 email received
07/10/17: Our case left NVC
07/13/17: Case arrived at New Delhi Consulate

07/18/17: Email received from New Delhi Embassy about Biometrics/VAC

07/18/17: Email received from New Delhi Embassy (missing Marriage Certificate - must have lost it since we included this in the RFE during the USCIS stage + got approved!)

07/18/17: Biometrics scheduled via UStraveldocs site
07/21/17: Biometrics completed

07/25/17: Medical scheduled (Max in Lajpat)

07/26/17: Medical completed (will be ready to pick up in 3-4 days)
08/01/17: Medical papers ready for pickup

08/16/17: Interview Day

08/16/17: Visa Approved - Woohoo! 💕

08/17/17: Visa issued + passport ready for pickup

08/18/17: Passport and sealed envelops picked up

08/19/17: Immigration Fee ($220) paid via ELIS
08/25/17: Plane ticket purchased (POE on Sep) 😍
09/14/17: POE at Dulles 

ROC

09/10/19: I-751 Packet sent 🤘
09/20/19: NOA I-797 received! 

Here is our Embassy review and interview details http://www.visajourney.com/reviews/view-dos-cis-reviews.php?entry=22377

Filed: IR-1/CR-1 Visa Country: Bolivia
Timeline
Posted
2 hours ago, SJLOVE said:

Yes...we seem to have alot if similar days throughout this process .I'm going to contact them the 3rd week in May.  

I will call in a month just to see where they are at 

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...