Filed: K-3 Visa Country: India
Timeline
Posted

ok everyone.. I need some advise.  I thought i sent the financial forms at the same time as the other nvc documents.  but after my aos payment was completed they sent me the cover sheet for the affidavit of support.  so do I send that separate from the other documents I send when i pay the second fee?

Posted
1 hour ago, nessasmom980 said:

ok everyone.. I need some advise.  I thought i sent the financial forms at the same time as the other nvc documents.  but after my aos payment was completed they sent me the cover sheet for the affidavit of support.  so do I send that separate from the other documents I send when i pay the second fee?

You were supposed to send in all your documents at the same time (see NVC instructions):

 

Quote

After you collect the financial evidence in Step 4, and supporting documents in Step 5, you must submit all of these items in ONE package to NVC. Your case may be significantly delayed if you don't submit all of your documents at the same time.

Did you include the civil documents with your packet?  Did the cover sheet you included have a bar code?  If yes to both, then they'll simply scan the checklist page.  If you did not include any sheets with a bar code...you could be facing some delays.  If you have not yet sent in your civil documents, then they won't touch your file until they receive them...and piece it together with the financial documents you sent earlier - again, more significant delays.

 

Nothing you can do in either case except call NVC to confirm if they've received your packet - and by "packet", I mean all required documentation.

In order for them to consider your document in queue for review, all fees must reflect PAID, all forms completed, and all required documentation received and entered into the system.

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Filed: K-3 Visa Country: India
Timeline
Posted
2 minutes ago, JessieABC said:

You were supposed to send in all your documents at the same time (see NVC instructions):

 

Did you include the civil documents with your packet?  Did the cover sheet you included have a bar code?  If yes to both, then they'll simply scan the checklist page.  If you did not include any sheets with a bar code...you could be facing some delays.  If you have not yet sent in your civil documents, then they won't touch your file until they receive them...and piece it together with the financial documents you sent earlier - again, more significant delays.

 

Nothing you can do in either case except call NVC to confirm if they've received your packet - and by "packet", I mean all required documentation.

In order for them to consider your document in queue for review, all fees must reflect PAID, all forms completed, and all required documentation received and entered into the system.

I have not sent anything yet.  I paid the $120 fee yesterday.. and waiting to send the next $325 fee once it's invoiced.  

...but today after my $120 fee cleared I was sent this email asking for my "affidavit of support".  I didn't think I was suppose to send anything until all fees are paid.  so I was confused when I received this email.

Screenshot_20170517-190919.png

Posted
Just now, nessasmom980 said:

I have not sent anything yet.  I paid the $120 fee yesterday.. and waiting to send the next $325 fee once it's invoiced.  

...but today after my $120 fee cleared I was sent this email asking for my "affidavit of support".  I didn't think I was suppose to send anything until all fees are paid.  so I was confused when I received this email.

 

Ah, that clarifies it.

 

You can send your documents in at any time, just make sure you include both the aos cover sheet and the checklist cover sheet you received with the welcome letter.

 

They won't look at it until all your fees are paid but you can still send it in while proceeding with the rest of the steps.  My suggestion would be to send it when you pay the IV fee.  DS 260 unlocks after 3-5 days so around the time you complete this last form is also approximately when they would receive your packet.  Shortcut :)

NVC Process Guide for UK:  NVC Process (timelines, numbers, documents, steps)  

_______________________________________________________________________________________

TIMELINE (CR1 Spouse Visa)
USCIS Phase (Married in England September 3, 2016!)
Spoiler
  • 09-22-2016:  I-130 Mailed to Chicago Lockbox (USPS Priority)
  • 09-25-2016:  USPS Priority delivery confirmation
  • 09-26-2016:  Priority date assigned (USC Spouse)
  • 09-28-2016:  I-797C NOA1 Email/Text received, check cashed; case sent to Nebraska Service Center
  • 10-03-2016:  I-797C NOA1 Hardcopy received
  • 02-15-2017:  Case transferred to Texas Service Center
  • 03-16-2017:  NOA2 Approval Date
  • 03-22-2017:  USCIS sent case to NVC, Case Status changed to "We sent your case to the Department of State for visa processing"
  • 03-23-2017:  NOA2 Harcdopy received

NVC Phase

Spoiler
  • 03-30-2017:  Case Received By NVC
  • 04-04-2017:  Case # and IIN Assigned (called NVC to confirm)
  • 04-05-2017:  DS-261 unlocked & completed, called NVC and reviewed over the phone (IV fee will unlock after a week)
  • 04-06-2017:  Received NVC Welcome Letter via Email, AOS Fee unlocked & paid online
  • 04-07-2017:  Called NVC again and rep stated DS 261 was not actually reviewed.  Re-reviewed DS-261
  • 04-11-2017:  Welcome Letter email received, IV Fee unlocked & paid online
  • 04-13-2017:  DS-260 unlocked
  • 04-14-2017:  DS-260 submitted
  • 04-30-2017:  Affidavit of Support/Documents sent via Fedex Priority Overnight (sent Sunday, to be delivered Tuesday)
  • 05-02-2017:  Affidavit of Support/Documents delivered to NVC
  • 05-04-2017:  Document Scan Date
  • 06-28-2017:  Checklist for Court Records (even though beneficiary has never been to court); escalated to Supervisor who requested case files
  • 07-03-2017:  CASE COMPLETE!!!  Called NVC on July 5 and representative confirmed status
  • 07-11-2017:  Case Complete email confirmation received
  • 07-13-2017:  NVC rep confirmed Interview Date assigned
  • 07-14-2017:  Email confirmation of Interview
  • 07-20-2017:  11 Week (77 day) expected Case Complete from Scan Date (5/4/2017)
  • 07-21-2017:  Appointment with General Practitioner to get all required shots and medical history
  • 08-01-2017,   1:10PM:  Immigration medical with Knighstbridge Doctors in London
  • 08-11-2017:  Medical files received by Consulate
  • 08-16-2017, 12:30PM:  Interview in London!!
  • 08-17-2017:  Visa status changed to Administrative Processing, then several hours later to "Issued"
  • 08-22-2017:  Passport with Visa delivered (paid for home delivery); paid immigration fee and added case to MyUSCIS for alerts
  • 11-18-2017:  Point of Entry at JFK in NYC!!! 
 
TIMELINE (I-751 Removal of Conditions for Spouse)
USCIS Phase 
Spoiler
  • 10-08-2019:  I-751 Mailed to Dallas USCIS PO Box (USPS Flat Rate Box)
  • 10-11-2019:  USPS delivery confirmation
  • 10-16-2019:  Text received confirming receipt number; case found in MyUSCIS system several hours later
  • 10-17-2019:  Check cashed by USCIS
  • 10-21-2019:  I-797 NOA received (Notice Date: 10/16) of acceptance
  • 11-01-2019:  I-797C NOA received (Notice Date: 10/25) for Biometrics appointment
  • 11-12-2019:  Biometrics completed
  • 11-13-2019:  Case status changed to “Fingerprint Review Was Completed”
  • 12-24-2019:  Case status changed to “Case Was Updated To Show Fingerprints Were Taken”
  • 05-27-2020:  Case status changed to “Case is Ready to be Scheduled for An Interview”
  • 04-22-2021:  Infopass appointment scheduled and extension stamp provided
  • 07-12-2021:  Inquiry submitted to USCIS for case beyond normal processing times (reply expected by 8/3)
  • 03-09-2022:  Received email response to inquiry from 7/12/22 restating status with no updates provided
  • 09-16-2022:  Inquiry submitted to USCIS for case beyond normal processing times
  • 10-17-2022:  Requested assistance from local Congressman
  • 11-28-2022:  Congressman's office received USCIS statement that "application has been identified as a potential interview waiver application"
  • 03-27-2023:  USCIS Requested additional evidence "as it has been several years since you've submitted this petition" 
  • 05-13-2023:  Sent RFE response via USPS certified Priority mail
  • 05-17-2023:  USCIS received RFE packet
  • 05-19-2023:  USCIS case status updated to “New Card is Being Produced" 
  • 05-22-2023:  USCIS case status updated to “Case Was Approved" 
  • 05-24-2023:  USCIS case status updated to reflect new Green Card was mailed
  • 05-25-2023:  USCIS case status updated to “Card Was Delivered To Me By The Post Office" 

 

Filed: K-3 Visa Country: India
Timeline
Posted
4 minutes ago, JessieABC said:

Ah, that clarifies it.

 

You can send your documents in at any time, just make sure you include both the aos cover sheet and the checklist cover sheet you received with the welcome letter.

 

They won't look at it until all your fees are paid but you can still send it in while proceeding with the rest of the steps.  My suggestion would be to send it when you pay the IV fee.  DS 260 unlocks after 3-5 days so around the time you complete this last form is also approximately when they would receive your packet.  Shortcut :)

awesome thank you so much😊 I have not received the welcome packet yet with my checklist but when I do.. I will send in the completed packet exactly as you directed.  thanks again for your help

 

Filed: IR-5 Country: Dominican Republic
Timeline
Posted
1 hour ago, Y&V6416 said:

Anybody actually receive an approval around the timeline estimator??

Nop, seriously Nebraska is the worst service center ever. SMH

TIMELINE

29 December 2015 - married in Dominican Republic

 

USCIS Phase

21 November 2016 - I-130 sent to USCIS Chicago Lockbox 

22 November 2016 I-130 received at Nebraska Service Center

25 November - NOA1 received in the mail

???? - NOA 2 via e-mail, app and USCIS website

????- NOA 2 received in the mail 

????- Case Was Sent to Department of State 

 

NVC Phase

????- Case received by NVC

???? - NVC case number assigned

???? -  DS-261 Completed Online
???? - Welcome e-mail received, AOS fee paid
????- IV fee Invoiced, IV fee paid
????- DS-260 Completed
???? - AOS and IV package sent

--------------------------------------------------------
??? - Scan date

??? - Case Complete

Filed: IR-1/CR-1 Visa Country: Uganda
Timeline
Posted

I am so sad to see that there are a number of you who have not yet been approved. I pray for you all. We will get through this. 

 

I believe that those of us who go through this harrowing process actually come out a stronger couple in the end. We are getting lessons in patience, organization, saving money, and planning like other couples will take years to accumulate.

 

I send my hugs to you all and hope you get your approvals soon.

 

Are you all calling? My online status did not change until we were sent to NVC. So do not rely only on the apps or website. Calling and talking to tier 2 is the safest bet.

 

Good luck. 💜💙💜💙

Posted

YES!!!!!! FINALLY!!!

 

Just got approved today, my case was transferred out of Nebraska on March 15 to Texas! And finally!!!!! Almost 6 months in a half of wait! Hope everyone is getting closer or got approved already? Been waiting since October 26th very frustrating but patience is key!

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted
2 hours ago, Venatiano said:

YES!!!!!! FINALLY!!!

 

Just got approved today, my case was transferred out of Nebraska on March 15 to Texas! And finally!!!!! Almost 6 months in a half of wait! Hope everyone is getting closer or got approved already? Been waiting since October 26th very frustrating but patience is key!

Congratulations!  Did you get approved around the VJ estimated timeline? You know where it says when you may be adjudicated. 

 

My PD is Oct 31 and I got transferred from Nebraska to Texas on March 23 so we are close..

Filed: IR-1/CR-1 Visa Country: Bahamas
Timeline
Posted
2 hours ago, AmyLo said:

NVC received my case on May 11 and we just got a case number assigned. I have never been more excited to pay large online fees! 

 

Hang in there everyone else! Stay strong and positive. Hugs to everyone. 

Congregations! When did you get approved?

 

 

Filed: IR-1/CR-1 Visa Country: Iraq
Timeline
Posted

I contacted my senator's office 2 weeks ago, after ignoring my emails and inquiries during those 2 weeks, they sent me this response yesterday:

"I heard back from the Nebraska Service Center and they said it hasn’t been assigned to an officer yet.  They are currently working on applications submitted the end of August and your priority date is October 25, 2016.  They asked that we check back in 60 days.  I have put a reminder in my calendar to check on it the middle of July.  I hope this information is helpful."

I mean who are they kidding? I called and talked to tier 2 yesterday and got the same old bs.

This whole thing is just a joke.

 

Posted
13 hours ago, A&M16 said:

I contacted my senator's office 2 weeks ago, after ignoring my emails and inquiries during those 2 weeks, they sent me this response yesterday:

"I heard back from the Nebraska Service Center and they said it hasn’t been assigned to an officer yet.  They are currently working on applications submitted the end of August and your priority date is October 25, 2016.  They asked that we check back in 60 days.  I have put a reminder in my calendar to check on it the middle of July.  I hope this information is helpful."

I mean who are they kidding? I called and talked to tier 2 yesterday and got the same old bs.

This whole thing is just a joke.

 

The same thing happened to me. I have the same priority date with you. My husband called tier 2 USCIS in the beginning of March and they said that they are still processing August 30th and we have to wait for 60days which is has passed 60days until today. My husband called tier 2 again last Friday and they said the same exact thing. My husband told them that they said the same exact thing when he callen on March. But they just said "every case is different". And they can't do anything! This is so frustated because my friend from the same country as me and her priority date is November but processing in Texas has got approved last month! Nebraska is really sllloooooooooowwwwwwww! It has been 7 months waiting and nothing that we can do except wait and wait and wait!

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...