Hi everyone has anyone got their biometric appointment? It's been a month now I haven't received anything yet and next week m traveling abroad. I will be gone for 3 weeks. M panicking now.

Hi, looks like CSC is taking some time to schedule biometrics appointment. I am assuming you must be traveling now and that by the time you get back, you will not have missed the appointment (if it was scheduled). I hope you have someone who can check mail on your behalf while you are gone. Keep checking back here to see if others from CSC get their biometrics appointment letters. Enjoy your trip.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

IMPORTANT!



* Make sure that your VJ Text Editor setting is set to Rich Text Editor.
* Go to the MOST RECENTLY POSTED VERSION of this list (go to the last post and scroll UP) and "Reply" to it, deleting the "quote" tags in your reply.
* Please DO NOT change the font, font size, add colors, stuff like that.
* Please PREVIEW before posting to make sure it is properly formatted.
* Please check that you have not deleted anyone's NAME & DATA.

Date of I-751 = The Date you sent your application.
NOA Date = The Receipt Date on your original NOA letter.
Biometrics = The Date of your biometrics appointment.
Approved = The Date your case was approved.

* Please Capitalize your VJ Name when adding it to the list.
* When you're on this list, please come back to update your information accordingly.
* If you cannot add your information yourself, please ask another VJ member to help you do so.

California Service Center (13 applicants, 0 approved - 0%)

VJName..............Date of I-751...NOA1 Date....Biometrics.....Approved

TWINKIE3841..............10/02/16....10/--/16......--/--/16.....--/--/--

KATIEFLOSSOM.............10/--/16....10/05/16......--/--/16.....--/--/--

MRBKK....................10/04/16....10/07/16......--/--/16.....--/--/--
TRATSING.................10/06/16....10/07/16......--/--/16.....--/--/--
POTATOFRITTATA...........10/07/16....10/13/16......--/--/16.....--/--/--

LIDA LIU.................10/07/16....10/17/16......--/--/16.....--/--/--
SKIWALLKER...............10/10/16....10/31/16......--/--/16.....--/--/--

STARGIRL83...............10/11/16....10/11/16......--/--/16.....--/--/--
DIONYSUS.................10/11/16....10/17/16......--/--/16.....--/--/--
TECHNOMAN................10/11/16....10/13/16......--/--/16.....--/--/--
TM713....................10/12/16....10/17/16......--/--/16.....--/--/--

PIKUSHI..................10/17/16....10/--/16......--/--/16.....--/--/--

AGUPTA...................10/--/16....10/--/16......--/--/16.....--/--/--


Vermont Service Center (6 applicants, 0 approved - 0%)

VJName..............Date of I-751....NOA1 Date.....Biometrics.....Approved
DILMERA............. 10/01/16.......10/04/16.......11/04/16.......--/--/--
SNOW CRASH...........10/11/16.......10/14/16.......11/18/16.......--/--/--
HUNNYBUNNY...........10/11/16.......10/17/16.......11/15/16.......--/--/--
PHLUTE7..............10/17/16.......10/19/16.......11/28/16.......--/--/--

ISLANDGIRL80.........10/--/16.......10/26/16.......--/--/16.......--/--/--

CJAX.................10/24/16.......10/27/16.......11/28/16.......--/--/--

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

twinkie3841, katieflossom, and Agupta, please update your dates on the list.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Just got an email from USCIS!

"On 11/07/2016, you or your representative contacted USCIS concerning your I-751 Form to notify us that you have not yet received your biometrics appointment notice. Below is a summary of what we found and how the issue has been or may be resolved.

Your appointment is scheduled for 12/06/2016 at "-time"- at your local USCIS Application Support Center.

We will place your I-751 on a processing hold until we obtain your biometrics (photograph/fingerprints).

What You Can Do

* Ensure that we have your current mailing address;

* Verify that you are registered to receive mail at the address you provide to us;

* Follow any instructions in the notice;

* Respond to the notice by the response deadline; and

* Submit any requested information and the original notice with your response.

Reschedule an Appointment

If you missed your biometric appointment or need to reschedule, please follow instructions on the biometric notice to reschedule your appointment. Please note that:

* You must submit a request for rescheduling within 87 days of the date of your appointment;

* You must include the original fingerprint appointment notice; and

* We will not consider requests submitted after 87 days.

We hope this information is helpful to you."

10.18.2013 - Married!

02.14.2014 - Day 00 - AOS package sent (I-485, I-130, I-765, I-131)

02.18.2014 - Day 06 - Package received at uscis

02.24.2014 - Day 12 - NOA received

02.27.2014 - Day 15 - Apt for biometrics received

03.13.2014 - Day 29 - Biometrics apt

03.18.2014 - Day 34 - I-485 case status changed to "testing and interview"

04.25.2014 - Day 72 - I-765 APPROVED! case status changed to "card production"

04.25.2014 - Day 72 - I-131 APPROVED! case status changed to "post decision activity"

04.30.2014 - Day 77 - Notification of EAD in the mail.

05.02.2014 - Day 79 - EAD in hand!

09.10.2014 - Day 210 - Received interview date, scheduled for 10.14.2014

10.14.2014 - Day 234 - Interview at Dallas TX USCIS office

10.15.2014 - Day 235 - I-485 & I-130 APPROVED! status changed to "card production"

10.20.2014 - Day 240 - Received approval letters for I-485 & I-130

10.21.2014 - Day 241 - Notification received, green card is in the mail

10.23.2014 - Day 243 - Green card in hand!

10.06.2016 - Day 00 - Mailed I-751 & documents to California Service Center (corporate shipping UPS next day air)

10.07.2016 - Day 01 - Package received and signed for at 10am

10.12.2016 - Day 06 - Check cashed

10.14.2016 - Day 08 - NOA received, dated 10.07.2016

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Italy
Timeline

USPS for the package, arrived in 2 business days (from FL to CA) as expected.

Also used a USPS money order for the payment, and it went through without problems (I've been reading it takes slightly longer for personal checks, as they actually have to clear your account). The only downside to the USPS Money Order is that even though they say you can track it, by the time they give you an answer, it's been already cashed, and you would already have your NOA1.

F-1 Visa: Academic years 2007/2010.

K-1 Visa: I-129F sent Aug 2013; Approved Jan 2014.

Green Card: AOS sent Feb 2014; Approved Jan 2015.

Removal of Conditions: I-751 sent Nov 2016; Approved Apr 2018.

US Citizenship: Application sent Nov 2017; Fingerprints Nov 2017; Civics/English exam March 2018; Oath May 2018.

Link to comment
Share on other sites

HI everyone.

I have done some math based on data shown on VisaJourney and I want to know just how accurate the math is. If you sent to Vermont Service Centre and have received your biometrics appointment date, can you try this equation and see if the result matches the date you were given for your biometrics. Thanks :-)

Use this equation for the date estimate. y = 0.9739x + 42.41. The R-Square value for the equation is up at 0.9834 so it is pretty accurate. The error in the final value is at 1.44 so you can plus or minus 1.44 days from your final answer to give you the date range for your biometrics.

Example:

I am sending my package off today, 21 November 2016. This is the 326th day of the year.

So for the 326th day of the year, the calculation will be y = (0.9739 multiplied by 326) plus 42.41 = 368.41.

There were 366 days in 2016. Because my calculated number 368.41 is bigger than 366, I know this means my biometrics will be in 2.41 days into 2017. If I plus and minus the error of 1.44 onto this I get day 0.97 or day 3.85 into 2017. Rounded up for simplicity, my biometrics will hopefully be some time between 1 January and 4 January 2017.

Looking forward to seeing how accurate this is :-)

Link to comment
Share on other sites

Filed: AOS (apr) Country: India
Timeline

Been over 5weeks, still waiting for fingerprint appointment letter.

Oct 11, 2016 - ROC package mailed via USPS priority (large bubble wrap envelope)

Oct 13, 2016 - Package delivered to CSC

Oct 17, 2016 - Check cashed

Dec 1, 2016 - Biometrics completed (early walk-in)

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Kenya
Timeline

Been over 5weeks, still waiting for fingerprint appointment letter.

Mine's taking long too but with the VSC. Sent in on 10/27/19 Received on 10/29 (NOA1 same day).

AOS timeline

Mailed AOS, EAD, 07/03/2014

Received 07/08/2014

NOA1 EAD and AOS received 07/14/2014

Biometrics received 07/14/2014 Biometrics date 08/01/2014

Biometrics done 08/01/2014

EAD approval email and text 09/02/2014

EAD card production 09/02/2014

EAD card mailed 09/08/2014

EAD NOA2 mailed 09/08/2014

EAD card deliverd 09/10/2014

AOS touched 09/11/2014

EAD received 09/12/2014

Interview notice 10/03/2104

Interview date 11/10/2014

Rescheduled interview 01/13/2015 (Approved on the spot)

See you in 1 year and 3 months.....

ROC;

10/27/16 : ROC mailed to VSC

10/29/16: Date of NOA1.

Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Kenya
Timeline

IMPORTANT!

* Make sure that your VJ Text Editor setting is set to Rich Text Editor.

* Go to the MOST RECENTLY POSTED VERSION of this list (go to the last post and scroll UP) and "Reply" to it, deleting the "quote" tags in your reply.

* Please DO NOT change the font, font size, add colors, stuff like that.

* Please PREVIEW before posting to make sure it is properly formatted.

* Please check that you have not deleted anyone's NAME & DATA.

Date of I-751 = The Date you sent your application.

NOA Date = The Receipt Date on your original NOA letter.

Biometrics = The Date of your biometrics appointment.

Approved = The Date your case was approved.

* Please Capitalize your VJ Name when adding it to the list.

* When you're on this list, please come back to update your information accordingly.

* If you cannot add your information yourself, please ask another VJ member to help you do so.

California Service Center (13 applicants, 0 approved - 0%)

VJName..............Date of I-751...NOA1 Date....Biometrics.....Approved

TWINKIE3841..............10/02/16....10/--/16......--/--/16.....--/--/--

KATIEFLOSSOM.............10/--/16....10/05/16......--/--/16.....--/--/--

MRBKK....................10/04/16....10/07/16......--/--/16.....--/--/--

TRATSING.................10/06/16....10/07/16......--/--/16.....--/--/--

POTATOFRITTATA...........10/07/16....10/13/16......--/--/16.....--/--/--

LIDA LIU.................10/07/16....10/17/16......--/--/16.....--/--/--

SKIWALLKER...............10/10/16....10/31/16......--/--/16.....--/--/--

STARGIRL83...............10/11/16....10/11/16......--/--/16.....--/--/--

DIONYSUS.................10/11/16....10/17/16......--/--/16.....--/--/--

TECHNOMAN................10/11/16....10/13/16......--/--/16.....--/--/--

TM713....................10/12/16....10/17/16......--/--/16.....--/--/--

PIKUSHI..................10/17/16....10/--/16......--/--/16.....--/--/--

AGUPTA...................10/--/16....10/--/16......--/--/16.....--/--/--

Vermont Service Center (6 applicants, 0 approved - 0%)

VJName..............Date of I-751....NOA1 Date.....Biometrics.....Approved

DILMERA............. 10/01/16.......10/04/16.......11/04/16.......--/--/--

SNOW CRASH...........10/11/16.......10/14/16.......11/18/16.......--/--/--

HUNNYBUNNY...........10/11/16.......10/17/16.......11/15/16.......--/--/--

PHLUTE7..............10/17/16.......10/19/16.......11/28/16.......--/--/--

ISLANDGIRL80.........10/--/16.......10/26/16.......--/--/16.......--/--/--

CJAX.................10/24/16.......10/27/16.......11/28/16.......--/--/--

MOEVA................10/27/16.......10/29/16.......--/--/--.......--/--/--

AOS timeline

Mailed AOS, EAD, 07/03/2014

Received 07/08/2014

NOA1 EAD and AOS received 07/14/2014

Biometrics received 07/14/2014 Biometrics date 08/01/2014

Biometrics done 08/01/2014

EAD approval email and text 09/02/2014

EAD card production 09/02/2014

EAD card mailed 09/08/2014

EAD NOA2 mailed 09/08/2014

EAD card deliverd 09/10/2014

AOS touched 09/11/2014

EAD received 09/12/2014

Interview notice 10/03/2104

Interview date 11/10/2014

Rescheduled interview 01/13/2015 (Approved on the spot)

See you in 1 year and 3 months.....

ROC;

10/27/16 : ROC mailed to VSC

10/29/16: Date of NOA1.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

IMPORTANT!








* Make sure that your VJ Text Editor setting is set to Rich Text Editor.
* Go to the MOST RECENTLY POSTED VERSION of this list (go to the last post and scroll UP) and "Reply" to it, deleting the "quote" tags in your reply.
* Please DO NOT change the font, font size, add colors, stuff like that.
* Please PREVIEW before posting to make sure it is properly formatted.
* Please check that you have not deleted anyone's NAME & DATA.

Date of I-751 = The Date you sent your application.
NOA Date = The Receipt Date on your original NOA letter.
Biometrics = The Date of your biometrics appointment.
Approved = The Date your case was approved.

* Please Capitalize your VJ Name when adding it to the list.
* When you're on this list, please come back to update your information accordingly.
* If you cannot add your information yourself, please ask another VJ member to help you do so.





California Service Center (13 applicants, 0 approved - 0%)


VJName..............Date of I-751...NOA1 Date....Biometrics.....Approved
TWINKIE3841..............10/02/16....10/--/16......--/--/16.....--/--/--
KATIEFLOSSOM.............10/--/16....10/05/16......--/--/16.....--/--/--
MRBKK....................10/04/16....10/07/16......--/--/16.....--/--/--
TRATSING.................10/06/16....10/07/16......--/--/16.....--/--/--
POTATOFRITTATA...........10/07/16....10/13/16......--/--/16.....--/--/--
LIDA LIU.................10/07/16....10/17/16......--/--/16.....--/--/--
SKIWALLKER...............10/10/16....10/31/16......--/--/16.....--/--/--
STARGIRL83...............10/11/16....10/11/16......--/--/16.....--/--/--
DIONYSUS.................10/11/16....10/17/16......--/--/16.....--/--/--
TECHNOMAN................10/11/16....10/13/16......--/--/16.....--/--/--
TM713....................10/12/16....10/17/16......--/--/16.....--/--/--
PIKUSHI..................10/17/16....10/--/16......--/--/16.....--/--/--
AGUPTA...................10/--/16....10/--/16......--/--/16.....--/--/--


Vermont Service Center (6 applicants, 0 approved - 0%)

VJName..............Date of I-751....NOA1 Date.....Biometrics.....Approved
DILMERA............. 10/01/16.......10/04/16.......11/04/16.......--/--/--
SNOW CRASH...........10/11/16.......10/14/16.......11/18/16.......--/--/--
HUNNYBUNNY...........10/11/16.......10/17/16.......11/15/16.......--/--/--
PHLUTE7..............10/17/16.......10/19/16.......11/28/16.......--/--/--
ISLANDGIRL80.........10/--/16.......10/26/16.......--/--/16.......--/--/--
CJAX.................10/24/16.......10/27/16.......11/28/16.......--/--/--

Edited by jyo_c
Link to comment
Share on other sites

Filed: Lift. Cond. (apr) Country: Kenya
Timeline

Just received my biometrics appointment letter from the VSC.

Edited by moeva

AOS timeline

Mailed AOS, EAD, 07/03/2014

Received 07/08/2014

NOA1 EAD and AOS received 07/14/2014

Biometrics received 07/14/2014 Biometrics date 08/01/2014

Biometrics done 08/01/2014

EAD approval email and text 09/02/2014

EAD card production 09/02/2014

EAD card mailed 09/08/2014

EAD NOA2 mailed 09/08/2014

EAD card deliverd 09/10/2014

AOS touched 09/11/2014

EAD received 09/12/2014

Interview notice 10/03/2104

Interview date 11/10/2014

Rescheduled interview 01/13/2015 (Approved on the spot)

See you in 1 year and 3 months.....

ROC;

10/27/16 : ROC mailed to VSC

10/29/16: Date of NOA1.

Link to comment
Share on other sites

I finally got my biometrics letter! I checked my status online and I'm confused.

It says "On October 7, 2016, we received your case and waived the filing fee for your Form CRI-89, Petition to Remove Conditions of Permanent Resident Status Received, Receipt Number XXX. We mailed you a notice describing how we will process your case. Please follow the instructions in the notice."

I didn't request to waive the fees and my check was cashed??? Are they giving me my money back???

Edited by Tratsing

10.18.2013 - Married!

02.14.2014 - Day 00 - AOS package sent (I-485, I-130, I-765, I-131)

02.18.2014 - Day 06 - Package received at uscis

02.24.2014 - Day 12 - NOA received

02.27.2014 - Day 15 - Apt for biometrics received

03.13.2014 - Day 29 - Biometrics apt

03.18.2014 - Day 34 - I-485 case status changed to "testing and interview"

04.25.2014 - Day 72 - I-765 APPROVED! case status changed to "card production"

04.25.2014 - Day 72 - I-131 APPROVED! case status changed to "post decision activity"

04.30.2014 - Day 77 - Notification of EAD in the mail.

05.02.2014 - Day 79 - EAD in hand!

09.10.2014 - Day 210 - Received interview date, scheduled for 10.14.2014

10.14.2014 - Day 234 - Interview at Dallas TX USCIS office

10.15.2014 - Day 235 - I-485 & I-130 APPROVED! status changed to "card production"

10.20.2014 - Day 240 - Received approval letters for I-485 & I-130

10.21.2014 - Day 241 - Notification received, green card is in the mail

10.23.2014 - Day 243 - Green card in hand!

10.06.2016 - Day 00 - Mailed I-751 & documents to California Service Center (corporate shipping UPS next day air)

10.07.2016 - Day 01 - Package received and signed for at 10am

10.12.2016 - Day 06 - Check cashed

10.14.2016 - Day 08 - NOA received, dated 10.07.2016

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...