Hey guys!

So we submitted our I-129F petition the other day, tracking it with USPS and it should arrive at the Dallas Lock Box facility hopefully today! Got a couple of questions I'm wondering if you guys can help me with...

1) I know the go to answer for petition times is 5 months as per the USCIS website, but I've noticed alot of them are getting processed quicker - as an example someone had theirs approved just recently when they filed in October - thats pretty quick! Is this common?

2) Whats the deal with the multiple processing centres? I've read that some of them are notoriously slow, some of them are better than others (IE CA being the best one etc.) is there any truth to this or is it just hear-say?

Thanks guys!

K1 Fiance Visa:

02/03/2016: I-129F sent

02/11/2016: I-129F petition received at Dallas

02/17/2016: NOA1 emailed and text

02/23/2016: Hardcopy NOA1 received

04/07/2016: NOA2 approved

04/12/2016: Hardcopy NOA2 received

Filed: K-1 Visa Country: United Kingdom
Timeline
Posted

Thats insane, sounds like we got our petition in just at the right time!

I absolutely will, where can I find the thread? :)

K1 Fiance Visa:

02/03/2016: I-129F sent

02/11/2016: I-129F petition received at Dallas

02/17/2016: NOA1 emailed and text

02/23/2016: Hardcopy NOA1 received

04/07/2016: NOA2 approved

04/12/2016: Hardcopy NOA2 received

Posted

At the moment as far as I know all I-129f petitions are being sent from Texas lock box to CSC. We have no idea if this is going to stay or change in the future (or at least I don't). They are processing in around 40-50 days at the moment which is much quicker than the 5 months they used to take before. But no one has any idea how long this will last.

K-1 Jan 2016 Applicant timeline.

I-129f sent to lock box 7th January 2016.
Delivered 11th January 2016.
NOA1 sent to CSC January 14th 2016.
NOA1 Hard copy January 21st 2016.
RFE email 10th March 2016.
RFE hard copy - 21th March 2016.
RFE Evidence sent- 4th April 2016.
RFE Received by USCIS- 6th April 2016.
NOA2 Received by email dated 18th April 2016.
NOA2 hard copy - April 21st 2016
NVC Recieved- May 9th 2016.
NVC number received- May 9th 2016.
DS-160 filled out - 9th May 2016.
Medical - May 18th 2016
CEAC in Transit - 11th May 2016.
CEAC update embassy received medical- may 24th 2016
Interview- June 15th 2016. - approved!!
POE- July 13th 2016 -Chicago

Married July 18th 2016. (L)

AOS

Package sent- August 18th 2016

Arrived at Chicago Lockbox- August 20th 2016.

NOA 1 - August 25th 2016 (text received 27th).

AP NOA1- 22nd August 2016 (text received 27th).

EAD NOA1- 22nd August 2016 (email received 27th).

NOA1 Hard copies received- September 1st 2016.

Bio-metrics- 20th September 2016.

Request Initial Information for I-485 - October 6th 2016.

RFIE- Affidavit Support information October 11th 2016.

RFIE- Response sent Overnight USPS. October 17th 2016.

RFIE- Delivered October 18th 2016.

RFIE- Received by USCIS October 20th 2016.

EAD- Card Being produced November 17th 2016.

AP- Approved November 17th 2016.

Filed: Timeline
Posted

Yes, it looks like it's moving very fast, some people get their visa in 2 months! We are hoping to be between them. We do have the big age gap (30 years, I am much older than my future husband yet he is so much more mature and independent than I am) but it does not bothers us, it was before to start dating, we both were trying to stop it, it didn't work, lol! So now, not worrying, just loving each other and doing what needs to be done for to be together in marriage and everything

Tasha

Posted

Hey guys!

So we submitted our I-129F petition the other day, tracking it with USPS and it should arrive at the Dallas Lock Box facility hopefully today! Got a couple of questions I'm wondering if you guys can help me with...

1) I know the go to answer for petition times is 5 months as per the USCIS website, but I've noticed alot of them are getting processed quicker - as an example someone had theirs approved just recently when they filed in October - thats pretty quick! Is this common?

2) Whats the deal with the multiple processing centres? I've read that some of them are notoriously slow, some of them are better than others (IE CA being the best one etc.) is there any truth to this or is it just hear-say?

Thanks guys!

The "5 months" means that the goal time is 5 months and they are within that goal time. What you can see on Visajourney timelines is that CSC is taking an average of 42 days to process them. 42 days is within 5 months. They do this because they are "allowed" to take up to 5 months, and they don't want to post live statistics because otherwise they'd have every filer calling off the hook on day 43 demanding to know what the delay is.

What was happening before, when they were being processed at Texas and California, is that they were sending the same amount or higher percentage of files to Texas, which clearly had far less staff. This made the average time at Texas 210 days (7 months) vs California which (at the time) was 21 days (3 weeks). After a *huge* effort by Visajourney folks, this mistake was noted and now all files have been going to CSC since late March. And it is clear that CSC has far more staff than TSC because in those 10 months, the average processing time at California has remained very, very fast-- well below the 5 month goal time. So instead of half of the applicants getting super duper lucky and half getting totally screwed, 100% of applicants get lucky (just not "super duper" with a sometimes 4 DAY turnaround). Yay Visajourney.

Marriage/ AOS Timeline:

23 Dec 2015: Legal marriage

23 Jan 2016: Wedding!

23 Jan 2016: "Blizzard of the Century", wedding canceled/rescheduled (thank goodness we were legally married first or we'd have had a big problem!) :sleepy:

24 Jan 2016: Small "civil ceremony" with friends and family who were snowed in with us. December was a bit of a secret and people had traveled internationally and knew we *had* to get married that weekend, and our December legal marriage was nothing but signing a piece of paper at our priest's kitchen table, without any sort of vows etc so this was actually a very special (if not legally significant) day. (L)

16 Apr 2016: Filed for AOS and EAD/AP (We delayed a bit-- no big rush, enjoying the USCIS break)

23 Apr 2016: Wedding! Finally! :luv:

27 Apr 2016: Electronic NOA1 for all 3 :dancing:
29 Apr 2016: NOA1 Hardcopy for all 3
29 Jul 2016: Online service request for late EAD (Day 104)
29 Jul 2016: EAD/AP Approved ~3 hours after online service request
04 Aug 2016: RFE for Green Card (requested medicals/ vaccination record. They already have it). :ranting:
05 Aug 2016: EAD/AP Combo Card arrived! (Day 111)
08 Aug 2016: Congressional constituent request to get guidance on the RFE. Hoping they see they have the form and approve!

K-1 Visa Timeline:

PLEASE NOTE. This timeline was during the period of time when TSC was working on I-129fs and had a huge backlog. The average processing time was 210+ days. This is in no way predictive of your own timeline if you filed during or after April 2015, unless CSC develops a backlog. A backlog is anything above the 5-month goal time listed on USCIS's site

14 Feb 2015: Mailed I-129f to Dallas Lockbox. (L) (Most expensive Valentine's card I've ever sent!)

17 Feb 2015: NOA1 "Received Date"
19 Feb 2015: NOA1 Notice Date
08 Aug 2015: NOA2 email! :luv: (173 days from NOA1)

17 Aug 2015: Sent to NVC

?? Aug 2015: Arrived at NVC

25 Aug 2015: NVC Case # Assigned

31 Aug 2015: Left NVC for Consulate in San Jose

09 Sep 2015: Consulate received :dancing: (32 days from NOA2)

11 Sep 2015: Packet 3 emailed from embassy to me, the petitioner (34 days from NOA2).

18 Sep 2015: Medicals complete

21 Sep 2015: Packet 3 complete, my boss puts a temporary moratorium on all time off due to work emergency :clock:

02 Oct 2015: Work emergency clears up, interview scheduled (soonest available was 5 business days away--Columbus Day was in there)

13 Oct 2015: Interview

13 Oct 2015: VISA APPROVED :thumbs: (236 days from NOA1)

19 Oct 2015: Visa-in-hand

24 Oct 2015: POE !

15 Dec 2015: Fiance's mother's B-2 visa interview: APPROVED! So happy she will be at the wedding! :thumbs:

!

Filed: K-1 Visa Country: United Kingdom
Timeline
Posted

Wow thats really great! So any idea when all applicants will stop going to CSC and the Texas one will begin to take on more applications again?

K1 Fiance Visa:

02/03/2016: I-129F sent

02/11/2016: I-129F petition received at Dallas

02/17/2016: NOA1 emailed and text

02/23/2016: Hardcopy NOA1 received

04/07/2016: NOA2 approved

04/12/2016: Hardcopy NOA2 received

Posted

Wow thats really great! So any idea when all applicants will stop going to CSC and the Texas one will begin to take on more applications again?

No one knows, they don't announce these things until they're done.

The good news is that IF they start sending to Texas again, there won't be any "line" there, and at least the initial applications would go through fast. The issue was basically a line. A line out the door and around the corner, with more people arriving in the line faster than the staff was processing. And no, apparently USCIS didn't notice this problem. If they're better at balancing the workload in the future, this should never happen again. Or suddenly CSC could be the slow center (if, for example, staff gets pulled off i-129fs for other visas, or new programs--- which is what the "rumor" is what happened in Texas-- that staff was pulled off i-129fs to handle DACA applicants. Not sure if I believe that). No way of knowing. Just know that at least for now, everyone who has applied recently and will apply in the near future is in a very good spot.

Marriage/ AOS Timeline:

23 Dec 2015: Legal marriage

23 Jan 2016: Wedding!

23 Jan 2016: "Blizzard of the Century", wedding canceled/rescheduled (thank goodness we were legally married first or we'd have had a big problem!) :sleepy:

24 Jan 2016: Small "civil ceremony" with friends and family who were snowed in with us. December was a bit of a secret and people had traveled internationally and knew we *had* to get married that weekend, and our December legal marriage was nothing but signing a piece of paper at our priest's kitchen table, without any sort of vows etc so this was actually a very special (if not legally significant) day. (L)

16 Apr 2016: Filed for AOS and EAD/AP (We delayed a bit-- no big rush, enjoying the USCIS break)

23 Apr 2016: Wedding! Finally! :luv:

27 Apr 2016: Electronic NOA1 for all 3 :dancing:
29 Apr 2016: NOA1 Hardcopy for all 3
29 Jul 2016: Online service request for late EAD (Day 104)
29 Jul 2016: EAD/AP Approved ~3 hours after online service request
04 Aug 2016: RFE for Green Card (requested medicals/ vaccination record. They already have it). :ranting:
05 Aug 2016: EAD/AP Combo Card arrived! (Day 111)
08 Aug 2016: Congressional constituent request to get guidance on the RFE. Hoping they see they have the form and approve!

K-1 Visa Timeline:

PLEASE NOTE. This timeline was during the period of time when TSC was working on I-129fs and had a huge backlog. The average processing time was 210+ days. This is in no way predictive of your own timeline if you filed during or after April 2015, unless CSC develops a backlog. A backlog is anything above the 5-month goal time listed on USCIS's site

14 Feb 2015: Mailed I-129f to Dallas Lockbox. (L) (Most expensive Valentine's card I've ever sent!)

17 Feb 2015: NOA1 "Received Date"
19 Feb 2015: NOA1 Notice Date
08 Aug 2015: NOA2 email! :luv: (173 days from NOA1)

17 Aug 2015: Sent to NVC

?? Aug 2015: Arrived at NVC

25 Aug 2015: NVC Case # Assigned

31 Aug 2015: Left NVC for Consulate in San Jose

09 Sep 2015: Consulate received :dancing: (32 days from NOA2)

11 Sep 2015: Packet 3 emailed from embassy to me, the petitioner (34 days from NOA2).

18 Sep 2015: Medicals complete

21 Sep 2015: Packet 3 complete, my boss puts a temporary moratorium on all time off due to work emergency :clock:

02 Oct 2015: Work emergency clears up, interview scheduled (soonest available was 5 business days away--Columbus Day was in there)

13 Oct 2015: Interview

13 Oct 2015: VISA APPROVED :thumbs: (236 days from NOA1)

19 Oct 2015: Visa-in-hand

24 Oct 2015: POE !

15 Dec 2015: Fiance's mother's B-2 visa interview: APPROVED! So happy she will be at the wedding! :thumbs:

!

Filed: K-1 Visa Country: United Kingdom
Timeline
Posted

Pretty crazy, I thought the processing times were pretty long based on another forum I use (British Expats) - who were saying to anticipate 8 months for the NOA2!

K1 Fiance Visa:

02/03/2016: I-129F sent

02/11/2016: I-129F petition received at Dallas

02/17/2016: NOA1 emailed and text

02/23/2016: Hardcopy NOA1 received

04/07/2016: NOA2 approved

04/12/2016: Hardcopy NOA2 received

Posted

Enjoy- the AOS process is starting to slow down lol. I've been watching my possible adjudicated time getting slowly pushed farther and farther away. :(

2015-03-07: Got engaged (L)

2015-03-30: Sent I-129F to Dallas lockbox

2015-04-14: NOA1 Packet received, sent to CSC

2015-05-07: NOA2 Approved!

2015-06-15: Received Packet 3 by mail

2015-06-17: Sent Packet 3 to Consulate

2015-07-14: Received Packet 4

2015-08-10: Medical in Toronto

2015-08-16: Received medical envelope

2015-08-24: Montreal interview- APPROVED!

2015-08-27: Visa arrives at Loomis location

2015-08-28: Visa in hand!

2015-09-17: Entered USA

2015-10-23: Married!

2016-01-11: Sent AOS Package I-485, I-765, I-131

2016-01-21: NOA1 Package received

2016-02-19: Biometrics

2016-04-01: AOS interview- APPROVED!

2016-04-07: 2 yr cond green card in hand

2018-03-12: sent ROC

2018-03-19: NOA date, 2018-03-24 letter rec'd

2018-05-18: Biometrics appt waived

2019-06-04 New biometrics letter received

2019-06-10 Biometrics

2019-06-18 ROC Approved
2019-06-25 10 year Green Card in hand

Filed: K-1 Visa Country: China
Timeline
Posted

The problem is not at the USCIS approval stage but at the appointment setting stage lol. After USCIS, its NVC then its Embassy.... the Embassy part is the bottleneck for appointment so far at least for China lol no appointment available....

=============
5/20/2019 - I129 Submitted

5/22/19 - NOA1

 

Filed: Timeline
Posted

No one knows, they don't announce these things until they're done.

The good news is that IF they start sending to Texas again, there won't be any "line" there, and at least the initial applications would go through fast. The issue was basically a line. A line out the door and around the corner, with more people arriving in the line faster than the staff was processing. And no, apparently USCIS didn't notice this problem. If they're better at balancing the workload in the future, this should never happen again. Or suddenly CSC could be the slow center (if, for example, staff gets pulled off i-129fs for other visas, or new programs--- which is what the "rumor" is what happened in Texas-- that staff was pulled off i-129fs to handle DACA applicants. Not sure if I believe that). No way of knowing. Just know that at least for now, everyone who has applied recently and will apply in the near future is in a very good spot.

Wow! I hope we all are lucky now. :thumbs:

Posted

Pretty crazy, I thought the processing times were pretty long based on another forum I use (British Expats) - who were saying to anticipate 8 months for the NOA2!

They're pretty out of date then. The last people to apply who were facing an 8 month wait for NOA2 were people who applied through the end of March 2014. Trust me this was a big, big thing here this time a year ago, and I applied right into it and was a part of the push (to the degree permitted by my employment-- long story there) to get the situation fixed.

Marriage/ AOS Timeline:

23 Dec 2015: Legal marriage

23 Jan 2016: Wedding!

23 Jan 2016: "Blizzard of the Century", wedding canceled/rescheduled (thank goodness we were legally married first or we'd have had a big problem!) :sleepy:

24 Jan 2016: Small "civil ceremony" with friends and family who were snowed in with us. December was a bit of a secret and people had traveled internationally and knew we *had* to get married that weekend, and our December legal marriage was nothing but signing a piece of paper at our priest's kitchen table, without any sort of vows etc so this was actually a very special (if not legally significant) day. (L)

16 Apr 2016: Filed for AOS and EAD/AP (We delayed a bit-- no big rush, enjoying the USCIS break)

23 Apr 2016: Wedding! Finally! :luv:

27 Apr 2016: Electronic NOA1 for all 3 :dancing:
29 Apr 2016: NOA1 Hardcopy for all 3
29 Jul 2016: Online service request for late EAD (Day 104)
29 Jul 2016: EAD/AP Approved ~3 hours after online service request
04 Aug 2016: RFE for Green Card (requested medicals/ vaccination record. They already have it). :ranting:
05 Aug 2016: EAD/AP Combo Card arrived! (Day 111)
08 Aug 2016: Congressional constituent request to get guidance on the RFE. Hoping they see they have the form and approve!

K-1 Visa Timeline:

PLEASE NOTE. This timeline was during the period of time when TSC was working on I-129fs and had a huge backlog. The average processing time was 210+ days. This is in no way predictive of your own timeline if you filed during or after April 2015, unless CSC develops a backlog. A backlog is anything above the 5-month goal time listed on USCIS's site

14 Feb 2015: Mailed I-129f to Dallas Lockbox. (L) (Most expensive Valentine's card I've ever sent!)

17 Feb 2015: NOA1 "Received Date"
19 Feb 2015: NOA1 Notice Date
08 Aug 2015: NOA2 email! :luv: (173 days from NOA1)

17 Aug 2015: Sent to NVC

?? Aug 2015: Arrived at NVC

25 Aug 2015: NVC Case # Assigned

31 Aug 2015: Left NVC for Consulate in San Jose

09 Sep 2015: Consulate received :dancing: (32 days from NOA2)

11 Sep 2015: Packet 3 emailed from embassy to me, the petitioner (34 days from NOA2).

18 Sep 2015: Medicals complete

21 Sep 2015: Packet 3 complete, my boss puts a temporary moratorium on all time off due to work emergency :clock:

02 Oct 2015: Work emergency clears up, interview scheduled (soonest available was 5 business days away--Columbus Day was in there)

13 Oct 2015: Interview

13 Oct 2015: VISA APPROVED :thumbs: (236 days from NOA1)

19 Oct 2015: Visa-in-hand

24 Oct 2015: POE !

15 Dec 2015: Fiance's mother's B-2 visa interview: APPROVED! So happy she will be at the wedding! :thumbs:

!

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...