Jump to content
dwheels76

Case Complete to Interview March 2016

 Share

1,921 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline

Well, I just called NVC nd spoke to a customer Rep who told me that my case is in transit to the embassy in Lagos because its an expedite case. She says the embassy would generate an interview appointment date for me as soon as the file gets there. She advice me to get to the embassy after 1 week concerning my appointment. Yayyyy!!!!

Congrats same here! im expedite and it says READY it shows on ceac last updated 2/18/16. But no interview yet i will call next week. Hope you hear good news soon!

_______________________________________________________________

USCIS CR-1/IR-1:
Aug 08/20/2015: Mailed I-130 (Phoenix Lockbox)
Aug 08/24/2015: NOA 1 (Nebraska)
Dec 12/08/2015: NOA 2 (Nebraska)
Dec 12/09/2015: Sent to NVC
--------------------------------------------------------------------------------------------------------------TOTAL DAYS IN USCIS: 107
NVC STAGE
Dec 12/11/2015: Case received at NVC
Dec 12/28/2015: Case # and Invoice number received
Dec 12/28/2015: Paid AOS Fee
Dec 12/28/2015: Completed DS-261 Choice of Agent
Dec 12/31/2015: NVC Welcome letter received by snail mail
Jan 01/06/2016: Reviewed DS-261 over the phone
Jan 01/07/2016: Choice of agent email + IV fee bill invoiced
Jan 01/07/2016: IV fee Paid
Jan 01/12/2016: AOS + IV packet sent
Jan 01/13/2016: AOS + IV packet received
Jan 01/13/2016: DS-260 Completed
Jan 01/13/2016: Scan Date
Feb 02/02/2016: Checklist :'(
Feb 02/04/2016 NEW scan date
Feb 02/10/2016 CASE COMPLETED!!!
Feb 02/16/2016 Case left NVC to Consulate (In Transit)
--------------------------------------------------------------------------------------------------------------------TOTAL DAYS IN NVC: 67 days
Feb 02/18/16 Case shows READY
Feb 02/19/16 Case on file at consulate (Juarez)
Feb 02/2/16 Interview date scheduled for 3/29
Feb 02/8/16 Interview letter notification received
CONSULATE - CUIDAD JUAREZ, MEXICO
Mar 03/25/16 Medical Exam
Mar 03/28/16 Biometrics
Mar 03/29/16 INTERVIEW
*******APPROVED!!!*******
TOTAL TIME FROM SUBMISSION TO INTERVIEW APPROVAL

222 days from the start date to the end date
7 months and 9 days

VISA

3/31/16 Sent to DHL specific location

4/01/16 Visa received at DHL location - VISA ON HAND -

4/08/16 UNITED STATES ENTRY

TOTAL TIME FROM SUBMISSION TO US ENTRY

232 days from the start date to the end date
7 months and 19 days

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Belize
Timeline

16. 180, 4x6 photos in an album. These pictures can be removed if need be.

I don´t have pictures right now. - We don´t even have photo albums only online and digital.

But we have been married for 8 years and have 2 kids.

Can be much more connected then that :)

:)

All of our pictures are also digital. I made a PowerPoint presentation with a bunch of our digital pics and printed it out.

I'll let you know after our interview on Tuesday how it worked out.

Service Center : California Service Center

Consulate :Belmopan

Marriage (if applicable): 2015-02-18

I-130 Sent : 2015-07-30

I-130 NOA1 : 2015-08-04

I-130 Approved : 2015-09-21 (48 Days)

NVC Received : 2015-10-08

Received Case # over the phone and received NVC Welcome letter via postal mail : 2015-10-26

Submitted DS-261 : 2015-10-26

Reviewed DS-261 with an agent on the phone, Paid AOS, and Mailed AOS and IV packages: 2015-11-18

AOS and IV Packages delivered, Per Fed Ex Tracking: 2015-11-19

Paid IV Fee: 2015-11-19

NVC Scan date (received email 2015-11-24) : 2015-11-19

AOS Fee shows paid, IV Fee still shows in process: 2015-11-23

IV Fee shows Paid, Submitted DS-260 : 2015-11-24

Case Complete at NVC : 2015-12-28

Interview Date : 2016-02-23 - APPROVED!

Medical Complete : 2016-01-18

POE: 2016-03-02 in Baltimore

 

R.O.C.

Service Center : Vermont Service Center

I-751 Sent : 2018-01-26

I-751 Received: 2018-01-29

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Denmark
Timeline

All of our pictures are also digital. I made a PowerPoint presentation with a bunch of our digital pics and printed it out.

I'll let you know after our interview on Tuesday how it worked out.

Thanks.

OH LOOK PICTURES - https://500px.com/sorenhelmer

K3 Visa Journey (That turned out to end up being IR1)

Marriage: 2008-03-25

USCIS:
I-130 Sent: 2015-09-10
I-130 Received: 2015-10-15
NOA1 : 2015-10-18
NOA2 : 2015-10-29


NVC:
NVC Received Case (I-130): 2015-11-12
NVC Case Number Received: 2015-12-03
Received DS-261 / AOS Bill: 2015-12-03
Submit DS-261: 2015-12-03
Pay AOS Bill: 2015-12-04
Receive IV Bill: 2015-12-08
Pay IV Bill: 2015-12-08
Send AOS Package: 2015-12-11
Send IV Package: 2015-12-11
Scan date: someplace around Dec 21st, nvc was not really shearing.

CC: 2016-01-29
Medical Examination: 2016-01-18
Embassy Interview: 2016-03-21 - NEW DATE 2016-03-02

AP: 2016-03-02

Issued: 2016-03-08

- They asked for more papers

Issued Again: 2016-03-10

- No new must be good news :rolleyes:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

Well, I just called NVC nd spoke to a customer Rep who told me that my case is in transit to the embassy in Lagos because its an expedite case. She says the embassy would generate an interview appointment date for me as soon as the file gets there. She advice me to get to the embassy after 1 week concerning my appointment. Yayyyy!!!!

Last shipment to Lagos: Left yesterday and will arrive on Feb 22.

Result Summary
Waybill: 3375250620Arrived at Sort Facility LEIPZIG - GERMANYSign up for shipment notifications Friday, February 19, 2016 at 22:11Origin Service Area:BOSTON, MA - PORTSMOUTH - USADestination Service Area:LAGOS - LAGOS - NIGERIA
Estimated Delivery:Monday, February 22, 2016By End of Day

1 Piece

Friday, February 19, 2016 Location Time Piece 7 Arrived at Sort Facility LEIPZIG - GERMANY LEIPZIG - GERMANY 22:11

1 Piece

6 Departed Facility in CINCINNATI HUB - USA CINCINNATI HUB, OH - USA 07:39

1 Piece

5 Processed at CINCINNATI HUB - USA CINCINNATI HUB, OH - USA 05:36

1 Piece

4 Arrived at Sort Facility CINCINNATI HUB - USA CINCINNATI HUB, OH - USA 01:23

1 Piece

Thursday, February 18, 2016 Location Time Piece 3 Departed Facility in BOSTON - USA BOSTON, MA - USA 23:18

1 Piece

2 Processed at BOSTON - USA BOSTON, MA - USA 23:16

1 Piece

1 Shipment picked up BOSTON, MA - USA 14:15

1 Piece

Hide Details

Edited by Frankjavir

CR-1 VISA

STAGE 1: USCIS

CALIFORNIA SERVICE CENTER US EMBASSY BOGOTA

09-08-2015 Express mailed my I-130 package to Chicago Lock-box.

09-11-2015 Received NOA1 via email with a PD of 09-09-2015

09-19-2015 Received I-797C via snail mail. (NOA1)

10-21-2015 My wife came to visit me on a B1/B2. No problems at POE Miami :P

11-04-2015 Received NOA2 via email. (56 days after NOA1)

11-08-2015 My wife ends visit and returns to Colombia to wait for interview :(

11-09-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-16-2015 NVC received our case,(12 days after NOA2).

12-07-2015 Emailed inquiry to NVC to inform them my email. http://travel.state.gov/content/visas/en/contact.html

12-08-2015 NVC assigned case and invoice ID number,(34 days after NOA2) Case was assigned after 13:00 PM. I called at 12:30 then at 19:00 PM

12-08-2015 Completed Choice of Agent DS-261

12-09-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-09-2015 AOS bill became available and I paid it. (IN PROCESS)

12-12-2015 Mailed AOS and IV packages.

12-14-2015 Received via email IV bill from ASKnvc@state.gov and paid the IV fee.

12-14-2015 AOS fee updated to PAID

12-15-2015 USPS tracking shows AOS/IV packages were delivered to NVC. Waiting for a SCAN date.

12-16-2015 IV fee updated to PAID and completed DS-260

12-19-2015 Scan Date (45 days after NOA2). I called on 01-13-16 and I was told my scan date is 12-15-15????

01-26-2016 Case complete. (83 days after NOA2)

01-29-2016 Called NVC, I was informed my CO Interview will be on 03-01-2016 at 08:00.

02-02-2016 Received Interview Letter (P4) via email.

02-09-2016 Package picked-up by DHL at 15:29 Waybill 5992952011. CEAC status "IN TRANSIT"

STAGE 3: US Embassy Bogota

02-11-2016 US Embassy Bogota received my package at 10:39.

02-12-2016 CEAC Visa Status changed from "IN TRANSIT" to "READY"

02-24-2016 Lab exams at the clinic and Bio-metrics at the CAS center.

02-25-2016 Medical Exams.

03-01-2016 Interview Date (175 days after I mailed I-130) VISA APPROVED. CEAC status changed to AP

03-02-2016 Paid Immigrant Visa Fee via ELIS account. CEAC status changed to ISSUED

03-03-2016 US Embassy Bogota sends Passport and Visa package via DHL Waybill 2900131780 to Cali.

03-04-2016 My wife picked up at DHL sealed approved IV package and her passport with a stamped I-551 IV Category CR1.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline

So hello to everyone I need real help because I am freaking out . So I read on the website of my embassy that the I-864 must be sealed by an American Notary .I Really dont understand beacuse we sent one the NVC that was not sealed just signed by my husband and another one by my Joint Sponsor and it was everything ok we got a CC. After I Got my interview date I asked my husband to sign and sent me another form just in case to have it with me at my interview, the one that I have is only signed by my husband not sealed by an American Notary ? What should I go please help. 4 days to the Interview !!!

So hello to everyone I need real help because I am freaking out . So I read on the website of my embassy that the I-864 must be sealed by an American Notary .I Really dont understand beacuse we sent one the NVC that was not sealed just signed by my husband and another one by my Joint Sponsor and it was everything ok we got a CC. After I Got my interview date I asked my husband to sign and sent me another form just in case to have it with me at my interview, the one that I have is only signed by my husband not sealed by an American Notary ? What should I go please help. 4 days to the Interview !!!

Have you contacted the Embassy about this? As far as I know the form does not NEED to be notarized but it may be a Embassy specific requirement so call them asap and inquire.

graphics-exclamation-mark-527817.gif April 9th: Got Married yektdeort6eji5ha.png

CR1 animal-graphics-pigeons-221733.gif CR2

Link to comment
Share on other sites

Filed: Country: Nigeria
Timeline

Last shipment to Lagos: Left yesterday and will arrive on Feb 22.

Result Summary

Waybill: 3375250620Arrived at Sort Facility LEIPZIG - GERMANYSign up for shipment notifications Friday, February 19, 2016 at 22:11Origin Service Area:BOSTON, MA - PORTSMOUTH - USADestination Service Area:LAGOS - LAGOS - NIGERIA

Estimated Delivery:Monday, February 22, 2016By End of Day

1 PieceFriday, February 19, 2016 Location Time Piece 7 Arrived at Sort Facility LEIPZIG - GERMANY LEIPZIG - GERMANY 22:11

1 Piece6 Departed Facility in CINCINNATI HUB - USA CINCINNATI HUB, OH - USA 07:39

1 Piece5 Processed at CINCINNATI HUB - USA CINCINNATI HUB, OH - USA 05:36

1 Piece4 Arrived at Sort Facility CINCINNATI HUB - USA CINCINNATI HUB, OH - USA 01:23

1 PieceThursday, February 18, 2016 Location Time Piece 3 Departed Facility in BOSTON - USA BOSTON, MA - USA 23:18

1 Piece2 Processed at BOSTON - USA BOSTON, MA - USA 23:16

1 Piece1 Shipment picked up BOSTON, MA - USA 14:15

1 Piece

Hide Details

Thanks for that breakdown. I dont have my tracking number because I never ask for it. I will do that next week Monday. I hope we all get good news next week. Best of luck to everyone nd thanks for all ur love, support nd encouragement. One love!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Kosova
Timeline

Have you contacted the Embassy about this? As far as I know the form does not NEED to be notarized but it may be a Embassy specific requirement so call them asap and inquire.

No , I have not called yet , but I did call the NVC to ask they said no need to be notarized , but they recommend to call the Embassy !

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

So hello to everyone I need real help because I am freaking out . So I read on the website of my embassy that the I-864 must be sealed by an American Notary .I Really dont understand beacuse we sent one the NVC that was not sealed just signed by my husband and another one by my Joint Sponsor and it was everything ok we got a CC. After I Got my interview date I asked my husband to sign and sent me another form just in case to have it with me at my interview, the one that I have is only signed by my husband not sealed by an American Notary ? What should I go please help. 4 days to the Interview !!!

So hello to everyone I need real help because I am freaking out . So I read on the website of my embassy that the I-864 must be sealed by an American Notary .I Really dont understand beacuse we sent one the NVC that was not sealed just signed by my husband and another one by my Joint Sponsor and it was everything ok we got a CC. After I Got my interview date I asked my husband to sign and sent me another form just in case to have it with me at my interview, the one that I have is only signed by my husband not sealed by an American Notary ? What should I go please help. 4 days to the Interview !!!

I would not worry about that, I search it and found what i BELIEVE YOU you also read:

http://photos.state.gov/libraries/macedonia/8573/archivePDFDec2010/iv-OF167.pdf

Its old (1993) and sounds like is for DCF which they do not do any more.

You paid a fee for AOS assesment, that by itself has more value or weight that a notarized I-864 which means nothing but a certification of the signature.

Trust me, sleep tight, DO NOT WORRY about a notarized I-864.

CR-1 VISA

STAGE 1: USCIS

CALIFORNIA SERVICE CENTER US EMBASSY BOGOTA

09-08-2015 Express mailed my I-130 package to Chicago Lock-box.

09-11-2015 Received NOA1 via email with a PD of 09-09-2015

09-19-2015 Received I-797C via snail mail. (NOA1)

10-21-2015 My wife came to visit me on a B1/B2. No problems at POE Miami :P

11-04-2015 Received NOA2 via email. (56 days after NOA1)

11-08-2015 My wife ends visit and returns to Colombia to wait for interview :(

11-09-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-16-2015 NVC received our case,(12 days after NOA2).

12-07-2015 Emailed inquiry to NVC to inform them my email. http://travel.state.gov/content/visas/en/contact.html

12-08-2015 NVC assigned case and invoice ID number,(34 days after NOA2) Case was assigned after 13:00 PM. I called at 12:30 then at 19:00 PM

12-08-2015 Completed Choice of Agent DS-261

12-09-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-09-2015 AOS bill became available and I paid it. (IN PROCESS)

12-12-2015 Mailed AOS and IV packages.

12-14-2015 Received via email IV bill from ASKnvc@state.gov and paid the IV fee.

12-14-2015 AOS fee updated to PAID

12-15-2015 USPS tracking shows AOS/IV packages were delivered to NVC. Waiting for a SCAN date.

12-16-2015 IV fee updated to PAID and completed DS-260

12-19-2015 Scan Date (45 days after NOA2). I called on 01-13-16 and I was told my scan date is 12-15-15????

01-26-2016 Case complete. (83 days after NOA2)

01-29-2016 Called NVC, I was informed my CO Interview will be on 03-01-2016 at 08:00.

02-02-2016 Received Interview Letter (P4) via email.

02-09-2016 Package picked-up by DHL at 15:29 Waybill 5992952011. CEAC status "IN TRANSIT"

STAGE 3: US Embassy Bogota

02-11-2016 US Embassy Bogota received my package at 10:39.

02-12-2016 CEAC Visa Status changed from "IN TRANSIT" to "READY"

02-24-2016 Lab exams at the clinic and Bio-metrics at the CAS center.

02-25-2016 Medical Exams.

03-01-2016 Interview Date (175 days after I mailed I-130) VISA APPROVED. CEAC status changed to AP

03-02-2016 Paid Immigrant Visa Fee via ELIS account. CEAC status changed to ISSUED

03-03-2016 US Embassy Bogota sends Passport and Visa package via DHL Waybill 2900131780 to Cali.

03-04-2016 My wife picked up at DHL sealed approved IV package and her passport with a stamped I-551 IV Category CR1.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

Thanks for that breakdown. I dont have my tracking number because I never ask for it. I will do that next week Monday. I hope we all get good news next week. Best of luck to everyone nd thanks for all ur love, support nd encouragement. One love!

I don't think anyone is going to give you a tracking number.

What I gave you it is as close as it gets as far as making an educated guess on the tracking of your package.

CR-1 VISA

STAGE 1: USCIS

CALIFORNIA SERVICE CENTER US EMBASSY BOGOTA

09-08-2015 Express mailed my I-130 package to Chicago Lock-box.

09-11-2015 Received NOA1 via email with a PD of 09-09-2015

09-19-2015 Received I-797C via snail mail. (NOA1)

10-21-2015 My wife came to visit me on a B1/B2. No problems at POE Miami :P

11-04-2015 Received NOA2 via email. (56 days after NOA1)

11-08-2015 My wife ends visit and returns to Colombia to wait for interview :(

11-09-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-16-2015 NVC received our case,(12 days after NOA2).

12-07-2015 Emailed inquiry to NVC to inform them my email. http://travel.state.gov/content/visas/en/contact.html

12-08-2015 NVC assigned case and invoice ID number,(34 days after NOA2) Case was assigned after 13:00 PM. I called at 12:30 then at 19:00 PM

12-08-2015 Completed Choice of Agent DS-261

12-09-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-09-2015 AOS bill became available and I paid it. (IN PROCESS)

12-12-2015 Mailed AOS and IV packages.

12-14-2015 Received via email IV bill from ASKnvc@state.gov and paid the IV fee.

12-14-2015 AOS fee updated to PAID

12-15-2015 USPS tracking shows AOS/IV packages were delivered to NVC. Waiting for a SCAN date.

12-16-2015 IV fee updated to PAID and completed DS-260

12-19-2015 Scan Date (45 days after NOA2). I called on 01-13-16 and I was told my scan date is 12-15-15????

01-26-2016 Case complete. (83 days after NOA2)

01-29-2016 Called NVC, I was informed my CO Interview will be on 03-01-2016 at 08:00.

02-02-2016 Received Interview Letter (P4) via email.

02-09-2016 Package picked-up by DHL at 15:29 Waybill 5992952011. CEAC status "IN TRANSIT"

STAGE 3: US Embassy Bogota

02-11-2016 US Embassy Bogota received my package at 10:39.

02-12-2016 CEAC Visa Status changed from "IN TRANSIT" to "READY"

02-24-2016 Lab exams at the clinic and Bio-metrics at the CAS center.

02-25-2016 Medical Exams.

03-01-2016 Interview Date (175 days after I mailed I-130) VISA APPROVED. CEAC status changed to AP

03-02-2016 Paid Immigrant Visa Fee via ELIS account. CEAC status changed to ISSUED

03-03-2016 US Embassy Bogota sends Passport and Visa package via DHL Waybill 2900131780 to Cali.

03-04-2016 My wife picked up at DHL sealed approved IV package and her passport with a stamped I-551 IV Category CR1.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Kosova
Timeline

I would not worry about that, I search it and found what i BELIEVE YOU you also read:

http://photos.state.gov/libraries/macedonia/8573/archivePDFDec2010/iv-OF167.pdf

Its old (1993) and sounds like is for DCF which they do not do any more.

You paid a fee for AOS assesment, that by itself has more value or weight that a notarized I-864 which means nothing but a certification of the signature.

Trust me, sleep tight, DO NOT WORRY about a notarized I-864.

I actually read it on the Embassy's website , but I think you are right because everybody is saying that is not needed.

I am Overthinking everything at this point ,so anxious about the Interview !

Thank You Frankjavir :)

Also do you think that I am good to go with these forms that are just signed by my Husband ,because he did not save a copy at the time he sent the doc to NVC ,so we just printed out and filled a new one ? is that okay ?

Edited by besarta
Link to comment
Share on other sites

Filed: Country: Nigeria
Timeline

I don't think anyone is going to give you a tracking number.

What I gave you it is as close as it gets as far as making an educated guess on the tracking of your package.

Thanks anyways. I still do appreciate it. I'm not too worried, but I will get my appointment date as soon as my package gets to the embassy. I trust God to help me get it done fast.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

I actually read it on the Embassy's website , but I think you are right because everybody is saying that is not needed.

I am Overthinking everything at this point ,so anxious about the Interview !

Thank You Frankjavir :)

The document I posted is from the embassy website.

Do not worry my friend, you will be ok.

CR-1 VISA

STAGE 1: USCIS

CALIFORNIA SERVICE CENTER US EMBASSY BOGOTA

09-08-2015 Express mailed my I-130 package to Chicago Lock-box.

09-11-2015 Received NOA1 via email with a PD of 09-09-2015

09-19-2015 Received I-797C via snail mail. (NOA1)

10-21-2015 My wife came to visit me on a B1/B2. No problems at POE Miami :P

11-04-2015 Received NOA2 via email. (56 days after NOA1)

11-08-2015 My wife ends visit and returns to Colombia to wait for interview :(

11-09-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-16-2015 NVC received our case,(12 days after NOA2).

12-07-2015 Emailed inquiry to NVC to inform them my email. http://travel.state.gov/content/visas/en/contact.html

12-08-2015 NVC assigned case and invoice ID number,(34 days after NOA2) Case was assigned after 13:00 PM. I called at 12:30 then at 19:00 PM

12-08-2015 Completed Choice of Agent DS-261

12-09-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-09-2015 AOS bill became available and I paid it. (IN PROCESS)

12-12-2015 Mailed AOS and IV packages.

12-14-2015 Received via email IV bill from ASKnvc@state.gov and paid the IV fee.

12-14-2015 AOS fee updated to PAID

12-15-2015 USPS tracking shows AOS/IV packages were delivered to NVC. Waiting for a SCAN date.

12-16-2015 IV fee updated to PAID and completed DS-260

12-19-2015 Scan Date (45 days after NOA2). I called on 01-13-16 and I was told my scan date is 12-15-15????

01-26-2016 Case complete. (83 days after NOA2)

01-29-2016 Called NVC, I was informed my CO Interview will be on 03-01-2016 at 08:00.

02-02-2016 Received Interview Letter (P4) via email.

02-09-2016 Package picked-up by DHL at 15:29 Waybill 5992952011. CEAC status "IN TRANSIT"

STAGE 3: US Embassy Bogota

02-11-2016 US Embassy Bogota received my package at 10:39.

02-12-2016 CEAC Visa Status changed from "IN TRANSIT" to "READY"

02-24-2016 Lab exams at the clinic and Bio-metrics at the CAS center.

02-25-2016 Medical Exams.

03-01-2016 Interview Date (175 days after I mailed I-130) VISA APPROVED. CEAC status changed to AP

03-02-2016 Paid Immigrant Visa Fee via ELIS account. CEAC status changed to ISSUED

03-03-2016 US Embassy Bogota sends Passport and Visa package via DHL Waybill 2900131780 to Cali.

03-04-2016 My wife picked up at DHL sealed approved IV package and her passport with a stamped I-551 IV Category CR1.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline

My husband called the embassy and his case is finally in the system in juarez. Yay

_______________________________________________________________

USCIS CR-1/IR-1:
Aug 08/20/2015: Mailed I-130 (Phoenix Lockbox)
Aug 08/24/2015: NOA 1 (Nebraska)
Dec 12/08/2015: NOA 2 (Nebraska)
Dec 12/09/2015: Sent to NVC
--------------------------------------------------------------------------------------------------------------TOTAL DAYS IN USCIS: 107
NVC STAGE
Dec 12/11/2015: Case received at NVC
Dec 12/28/2015: Case # and Invoice number received
Dec 12/28/2015: Paid AOS Fee
Dec 12/28/2015: Completed DS-261 Choice of Agent
Dec 12/31/2015: NVC Welcome letter received by snail mail
Jan 01/06/2016: Reviewed DS-261 over the phone
Jan 01/07/2016: Choice of agent email + IV fee bill invoiced
Jan 01/07/2016: IV fee Paid
Jan 01/12/2016: AOS + IV packet sent
Jan 01/13/2016: AOS + IV packet received
Jan 01/13/2016: DS-260 Completed
Jan 01/13/2016: Scan Date
Feb 02/02/2016: Checklist :'(
Feb 02/04/2016 NEW scan date
Feb 02/10/2016 CASE COMPLETED!!!
Feb 02/16/2016 Case left NVC to Consulate (In Transit)
--------------------------------------------------------------------------------------------------------------------TOTAL DAYS IN NVC: 67 days
Feb 02/18/16 Case shows READY
Feb 02/19/16 Case on file at consulate (Juarez)
Feb 02/2/16 Interview date scheduled for 3/29
Feb 02/8/16 Interview letter notification received
CONSULATE - CUIDAD JUAREZ, MEXICO
Mar 03/25/16 Medical Exam
Mar 03/28/16 Biometrics
Mar 03/29/16 INTERVIEW
*******APPROVED!!!*******
TOTAL TIME FROM SUBMISSION TO INTERVIEW APPROVAL

222 days from the start date to the end date
7 months and 9 days

VISA

3/31/16 Sent to DHL specific location

4/01/16 Visa received at DHL location - VISA ON HAND -

4/08/16 UNITED STATES ENTRY

TOTAL TIME FROM SUBMISSION TO US ENTRY

232 days from the start date to the end date
7 months and 19 days

Link to comment
Share on other sites

My husband called the embassy and his case is finally in the system in juarez. Yay

So happy for you! *hugs*

Married in Barbados: June 10 2015

***USCIS***

Jul 20 2015: Lawyer Mailed I-130 Packet to Chicago lockbox

Aug 7 2015: I-130 NOA1 (California!!!)

Nov 17 2015: I-130 approved (102 days since NOA1)

***NVC***

Nov 25 2015: NVC received our file

Dec 11 2015: NVC case # assigned

Dec 14 2015: AOS & IV billed (same time as we have lawyer)

Dec 14 2015: Received email with case number and invoice number

Dec 15 2015: Paid AOS & IV Fees

Dec 20 2015: Fees show as "paid".

Dec 20 2015: Email expedite request (financial & medical)

Dec 31 2015: Email from NVC. EXPEDITE APPROVED!

Jan 8 2016: Mailed AOS & IV packets

Jan 11 2016: Packets delivered to NVC & marked "in transit" to consulate!

Jan 12 2016: CEAC status "READY"!

Jan 14 2016: DHL tracking shows file" delivered"

Jan 16 2016: Appointment letter (pkt4) Feb 16!!!

Feb 9 2016: Medical

Feb 16 2016: Interview/Approved!!!!

Feb 17 2016: Issued!

Feb 29 2016: POE!!!!!!!!!!!!!!!!!!! Together! <3

************

ROC

Feb 22 2018: ROC packet sent

Feb 26 2018: USPS confirmed delivery

Mar 10 2018: NOA1 dated March 6 2018

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...