Jump to content
dwheels76

Case Complete to Interview March 2016

 Share

1,921 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

That means ADMINSTRATIVE PROCEDURE, a more in depth review of your paperwork, but I believe every body in Pakistan goes through it.

You will be fine, do not worry my man.

I am more worried about what they committed to me. The CO said we would get it within 3 weeks so will that be possible or it would a false statement

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Do not worry about it it's just that most visa like 90% of in your country have to go through mandatory Administrative processing......It will change to issue once it is done. Just give it a week or so.

Bro I am confident over it because the interview was very easy the CO did not even asked for the pictures or any evidences but he just asked 3 questions to me. I was with my wife. The worrying thing is He did not used any word liked approved or congratulations, he said you will receive your passport within 3 weeks then before leaving the counter my wife asked him straight away is it approved he said yes and he smiled. So I was just thinking and I am worried over the commitment he made to send my passport within three weeks

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Bro I am confident over it because the interview was very easy the CO did not even asked for the pictures or any evidences but he just asked 3 questions to me. I was with my wife. The worrying thing is He did not used any word liked approved or congratulations, he said you will receive your passport within 3 weeks then before leaving the counter my wife asked him straight away is it approved he said yes and he smiled. So I was just thinking and I am worried over the commitment he made to send my passport within three weeks

Yeah AP usually is that a decision cannot be made as of that day so that is why he did not gave any confirmation....But usually people clear AP if there is nothing to hide or they find something in background. There is a lot of reason for AP.

1. Name check pending.

2. Need to verify some papers you submitted.

etc etc.... but it is very common for your embassy. Just look in the regional forum of CR1 for Pakistan....

CR-1 VISA

STAGE 1: USCIS

NEBRASKA SERVICE CENTER US EMBASSY NEW DELHI

05-01-2015 Marriage in INDIA

05-27-2015 Express mailed my I-130 package to Chicago Lock-box.

05-27-2015 Priority date as per NOA1

05-29-2015 Received NOA1 via email.

10-29-2015 Received NOA2 via email.

11-04-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-13-2015 NVC received our case.

12-04-2015 NVC assigned case and invoice ID number

12-04-2015 Completed Choice of Agent DS-261

12-07-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-07-2015 AOS bill became available and I paid it.

12-08-2015 DS-261 reviewed on phone.

12-09-2015 Mailed AOS and IV packages.

12-10-2015 AOS fees appeared Paid.

12-10-2015 AOS and IV packages received.(30 days Email Received on 12-12-2015 - Scan Date 12-10-2015)

12-10-2015 IV bill available and Paid.

12-14-2015 IV fees appeared Paid.

12-15-2015 DS-260 available and completed and submitted.

01-19-2016 Case Complete at NVC :dancing: :dancing: :dancing: :dancing: :dancing:

02-09-2016 Interview Date assigned 03-14-2016 i.e. March 14, 2016

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Just bought my plane tickets to Canada for my husbands interview. I'm counting on spending my birthday weekend in Canada celebrating our visa approval! :) Things are moving along, I think I am just going to relax the next 2-3 weeks before finishing getting all the interview documents in order. I have about 85% of our accordion folder labeled and filled with everything the embassy will ask for, and then some. Wait did I just say I am going to relax.. happy day!! :dancing:

Link to comment
Share on other sites

I'm very excited cuz my husband papers are on it's way to DR and once they get it the embassy will set up the date for his interview meaning that the NVC has nothing to do with the case anymore

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline

I just got an email saying my case was accepted for expedite processing:

"The U.S. Embassy/Consulate General has accepted this case for expedited processing. This file will be immediately forwarded to the U.S. Embassy/Consulate General. Any further questions concerning processing or the interview appointment date should be directed to the U.S. Embassy or Consulate General."

Anyone know what I should do next? or how long to contact the embassy regarding the interview? not sure how quick they send it out to the consulate (MEXICO) if its expedited. I know they closed appointments for March but do you think they have reserved slots for expedites?

Thanks in advanced! So excited!


expedite? Congrats ya merito!

I'm very excited cuz my husband papers are on it's way to DR and once they get it the embassy will set up the date for his interview meaning that the NVC has nothing to do with the case anymore

_______________________________________________________________

USCIS CR-1/IR-1:
Aug 08/20/2015: Mailed I-130 (Phoenix Lockbox)
Aug 08/24/2015: NOA 1 (Nebraska)
Dec 12/08/2015: NOA 2 (Nebraska)
Dec 12/09/2015: Sent to NVC
--------------------------------------------------------------------------------------------------------------TOTAL DAYS IN USCIS: 107
NVC STAGE
Dec 12/11/2015: Case received at NVC
Dec 12/28/2015: Case # and Invoice number received
Dec 12/28/2015: Paid AOS Fee
Dec 12/28/2015: Completed DS-261 Choice of Agent
Dec 12/31/2015: NVC Welcome letter received by snail mail
Jan 01/06/2016: Reviewed DS-261 over the phone
Jan 01/07/2016: Choice of agent email + IV fee bill invoiced
Jan 01/07/2016: IV fee Paid
Jan 01/12/2016: AOS + IV packet sent
Jan 01/13/2016: AOS + IV packet received
Jan 01/13/2016: DS-260 Completed
Jan 01/13/2016: Scan Date
Feb 02/02/2016: Checklist :'(
Feb 02/04/2016 NEW scan date
Feb 02/10/2016 CASE COMPLETED!!!
Feb 02/16/2016 Case left NVC to Consulate (In Transit)
--------------------------------------------------------------------------------------------------------------------TOTAL DAYS IN NVC: 67 days
Feb 02/18/16 Case shows READY
Feb 02/19/16 Case on file at consulate (Juarez)
Feb 02/2/16 Interview date scheduled for 3/29
Feb 02/8/16 Interview letter notification received
CONSULATE - CUIDAD JUAREZ, MEXICO
Mar 03/25/16 Medical Exam
Mar 03/28/16 Biometrics
Mar 03/29/16 INTERVIEW
*******APPROVED!!!*******
TOTAL TIME FROM SUBMISSION TO INTERVIEW APPROVAL

222 days from the start date to the end date
7 months and 9 days

VISA

3/31/16 Sent to DHL specific location

4/01/16 Visa received at DHL location - VISA ON HAND -

4/08/16 UNITED STATES ENTRY

TOTAL TIME FROM SUBMISSION TO US ENTRY

232 days from the start date to the end date
7 months and 19 days

Link to comment
Share on other sites

Filed: K-1 Visa Country: Serbia
Timeline

Hi dwheels76, we got our CCs on same day, just talked to rep and got the same response(march calendar closed) but I have noticed one thing when I looked over spreadsheet, most of the peoples(my country mates) who got CC between 1 to 10 scheduled for interview in next month. Still not believing rep telling us the truth. Any advice please...

Okay NVC Interview scheduling

Just called NVC to see about March date and the nice lady told me that they were all notified yesterday that March calendar is closed. April assignments will be starting in about 2 weeks (end of month).

I must say I have gotten the most informative and nicest people. Like for me I asked when I called yesterday and they lady broke it down to me for my embassy they stopped on CC 2/2. That was very helpful.

So looks like my June filers peeps are leaving me on the dock of the bay. But ya'll know me I am always at the dock launching all of you off to your love ones.

female-smiley-waving-hello-white-backgro

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Denmark
Timeline

What status is showing READY or ISSUED?

My CEAC status changed today from "IN TRANSIT" to "READY"

attachicon.gifCEAC.PNG

Nice :)

I have not heard back from NVC or Stockholm. So i think they hates me and will ignore me :)

OH LOOK PICTURES - https://500px.com/sorenhelmer

K3 Visa Journey (That turned out to end up being IR1)

Marriage: 2008-03-25

USCIS:
I-130 Sent: 2015-09-10
I-130 Received: 2015-10-15
NOA1 : 2015-10-18
NOA2 : 2015-10-29


NVC:
NVC Received Case (I-130): 2015-11-12
NVC Case Number Received: 2015-12-03
Received DS-261 / AOS Bill: 2015-12-03
Submit DS-261: 2015-12-03
Pay AOS Bill: 2015-12-04
Receive IV Bill: 2015-12-08
Pay IV Bill: 2015-12-08
Send AOS Package: 2015-12-11
Send IV Package: 2015-12-11
Scan date: someplace around Dec 21st, nvc was not really shearing.

CC: 2016-01-29
Medical Examination: 2016-01-18
Embassy Interview: 2016-03-21 - NEW DATE 2016-03-02

AP: 2016-03-02

Issued: 2016-03-08

- They asked for more papers

Issued Again: 2016-03-10

- No new must be good news :rolleyes:

Link to comment
Share on other sites

That means ADMINSTRATIVE PROCESSING, a more in depth review of your paperwork, but I believe every body in Pakistan goes through it.

You will be fine, do not worry my man.

My wife is going through Pakistan and her status is "Ready" ever since her interview date on Feb. 10. The "last updated" date changed to Feb. 10 but it has stayed on that date since. I truly believe they're going to leave her file just collecting dust until our anniversary date in a few days, just like the CO said. Still makes zero sense to me. Why would they force me to convert my CR-1 to an IR-1 if I didn't mind filing as a CR-1?

I-130 Petition sent May 8, 2015 (waited until I naturalized as a US citizen on 4/1/15)
NOA1 date May 11, 2015 (NSC)
NOA2 date Sep 15, 2015

Mailed to NVC Sep 21, 2015
NVC Received Sep 9, 2015 <--not sure about this date, I thought maybe it's the welcome letter date?
NVC Case Number Assigned Oct 9, 2015
NVC AoS Invoice online Oct 13, 2015
NVC Selected Agent online Oct 13, 2015
NVC AoS Invoice paid online Oct 14, 2015
NVC AoS Fee marked as paid on CEAC (online) Oct 19, 2015
NVC IV Invoice online Nov 3, 2015
NVC IV Fee Paid Online Nov 3, 2015
NCV IV Fee marked as paid on CEAC (online) Nov, 8 2015
NVC DS 260 Completed Nov 8, 2015
NVC AoS/IV Package Mailed Nov 20, 2015 (confirmed delivery via FedEx)
NVC Case Complete Dec 29, 2015 (confirmed by calling NVC after seeing 3 N/As on CEAC website on 12/30/2015)
NVC Case Complete email received on Jan 5, 2016
NVC Interview date scheduled on Jan 11, 2016 (confirmed by calling NVC)

Embassy:
Interview date: Feb 10, 2016

Decision: Approved

Estimated passport return date: Feb 29, 2016

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

My wife is going through Pakistan and her status is "Ready" ever since her interview date on Feb. 10. The "last updated" date changed to Feb. 10 but it has stayed on that date since. I truly believe they're going to leave her file just collecting dust until our anniversary date in a few days, just like the CO said. Still makes zero sense to me. Why would they force me to convert my CR-1 to an IR-1 if I didn't mind filing as a CR-1?

Sir what is the time frame CO gave to your wife to get her passport back? can you please share?

Thanks

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Australia
Timeline

My wife is going through Pakistan and her status is "Ready" ever since her interview date on Feb. 10. The "last updated" date changed to Feb. 10 but it has stayed on that date since. I truly believe they're going to leave her file just collecting dust until our anniversary date in a few days, just like the CO said. Still makes zero sense to me. Why would they force me to convert my CR-1 to an IR-1 if I didn't mind filing as a CR-1?

I know after all this time that ANY delay is a royal pain in the @$$. But you are saving yourself SO much money and SO much work by getting an IR-1!!! The bad thing is that you were not given a choice. But honestly, I'm getting ready to file to Remove Conditions for our CR-1, and it's ANOTHER nearly $600, not counting the time it's taken me to save papers for two years, and then the pain of organizing, copying, traveling 100 miles for biometrics, and then having to wonder whether or not we'll have to go through an interview.

I wish we had had the option to go IR-1 - but we were way too far away from our 2nd anniversary date.

Best of luck to you - and I'm so sorry you were not given your choice of the CR-1.

Sukie in NY

Spoiler

 

Spoiler

Our Prior Journey

N-400 Naturalization

18-Feb-2018 - submitted N-400 online, credit card charged

18-Feb-2018 - NOA1

12-Mar-2018 - Biometrics 

18-June-2018 - Notice of interview received

26-July-2018 - Interview  - APPROVED!!!

26-July-2018 - Oath Ceremony Scheduled

17-Aug-2018 - Oath Ceremony

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Denmark
Timeline

So i have been looking P4 over.

And found this:

FEE PAYMENT marked with $ - $ is Payment received

But will that say that there is no fee to pay at the Embassy?

OH LOOK PICTURES - https://500px.com/sorenhelmer

K3 Visa Journey (That turned out to end up being IR1)

Marriage: 2008-03-25

USCIS:
I-130 Sent: 2015-09-10
I-130 Received: 2015-10-15
NOA1 : 2015-10-18
NOA2 : 2015-10-29


NVC:
NVC Received Case (I-130): 2015-11-12
NVC Case Number Received: 2015-12-03
Received DS-261 / AOS Bill: 2015-12-03
Submit DS-261: 2015-12-03
Pay AOS Bill: 2015-12-04
Receive IV Bill: 2015-12-08
Pay IV Bill: 2015-12-08
Send AOS Package: 2015-12-11
Send IV Package: 2015-12-11
Scan date: someplace around Dec 21st, nvc was not really shearing.

CC: 2016-01-29
Medical Examination: 2016-01-18
Embassy Interview: 2016-03-21 - NEW DATE 2016-03-02

AP: 2016-03-02

Issued: 2016-03-08

- They asked for more papers

Issued Again: 2016-03-10

- No new must be good news :rolleyes:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

So i have been looking P4 over.

And found this:

But will that say that there is no fee to pay at the Embassy?

I believe fees on a P4 for IR1/CR1 are just clerical errors from NVC.

Mine does not show any fees to pay.

CR-1 VISA

STAGE 1: USCIS

CALIFORNIA SERVICE CENTER US EMBASSY BOGOTA

09-08-2015 Express mailed my I-130 package to Chicago Lock-box.

09-11-2015 Received NOA1 via email with a PD of 09-09-2015

09-19-2015 Received I-797C via snail mail. (NOA1)

10-21-2015 My wife came to visit me on a B1/B2. No problems at POE Miami :P

11-04-2015 Received NOA2 via email. (56 days after NOA1)

11-08-2015 My wife ends visit and returns to Colombia to wait for interview :(

11-09-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-16-2015 NVC received our case,(12 days after NOA2).

12-07-2015 Emailed inquiry to NVC to inform them my email. http://travel.state.gov/content/visas/en/contact.html

12-08-2015 NVC assigned case and invoice ID number,(34 days after NOA2) Case was assigned after 13:00 PM. I called at 12:30 then at 19:00 PM

12-08-2015 Completed Choice of Agent DS-261

12-09-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-09-2015 AOS bill became available and I paid it. (IN PROCESS)

12-12-2015 Mailed AOS and IV packages.

12-14-2015 Received via email IV bill from ASKnvc@state.gov and paid the IV fee.

12-14-2015 AOS fee updated to PAID

12-15-2015 USPS tracking shows AOS/IV packages were delivered to NVC. Waiting for a SCAN date.

12-16-2015 IV fee updated to PAID and completed DS-260

12-19-2015 Scan Date (45 days after NOA2). I called on 01-13-16 and I was told my scan date is 12-15-15????

01-26-2016 Case complete. (83 days after NOA2)

01-29-2016 Called NVC, I was informed my CO Interview will be on 03-01-2016 at 08:00.

02-02-2016 Received Interview Letter (P4) via email.

02-09-2016 Package picked-up by DHL at 15:29 Waybill 5992952011. CEAC status "IN TRANSIT"

STAGE 3: US Embassy Bogota

02-11-2016 US Embassy Bogota received my package at 10:39.

02-12-2016 CEAC Visa Status changed from "IN TRANSIT" to "READY"

02-24-2016 Lab exams at the clinic and Bio-metrics at the CAS center.

02-25-2016 Medical Exams.

03-01-2016 Interview Date (175 days after I mailed I-130) VISA APPROVED. CEAC status changed to AP

03-02-2016 Paid Immigrant Visa Fee via ELIS account. CEAC status changed to ISSUED

03-03-2016 US Embassy Bogota sends Passport and Visa package via DHL Waybill 2900131780 to Cali.

03-04-2016 My wife picked up at DHL sealed approved IV package and her passport with a stamped I-551 IV Category CR1.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Denmark
Timeline

I believe fees on a P4 for IR1/CR1 are just clerical errors from NVC.

Mine does not show any fees to pay.

Okay, i just remember to have read that there was a fee for $160.

But maybe that's a K1/K3 thing.

OH LOOK PICTURES - https://500px.com/sorenhelmer

K3 Visa Journey (That turned out to end up being IR1)

Marriage: 2008-03-25

USCIS:
I-130 Sent: 2015-09-10
I-130 Received: 2015-10-15
NOA1 : 2015-10-18
NOA2 : 2015-10-29


NVC:
NVC Received Case (I-130): 2015-11-12
NVC Case Number Received: 2015-12-03
Received DS-261 / AOS Bill: 2015-12-03
Submit DS-261: 2015-12-03
Pay AOS Bill: 2015-12-04
Receive IV Bill: 2015-12-08
Pay IV Bill: 2015-12-08
Send AOS Package: 2015-12-11
Send IV Package: 2015-12-11
Scan date: someplace around Dec 21st, nvc was not really shearing.

CC: 2016-01-29
Medical Examination: 2016-01-18
Embassy Interview: 2016-03-21 - NEW DATE 2016-03-02

AP: 2016-03-02

Issued: 2016-03-08

- They asked for more papers

Issued Again: 2016-03-10

- No new must be good news :rolleyes:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

Okay, i just remember to have read that there was a fee for $160.

But maybe that's a K1/K3 thing.

That fee ($165.00) is for the GREEN CARD itself and applies to every one receiving one including IR1/CR1.

If you do not pay it, you never receive one.

Its paid online before or after entering US. Need to open an ELIS account.

https://www.uscis.gov/file-online/how-pay-uscis-immigrant-fee

Edited by Frankjavir

CR-1 VISA

STAGE 1: USCIS

CALIFORNIA SERVICE CENTER US EMBASSY BOGOTA

09-08-2015 Express mailed my I-130 package to Chicago Lock-box.

09-11-2015 Received NOA1 via email with a PD of 09-09-2015

09-19-2015 Received I-797C via snail mail. (NOA1)

10-21-2015 My wife came to visit me on a B1/B2. No problems at POE Miami :P

11-04-2015 Received NOA2 via email. (56 days after NOA1)

11-08-2015 My wife ends visit and returns to Colombia to wait for interview :(

11-09-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-16-2015 NVC received our case,(12 days after NOA2).

12-07-2015 Emailed inquiry to NVC to inform them my email. http://travel.state.gov/content/visas/en/contact.html

12-08-2015 NVC assigned case and invoice ID number,(34 days after NOA2) Case was assigned after 13:00 PM. I called at 12:30 then at 19:00 PM

12-08-2015 Completed Choice of Agent DS-261

12-09-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-09-2015 AOS bill became available and I paid it. (IN PROCESS)

12-12-2015 Mailed AOS and IV packages.

12-14-2015 Received via email IV bill from ASKnvc@state.gov and paid the IV fee.

12-14-2015 AOS fee updated to PAID

12-15-2015 USPS tracking shows AOS/IV packages were delivered to NVC. Waiting for a SCAN date.

12-16-2015 IV fee updated to PAID and completed DS-260

12-19-2015 Scan Date (45 days after NOA2). I called on 01-13-16 and I was told my scan date is 12-15-15????

01-26-2016 Case complete. (83 days after NOA2)

01-29-2016 Called NVC, I was informed my CO Interview will be on 03-01-2016 at 08:00.

02-02-2016 Received Interview Letter (P4) via email.

02-09-2016 Package picked-up by DHL at 15:29 Waybill 5992952011. CEAC status "IN TRANSIT"

STAGE 3: US Embassy Bogota

02-11-2016 US Embassy Bogota received my package at 10:39.

02-12-2016 CEAC Visa Status changed from "IN TRANSIT" to "READY"

02-24-2016 Lab exams at the clinic and Bio-metrics at the CAS center.

02-25-2016 Medical Exams.

03-01-2016 Interview Date (175 days after I mailed I-130) VISA APPROVED. CEAC status changed to AP

03-02-2016 Paid Immigrant Visa Fee via ELIS account. CEAC status changed to ISSUED

03-03-2016 US Embassy Bogota sends Passport and Visa package via DHL Waybill 2900131780 to Cali.

03-04-2016 My wife picked up at DHL sealed approved IV package and her passport with a stamped I-551 IV Category CR1.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...