I´m just reading this:

https://travel.state.gov/content/dam/visas/NVC%20AILA%20Meeting%20QAs_Nov2015.pdf

And there is a lot of info in there.

This is one of them:

f.What is the current time it takes for a case to be forwarded to Post once all required documents have been received?
RESPONSE
: NVC schedules appointments two times per month on a first - come, first- served basis based upon the appointment capacity of the post.
If a case is documentarily qualified ( and current by cut - off date), it will be placed in the appointment queue and a letter confirming DQ status will be sent
to the agent.
Most interviews are scheduled within 30 days of the case being recognized as DQ. But, if demand at a particular post is high, it may take longer.
NVC receives posts’ appointment capacity only on a monthly basis so is not able to predict when a
specific case may receive an interview appointment.
Once an appointment has been set, NVC sends a notice to the applicant with the appointment date and time, along with a link to the post website with further
information about how to prepare for the interview. The case file is then prepared for
shipping (or electronic transfer for posts who accept electronic processing) and sent to post within 10 days. Posts receive appointment and shipment lists from NVC
electronically and generally receive the physical case file within 10 days of thescheduled interview.

OH LOOK PICTURES - https://500px.com/sorenhelmer

K3 Visa Journey (That turned out to end up being IR1)

Marriage: 2008-03-25

USCIS:
I-130 Sent: 2015-09-10
I-130 Received: 2015-10-15
NOA1 : 2015-10-18
NOA2 : 2015-10-29


NVC:
NVC Received Case (I-130): 2015-11-12
NVC Case Number Received: 2015-12-03
Received DS-261 / AOS Bill: 2015-12-03
Submit DS-261: 2015-12-03
Pay AOS Bill: 2015-12-04
Receive IV Bill: 2015-12-08
Pay IV Bill: 2015-12-08
Send AOS Package: 2015-12-11
Send IV Package: 2015-12-11
Scan date: someplace around Dec 21st, nvc was not really shearing.

CC: 2016-01-29
Medical Examination: 2016-01-18
Embassy Interview: 2016-03-21 - NEW DATE 2016-03-02

AP: 2016-03-02

Issued: 2016-03-08

- They asked for more papers

Issued Again: 2016-03-10

- No new must be good news :rolleyes:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Denmark
Timeline

Frank this is for you :)

Additional Information
Expedites
NVC receives about 4,000 expedite requests per month.
Edited by SoerenHelmer

OH LOOK PICTURES - https://500px.com/sorenhelmer

K3 Visa Journey (That turned out to end up being IR1)

Marriage: 2008-03-25

USCIS:
I-130 Sent: 2015-09-10
I-130 Received: 2015-10-15
NOA1 : 2015-10-18
NOA2 : 2015-10-29


NVC:
NVC Received Case (I-130): 2015-11-12
NVC Case Number Received: 2015-12-03
Received DS-261 / AOS Bill: 2015-12-03
Submit DS-261: 2015-12-03
Pay AOS Bill: 2015-12-04
Receive IV Bill: 2015-12-08
Pay IV Bill: 2015-12-08
Send AOS Package: 2015-12-11
Send IV Package: 2015-12-11
Scan date: someplace around Dec 21st, nvc was not really shearing.

CC: 2016-01-29
Medical Examination: 2016-01-18
Embassy Interview: 2016-03-21 - NEW DATE 2016-03-02

AP: 2016-03-02

Issued: 2016-03-08

- They asked for more papers

Issued Again: 2016-03-10

- No new must be good news :rolleyes:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

Frank this is for you :)

Screenshot_22.jpg

Additional Information

Expedites

NVC receives about 4,000 expedite requests per month.

= = = = = = = = = = = = = = = = =

Holy caca, that's a lot of cases.

Thanks for sharing.

CR-1 VISA

STAGE 1: USCIS

CALIFORNIA SERVICE CENTER US EMBASSY BOGOTA

09-08-2015 Express mailed my I-130 package to Chicago Lock-box.

09-11-2015 Received NOA1 via email with a PD of 09-09-2015

09-19-2015 Received I-797C via snail mail. (NOA1)

10-21-2015 My wife came to visit me on a B1/B2. No problems at POE Miami :P

11-04-2015 Received NOA2 via email. (56 days after NOA1)

11-08-2015 My wife ends visit and returns to Colombia to wait for interview :(

11-09-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-16-2015 NVC received our case,(12 days after NOA2).

12-07-2015 Emailed inquiry to NVC to inform them my email. http://travel.state.gov/content/visas/en/contact.html

12-08-2015 NVC assigned case and invoice ID number,(34 days after NOA2) Case was assigned after 13:00 PM. I called at 12:30 then at 19:00 PM

12-08-2015 Completed Choice of Agent DS-261

12-09-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-09-2015 AOS bill became available and I paid it. (IN PROCESS)

12-12-2015 Mailed AOS and IV packages.

12-14-2015 Received via email IV bill from ASKnvc@state.gov and paid the IV fee.

12-14-2015 AOS fee updated to PAID

12-15-2015 USPS tracking shows AOS/IV packages were delivered to NVC. Waiting for a SCAN date.

12-16-2015 IV fee updated to PAID and completed DS-260

12-19-2015 Scan Date (45 days after NOA2). I called on 01-13-16 and I was told my scan date is 12-15-15????

01-26-2016 Case complete. (83 days after NOA2)

01-29-2016 Called NVC, I was informed my CO Interview will be on 03-01-2016 at 08:00.

02-02-2016 Received Interview Letter (P4) via email.

02-09-2016 Package picked-up by DHL at 15:29 Waybill 5992952011. CEAC status "IN TRANSIT"

STAGE 3: US Embassy Bogota

02-11-2016 US Embassy Bogota received my package at 10:39.

02-12-2016 CEAC Visa Status changed from "IN TRANSIT" to "READY"

02-24-2016 Lab exams at the clinic and Bio-metrics at the CAS center.

02-25-2016 Medical Exams.

03-01-2016 Interview Date (175 days after I mailed I-130) VISA APPROVED. CEAC status changed to AP

03-02-2016 Paid Immigrant Visa Fee via ELIS account. CEAC status changed to ISSUED

03-03-2016 US Embassy Bogota sends Passport and Visa package via DHL Waybill 2900131780 to Cali.

03-04-2016 My wife picked up at DHL sealed approved IV package and her passport with a stamped I-551 IV Category CR1.

Link to comment
Share on other sites

They send out an email 7 days after completion of the case. or at least thats what i know

Edited by robrom123

April 17 2015 send I-130

April 22 2015 recieved I-130 vermont

april 28 2015 noa 1 in the mail

September 21 2015 transffered from vermont to california

October 05 2015 I-130 approved at california

october 09 2015 noa 2 in the mail

October 21 2015 case recieved at nvc

December 9 2015 all mail at nvc

January 16 2016 case completed at nvc

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Denmark
Timeline

They send out an email 7 days after completion of the case. or at least thats what i know

This information is from a Q and A with ppl at NVC.

So i hope there information is better then what we all think we know :)

= = = = = = = = = = = = = = = = =

Holy caca, that's a lot of cases.

Thanks for sharing.

No problem Frank.

Now we have some numbers :)

OH LOOK PICTURES - https://500px.com/sorenhelmer

K3 Visa Journey (That turned out to end up being IR1)

Marriage: 2008-03-25

USCIS:
I-130 Sent: 2015-09-10
I-130 Received: 2015-10-15
NOA1 : 2015-10-18
NOA2 : 2015-10-29


NVC:
NVC Received Case (I-130): 2015-11-12
NVC Case Number Received: 2015-12-03
Received DS-261 / AOS Bill: 2015-12-03
Submit DS-261: 2015-12-03
Pay AOS Bill: 2015-12-04
Receive IV Bill: 2015-12-08
Pay IV Bill: 2015-12-08
Send AOS Package: 2015-12-11
Send IV Package: 2015-12-11
Scan date: someplace around Dec 21st, nvc was not really shearing.

CC: 2016-01-29
Medical Examination: 2016-01-18
Embassy Interview: 2016-03-21 - NEW DATE 2016-03-02

AP: 2016-03-02

Issued: 2016-03-08

- They asked for more papers

Issued Again: 2016-03-10

- No new must be good news :rolleyes:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

I´m just reading this:

https://travel.state.gov/content/dam/visas/NVC%20AILA%20Meeting%20QAs_Nov2015.pdf

And there is a lot of info in there.

This is one of them:

f.What is the current time it takes for a case to be forwarded to Post once all required documents have been received?

RESPONSE

: NVC schedules appointments two times per month on a first - come, first- served basis based upon the appointment capacity of the post.

If a case is documentarily qualified ( and current by cut - off date), it will be placed in the appointment queue and a letter confirming DQ status will be sent

to the agent.

Most interviews are scheduled within 30 days of the case being recognized as DQ. But, if demand at a particular post is high, it may take longer.

NVC receives posts appointment capacity only on a monthly basis so is not able to predict when a

specific case may receive an interview appointment.

Once an appointment has been set, NVC sends a notice to the applicant with the appointment date and time, along with a link to the post website with further

information about how to prepare for the interview. The case file is then prepared for

shipping (or electronic transfer for posts who accept electronic processing) and sent to post within 10 days. Posts receive appointment and shipment lists from NVC

electronically and generally receive the physical case file within 10 days of thescheduled interview.

???Glad someone found it helpful besides me!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Denmark
Timeline

???Glad someone found it helpful besides me!!!

Yes it was/is fantastic to read :)

Thx for the link

OH LOOK PICTURES - https://500px.com/sorenhelmer

K3 Visa Journey (That turned out to end up being IR1)

Marriage: 2008-03-25

USCIS:
I-130 Sent: 2015-09-10
I-130 Received: 2015-10-15
NOA1 : 2015-10-18
NOA2 : 2015-10-29


NVC:
NVC Received Case (I-130): 2015-11-12
NVC Case Number Received: 2015-12-03
Received DS-261 / AOS Bill: 2015-12-03
Submit DS-261: 2015-12-03
Pay AOS Bill: 2015-12-04
Receive IV Bill: 2015-12-08
Pay IV Bill: 2015-12-08
Send AOS Package: 2015-12-11
Send IV Package: 2015-12-11
Scan date: someplace around Dec 21st, nvc was not really shearing.

CC: 2016-01-29
Medical Examination: 2016-01-18
Embassy Interview: 2016-03-21 - NEW DATE 2016-03-02

AP: 2016-03-02

Issued: 2016-03-08

- They asked for more papers

Issued Again: 2016-03-10

- No new must be good news :rolleyes:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

???Glad someone found it helpful besides me!!!

= = = = = = = = = = = = = = = = = =

Good information.

Thanks for sharing it

I am not crazy!!!!

CR-1 VISA

STAGE 1: USCIS

CALIFORNIA SERVICE CENTER US EMBASSY BOGOTA

09-08-2015 Express mailed my I-130 package to Chicago Lock-box.

09-11-2015 Received NOA1 via email with a PD of 09-09-2015

09-19-2015 Received I-797C via snail mail. (NOA1)

10-21-2015 My wife came to visit me on a B1/B2. No problems at POE Miami :P

11-04-2015 Received NOA2 via email. (56 days after NOA1)

11-08-2015 My wife ends visit and returns to Colombia to wait for interview :(

11-09-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-16-2015 NVC received our case,(12 days after NOA2).

12-07-2015 Emailed inquiry to NVC to inform them my email. http://travel.state.gov/content/visas/en/contact.html

12-08-2015 NVC assigned case and invoice ID number,(34 days after NOA2) Case was assigned after 13:00 PM. I called at 12:30 then at 19:00 PM

12-08-2015 Completed Choice of Agent DS-261

12-09-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-09-2015 AOS bill became available and I paid it. (IN PROCESS)

12-12-2015 Mailed AOS and IV packages.

12-14-2015 Received via email IV bill from ASKnvc@state.gov and paid the IV fee.

12-14-2015 AOS fee updated to PAID

12-15-2015 USPS tracking shows AOS/IV packages were delivered to NVC. Waiting for a SCAN date.

12-16-2015 IV fee updated to PAID and completed DS-260

12-19-2015 Scan Date (45 days after NOA2). I called on 01-13-16 and I was told my scan date is 12-15-15????

01-26-2016 Case complete. (83 days after NOA2)

01-29-2016 Called NVC, I was informed my CO Interview will be on 03-01-2016 at 08:00.

02-02-2016 Received Interview Letter (P4) via email.

02-09-2016 Package picked-up by DHL at 15:29 Waybill 5992952011. CEAC status "IN TRANSIT"

STAGE 3: US Embassy Bogota

02-11-2016 US Embassy Bogota received my package at 10:39.

02-12-2016 CEAC Visa Status changed from "IN TRANSIT" to "READY"

02-24-2016 Lab exams at the clinic and Bio-metrics at the CAS center.

02-25-2016 Medical Exams.

03-01-2016 Interview Date (175 days after I mailed I-130) VISA APPROVED. CEAC status changed to AP

03-02-2016 Paid Immigrant Visa Fee via ELIS account. CEAC status changed to ISSUED

03-03-2016 US Embassy Bogota sends Passport and Visa package via DHL Waybill 2900131780 to Cali.

03-04-2016 My wife picked up at DHL sealed approved IV package and her passport with a stamped I-551 IV Category CR1.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Denmark
Timeline

= = = = = = = = = = = = = = = = = =

Good information.

Thanks for sharing it

I am not crazy!!!! - :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :rofl: :wow:

OH LOOK PICTURES - https://500px.com/sorenhelmer

K3 Visa Journey (That turned out to end up being IR1)

Marriage: 2008-03-25

USCIS:
I-130 Sent: 2015-09-10
I-130 Received: 2015-10-15
NOA1 : 2015-10-18
NOA2 : 2015-10-29


NVC:
NVC Received Case (I-130): 2015-11-12
NVC Case Number Received: 2015-12-03
Received DS-261 / AOS Bill: 2015-12-03
Submit DS-261: 2015-12-03
Pay AOS Bill: 2015-12-04
Receive IV Bill: 2015-12-08
Pay IV Bill: 2015-12-08
Send AOS Package: 2015-12-11
Send IV Package: 2015-12-11
Scan date: someplace around Dec 21st, nvc was not really shearing.

CC: 2016-01-29
Medical Examination: 2016-01-18
Embassy Interview: 2016-03-21 - NEW DATE 2016-03-02

AP: 2016-03-02

Issued: 2016-03-08

- They asked for more papers

Issued Again: 2016-03-10

- No new must be good news :rolleyes:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

= = = = = = = = = = = = = = = = = =

Good information.

Thanks for sharing it

I am not crazy!!!!

Lol...you are most welcome...

Okay, you're not cra cra....??

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jamaica
Timeline

Hello every1. I ave a hyphenated last name but ntn from uscis or nvc has the hyphen...now i am completing ds260 n the instructions states to complete as in passport and i did and i says error because i put the hyphen in

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Guyana
Timeline

They send out an email 7 days after completion of the case. or at least thats what i know

So, does this mean that the NVC can complete a case and you won't know for 7 days unless, say, you call into the center to hear it directly from them?


USCIS Stage


Marriage: 3/21/15


I-130 Sent: 5/03/15


NOA1: 5/08/15


NOA2 (approval): 10/26/15



NVC Stage (CR1)


NVC Received Case: 11/12/15


NVC Scan Date: 12/2/15


Paid AOS fee: 12/04/15


Paid IV fee: 12/04/15


AOS & IV Package sent: 12/16/15


NVC Case Complete: 1/26/16


Interview Date: 4/27/16


Interview Result: Approved!!!






Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

So, does this mean that the NVC can complete a case and you won't know for 7 days unless, say, you call into the center to hear it directly from them?

= = = = = = = = = = = = = = = = = = = =

That is true.

That's the beauty of VJ.

Edited by Frankjavir

CR-1 VISA

STAGE 1: USCIS

CALIFORNIA SERVICE CENTER US EMBASSY BOGOTA

09-08-2015 Express mailed my I-130 package to Chicago Lock-box.

09-11-2015 Received NOA1 via email with a PD of 09-09-2015

09-19-2015 Received I-797C via snail mail. (NOA1)

10-21-2015 My wife came to visit me on a B1/B2. No problems at POE Miami :P

11-04-2015 Received NOA2 via email. (56 days after NOA1)

11-08-2015 My wife ends visit and returns to Colombia to wait for interview :(

11-09-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-16-2015 NVC received our case,(12 days after NOA2).

12-07-2015 Emailed inquiry to NVC to inform them my email. http://travel.state.gov/content/visas/en/contact.html

12-08-2015 NVC assigned case and invoice ID number,(34 days after NOA2) Case was assigned after 13:00 PM. I called at 12:30 then at 19:00 PM

12-08-2015 Completed Choice of Agent DS-261

12-09-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-09-2015 AOS bill became available and I paid it. (IN PROCESS)

12-12-2015 Mailed AOS and IV packages.

12-14-2015 Received via email IV bill from ASKnvc@state.gov and paid the IV fee.

12-14-2015 AOS fee updated to PAID

12-15-2015 USPS tracking shows AOS/IV packages were delivered to NVC. Waiting for a SCAN date.

12-16-2015 IV fee updated to PAID and completed DS-260

12-19-2015 Scan Date (45 days after NOA2). I called on 01-13-16 and I was told my scan date is 12-15-15????

01-26-2016 Case complete. (83 days after NOA2)

01-29-2016 Called NVC, I was informed my CO Interview will be on 03-01-2016 at 08:00.

02-02-2016 Received Interview Letter (P4) via email.

02-09-2016 Package picked-up by DHL at 15:29 Waybill 5992952011. CEAC status "IN TRANSIT"

STAGE 3: US Embassy Bogota

02-11-2016 US Embassy Bogota received my package at 10:39.

02-12-2016 CEAC Visa Status changed from "IN TRANSIT" to "READY"

02-24-2016 Lab exams at the clinic and Bio-metrics at the CAS center.

02-25-2016 Medical Exams.

03-01-2016 Interview Date (175 days after I mailed I-130) VISA APPROVED. CEAC status changed to AP

03-02-2016 Paid Immigrant Visa Fee via ELIS account. CEAC status changed to ISSUED

03-03-2016 US Embassy Bogota sends Passport and Visa package via DHL Waybill 2900131780 to Cali.

03-04-2016 My wife picked up at DHL sealed approved IV package and her passport with a stamped I-551 IV Category CR1.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Denmark
Timeline

So, does this mean that the NVC can complete a case and you won't know for 7 days unless, say, you call into the center to hear it directly from them?

Well you can look at CEAC after the 3 N/A or you can wait it out for email/letter.

But yes.

OH LOOK PICTURES - https://500px.com/sorenhelmer

K3 Visa Journey (That turned out to end up being IR1)

Marriage: 2008-03-25

USCIS:
I-130 Sent: 2015-09-10
I-130 Received: 2015-10-15
NOA1 : 2015-10-18
NOA2 : 2015-10-29


NVC:
NVC Received Case (I-130): 2015-11-12
NVC Case Number Received: 2015-12-03
Received DS-261 / AOS Bill: 2015-12-03
Submit DS-261: 2015-12-03
Pay AOS Bill: 2015-12-04
Receive IV Bill: 2015-12-08
Pay IV Bill: 2015-12-08
Send AOS Package: 2015-12-11
Send IV Package: 2015-12-11
Scan date: someplace around Dec 21st, nvc was not really shearing.

CC: 2016-01-29
Medical Examination: 2016-01-18
Embassy Interview: 2016-03-21 - NEW DATE 2016-03-02

AP: 2016-03-02

Issued: 2016-03-08

- They asked for more papers

Issued Again: 2016-03-10

- No new must be good news :rolleyes:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline

Lol...you are most welcome...

Okay, you're not cra cra....??[/quote)

= = = = = = = = = = = = = =

Hummmm...hummmm. hey maaaan that's Bob Marley my maaaan . Lol..lol

Edited by Frankjavir

CR-1 VISA

STAGE 1: USCIS

CALIFORNIA SERVICE CENTER US EMBASSY BOGOTA

09-08-2015 Express mailed my I-130 package to Chicago Lock-box.

09-11-2015 Received NOA1 via email with a PD of 09-09-2015

09-19-2015 Received I-797C via snail mail. (NOA1)

10-21-2015 My wife came to visit me on a B1/B2. No problems at POE Miami :P

11-04-2015 Received NOA2 via email. (56 days after NOA1)

11-08-2015 My wife ends visit and returns to Colombia to wait for interview :(

11-09-2015 Received I-797 via snail mail. (NOA2)

STAGE 2: NVC

11-16-2015 NVC received our case,(12 days after NOA2).

12-07-2015 Emailed inquiry to NVC to inform them my email. http://travel.state.gov/content/visas/en/contact.html

12-08-2015 NVC assigned case and invoice ID number,(34 days after NOA2) Case was assigned after 13:00 PM. I called at 12:30 then at 19:00 PM

12-08-2015 Completed Choice of Agent DS-261

12-09-2015 Received 2 emails with Welcome Letters for my wife and I, they were sent by ASKnvc@state.gov

12-09-2015 AOS bill became available and I paid it. (IN PROCESS)

12-12-2015 Mailed AOS and IV packages.

12-14-2015 Received via email IV bill from ASKnvc@state.gov and paid the IV fee.

12-14-2015 AOS fee updated to PAID

12-15-2015 USPS tracking shows AOS/IV packages were delivered to NVC. Waiting for a SCAN date.

12-16-2015 IV fee updated to PAID and completed DS-260

12-19-2015 Scan Date (45 days after NOA2). I called on 01-13-16 and I was told my scan date is 12-15-15????

01-26-2016 Case complete. (83 days after NOA2)

01-29-2016 Called NVC, I was informed my CO Interview will be on 03-01-2016 at 08:00.

02-02-2016 Received Interview Letter (P4) via email.

02-09-2016 Package picked-up by DHL at 15:29 Waybill 5992952011. CEAC status "IN TRANSIT"

STAGE 3: US Embassy Bogota

02-11-2016 US Embassy Bogota received my package at 10:39.

02-12-2016 CEAC Visa Status changed from "IN TRANSIT" to "READY"

02-24-2016 Lab exams at the clinic and Bio-metrics at the CAS center.

02-25-2016 Medical Exams.

03-01-2016 Interview Date (175 days after I mailed I-130) VISA APPROVED. CEAC status changed to AP

03-02-2016 Paid Immigrant Visa Fee via ELIS account. CEAC status changed to ISSUED

03-03-2016 US Embassy Bogota sends Passport and Visa package via DHL Waybill 2900131780 to Cali.

03-04-2016 My wife picked up at DHL sealed approved IV package and her passport with a stamped I-551 IV Category CR1.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...