Filed: IR-1/CR-1 Visa Country: Jordan
Timeline
Posted

So So Happy for all of you guys who got their interview dates, this is a great forum that brings people together from different nationalities and cultures, sharing our immotions; anger, anticipation, sadness, confusion, and most importantly HAPPINESS. Like a family.

Thanks Dwheels for your dedication and continued support.

I have a suggestion, August is coming to an end very soon, instead of loosing the amount of activity and ranking of our forum on the VJ site, why not remove the month from the name of the Forum, and archive the posts at the end of every month, I don't know if that is possible, but if it can be done, I believe our discussion we will gain more visibility and participation on the VJ site specially for newbies

Original SD : 01/23/2015

Check List : 04/01/2015

New SD : 04/09/2015

Case Completed: 05/07/2015

Interview Date: 11/10/2015

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline
Posted

hi guys,

I jus called NVC, i got interview date Sept 16th, 2015 @ 0830AM

But it still shows my case at NVC on ceac.state.gov

Wat should i do since my interview is only over 2 wks ahead.

I havent received any instruction how to follow before interview

Any help pls

Thanks

It takes a couple days to switch from "NVC" to "IN TRANSIT" and then to "READY".

It should get there in time, but wouldn't hurt to give the embassy a call or e-mail them a couple days before your interview, specially if you live far from the embassy.. Someone recently (Tunisia or Turkey?) had an interview but the documents weren't there yet..

I-130 for Spouse

USCIS

10/14/2014 - I-130 Mailed to Chicago Lockbox

10/22/2014 - NOA1 (Nebraska Service Center)

04/01/2015 - NOA2 (161 days)

NVC

04/16/2015 - NVC Received

04/23/2015 - Case # assigned / DS-261 completed

04/24/2015 - AOS fee invoiced and paid

04/30/2015 - AOS+IV packages mailed

05/04/2015 - AOS+IV packages received (scan date)

05/15/2015 - IV fee money order payment confirmed

06/03/2015 - Checklist received: missing DS-260 form

06/19/2015 - DS-260 available online and submitted

07/31/2015 - Case Complete (107 days from arriving @NVC or 89 days from scan date)

Embassy

08/25/2015 - Scheduled interview

09/21/2015 - Interview, approved!

10/02/2015 - Passport received

10/04/2015 - POE! (348 days from NOA1)

Filed: Citizen (apr) Country: Nigeria
Timeline
Posted

@TeamLAGOS congrats to you..so happy for you..can u please forward NVC No. 2me so I can also call(with the statecode)pls & d Nigtime I can have a call go through to them ..my cc is aug 10 though kipping my finger cross till they schedule an appointment hopefully soon..

Got to be honest Lagos is still assigning interview dates for June CC people. I sure wouldn't call. Keep eye on your inbox and see.

NVC# 603-334-0700 Push #1 than #7 for Interview They are open 7am to midnight eastern time. We have n state code. don;t forget the country code.

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Filed: Citizen (apr) Country: Nigeria
Timeline
Posted

hi guys,

I jus called NVC, i got interview date Sept 16th, 2015 @ 0830AM

But it still shows my case at NVC on ceac.state.gov

Wat should i do since my interview is only over 2 wks ahead.

I havent received any instruction how to follow before interview

Any help pls

Thanks

Okay you got to give them a minute. They don't send your petition off immediately. Probably go out friday. So just keep your eyes on your inbox for your P4 letter.

Congratulations you are updated.

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Filed: Citizen (apr) Country: Nigeria
Timeline
Posted

So So Happy for all of you guys who got their interview dates, this is a great forum that brings people together from different nationalities and cultures, sharing our immotions; anger, anticipation, sadness, confusion, and most importantly HAPPINESS. Like a family.

Thanks Dwheels for your dedication and continued support.

I have a suggestion, August is coming to an end very soon, instead of loosing the amount of activity and ranking of our forum on the VJ site, why not remove the month from the name of the Forum, and archive the posts at the end of every month, I don't know if that is possible, but if it can be done, I believe our discussion we will gain more visibility and participation on the VJ site specially for newbies

Each months thread is archived you can always go read them. We just lock them so people most along to next month. We follow the same path as the NVC Filers thread.

It was decided a while ago having the month titled helps. We have people come and post who had interviews whenever. It's not just for September babies.

Also for housekeeping purposes having just a thread for "2015 Interviews" is just too massive. People don;t follow the guidelines like fill out the form. They just say add me. And I do it gladly. But imagine 100's and thousands of pages sometimes I step away from the tread (I do have a full time job) and come back and I am 10 pages behind.

I have to read each and every post for questions, add me, update me. So having month to month keeps it all nice and neat ad we move on to the next.

In 5 days we will have October Interview thread because by than October Interviews will or should e announcement. So it just better to flow with that.

Thanks for the suggestion though. Keep them coming. I am trying to figure a way to get people to input their actual VJ member name on the form so I can add. No longer just adding any name. And if it could update automatically when people change names would e so nice. :goofy:

Case Complete to Interview spreadsheet

From now on your VJ Member name will be verified. If the name you put on form to be added to spreadsheet comes up not found, you will not be added to the spreadsheet. If you don't have a timeline you will not be added to the spreadsheet.

Please Please put your VJ member name only. Not nicknames or real names whatever your VJ name is. It's below your profile picture!!

 

Come join the current Interview thread: 

DQ-to-Interview-2023-all-countries

Case Complete to Interview Spreadsheet
Case Complete to Interview Form

 

 

 

ROC I-751
5/21/2018: Filed i751 ROC
6/12/2018: NOA1 Date
3/5/2019: Biometrics Appt
12/28/2019: 18 month Extension has expired
1/9/2020: InfoPass Appt to get stamp in Passport
2/27/2020: Combo Interview (ROC and Citizenship)
3/31/2020: submitted service request for being pass normal processing time
4/7/2020: Card being produced
4/8/2020: Approved
4/10/2020: Card mailed
4/15/2020: 10 year green card received
 
 
N-400
5/21/2019: Filed Online
5/21/2019: NOA1 Date
6/13/2019: Biometrics Appt
2/27/2020: Citizenship Interview
4/7/2020: In queue for Oath Ceremony to be scheduled
6/19/2020: Notice Oath Ceremony scheduled
7/8/2020: Oath Ceremony (Houston)

 

 

 

 

 

 

 

 

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

My god, so many posts in one night, my mobile was sweating when i turned on the data, So happy that you are getting interview dates, atleast nvc is working we know, no date for me, mumbai, CC date July 15...

USCIS

16/Sep/2014 - Case mailed to USCIS
23/Sep/2014 - Case accepted at USCIS - NOA 1
23/Sep/2014 - Case routed to Nebraska processing center
17/Mar/2015 - Case approved by USCIS - NOA 2

NVC

02/Apr/2015 - Case received at NVC

16/Apr/2015 - Received case no. and invoice number via call center

16/Apr/2015 - Paid AOS bill

16/Apr/2015 - Completed DS-261

04/Mat/2015 - DS-261 reviewed over phone

04/May/2015 - AOS & IV package sent

06/May/2015 - NVC received package

08/May/2015 - NVC invoiced our IV fee

09/May/2015- Payment website encountered error, unable to make payment.

19/May/2015 - Sent IV fee via check to NVC

29/May/2015 - NVC acknowledge IV fees payment via check.

03/June/2015 - NVC website still not showing payment information.

03/June/2015 - Waiting for DS-260 to be enabled.

19/June/2015 - Check list documents scan date.

06/July/2015 - Filled DS-260.

15/July/2015 - Case Complete

01/Oct/2015 - Interview date, Mumbai India :energy:

event.png

Posted

One entry at the top of dwheels76 Spreadsheet has a Dutch interview scheduled same day as cc. Is that a typo? Else, wow!

USCIS

January 16, 2015 I-130 Mailed, Chi lockbox January 20, 2015 Priority Date, January 21, 2015 NOA1 notice date, Assigned VSC, January 23, 2015 Check Cashed, electronically March 5, 2015 NOA2

NVC

March 27, 2015 NVC received April 6, 2015 Case#, IIN# assigned April 8, 2015 Paid AOS + IV fee Invoices May 5, 2015 AOS + IV package submitted May 11, 2015 Scan Date

June 11, 2015 DS-260 submitted June 25, 2015 False checklist (for ds260).. hello? June 30, 2015 Answered checklist Aug 5, 2015 Escalated to Supervisor review Aug 13, 2015 Case Complete

Consular

Sept 10, 2015 Interview Scheduled Sept 11, 2015 P4 Letter received Sept 21, 2015 file In transit from NVC Sept 23, 2015 file at Embassy

Sept 28, 2015 Medical Oct 14, 2015 Biometrics Oct 15, 2015 Interview (Approved) Oct 19, 2015 IV visa Issued Oct 23, 2015 Passport Pickup

POE

Nov 2, 2015 Entered the US Nov 16, 2015 Applied for SSN, walk-in Nov 20, 2015 Social Security Card recd Jan 15, 2016 GC received

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

My god, so many posts in one night, my mobile was sweating when i turned on the data, So happy that you are getting interview dates, atleast nvc is working we know, no date for me, mumbai, CC date July 15...

rony rude,

Have u called NVC?

My god, so many posts in one night, my mobile was sweating when i turned on the data, So happy that you are getting interview dates, atleast nvc is working we know, no date for me, mumbai, CC date July 15...

Have u called NVC?

18-Apr-2014-----------------Marriage
USCIS
18-Aug-2014-----------------I130 Sent
19-Aug-2014-----------------I130 NOA1
21-Jan-2015-----------------I130 NOA2 (Five months and two days)
NVC
04-Feb-2015-----------------NVC Received Our Case
04-Feb-2015-----------------Husband naturalized and IR1 upgrade request sent to NVC
21-May-2015-----------------Case Upgraded to IR1
05-Aug-2015-----------------Received Case Complete confirmation email
10-Sep-2015------------------Interview Scheduled
16-Sep-2015------------------Interview email Received
Mumbai Embassy
18-Sep-2015------------------Medical (Chennai Apollo)
23-Sep-2015------------------Finger Printing (Chennai)
05-Oct-2015-------------------Interview - APPROVED
07-Oct-2015-------------------Passport Picked Up in CHENNAI
Check my profile for the detail timeline.

Filed: K-1 Visa Country: India
Timeline
Posted

Congratulations everyone who got the interview!

This still proves the theory that

1. NVC does not schedule all month round.

2. VJ members are good sample size. (It is just quite impossible coincidence otherwise that bunch of people start receiving interviews after months of complete silence)

3. NVC reps on phone does not have any information whatsoever, other that if your particular situation is listed on your file. What that means is, if they keep telling you that they started scheduling for so and so month, and finished so and so month, they are making up that information. Which has no relation to reality.
4. VJ sample can tell an actual story about when interviews are getting scheduled and when they are not.

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

rony rude,

Have u called NVC?

Have u called NVC?

Last call was on monday, rep said to me that september is over... today i'll call again.

USCIS

16/Sep/2014 - Case mailed to USCIS
23/Sep/2014 - Case accepted at USCIS - NOA 1
23/Sep/2014 - Case routed to Nebraska processing center
17/Mar/2015 - Case approved by USCIS - NOA 2

NVC

02/Apr/2015 - Case received at NVC

16/Apr/2015 - Received case no. and invoice number via call center

16/Apr/2015 - Paid AOS bill

16/Apr/2015 - Completed DS-261

04/Mat/2015 - DS-261 reviewed over phone

04/May/2015 - AOS & IV package sent

06/May/2015 - NVC received package

08/May/2015 - NVC invoiced our IV fee

09/May/2015- Payment website encountered error, unable to make payment.

19/May/2015 - Sent IV fee via check to NVC

29/May/2015 - NVC acknowledge IV fees payment via check.

03/June/2015 - NVC website still not showing payment information.

03/June/2015 - Waiting for DS-260 to be enabled.

19/June/2015 - Check list documents scan date.

06/July/2015 - Filled DS-260.

15/July/2015 - Case Complete

01/Oct/2015 - Interview date, Mumbai India :energy:

event.png

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

I just received the P4 letter....feeling nervous and excited :dance:

Got my interview letter. ,thank god!! Alhamdullilah

Sept 29th please update me

Got my interview letter. ,thank god!! Alhamdullilah

Sept 29th please update me

Interview schedule for 9-30.

CC date 8-10

21 july.Thank you dwheel

AHHHHHHHHHHHHHHHHHHH Bouncing off the walls, interview is september 22 :joy::joy::joy::joy::joy:

hey Vj'ers

cc : August 05

Scheduled : August 26

Interview : September 29

Best of luck to all of you. :)

We got an interview date!!!! Woo hoo! September 30th at 7 am! :)

Congrats Guys....

Today was really a PAKISTANI DAY....

We just have 1 soldier left at NVC, Sabeehnajam :idea: He will also come flying out of it.Amen

By The way, I got MINE tooooo .. BAZINGAAAAAA

Interview date 28 september

JULY-08-2014 PRIORITY DATE

OCT-19-2015 INTERVIEW

RESULT ADMINISTRATIVE PROCESSING

MUCH AWAITED UPDATES :

OCT-19-2015

OCT-20-2015

OCT-27-2015

NOV-17-2015 (most likely it was due to my email inquiry)

JAN-08-2016 (due to my email inquiry)

FEB-09-2016 (first real update)

MAR-08-2016

MAR-09-2016

MAR-10-2016 ISSUED

Posted

I am also. Are you planning to attend the interview?

No, i am not planning to attend the interview. I will let my spouse know to say hi to you. :-)

Spoiler

USCIS
01/14/2015 - Sent I-130 -----------------------------------------
01/20/2015 - NOA 1 ------------------------------02/03/2015 - I-130 Approval/NOA2

 

NVC

02/23/2015 - Case received ------------------------------------------------------------------------------------------------------------------------------------------03/02/2015 - Case Number and IIN assigned

03/06/2015 - DS -261 Available and complete ------------------------------------------------------------------------------------------------------------------03/10/2015 - AOS Bill "PAID" status

03/10/2015 - AOS and IV Packages sent ------and now the wait begins!! praying for no checklists -----------------------------------------------03/13/2015 - AOS and IV Packages scanned at NVC----please God no checklist.....

03/31/2015 - AOS Form Review Completed by a Supervisor (Had to call many times) --------------------------------------------------------------04/02/2015 - Paid IV Bill Online

04/06/2015 - IV Bill "PAID" status -----------------------------------------------------------------------------------------------------------------------------------04/10/2015 - Check List Number 1

04/26/2015 - DS-260 Completed online ---------------------------------------------------------------------------------------------------------------------------05/15/2015 - Case sent for Supervisor Review....seems like I am only getting things done through Supervisors

06/29/2015 - 2nd Review to Supervisor triggered, still stuck in NVC hell ---------------------------------------------------------------------------------07/13/2015 - Case completed

07/20/2015 - Received Case Completed confirmation email-------------------------------------------------------------------------------------------------08/24/2015 - Interview Scheduled Date Confirmation over the Phone

08/26/2015 - Received Interview Scheduled confirmation email -------------------------------------------------------------------------------------------09/04/2015 - NVC called to inform about interview cancellation date

09/08/2015 - Received Interview Cancellation Email ----------------------------------------------------------------------------------------------------------09/22/2015 - Interview Date---------------Finally ----Old Interview Date  

09/10/2015 - Interview Rescheduled Date Confirmation over the Phone ---------------------------------------------------------------------------------09/11/2015 - Received Interview Rescheduled confirmation email

09/17/2015 - Case Status "In Transit" ------------------------------------------------------------------------------------------------------------------------------09/18/2015 - Case Status "Ready"  

10/01/2015 - Interview Rescheduled Date

 

Embassy
09/11/2015 - Medical ----------------------------------------------------------------------------------10/01/2015 - Interview and Approval Date 1

0/01/2015 - Case Status Changed to "Administrative Processing" ------------------------10/02/2015 - Case Status Changed to "Issued" 

XXXXXXX - Visa in hand ------------------------------------------------------------------------------XXXXXXX - POE

 

I-751
09/06/2015 - Package with USPS ------------------------ 09/09/2017 Delivered at Vermont Service Center

09/15/2017 Check Cashed --------------------------------- 09/19/2017- NOA received

 

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...