Jump to content
dwheels76

September 2015 Interviews

 Share

1,743 posts in this topic

Recommended Posts

This is where you search. https://ceac.state.gov/CEACStatTracker/Status.aspx?eQs=o/iS8zDpeAKjMWCuebHqOw==

It says either "At NVC", "in Transit" or "Ready" when its at the embassy

Yeah, I tried this website before. Doesn't work for me, I can't log on. I haven't received the instruction to do so yet, so I guess that's why

We met in 2002, dated and were torn apart in 2003and we reconnected end of 2013

I married the love of my life (L) : March 21, 2014

We sent in our I-130 package to USCIS: August 8, 2014

USCIS received I-130: August 11, 2014

USCIS approves our case: February 10, 2015

USCIS sends case to NVC: February 18, 2015

NVC welcome letter + email received: March 10, 2015 - date on letter March 3, 2015

NVC assigned case number: March 1, 2015

DS-261 filed: March 10, 2015

AOS fee payed online: March 10, 2015

NVC confirmation letter for choice of agent being registered: May 5, 2015 - received this letter thru email on May 7, 2014 and again via letter/email May 8, 2015

IV bill received: May 7 and May 8, 2015 (together with letter ds261 review confirmation)

Send in AOS an IV package: May 6, 2015

Payed IV bill thru money order: May 8, 2015

Email from NVC with letter of acceptance of AOS and IV package: May 15, 2015 (processing time: at least 60 days)

Scan date: May 12, 2015

NVC cashed money order IV bill fee: May 15, 2015

Received confirmation letter thru email that IV fee is received: May19, 2015 - date in letter May 15, 2015

Received checklist: June 22,2015 - date on checklist June 19,2015

New scan date checklist: June 24, 2015 (processing time: 30 days)

Filed DS260: July 7, 2015

Case Complete: July 21, 2015!!!!!!

Receives confirmation of case complete on August 1, 2015

Received interview letter on August 11, 2015

Medical: September 9, 2015

Interview date: September 24, 2015

event.png

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline

Yeah, I tried this website before. Doesn't work for me, I can't log on. I haven't received the instruction to do so yet, so I guess that's why

Nothing to log on to.. Hmm. You just search w your case number.

post-205487-0-28385400-1439364185_thumb.png

Edited by fridaab

USCIS

12/01/14: NOA1

04/16/15: NOA2

NVC

05/01/15: NVC received the case

05/13/15: Case number assigned and IIN

05/28/15: SCAN DATE, IV and AOS package

06/02/15: DS-261 available and completed

06/08/15: AOS bill available and paid

06/23/15: SECOND SCAN DATE (checklist for new i864 form)

07/05/15: IV bill available and paid

07/08/15: DS-260 Available and completed

07/17/15 Case Complete

EMBASSY STAGE

07/15/15: Medical examination

09/02/15: Interview (Changed from 09/23/15) approved (L)

09/10/15: Visa in hand

09/12/15: POE, Los Angeles

Link to comment
Share on other sites

Nothing to log on to.. Hmm. You just search w your case number.

attachicon.gifScreen Shot 2015-08-12 at 9.19.54 AM.png

Aha, it's searching not login on. I didn't know. Well, it's sorta says to go to nvc s website and read what to do from here. Which would be the standard instructions about when you receive your interview letter. I don't k Ow where people get this second website info anyway.

We met in 2002, dated and were torn apart in 2003and we reconnected end of 2013

I married the love of my life (L) : March 21, 2014

We sent in our I-130 package to USCIS: August 8, 2014

USCIS received I-130: August 11, 2014

USCIS approves our case: February 10, 2015

USCIS sends case to NVC: February 18, 2015

NVC welcome letter + email received: March 10, 2015 - date on letter March 3, 2015

NVC assigned case number: March 1, 2015

DS-261 filed: March 10, 2015

AOS fee payed online: March 10, 2015

NVC confirmation letter for choice of agent being registered: May 5, 2015 - received this letter thru email on May 7, 2014 and again via letter/email May 8, 2015

IV bill received: May 7 and May 8, 2015 (together with letter ds261 review confirmation)

Send in AOS an IV package: May 6, 2015

Payed IV bill thru money order: May 8, 2015

Email from NVC with letter of acceptance of AOS and IV package: May 15, 2015 (processing time: at least 60 days)

Scan date: May 12, 2015

NVC cashed money order IV bill fee: May 15, 2015

Received confirmation letter thru email that IV fee is received: May19, 2015 - date in letter May 15, 2015

Received checklist: June 22,2015 - date on checklist June 19,2015

New scan date checklist: June 24, 2015 (processing time: 30 days)

Filed DS260: July 7, 2015

Case Complete: July 21, 2015!!!!!!

Receives confirmation of case complete on August 1, 2015

Received interview letter on August 11, 2015

Medical: September 9, 2015

Interview date: September 24, 2015

event.png

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline

Aha, it's searching not login on. I didn't know. Well, it's sorta says to go to nvc s website and read what to do from here. Which would be the standard instructions about when you receive your interview letter. I don't k Ow where people get this second website info anyway.

Well the search engine is for you to see where your case is at, to track it. Doesn't have anything to do with the instructions you were given in your interview letter. Just thought you might wanna check it out. Its not second website info.. Its on the first page of the CEAC portal.

Edited by fridaab

USCIS

12/01/14: NOA1

04/16/15: NOA2

NVC

05/01/15: NVC received the case

05/13/15: Case number assigned and IIN

05/28/15: SCAN DATE, IV and AOS package

06/02/15: DS-261 available and completed

06/08/15: AOS bill available and paid

06/23/15: SECOND SCAN DATE (checklist for new i864 form)

07/05/15: IV bill available and paid

07/08/15: DS-260 Available and completed

07/17/15 Case Complete

EMBASSY STAGE

07/15/15: Medical examination

09/02/15: Interview (Changed from 09/23/15) approved (L)

09/10/15: Visa in hand

09/12/15: POE, Los Angeles

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline

dwheels76, please help if you can, I'm freaking out a little bit. My interview is coming up on August 20th, and I only have a scanned copy of my husband's divorce decree from his previous marriage. My divorce decree from my previous marriage is fine - it's original and apostilled, but neither my husband nor his ex-wife have an original of this document, and neither of them are in the country to request an original. Will it be fine if I just take the original of my decree, and the scanned (not certified!) copy of my husband's decree?

It might be a little late now but usually you can order a certified copy from the county clerk's office and they will just send it home to you.

Met online October 2010


Engaged December 31st 2011


heart.gifMarried May 14th 2013 heart.gif



USCIS Stage


September 8th 2014 - Filed I-130 with Nebraska Service Center


September 16th 2014 - NOA1 received


March 2nd 2015 - NOA2 received :dancing:



NVC Stage


March 28th 2015 - Choice of agent complete & AOS fee paid


April 17th 2015 - IV fee paid


May 1st 2015 - Sent in IV application


May 12th 2015 - Sent in AOS and IV documents


May 18th 2015 - Scan Date


June 18th 2015 - Checklist received


June 22nd 2015 - Checklist response sent to NVC


June 25th 2015 - Put for Supervisor Review


Sept 15th 2015 - Request help from Texas US Senator Cornyn and his team


Sept 23rd 2015 - Our case is moved from supervisor review to NVC's team for dealing with Senator requests


Nov 4th 2015 - CASE COMPLETE!!!! :dancing:



Embassy Stage


Dec 16th 2015 - Medical exam


Dec 21st 2015 - Interview


Dec 21st 2015 - 221(g) issued at interview for updated forms


Jan 13th 2016 - Mailed our reply to the 221(g) to the US Embassy, received and CEAC updated the next morning


Jan 20th 2016 - Embassy require more in-depth info on asset for i-864


Feb 1st 2016 - Sent more in-depth info on assets as requested. Received the next morning


Feb 16th 2016 - Visa has been issued :dancing: :dancing: :dancing: :dancing: :dancing:



In the US


April 5th 2016 - POE Newark. No questions asked.


April 14th 2016 - SSN received


May 10th 2016 - First day at my new job :dancing:


May 27th 2016 - Green Card received


June 7th 2016 - Got my Texas driver's license

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ethiopia
Timeline

Love the new system no waiting . The option when calling is 1 for English then 7 . They picked right up

Edited by ItsGonnaBeWorthIt

USCIS : 7 months
Marriage : March 21, 2014
I-130 Sent : April 18, 2014
I-130 NOA1 : April 22, 2014
I-130 Approved: November 14, 2014 
after two service request

NVC6 months
Received : December 1, 2014
Received DS-261 / AOS Bill : January 1, 2015
Pay AOS Bill : January 9, 2015
Submit DS-261 : January 7, 2015
Receive IV Bill : January 15, 2015 
called after AOS showed paid, they released it overnight)
Pay IV Bill : January 23, 2015
Send IV and AOS: January 29, 2015
Scan date: February 3, 2015
Checklist: March 19, 2015
 (only need to send south Africa police report)
Case Complete: June 3, 2015 

EMBASSY: 10 months
Interview appointment letter : December 4, 2015
Interview Date : January 21, 2016 
medical wasn't complete
Second interview date: April 4th 2016
Interview Result :APPROVED!!!

Visa Received : 4/13/2016 ( they sent us a email stating our visa was ready for pick up)

USA LIFE
US Entry :4/29/2016 
Social Security : 5/10/2016 (filed from the actual office)
State ID: 5/14/2016
Started working!!: 5/25/2016
Finally paid green card fee: 6/24/2016 ( note said we will receive it within 60 days)
Green card in hand: 7/5/2016 10 year green card we done!! 

1st king born: 6/30/2016

April 2017 update: Marriage still going strong, baby boy getting bigger. Life is good 

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Georgia
Timeline

@Dwheels - please update my case, this is for R5 for my mother.

Interview was scheduled on 7/15 for 8/25. We requested an earlier date with the consulate and got rescheduled for 8/12. The interview went well today, now waiting to get the paperwork back from them. Country is Georgia.

Thanks to all for all your help and support! It''s been a nerve-wrecking journey but this forum has made a huge difference!

R5 Case, Parent of USC:

USCIS:

2014-10-14: I-130 Sent

2014-10-20: NOA1 Received in mail. Case sent to Vermont Service Center

2014-11-25: Case approved at USCIS

2014-12-09: Case got to NVC

2015-01-13: NVC assigned a case number and invoice # (obtained via phone)

2015-03-06: AOS invoice received via email

2015-03-06: AOS invoice paid online

2015-03-07: Submitted DS-261 Agent Form online

2015-03-26: Sent AOS and IV packages (hard copy) in one package

2015-03-30: NVC received AOS and IV packages

2015-04-24: AOS and IV packages reviewed and complete

2015-04-24: IV invoice received via email

2015-04-30: IV invoice paid online

2015-05-04: Submitted DS-260 Form online

2015-05-04: Received email acknowledgment from NVC about DS-260 Form submission. It said the review will take Up To 30 Business Days!

2015-06-05: Called NVC to request case be reviewed by supervisor since past 30 days... case in limbo

2015-06-15: Another supervisor requested the case for review...

2015-06-19: NVC Case Complete (learned over the phone)

2015-06-26: Received NVC email about Case Complete, dated 26-JUN-15

2015-07-15: P4 Email came about interview scheduling, scheduled for August 25

2015-07-24: Medical

2015-08-12: Interview in Tbilisi, Georgia (Original interview date was August 25)

2015-08-19: ELIS fee paid

2015-09-12: POE JFK

2015-10-03: Green Card Arrived

2015-10-09: Applied for SSN Card at the SSN Office

2015-10-16: SSN Card Arrived

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline

Anyone got news today yet?

USCIS

12/01/14: NOA1

04/16/15: NOA2

NVC

05/01/15: NVC received the case

05/13/15: Case number assigned and IIN

05/28/15: SCAN DATE, IV and AOS package

06/02/15: DS-261 available and completed

06/08/15: AOS bill available and paid

06/23/15: SECOND SCAN DATE (checklist for new i864 form)

07/05/15: IV bill available and paid

07/08/15: DS-260 Available and completed

07/17/15 Case Complete

EMBASSY STAGE

07/15/15: Medical examination

09/02/15: Interview (Changed from 09/23/15) approved (L)

09/10/15: Visa in hand

09/12/15: POE, Los Angeles

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline

Just got off the phone with the NVC I was told that they are scheduling for September which we already know then she said that they will start scheduling to the end of the month

I-601A TimeLine
Application sent: 03-31-15
Lockbox receipt: 04-06-15
Biometrics letter received: 04-18-15
Biometrics scheduled for: 04-27-15
Biometrics done : 04-27-15
RFE received?: NO
Waiver decision date: 06-07-15
Waiver decision: Approved
Filing country: Mexico
NVC Process
NVC Packet Sent 06-24-15
NVC Scan Date 06-30-15
NVC Case Closed Date: 07-09-15
Visa interview date: Waiting
Visa received:
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline

Just got off the phone with the NVC I was told that they are scheduling for September which we already know then she said that they will start scheduling to the end of the month

She said they had started now, and that they will start end of the month also? confusing... :P

Maybe that they will continue to end of the month?

Edited by fridaab

USCIS

12/01/14: NOA1

04/16/15: NOA2

NVC

05/01/15: NVC received the case

05/13/15: Case number assigned and IIN

05/28/15: SCAN DATE, IV and AOS package

06/02/15: DS-261 available and completed

06/08/15: AOS bill available and paid

06/23/15: SECOND SCAN DATE (checklist for new i864 form)

07/05/15: IV bill available and paid

07/08/15: DS-260 Available and completed

07/17/15 Case Complete

EMBASSY STAGE

07/15/15: Medical examination

09/02/15: Interview (Changed from 09/23/15) approved (L)

09/10/15: Visa in hand

09/12/15: POE, Los Angeles

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ethiopia
Timeline

She said they had started now, and that they will start end of the month also? confusing... :P

think they were saying they are starting now and will scheduling interviews from when they started until the end of the month. so pretty much for the rest of the month they will be doing them

USCIS : 7 months
Marriage : March 21, 2014
I-130 Sent : April 18, 2014
I-130 NOA1 : April 22, 2014
I-130 Approved: November 14, 2014 
after two service request

NVC6 months
Received : December 1, 2014
Received DS-261 / AOS Bill : January 1, 2015
Pay AOS Bill : January 9, 2015
Submit DS-261 : January 7, 2015
Receive IV Bill : January 15, 2015 
called after AOS showed paid, they released it overnight)
Pay IV Bill : January 23, 2015
Send IV and AOS: January 29, 2015
Scan date: February 3, 2015
Checklist: March 19, 2015
 (only need to send south Africa police report)
Case Complete: June 3, 2015 

EMBASSY: 10 months
Interview appointment letter : December 4, 2015
Interview Date : January 21, 2016 
medical wasn't complete
Second interview date: April 4th 2016
Interview Result :APPROVED!!!

Visa Received : 4/13/2016 ( they sent us a email stating our visa was ready for pick up)

USA LIFE
US Entry :4/29/2016 
Social Security : 5/10/2016 (filed from the actual office)
State ID: 5/14/2016
Started working!!: 5/25/2016
Finally paid green card fee: 6/24/2016 ( note said we will receive it within 60 days)
Green card in hand: 7/5/2016 10 year green card we done!! 

1st king born: 6/30/2016

April 2017 update: Marriage still going strong, baby boy getting bigger. Life is good 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline

think they were saying they are starting now and will scheduling interviews from when they started until the end of the month. so pretty much for the rest of the month they will be doing them

exactly. But never seen they schedule for that long of a period..

USCIS

12/01/14: NOA1

04/16/15: NOA2

NVC

05/01/15: NVC received the case

05/13/15: Case number assigned and IIN

05/28/15: SCAN DATE, IV and AOS package

06/02/15: DS-261 available and completed

06/08/15: AOS bill available and paid

06/23/15: SECOND SCAN DATE (checklist for new i864 form)

07/05/15: IV bill available and paid

07/08/15: DS-260 Available and completed

07/17/15 Case Complete

EMBASSY STAGE

07/15/15: Medical examination

09/02/15: Interview (Changed from 09/23/15) approved (L)

09/10/15: Visa in hand

09/12/15: POE, Los Angeles

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Ethiopia
Timeline

exactly. But never seen they schedule for that long of a period..

hey maybe there is a new boss in town and he/she gets things done! one can hope right? lol

USCIS : 7 months
Marriage : March 21, 2014
I-130 Sent : April 18, 2014
I-130 NOA1 : April 22, 2014
I-130 Approved: November 14, 2014 
after two service request

NVC6 months
Received : December 1, 2014
Received DS-261 / AOS Bill : January 1, 2015
Pay AOS Bill : January 9, 2015
Submit DS-261 : January 7, 2015
Receive IV Bill : January 15, 2015 
called after AOS showed paid, they released it overnight)
Pay IV Bill : January 23, 2015
Send IV and AOS: January 29, 2015
Scan date: February 3, 2015
Checklist: March 19, 2015
 (only need to send south Africa police report)
Case Complete: June 3, 2015 

EMBASSY: 10 months
Interview appointment letter : December 4, 2015
Interview Date : January 21, 2016 
medical wasn't complete
Second interview date: April 4th 2016
Interview Result :APPROVED!!!

Visa Received : 4/13/2016 ( they sent us a email stating our visa was ready for pick up)

USA LIFE
US Entry :4/29/2016 
Social Security : 5/10/2016 (filed from the actual office)
State ID: 5/14/2016
Started working!!: 5/25/2016
Finally paid green card fee: 6/24/2016 ( note said we will receive it within 60 days)
Green card in hand: 7/5/2016 10 year green card we done!! 

1st king born: 6/30/2016

April 2017 update: Marriage still going strong, baby boy getting bigger. Life is good 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline

hey maybe there is a new boss in town and he/she gets things done! one can hope right? lol

haha yea for sure ;)

or rep doesn't know what he is talking about (most likely)

USCIS

12/01/14: NOA1

04/16/15: NOA2

NVC

05/01/15: NVC received the case

05/13/15: Case number assigned and IIN

05/28/15: SCAN DATE, IV and AOS package

06/02/15: DS-261 available and completed

06/08/15: AOS bill available and paid

06/23/15: SECOND SCAN DATE (checklist for new i864 form)

07/05/15: IV bill available and paid

07/08/15: DS-260 Available and completed

07/17/15 Case Complete

EMBASSY STAGE

07/15/15: Medical examination

09/02/15: Interview (Changed from 09/23/15) approved (L)

09/10/15: Visa in hand

09/12/15: POE, Los Angeles

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...