I'm really convinced this June 12 date is not a target or hard deadline for them to fix the issue.

From all responses people have been getting from the NVC, including myself before and after that notice was posted online, and the response our Senator got after we made a congressional inquiry (see pasted below), it's more like a "free beer tomorrow" sign on a bar: it will be fixed 10 days from whenever you ask.

This e-mail was dated today, June 12:

Well,

those ten days are a hoax anyway. The problem exists for 1-2 months now. Maybe they are just trying to buy more time and get people off their backs. It was, is and will continue to be a waiting game.

We met in 2002, dated and were torn apart in 2003and we reconnected end of 2013

I married the love of my life (L) : March 21, 2014

We sent in our I-130 package to USCIS: August 8, 2014

USCIS received I-130: August 11, 2014

USCIS approves our case: February 10, 2015

USCIS sends case to NVC: February 18, 2015

NVC welcome letter + email received: March 10, 2015 - date on letter March 3, 2015

NVC assigned case number: March 1, 2015

DS-261 filed: March 10, 2015

AOS fee payed online: March 10, 2015

NVC confirmation letter for choice of agent being registered: May 5, 2015 - received this letter thru email on May 7, 2014 and again via letter/email May 8, 2015

IV bill received: May 7 and May 8, 2015 (together with letter ds261 review confirmation)

Send in AOS an IV package: May 6, 2015

Payed IV bill thru money order: May 8, 2015

Email from NVC with letter of acceptance of AOS and IV package: May 15, 2015 (processing time: at least 60 days)

Scan date: May 12, 2015

NVC cashed money order IV bill fee: May 15, 2015

Received confirmation letter thru email that IV fee is received: May19, 2015 - date in letter May 15, 2015

Received checklist: June 22,2015 - date on checklist June 19,2015

New scan date checklist: June 24, 2015 (processing time: 30 days)

Filed DS260: July 7, 2015

Case Complete: July 21, 2015!!!!!!

Receives confirmation of case complete on August 1, 2015

Received interview letter on August 11, 2015

Medical: September 9, 2015

Interview date: September 24, 2015

event.png

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jordan
Timeline

Well,

those ten days are a hoax anyway. The problem exists for 1-2 months now. Maybe they are just trying to buy more time and get people off their backs. It was, is and will continue to be a waiting game.

they told me another 10 days again today I'm so sick of them .
Link to comment
Share on other sites

Filed: Country: India
Timeline

Hello, my ds 261 was reviewed on june 5th I got my iv bill invoice via email on june 9th. Still not able to pay online. It shows 0.00 I was wondering if anyone else can't pay online? Called nvc the lady told me to wait 10 days. Should I send the money via mail or wait?

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

I haven't heard of anyone that has mailed the IV fee being able to fill the DS260.

Our fee was received and processed on May 15 and now, 30 days later, it still shows as unpaid at the website and the DS260 isn't available.

Paying by mail doesn't sound like a solution if they don't input your payment on their system anyway.

I-130 for Spouse

USCIS

10/14/2014 - I-130 Mailed to Chicago Lockbox

10/22/2014 - NOA1 (Nebraska Service Center)

04/01/2015 - NOA2 (161 days)

NVC

04/16/2015 - NVC Received

04/23/2015 - Case # assigned / DS-261 completed

04/24/2015 - AOS fee invoiced and paid

04/30/2015 - AOS+IV packages mailed

05/04/2015 - AOS+IV packages received (scan date)

05/15/2015 - IV fee money order payment confirmed

06/03/2015 - Checklist received: missing DS-260 form

06/19/2015 - DS-260 available online and submitted

07/31/2015 - Case Complete (107 days from arriving @NVC or 89 days from scan date)

Embassy

08/25/2015 - Scheduled interview

09/21/2015 - Interview, approved!

10/02/2015 - Passport received

10/04/2015 - POE! (348 days from NOA1)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

The same happended to me!

I've just received the second invoice, dated June 12th

:clock: Well, let's wait and see

What's going on at the NVC?

I received a second IV invoice this afternoon. The first IV invoice was dated June 10. The second IV invoice was dated June 12. Both invoices arrived on Sunday about 7 hours apart.

Still no luck with the online payment system.

USCIS:

2015/3/23: I-130 Sent: (Let's start the waiting game!)

2015/3/25: NOA1 Sent by email, case routed to the USCIS California Service Center (hardcopy 2015/6/4)

2015/4/21: NOA2 (email; got hardcopy in 2015/5/6)

NVC:

2015/5/21: Got NVC case # and IIN

2015/5/29: Filled DS261 online

2015/6/1: Payed AOS fee online

2015/6/5: Sent AOS and IV packages

2015/6/8: DS261 reviewed over the phone

2015/6/8: Scan Date

2015/7/5: Payed IV fee online

2015/7/8: Filled DS260

2015/7/23: Checklist!!

2015/7/25: Checklist Scan Date

2015/8/18: NVC CC

2015/9/11: Interview Scheduled for October 8th (no letter yet, just called NVC!)

2015/10/1: Medical

2015/10/8: Interview - Approved!!!

2015/10/30: POE

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

We did exactly the same as you did

In our case we managed to send documents once the AOS was paid while you can use the bar-code cover sheet!!

USCIS:

2015/3/23: I-130 Sent: (Let's start the waiting game!)

2015/3/25: NOA1 Sent by email, case routed to the USCIS California Service Center (hardcopy 2015/6/4)

2015/4/21: NOA2 (email; got hardcopy in 2015/5/6)

NVC:

2015/5/21: Got NVC case # and IIN

2015/5/29: Filled DS261 online

2015/6/1: Payed AOS fee online

2015/6/5: Sent AOS and IV packages

2015/6/8: DS261 reviewed over the phone

2015/6/8: Scan Date

2015/7/5: Payed IV fee online

2015/7/8: Filled DS260

2015/7/23: Checklist!!

2015/7/25: Checklist Scan Date

2015/8/18: NVC CC

2015/9/11: Interview Scheduled for October 8th (no letter yet, just called NVC!)

2015/10/1: Medical

2015/10/8: Interview - Approved!!!

2015/10/30: POE

Link to comment
Share on other sites

First time I called NVC last June 10 around 7:40a.m. and it just took me 5 minutes to speak with an nvc representative named Arianne. She said our case was received June 4th and I need to call them back after 4 weeks or so. :oops:

I called again on the 12th and still the same able to speak with NVC representative within 5 minutes waiting. Her name is Grace and she told me the same date June 4th that my case was received by NVC. But, she told me another info about receiving a welcome letter from NVC on July 9. Have you been told about that guys?

Why wait for that Welcome letter from NVC till July 9th? I will call them again next week. :protest:

The welcome letter has your Case and ID number in it which you will need for further processing. It also holds instructions on what to do next.

It usually doesnt take that long from the date that NVC receives your package from USCIS and assigning a case number. For us for example it took 7 days. Take in account a few extra days before they notify you.

We met in 2002, dated and were torn apart in 2003and we reconnected end of 2013

I married the love of my life (L) : March 21, 2014

We sent in our I-130 package to USCIS: August 8, 2014

USCIS received I-130: August 11, 2014

USCIS approves our case: February 10, 2015

USCIS sends case to NVC: February 18, 2015

NVC welcome letter + email received: March 10, 2015 - date on letter March 3, 2015

NVC assigned case number: March 1, 2015

DS-261 filed: March 10, 2015

AOS fee payed online: March 10, 2015

NVC confirmation letter for choice of agent being registered: May 5, 2015 - received this letter thru email on May 7, 2014 and again via letter/email May 8, 2015

IV bill received: May 7 and May 8, 2015 (together with letter ds261 review confirmation)

Send in AOS an IV package: May 6, 2015

Payed IV bill thru money order: May 8, 2015

Email from NVC with letter of acceptance of AOS and IV package: May 15, 2015 (processing time: at least 60 days)

Scan date: May 12, 2015

NVC cashed money order IV bill fee: May 15, 2015

Received confirmation letter thru email that IV fee is received: May19, 2015 - date in letter May 15, 2015

Received checklist: June 22,2015 - date on checklist June 19,2015

New scan date checklist: June 24, 2015 (processing time: 30 days)

Filed DS260: July 7, 2015

Case Complete: July 21, 2015!!!!!!

Receives confirmation of case complete on August 1, 2015

Received interview letter on August 11, 2015

Medical: September 9, 2015

Interview date: September 24, 2015

event.png

event.png

Link to comment
Share on other sites

Did anybody fill in DS-260 after you sent cashier check? June 13 is already over but I still cannot fill in DS-260?

Nope, checked the website today, still nothing.

NVC confirmed us by email on May 15th that they received our IV fee by cheque. Still no acces to DS260.

On the website it still says 'pay now' for the IV bill, with the amount of 325 dollars.

We met in 2002, dated and were torn apart in 2003and we reconnected end of 2013

I married the love of my life (L) : March 21, 2014

We sent in our I-130 package to USCIS: August 8, 2014

USCIS received I-130: August 11, 2014

USCIS approves our case: February 10, 2015

USCIS sends case to NVC: February 18, 2015

NVC welcome letter + email received: March 10, 2015 - date on letter March 3, 2015

NVC assigned case number: March 1, 2015

DS-261 filed: March 10, 2015

AOS fee payed online: March 10, 2015

NVC confirmation letter for choice of agent being registered: May 5, 2015 - received this letter thru email on May 7, 2014 and again via letter/email May 8, 2015

IV bill received: May 7 and May 8, 2015 (together with letter ds261 review confirmation)

Send in AOS an IV package: May 6, 2015

Payed IV bill thru money order: May 8, 2015

Email from NVC with letter of acceptance of AOS and IV package: May 15, 2015 (processing time: at least 60 days)

Scan date: May 12, 2015

NVC cashed money order IV bill fee: May 15, 2015

Received confirmation letter thru email that IV fee is received: May19, 2015 - date in letter May 15, 2015

Received checklist: June 22,2015 - date on checklist June 19,2015

New scan date checklist: June 24, 2015 (processing time: 30 days)

Filed DS260: July 7, 2015

Case Complete: July 21, 2015!!!!!!

Receives confirmation of case complete on August 1, 2015

Received interview letter on August 11, 2015

Medical: September 9, 2015

Interview date: September 24, 2015

event.png

event.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: France
Timeline

I haven't heard of anyone that has mailed the IV fee being able to fill the DS260.

Our fee was received and processed on May 15 and now, 30 days later, it still shows as unpaid at the website and the DS260 isn't available.

Paying by mail doesn't sound like a solution if they don't input your payment on their system anyway.

I found one person on the forum who mailed the IV fee late May, and could complete ds260 on june 3rd (fellaamazing)

Submit DS-261 : 2015-03-22

Pay AOS Bill : 2015-03-25

Receive IV Bill : 2015-04-30

Pay IV Bill : 2015-05-14

Send IV & AOS Package : 2015-05-11

Completed DS260 : 2015-06-23

Checklist : 2015-06-30

New Scan date : 2015-07-06

Put on supervisor review : 2015-08-05

CC : 2015-10-14

Interview date : 2015-12-08

..........

Link to comment
Share on other sites

What's going on at the NVC?

I received a second IV invoice this afternoon. The first IV invoice was dated June 10. The second IV invoice was dated June 12. Both invoices arrived on Sunday about 7 hours apart.

Still no luck with the online payment system.

We had the same thing.

Just check if the invoice numbers are the same.If so, then disregard the second one.

We met in 2002, dated and were torn apart in 2003and we reconnected end of 2013

I married the love of my life (L) : March 21, 2014

We sent in our I-130 package to USCIS: August 8, 2014

USCIS received I-130: August 11, 2014

USCIS approves our case: February 10, 2015

USCIS sends case to NVC: February 18, 2015

NVC welcome letter + email received: March 10, 2015 - date on letter March 3, 2015

NVC assigned case number: March 1, 2015

DS-261 filed: March 10, 2015

AOS fee payed online: March 10, 2015

NVC confirmation letter for choice of agent being registered: May 5, 2015 - received this letter thru email on May 7, 2014 and again via letter/email May 8, 2015

IV bill received: May 7 and May 8, 2015 (together with letter ds261 review confirmation)

Send in AOS an IV package: May 6, 2015

Payed IV bill thru money order: May 8, 2015

Email from NVC with letter of acceptance of AOS and IV package: May 15, 2015 (processing time: at least 60 days)

Scan date: May 12, 2015

NVC cashed money order IV bill fee: May 15, 2015

Received confirmation letter thru email that IV fee is received: May19, 2015 - date in letter May 15, 2015

Received checklist: June 22,2015 - date on checklist June 19,2015

New scan date checklist: June 24, 2015 (processing time: 30 days)

Filed DS260: July 7, 2015

Case Complete: July 21, 2015!!!!!!

Receives confirmation of case complete on August 1, 2015

Received interview letter on August 11, 2015

Medical: September 9, 2015

Interview date: September 24, 2015

event.png

event.png

Link to comment
Share on other sites

Our ds261 was reviewed on 6/1 and we still haven't received the IV invoice.

It takes up to 45 days, I believe business days even, from ds261 reviewed to recieving IV bill.

Tip, dont re-open ds261 or those 45 days start all over again.

I don't mean the be rude, but you really shouldn't complain after 2 weeks of not having heard from NVC. People on this thread are sometimes waiting for 2 months ore more for anything to happen. You really need to start practicing on your patience, there is no order and only chaos at NVC. ;)

We met in 2002, dated and were torn apart in 2003and we reconnected end of 2013

I married the love of my life (L) : March 21, 2014

We sent in our I-130 package to USCIS: August 8, 2014

USCIS received I-130: August 11, 2014

USCIS approves our case: February 10, 2015

USCIS sends case to NVC: February 18, 2015

NVC welcome letter + email received: March 10, 2015 - date on letter March 3, 2015

NVC assigned case number: March 1, 2015

DS-261 filed: March 10, 2015

AOS fee payed online: March 10, 2015

NVC confirmation letter for choice of agent being registered: May 5, 2015 - received this letter thru email on May 7, 2014 and again via letter/email May 8, 2015

IV bill received: May 7 and May 8, 2015 (together with letter ds261 review confirmation)

Send in AOS an IV package: May 6, 2015

Payed IV bill thru money order: May 8, 2015

Email from NVC with letter of acceptance of AOS and IV package: May 15, 2015 (processing time: at least 60 days)

Scan date: May 12, 2015

NVC cashed money order IV bill fee: May 15, 2015

Received confirmation letter thru email that IV fee is received: May19, 2015 - date in letter May 15, 2015

Received checklist: June 22,2015 - date on checklist June 19,2015

New scan date checklist: June 24, 2015 (processing time: 30 days)

Filed DS260: July 7, 2015

Case Complete: July 21, 2015!!!!!!

Receives confirmation of case complete on August 1, 2015

Received interview letter on August 11, 2015

Medical: September 9, 2015

Interview date: September 24, 2015

event.png

event.png

Link to comment
Share on other sites

Filed: F-2A Visa Country: India
Timeline

Nope, checked the website today, still nothing.

NVC confirmed us by email on May 15th that they received our IV fee by cheque. Still no acces to DS260.

On the website it still says 'pay now' for the IV bill, with the amount of 325 dollars.

why u paid by mail if u r able to pay online... Coz if u pay online ur fees will b automatically paid and immediately it shows as paid ur ds 260 will unlock automatically... Thats what happened to me ... I sent my money order by mail and after 3 weeks they said they haven't got my money order even though it was cashed...

I saw before my web page showed 0.00$ for IV bill but after few days it was invoiced....

I paid it online and within 3 days it showed paid n immediately ds260 was available to fill.. I filled it and submitted n got confirmation too... Now waiting to get reviewed...

I-130 / F-2A



USCIS


November 14 2013 I-130 Sent to Chicago Lockbox


November 15 2013 I-130 Received at Chicago Lockbox Facility


November 18 2013 Email from USCIS about Petition Acceptance (PD Nov 15 2013)


November 19 2013 I 797 NOA 1 received by mail


March 24 2015 Received E Mail and Text Notification about Case transfer to another USCIS Office


March 28 2015 Received Hard copy of Transfer Notice from USCIS


March 31 2015 Case Approved by USCIS


April 1 2015 Received Email and Text message for Case Approval


April 4 2015 Received Hard Copy of NOA2 from USCIS



NVC STAGE


April 16 2015 Case received at NVC


April 24 2015 Case Number and IIN received on Call


April 27 2015 Paid AOS Fees and Submitted DS-261


April 29 2015 Welcome Letter from NVC in Email


May 05 2015 DS-261 reviewed over phone


May 06 2015 AOS & Civil Documents sent to NVC


May 07 2015 Documents received at NVC


May 08 2015 Email from NVC to pay IV Fees


June 08 2015 IV PAID


June 10 2015 Submitted DS-260


July 13 2015 Case Completed


July 29 2015 Finally....Got Interview Date


Sep 18 2015 Interview (Approved)






Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

why u paid by mail if u r able to pay online... Coz if u pay online ur fees will b automatically paid and immediately it shows as paid ur ds 260 will unlock automatically... Thats what happened to me ... I sent my money order by mail and after 3 weeks they said they haven't got my money order even though it was cashed...

I saw before my web page showed 0.00$ for IV bill but after few days it was invoiced....

I paid it online and within 3 days it showed paid n immediately ds260 was available to fill.. I filled it and submitted n got confirmation too... Now waiting to get reviewed...

Can you explain again that last part? Our check was cashed and we got a receipt on May 15th. We mailed it because back then the IV fee wasn't showing anything online.

Now it shows to pay $325. I have considered paying it again (and figuring out a way to get refunded for paying it twice somehow) to see if the DS260 appears.

Are you saying you did pay online even after mailing in a check and got your DS260? Are they refunding you for paying twice?

I-130 for Spouse

USCIS

10/14/2014 - I-130 Mailed to Chicago Lockbox

10/22/2014 - NOA1 (Nebraska Service Center)

04/01/2015 - NOA2 (161 days)

NVC

04/16/2015 - NVC Received

04/23/2015 - Case # assigned / DS-261 completed

04/24/2015 - AOS fee invoiced and paid

04/30/2015 - AOS+IV packages mailed

05/04/2015 - AOS+IV packages received (scan date)

05/15/2015 - IV fee money order payment confirmed

06/03/2015 - Checklist received: missing DS-260 form

06/19/2015 - DS-260 available online and submitted

07/31/2015 - Case Complete (107 days from arriving @NVC or 89 days from scan date)

Embassy

08/25/2015 - Scheduled interview

09/21/2015 - Interview, approved!

10/02/2015 - Passport received

10/04/2015 - POE! (348 days from NOA1)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Hello, my ds 261 was reviewed on june 5th I got my iv bill invoice via email on june 9th. Still not able to pay online. It shows 0.00 I was wondering if anyone else can't pay online? Called nvc the lady told me to wait 10 days. Should I send the money via mail or wait?

hardeep its a gamble, no one can predict which way itd be a win, but some of us have been mailing it in and some have been getting lucky getting it show as paid pretty quickly as well.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Jordan
Timeline

I found one person on the forum who mailed the IV fee late May, and could complete ds260 on june 3rd (fellaamazing)

he isn't doing a spouse visa so his I feel works just slightly different in my opinion . I think he mentioned his was a work related visa of some sort .
Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...