Jump to content

1,449 posts in this topic

Recommended Posts

Posted

So I called them today. The first rep told me I had to wait 90 days, after which I found that it says on the USCIS processing time page that you can call after 75 days (https://egov.uscis.gov/cris/processTimesDisplayInit.do), so I called them back again and opened up a case.

I was told that I will hear from the processing center within 15 days, either via mail or email. Is this what you guys heard?

Do I just wait for a status update now?

You'll probably hear something in the morning going off a few others including mine. Check online later tonight and see if the case has been assigned to an officer. I was told 15 days and it took less than 1.

Adjustment of Status (AOS), Removal of Conditions (ROC) Followed by N400 

 

AOS from ESTA

03-13-2015: AOS Packet Mailed to Chicago Lockbox Facility via USPS

03-14-2015: Arrived at Post Office Chicago, IL

03-17-2015: AOS Packet received by USCIS

03-23-2015: Text/ Email Notification: Notice of Acceptance

03-28-2015: NOA1 for AOS, AP & EAD received in the mail

04-03-2015: Notice of Appointment for Biometrics on the 14th of April at 9 a.m arrived with lawyer

04-07-2015: Notice of Appointment for Biometrics on the 14th of April at 9 a.m arrived at my address (lot slower)

04-06-2015: Early walk in for Biometrics complete 6th April, walked in at 3pm and spoke with the centre manager

05-14-2015: Expedite request made

05-15-2015: USCIS site says expedite complete but no change.

06-01-2015: Case enquiry opened with USCIS as its passed 75 days.

06-02-2015: EAD/AP card in production and to be distributed.

06-05-2014: Hard copy notice to say EAD approved.

06-08-2015: EAD Card arrived in the mail.

08-25-2015: 161 Days since filing and no interview date.

01-12-2016: 300 Days since filingand no interview date.

02-24-2016: Case scheduled for Interview March 26th 2016 (347 days after filing and will be well over a year come interview date).

04-02-2016: GREEN CARD ARRIVED.
 
ROC I-751
01-02-2018: ROC I-751 package sent
01-03-2018: I-751 signed for in California 
01-08-2018: NOA-1 Received (1 year Extension Letter)
03-20-2019: ROC APPROVED (442 DAYS since APPLYING) 
 
N400
12-28-2018: N400 Submitted Online 
01-12-2019: Biometrics for N400 
10-04-2019: N400 Interview PASS
10-31-2019: I AM A U.S. CITIZEN!!!!!!!!!!!!!!!!!!!!!!!!! ITS OVER
 
 

 

 

 
Posted

So I'll have my 75 days pass this weekend. How do I inquire ? Is it me or the my husband (the US citizen) that needs to make the call? And what is the number to call? Since I'm wating anyways, I better get prepared for when I cal make an inquiry :-p

Thank you!

You can call as you are enquiring about your EAD/AP. Have your paper work in front of you, you'll need the receipt number your A number, address and persona info. Just say its been over 75 days you would like to open a case enquiry. You can call the standard customer service number and go to the option of case update. You'll be given a reference number at the end so have a pen and paper.

Adjustment of Status (AOS), Removal of Conditions (ROC) Followed by N400 

 

AOS from ESTA

03-13-2015: AOS Packet Mailed to Chicago Lockbox Facility via USPS

03-14-2015: Arrived at Post Office Chicago, IL

03-17-2015: AOS Packet received by USCIS

03-23-2015: Text/ Email Notification: Notice of Acceptance

03-28-2015: NOA1 for AOS, AP & EAD received in the mail

04-03-2015: Notice of Appointment for Biometrics on the 14th of April at 9 a.m arrived with lawyer

04-07-2015: Notice of Appointment for Biometrics on the 14th of April at 9 a.m arrived at my address (lot slower)

04-06-2015: Early walk in for Biometrics complete 6th April, walked in at 3pm and spoke with the centre manager

05-14-2015: Expedite request made

05-15-2015: USCIS site says expedite complete but no change.

06-01-2015: Case enquiry opened with USCIS as its passed 75 days.

06-02-2015: EAD/AP card in production and to be distributed.

06-05-2014: Hard copy notice to say EAD approved.

06-08-2015: EAD Card arrived in the mail.

08-25-2015: 161 Days since filing and no interview date.

01-12-2016: 300 Days since filingand no interview date.

02-24-2016: Case scheduled for Interview March 26th 2016 (347 days after filing and will be well over a year come interview date).

04-02-2016: GREEN CARD ARRIVED.
 
ROC I-751
01-02-2018: ROC I-751 package sent
01-03-2018: I-751 signed for in California 
01-08-2018: NOA-1 Received (1 year Extension Letter)
03-20-2019: ROC APPROVED (442 DAYS since APPLYING) 
 
N400
12-28-2018: N400 Submitted Online 
01-12-2019: Biometrics for N400 
10-04-2019: N400 Interview PASS
10-31-2019: I AM A U.S. CITIZEN!!!!!!!!!!!!!!!!!!!!!!!!! ITS OVER
 
 

 

 

 
Filed: Lift. Cond. (pnd) Country: China
Timeline
Posted

Omg!!! Congrats!!! I guess u are the first one got green card in our group!!

3/17/2015 sent out my whole AOS package thru overnight delivery

3/18/2015 received by USCIS in Chicago

3/24/2015 3 Text/e-mail notifications received

3/28/2015 Hardcopies of NOAs in the mailbox (i-130, i-485, i-765)

4/06/2015 Received notification of biometrics

4/17/2015 Biometrics done as scheduled.

4/27/2015 i-485 online status changed ready to schedule an interview. YAY!!!

5/21/2015 i-485 interview is scheduled for June 23rd!!! OMG so surprised!!!!

5/23/2015 i-485 interview notice received in hand

5/29/2015 i-765 is approved and new card is ordered to be produced.

6/05/2015 i-765 approval notice received

6/06/2015 EAD received in hand !!!

6/23/2015 i-485 and i-130 got approved on the spot!!!! waiting for green card to arrive!!

6/29/2015 i-485 and i-130 approval notices received in mail. (welcome letter) YAY!!!

7/09/2015 Finally, received my green card in hand!!!!

ROC Journey now

6/02/2017 i751 package to CSC

6/03/2017 i751 was received by CSC

6/06/2017 check was cashed

6/08/2017 NOA 1 received in mail

6/17/2017 NOA 2 received in mail. Biometrics is scheduled on 6/29/2017 

8/29/2018 Case status changed to "Approved", now waiting for Permanent green card to be delivered!

9/08/2018 10 year GC was delivered.   This journey finally ended today!! yay

Filed: Timeline
Posted

You can call as you are enquiring about your EAD/AP. Have your paper work in front of you, you'll need the receipt number your A number, address and persona info. Just say its been over 75 days you would like to open a case enquiry. You can call the standard customer service number and go to the option of case update. You'll be given a reference number at the end so have a pen and paper.

Thank you!

03/18/15: Send application

03/22/15: Application received

03/25/15: NOA 1 emails/texts

04/13/15: biomnetrics appointment letter

04/16/15: successful biometrics appointment

06/10/15: Received email - EAD picked up by post office!

06/11/15: Received EAD

06/18/15: Received interview notice in the mail for July 20th 2015 (was send on 06/12/15)

.....

Filed: AOS (pnd) Country: Canada
Timeline
Posted

You'll probably hear something in the morning going off a few others including mine. Check online later tonight and see if the case has been assigned to an officer. I was told 15 days and it took less than 1.

I really hope so! Checked last night and again this morning, no changes as of yet! I think I'm getting really paranoid thinking that someone may have lost my application or something...

+++++++++++++++++++++++++++++++ AOS Timeline +++++++++++++++++++++++++++++++++++

03/13/2015: Filed AOS package (I-130, I-485, I-765, I-131) via USPS priority mail to Chicago Lockbox

03/17/2015 (Day 0): USPS shows delivered

03/24/2015 (Day 7): Received electronic NOAs for all forms (I-130, I-485, I-765, I-131)

03/31/2015 (Day 14): Received hardcopy NOAs for all forms (I-130, I-485, I-765, I-131)

04/03/2015 (Day 17): Received biometrics appointment letter scheduled for 04/15/2015

04/15/2015 (Day 29): Biometrics done

06/03/2015 (Day 77): called USCIS to open up a case inquiry, case was not assigned anyone.

06/05/2015 (Day 79): received email confirmation of case inquiry. Case assigned to officer, standard reply that the case is under review, blah blah.

06/11/2015 (Day 85): apparently NOA is issued on this day, EAD/AP approved the day before, see next line.

06/16/2015 (Day 90): received hardcopy NOA in mailbox, EAD/AP approved. No updates electronically.

06/19/2015 (Day 93): EAD/AP combo card received in mail! Online status suddenly changed to card delivered.

07/13/2015 (Day 117): received electronic NOA for I-485, interview scheduled for August 13th!

08/13/2015 (Day 147): interview! I think we are approved?

08/29/2015 (Day 163): e-notification that card is being produced!

08/31/2015 (Day 165): I-130 approved, welcome notice mailed.

09/03/2015 (Day 168): Card mailed.

09/08/2015 (Day 173): Received green card!

Filed: J-1 Visa Country: France
Timeline
Posted

Did anyone else had a notification from USCIS app on iPhone saying that your case status has changed from "Fee received" to "case approved"?

Two mornings in a row I woke up with this notification, but then when I access the app, notice had changed.

I wonder if it's a malfunction of the app?

Two times I had hope but nothing! Very frustrating..

Filed: AOS (apr) Country: Mexico
Timeline
Posted

Did anyone else had a notification from USCIS app on iPhone saying that your case status has changed from "Fee received" to "case approved"?

Two mornings in a row I woke up with this notification, but then when I access the app, notice had changed.

I wonder if it's a malfunction of the app?

Two times I had hope but nothing! Very frustrating..

Yes, that happened to me this morning. :(

1/02/15 Married to a USC

2/20/15 Traveled to Mexico via air with I-131 DACA

2/23/15 Returned/Paroled to USA via air

3/11/15 Sent I-485, I-130, and I-131

3/12/15 Received by USCIS according to USPS

3/21/15 Received I-797C for all applications

3/28/15 Received Biometrics Appointment

3/30/15 Walked-In to Biometrics

6/2/15 AP Document Approved (Day 82)

9/4/15 Received Interview Notice for 10/8/2015 (Day 175)

10/08/15 Approved

Filed: AOS (pnd) Country: France
Timeline
Posted

me too. 3 to 4 times a day for the last 2 or 3 days.. its really annoying.

Did anyone else had a notification from USCIS app on iPhone saying that your case status has changed from "Fee received" to "case approved"?
Two mornings in a row I woke up with this notification, but then when I access the app, notice had changed.
I wonder if it's a malfunction of the app?
Two times I had hope but nothing! Very frustrating..

- 03/25/2015 : Package sent via USPS certified mail with return receipt.

- 03/27/2015 : Notification from USPS - Package delivered and signed for at 7am.

- 04/01/2015 : Emails/Texts from USCIS.

- 04/02/2015 : Money was taken out of bank account.

- 04/06/2015 : Hard copies of receipts.

- 04/10/2015 : Biometrics letter in mail. Scheduled for 04/20

- 04/20/2015 : Biometrics completed. In and out in 5 min.

- 05/15/2015 : Opened a service request about the EAD

- 05/19/2015 : EAD card picked up by post office.

- 05/19/2015 : EAD card delivered.

- 08/25/2015 : Interview scheduled for 09/29/2015 (approved on spot)

- 10/03/2015 : Card received (4 days after interview)

Filed: AOS (pnd) Country: Jamaica
Timeline
Posted

Waiting! !!!!!!!!

*i130 accepted and assigned to Vermont Service Center - February 24,2015

*i485, i765 filed along with i797c for i130 accepted -- March 31,2015

**birth of baby boy Samir ------ April 2, 2015

*i797c for i485, i765 received in mail ------ April 11,2015

*biometrics appointment notice for april 27, 2015 ----- April 17, 2015

*biometrics completed at East Hartford ASC ---- April 27,2015

*EAD approved(found out via uscis ombudsman) -- June 13,2015

*EAD picked up by USPS --- June 19, 2015

*notification: EAD delivered by USPS to my mailbox (none seen) --- June 20, 2015

* received EAD in mail ------- June 22,2015

* applied for SSN -------- June 25, 2015

* went to local SSA office and got SSN (not card) --- June 30, 2015

*i130 approved ----- July 1,2015

*received SSN card in mail ---- July 2,2015

------------------------

**Moved to Massachusetts ---- July 16, 2015

***notifications: interview scheduled for September 29, 2015---- August 24, 2015

** Green Card Approved on spot - September 29, 2015

** notification : card ordered - September 29, 2015

** notification : welcome notice mailed - September 29, 2015

** notification : card mailed - October 1, 2015

*** green card received in mail -October 3, 2015

Adjusted from b1/b2 visa ( SERVICE CENTER - NATIONAL BENEFITS CENTER -- MSC)

Filed: AOS (pnd) Country: France
Timeline
Posted

that's all i'm hoping for. I so crossed my fingers that they now hurt..

I see our timelines are pretty similar. Maybe that "fake notification" a good sign too, that our cases will actually be updated very soon

- 03/25/2015 : Package sent via USPS certified mail with return receipt.

- 03/27/2015 : Notification from USPS - Package delivered and signed for at 7am.

- 04/01/2015 : Emails/Texts from USCIS.

- 04/02/2015 : Money was taken out of bank account.

- 04/06/2015 : Hard copies of receipts.

- 04/10/2015 : Biometrics letter in mail. Scheduled for 04/20

- 04/20/2015 : Biometrics completed. In and out in 5 min.

- 05/15/2015 : Opened a service request about the EAD

- 05/19/2015 : EAD card picked up by post office.

- 05/19/2015 : EAD card delivered.

- 08/25/2015 : Interview scheduled for 09/29/2015 (approved on spot)

- 10/03/2015 : Card received (4 days after interview)

Posted

My EAD card was delivered today.

Adjusting from F-1 Visa

**************************************************************************************************

Day XX >> March 07,2015 --- Sent AOS Package containing I-130, I-485, I-765.
Day 01 >> March 09, 2015 --- USPS delivered the package to Chicago Lockbox.
Day 08 >> March 16, 2015 --- Received text messages and email notifications for 3 different Receipt numbers.
Day 09 >> March 17, 2015 --- Checks were cashed.
Day 12 >> March 20, 2015 --- Received NOA1 for I-130, I-485 and I-765.

Day 20 >> March 28, 2015 --- Received letter for biometrics appointment.
Day 29 >> April 6, 2015 --- Successfully completed the scheduled biometrics appointment (took only 10 minutes, very good staff in Albany :thumbs: )

Day 79 >> May 26, 2015 --- Contacted USCIS to raise a service request for I-765

Day 80 >> May 27, 2015 --- Received an email notification and the case status for I-765 changed to indicate that employment card for I-765 was ordered

Day 85 >> June 01, 2015 --- EAD Card was mailed

Day 88 >> June 04, 2015 --- Received the EAD Card

Day 117 >> July 03, 2015 --- Received the email and the case status for I-485 changed to show interview is scheduled for July 30.

Day 144 >> July 30, 2015 --- Had our interview and got approved immediately. Case status was updated to show that the Green Card is being produced :)

Day 166 >> August 21, 2015 --- Case status updated to "Green card was mailed" (did not see any tracking number)

Day 169 >> August 24, 2015 --- Received 2 year Conditional GC in mail. :dance:

Filed: Lift. Cond. (pnd) Country: China
Timeline
Posted

OMG I still havent got my I-765 approval notice and its been a week, but I jus checked case status and it has changed to "USPS picked up and tracking number..."

then I tracked it with that given number and my EAD will be delivered on Saturday !!!! So excited!!!

For the very first time, I feel USCIS is so generous cos they used priority 2-day mail. LOL

3/17/2015 sent out my whole AOS package thru overnight delivery

3/18/2015 received by USCIS in Chicago

3/24/2015 3 Text/e-mail notifications received

3/28/2015 Hardcopies of NOAs in the mailbox (i-130, i-485, i-765)

4/06/2015 Received notification of biometrics

4/17/2015 Biometrics done as scheduled.

4/27/2015 i-485 online status changed ready to schedule an interview. YAY!!!

5/21/2015 i-485 interview is scheduled for June 23rd!!! OMG so surprised!!!!

5/23/2015 i-485 interview notice received in hand

5/29/2015 i-765 is approved and new card is ordered to be produced.

6/05/2015 i-765 approval notice received

6/06/2015 EAD received in hand !!!

6/23/2015 i-485 and i-130 got approved on the spot!!!! waiting for green card to arrive!!

6/29/2015 i-485 and i-130 approval notices received in mail. (welcome letter) YAY!!!

7/09/2015 Finally, received my green card in hand!!!!

ROC Journey now

6/02/2017 i751 package to CSC

6/03/2017 i751 was received by CSC

6/06/2017 check was cashed

6/08/2017 NOA 1 received in mail

6/17/2017 NOA 2 received in mail. Biometrics is scheduled on 6/29/2017 

8/29/2018 Case status changed to "Approved", now waiting for Permanent green card to be delivered!

9/08/2018 10 year GC was delivered.   This journey finally ended today!! yay

Filed: AOS (pnd) Country: Canada
Timeline
Posted

Just checked I-756 status online and nothing has changed, also, right under "Next Steps" on the bottom right, it said "As of June 3, 2015, your inquiry about the status of your Employment Authorization application, referral number TxxxxxxxxxxMSC, is currently not assigned for processing."

Did anyone have this? What does it mean? Are they ignoring it?

+++++++++++++++++++++++++++++++ AOS Timeline +++++++++++++++++++++++++++++++++++

03/13/2015: Filed AOS package (I-130, I-485, I-765, I-131) via USPS priority mail to Chicago Lockbox

03/17/2015 (Day 0): USPS shows delivered

03/24/2015 (Day 7): Received electronic NOAs for all forms (I-130, I-485, I-765, I-131)

03/31/2015 (Day 14): Received hardcopy NOAs for all forms (I-130, I-485, I-765, I-131)

04/03/2015 (Day 17): Received biometrics appointment letter scheduled for 04/15/2015

04/15/2015 (Day 29): Biometrics done

06/03/2015 (Day 77): called USCIS to open up a case inquiry, case was not assigned anyone.

06/05/2015 (Day 79): received email confirmation of case inquiry. Case assigned to officer, standard reply that the case is under review, blah blah.

06/11/2015 (Day 85): apparently NOA is issued on this day, EAD/AP approved the day before, see next line.

06/16/2015 (Day 90): received hardcopy NOA in mailbox, EAD/AP approved. No updates electronically.

06/19/2015 (Day 93): EAD/AP combo card received in mail! Online status suddenly changed to card delivered.

07/13/2015 (Day 117): received electronic NOA for I-485, interview scheduled for August 13th!

08/13/2015 (Day 147): interview! I think we are approved?

08/29/2015 (Day 163): e-notification that card is being produced!

08/31/2015 (Day 165): I-130 approved, welcome notice mailed.

09/03/2015 (Day 168): Card mailed.

09/08/2015 (Day 173): Received green card!

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
“;}
×
×
  • Create New...