Just got email notification that MSC will be processing I-130, I-485, I-131 and I-765.

But, when I went to MSC web site, it appears they do not process I-130 and I-485.

Anyone else being processed at MSC ?


- - - - - - - - - - - - - - - - Time Line - - - - - - - - - - - - - - - - - -

10 YEAR GREEN CARD PROCESS

July 22, 2017  ROC packet sent to Vermont.

July 24, 2017  ROC packet signed for in Vermont.

August 8, 2017  NOA received at house.  15 days since ROC signed for in VSC.

August 12, 2017 ASC appointment received. 19 days since ROC in VSC.

August 25, 2017 BIO completed. 32 days since ROC received in VSC.

August 11, 2018  18 month 'Courtesy Copy' extension letter received.  Critical number  297

October 20, 2018 18 month 'Official' extension letter received.  Critical number 297

December 4, 2018  USCIS Account shows: We approved your Form I-751, Petition to Remove Conditions on Residence, 

December 4, 2018, ordered your new card for Receipt # EAC17297003XX, and will mail to the address you gave.

491 days from NOA issued by VSC until Petition approved.

December 7, 2018 USCIS sent notice:  Card mailed.

December 12, 2018 Ten year Green Card received from Lees Summit, MO

499 days from NOA issued by VSC until Green Card received.

- - - - - - - - - - 

CITIZENSHIP PROCESS

December 6, 2018 submitted N-400 application on-line.  Estimated Completion Time: 8 months or August 2019.

December 8, 2018 received notice on USCIS that Biometrics scheduled . . . but the actual date was not yet shown.

December 11, 2018 saw in 'Documents' section of USCIS that Bio scheduled for 24 December 2018.

December 21, 2018 saw on USCIS website that they will be closed 24 December 2018 as extra holiday.

January 9, 2019 went for re-scheduled BIO appointment.  33 days after N-400 submitted on-line.

February 19, 2019 received letter in US mail that Citizenship interview scheduled for 26 March 2019. 74 days after submission on-line.

March 26, 2019 Citizenship interview scheduled for.  109 days after N-400 submitted on-line.

March 26, 2019 Passed Citizenship interview.

April 12, 2019  Received notice that Oath Ceremony had been scheduled for 24 April 2019.  17 days after interview.

April 24, 2019  Oath Ceremony completed.  29 days after interview.     139 days after N-400 submitted on-line.

April 25, 2019  USA Passport Application submitted.

May 3, 2019     USA Passport received.    149 days after N-400 submitted on-line.

May 9, 2019     Certificate of Naturalization and Citizenship returned in mail.

 

 

 

 

Link to comment
Share on other sites

Filed: Country: United Kingdom
Timeline

Yes, I am and sent the same things you did as well and have the same response, all I can say is I sent them all in and they were received on 26th dec, I have done my biometrics and now I'm just waiting.

12/24/2014.................forms i130, i485, i765, i131 mailed via usps12/26/2014.................forms delivered01/05/2015.................NOA1 for all forms wth 26th dec as priority date01/24/2015.................bio apt received for 02/0601/26/2015................. walk in bio failed, supervisor said that the office is way to busy to come back closer to my apt date02/06/2015................. completed biometrics02/11/2015.................Aos status update 'case is ready to be scheduled for an interview'<p>02/24/2015................EAD updated to 'card in production' AP updated to case approved

09/17/2015....... interview scheduled for OCT 21st.

10/21/2015....... attended interview, approved on the spot, also received updates on case status.

10/23/2015...... green card mailed

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ukraine
Timeline

Hi Mayfield, the MSC is called NBC (National Benefits Center) and seems to operate completely different from the 4 other regular processing centers in CA, TX, NE and VT.

Anything bad about being sent to MSC-NBC that you know of?


- - - - - - - - - - - - - - - - Time Line - - - - - - - - - - - - - - - - - -

10 YEAR GREEN CARD PROCESS

July 22, 2017  ROC packet sent to Vermont.

July 24, 2017  ROC packet signed for in Vermont.

August 8, 2017  NOA received at house.  15 days since ROC signed for in VSC.

August 12, 2017 ASC appointment received. 19 days since ROC in VSC.

August 25, 2017 BIO completed. 32 days since ROC received in VSC.

August 11, 2018  18 month 'Courtesy Copy' extension letter received.  Critical number  297

October 20, 2018 18 month 'Official' extension letter received.  Critical number 297

December 4, 2018  USCIS Account shows: We approved your Form I-751, Petition to Remove Conditions on Residence, 

December 4, 2018, ordered your new card for Receipt # EAC17297003XX, and will mail to the address you gave.

491 days from NOA issued by VSC until Petition approved.

December 7, 2018 USCIS sent notice:  Card mailed.

December 12, 2018 Ten year Green Card received from Lees Summit, MO

499 days from NOA issued by VSC until Green Card received.

- - - - - - - - - - 

CITIZENSHIP PROCESS

December 6, 2018 submitted N-400 application on-line.  Estimated Completion Time: 8 months or August 2019.

December 8, 2018 received notice on USCIS that Biometrics scheduled . . . but the actual date was not yet shown.

December 11, 2018 saw in 'Documents' section of USCIS that Bio scheduled for 24 December 2018.

December 21, 2018 saw on USCIS website that they will be closed 24 December 2018 as extra holiday.

January 9, 2019 went for re-scheduled BIO appointment.  33 days after N-400 submitted on-line.

February 19, 2019 received letter in US mail that Citizenship interview scheduled for 26 March 2019. 74 days after submission on-line.

March 26, 2019 Citizenship interview scheduled for.  109 days after N-400 submitted on-line.

March 26, 2019 Passed Citizenship interview.

April 12, 2019  Received notice that Oath Ceremony had been scheduled for 24 April 2019.  17 days after interview.

April 24, 2019  Oath Ceremony completed.  29 days after interview.     139 days after N-400 submitted on-line.

April 25, 2019  USA Passport Application submitted.

May 3, 2019     USA Passport received.    149 days after N-400 submitted on-line.

May 9, 2019     Certificate of Naturalization and Citizenship returned in mail.

 

 

 

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Our I-130 was recently transferred from the Texas Service Center to the National Benefits Center. I started a thread about that hoping for some answers as I also could not find any reliable information on processing times for those petitions or reasons it might have been sent there. I didn't get much response so I'm guessing no one really knows! My transfer said it was to speed up processing so I'm hoping it's a good thing.

Link to comment
Share on other sites

My case according to the USCIS is there and unfortunately I don't have good news.

I sent my paperwork in February and they received it in March the 3rd everything was going according to the normal procedures until I received a letter from National benefit Center telling me that I was a potencial interview waiver, I received this letter back in June 2014. They stated a delay for workload factors not related to my case and asked for 6 more months.

Today I have waited 8 months after I received that letter, I have also sent a request that my case is outside of the processing time and I received the same letter in January (Apparently an answer from my request that I sent in November) but this time the letter doesn't say how long I need to wait.

I truly hope none of you have to wait or go through this and that you can get your case out of there or a responsible office can resolve your case in a timely manner.

Ny the way, they are processing my I-485.

Edited by Parceritos :)
Link to comment
Share on other sites

All family-based AoS cases are initially processed at the NBC.

Widow/er AoS Guide | Have AoS questions? Read (some) answers here

 

AoS

Day 0 (4/23/12) Petitions mailed (I-360, I-485, I-765)
2 (4/25/12) Petitions delivered to Chicago Lockbox
11 (5/3/12) Received 3 paper NOAs
13 (5/5/12) Received biometrics appointment for 5/23
15 (5/7/12) Did an unpleasant walk-in biometrics in Fort Worth, TX
45 (6/7/12) Received email & text notification of an interview on 7/10
67 (6/29/12) EAD production ordered
77 (7/9/12) Received EAD
78 (7/10/12) Interview
100 (8/1/12) I-485 transferred to Vermont Service Centre
143 (9/13/12) Contacted DHS Ombudsman
268 (1/16/13) I-360, I-485 consolidated and transferred to Dallas
299 (2/16/13) Received second interview letter for 3/8
319 (3/8/13) Approved at interview
345 (4/3/13) I-360, I-485 formally approved; green card production ordered
353 (4/11/13) Received green card

 

Naturalisation

Day 0 (1/3/18) N-400 filed online

Day 6 (1/9/18) Walk-in biometrics in Fort Worth, TX

Day 341 (12/10/18) Interview was scheduled for 1/14/19

Day 376 (1/14/19) Interview

Day 385 (1/23/19) Denied

Day 400 (2/7/19) Denial revoked; N-400 approved; oath ceremony set for 2/14/19

Day 407 (2/14/19) Oath ceremony in Dallas, TX

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ukraine
Timeline

But myself and those on this sub-forum are not doing a family based AOS.


- - - - - - - - - - - - - - - - Time Line - - - - - - - - - - - - - - - - - -

10 YEAR GREEN CARD PROCESS

July 22, 2017  ROC packet sent to Vermont.

July 24, 2017  ROC packet signed for in Vermont.

August 8, 2017  NOA received at house.  15 days since ROC signed for in VSC.

August 12, 2017 ASC appointment received. 19 days since ROC in VSC.

August 25, 2017 BIO completed. 32 days since ROC received in VSC.

August 11, 2018  18 month 'Courtesy Copy' extension letter received.  Critical number  297

October 20, 2018 18 month 'Official' extension letter received.  Critical number 297

December 4, 2018  USCIS Account shows: We approved your Form I-751, Petition to Remove Conditions on Residence, 

December 4, 2018, ordered your new card for Receipt # EAC17297003XX, and will mail to the address you gave.

491 days from NOA issued by VSC until Petition approved.

December 7, 2018 USCIS sent notice:  Card mailed.

December 12, 2018 Ten year Green Card received from Lees Summit, MO

499 days from NOA issued by VSC until Green Card received.

- - - - - - - - - - 

CITIZENSHIP PROCESS

December 6, 2018 submitted N-400 application on-line.  Estimated Completion Time: 8 months or August 2019.

December 8, 2018 received notice on USCIS that Biometrics scheduled . . . but the actual date was not yet shown.

December 11, 2018 saw in 'Documents' section of USCIS that Bio scheduled for 24 December 2018.

December 21, 2018 saw on USCIS website that they will be closed 24 December 2018 as extra holiday.

January 9, 2019 went for re-scheduled BIO appointment.  33 days after N-400 submitted on-line.

February 19, 2019 received letter in US mail that Citizenship interview scheduled for 26 March 2019. 74 days after submission on-line.

March 26, 2019 Citizenship interview scheduled for.  109 days after N-400 submitted on-line.

March 26, 2019 Passed Citizenship interview.

April 12, 2019  Received notice that Oath Ceremony had been scheduled for 24 April 2019.  17 days after interview.

April 24, 2019  Oath Ceremony completed.  29 days after interview.     139 days after N-400 submitted on-line.

April 25, 2019  USA Passport Application submitted.

May 3, 2019     USA Passport received.    149 days after N-400 submitted on-line.

May 9, 2019     Certificate of Naturalization and Citizenship returned in mail.

 

 

 

 

Link to comment
Share on other sites

Yes you are. You're adjusting status based on marriage to a US citizen.

Widow/er AoS Guide | Have AoS questions? Read (some) answers here

 

AoS

Day 0 (4/23/12) Petitions mailed (I-360, I-485, I-765)
2 (4/25/12) Petitions delivered to Chicago Lockbox
11 (5/3/12) Received 3 paper NOAs
13 (5/5/12) Received biometrics appointment for 5/23
15 (5/7/12) Did an unpleasant walk-in biometrics in Fort Worth, TX
45 (6/7/12) Received email & text notification of an interview on 7/10
67 (6/29/12) EAD production ordered
77 (7/9/12) Received EAD
78 (7/10/12) Interview
100 (8/1/12) I-485 transferred to Vermont Service Centre
143 (9/13/12) Contacted DHS Ombudsman
268 (1/16/13) I-360, I-485 consolidated and transferred to Dallas
299 (2/16/13) Received second interview letter for 3/8
319 (3/8/13) Approved at interview
345 (4/3/13) I-360, I-485 formally approved; green card production ordered
353 (4/11/13) Received green card

 

Naturalisation

Day 0 (1/3/18) N-400 filed online

Day 6 (1/9/18) Walk-in biometrics in Fort Worth, TX

Day 341 (12/10/18) Interview was scheduled for 1/14/19

Day 376 (1/14/19) Interview

Day 385 (1/23/19) Denied

Day 400 (2/7/19) Denial revoked; N-400 approved; oath ceremony set for 2/14/19

Day 407 (2/14/19) Oath ceremony in Dallas, TX

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ukraine
Timeline

We have two sub forums here: This one is for Work, Student and Tourist AOS.

The other sub forum is for Family based AOS.

Hypnos, are you saying USCIS doesn't make this distinction and split that is done here?


- - - - - - - - - - - - - - - - Time Line - - - - - - - - - - - - - - - - - -

10 YEAR GREEN CARD PROCESS

July 22, 2017  ROC packet sent to Vermont.

July 24, 2017  ROC packet signed for in Vermont.

August 8, 2017  NOA received at house.  15 days since ROC signed for in VSC.

August 12, 2017 ASC appointment received. 19 days since ROC in VSC.

August 25, 2017 BIO completed. 32 days since ROC received in VSC.

August 11, 2018  18 month 'Courtesy Copy' extension letter received.  Critical number  297

October 20, 2018 18 month 'Official' extension letter received.  Critical number 297

December 4, 2018  USCIS Account shows: We approved your Form I-751, Petition to Remove Conditions on Residence, 

December 4, 2018, ordered your new card for Receipt # EAC17297003XX, and will mail to the address you gave.

491 days from NOA issued by VSC until Petition approved.

December 7, 2018 USCIS sent notice:  Card mailed.

December 12, 2018 Ten year Green Card received from Lees Summit, MO

499 days from NOA issued by VSC until Green Card received.

- - - - - - - - - - 

CITIZENSHIP PROCESS

December 6, 2018 submitted N-400 application on-line.  Estimated Completion Time: 8 months or August 2019.

December 8, 2018 received notice on USCIS that Biometrics scheduled . . . but the actual date was not yet shown.

December 11, 2018 saw in 'Documents' section of USCIS that Bio scheduled for 24 December 2018.

December 21, 2018 saw on USCIS website that they will be closed 24 December 2018 as extra holiday.

January 9, 2019 went for re-scheduled BIO appointment.  33 days after N-400 submitted on-line.

February 19, 2019 received letter in US mail that Citizenship interview scheduled for 26 March 2019. 74 days after submission on-line.

March 26, 2019 Citizenship interview scheduled for.  109 days after N-400 submitted on-line.

March 26, 2019 Passed Citizenship interview.

April 12, 2019  Received notice that Oath Ceremony had been scheduled for 24 April 2019.  17 days after interview.

April 24, 2019  Oath Ceremony completed.  29 days after interview.     139 days after N-400 submitted on-line.

April 25, 2019  USA Passport Application submitted.

May 3, 2019     USA Passport received.    149 days after N-400 submitted on-line.

May 9, 2019     Certificate of Naturalization and Citizenship returned in mail.

 

 

 

 

Link to comment
Share on other sites

Correct.

K visa adjustment applicants get some perks, like sometimes not needing an AoS interview, or not needing an I-130 to be filed. It's still a family-based adjustment though, because you're eligible through a family member (in this case: a spouse).

Edited by Hypnos

Widow/er AoS Guide | Have AoS questions? Read (some) answers here

 

AoS

Day 0 (4/23/12) Petitions mailed (I-360, I-485, I-765)
2 (4/25/12) Petitions delivered to Chicago Lockbox
11 (5/3/12) Received 3 paper NOAs
13 (5/5/12) Received biometrics appointment for 5/23
15 (5/7/12) Did an unpleasant walk-in biometrics in Fort Worth, TX
45 (6/7/12) Received email & text notification of an interview on 7/10
67 (6/29/12) EAD production ordered
77 (7/9/12) Received EAD
78 (7/10/12) Interview
100 (8/1/12) I-485 transferred to Vermont Service Centre
143 (9/13/12) Contacted DHS Ombudsman
268 (1/16/13) I-360, I-485 consolidated and transferred to Dallas
299 (2/16/13) Received second interview letter for 3/8
319 (3/8/13) Approved at interview
345 (4/3/13) I-360, I-485 formally approved; green card production ordered
353 (4/11/13) Received green card

 

Naturalisation

Day 0 (1/3/18) N-400 filed online

Day 6 (1/9/18) Walk-in biometrics in Fort Worth, TX

Day 341 (12/10/18) Interview was scheduled for 1/14/19

Day 376 (1/14/19) Interview

Day 385 (1/23/19) Denied

Day 400 (2/7/19) Denial revoked; N-400 approved; oath ceremony set for 2/14/19

Day 407 (2/14/19) Oath ceremony in Dallas, TX

Link to comment
Share on other sites

Filed: Country: United Kingdom
Timeline

yesssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssss

finally status changes to case ready to be scheduled for interview i have been checking every hour since i did my bio metrics last week.

so happy that I don't have an rfe, no just for them to get my EAD ready my wife is pregnant and I want to stat working ASAP to carry the burden off her.

I hope all of you waiting will get your cases ready for interview very soon too.

12/24/2014.................forms i130, i485, i765, i131 mailed via usps12/26/2014.................forms delivered01/05/2015.................NOA1 for all forms wth 26th dec as priority date01/24/2015.................bio apt received for 02/0601/26/2015................. walk in bio failed, supervisor said that the office is way to busy to come back closer to my apt date02/06/2015................. completed biometrics02/11/2015.................Aos status update 'case is ready to be scheduled for an interview'<p>02/24/2015................EAD updated to 'card in production' AP updated to case approved

09/17/2015....... interview scheduled for OCT 21st.

10/21/2015....... attended interview, approved on the spot, also received updates on case status.

10/23/2015...... green card mailed

Link to comment
Share on other sites

You can receive an RFE an the interview or even after it, on rare occasions.

Widow/er AoS Guide | Have AoS questions? Read (some) answers here

 

AoS

Day 0 (4/23/12) Petitions mailed (I-360, I-485, I-765)
2 (4/25/12) Petitions delivered to Chicago Lockbox
11 (5/3/12) Received 3 paper NOAs
13 (5/5/12) Received biometrics appointment for 5/23
15 (5/7/12) Did an unpleasant walk-in biometrics in Fort Worth, TX
45 (6/7/12) Received email & text notification of an interview on 7/10
67 (6/29/12) EAD production ordered
77 (7/9/12) Received EAD
78 (7/10/12) Interview
100 (8/1/12) I-485 transferred to Vermont Service Centre
143 (9/13/12) Contacted DHS Ombudsman
268 (1/16/13) I-360, I-485 consolidated and transferred to Dallas
299 (2/16/13) Received second interview letter for 3/8
319 (3/8/13) Approved at interview
345 (4/3/13) I-360, I-485 formally approved; green card production ordered
353 (4/11/13) Received green card

 

Naturalisation

Day 0 (1/3/18) N-400 filed online

Day 6 (1/9/18) Walk-in biometrics in Fort Worth, TX

Day 341 (12/10/18) Interview was scheduled for 1/14/19

Day 376 (1/14/19) Interview

Day 385 (1/23/19) Denied

Day 400 (2/7/19) Denial revoked; N-400 approved; oath ceremony set for 2/14/19

Day 407 (2/14/19) Oath ceremony in Dallas, TX

Link to comment
Share on other sites

Filed: Country: United Kingdom
Timeline

oh really, I thot they did all those before the interview,

ok then will just have to keep my fingers crossed that I dont get one later, I know i sent everything in and my sponsor meets the poverty guidelines so hopefully I wont have any issues

12/24/2014.................forms i130, i485, i765, i131 mailed via usps12/26/2014.................forms delivered01/05/2015.................NOA1 for all forms wth 26th dec as priority date01/24/2015.................bio apt received for 02/0601/26/2015................. walk in bio failed, supervisor said that the office is way to busy to come back closer to my apt date02/06/2015................. completed biometrics02/11/2015.................Aos status update 'case is ready to be scheduled for an interview'<p>02/24/2015................EAD updated to 'card in production' AP updated to case approved

09/17/2015....... interview scheduled for OCT 21st.

10/21/2015....... attended interview, approved on the spot, also received updates on case status.

10/23/2015...... green card mailed

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Russia
Timeline

So will the speed of my case processing depend on how well NBC works or how well my local office works?

It actually makes me sad looking at the timelines of the field office in Portland :(

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
“;}
×
×
  • Create New...