I am still unclear as to the exact process, but I think that the EAD/AP cards are processed and produced by NBC in Missouri for most of us, and at other centers for the few of us in February who are adjusting from Work visa.

So, most of us will receive EAD/AP cards in rough approximation of time from submission.

There will be some variation because each application can probably be assigned to different persons at NBC, and those individuals can work at different speeds or have different backlogs due to sick days off, etc.

But, I believe the I-130 and I-485 parts are processed almost entirely at local branches.

This can lead to widely (and perhaps even wildly) different processing times because of extreme workload differences from local office to local office.

Thus, I would expect to see some of our February group processed for Green card within 3 months and others dragged out 4-6 months or more.

Unfortunately for wifey, we could be on the long end because I was told that Pittsburgh was the processing center for Bhutan refugees coming into USA.

Edited by Leo7777


- - - - - - - - - - - - - - - - Time Line - - - - - - - - - - - - - - - - - -

10 YEAR GREEN CARD PROCESS

July 22, 2017  ROC packet sent to Vermont.

July 24, 2017  ROC packet signed for in Vermont.

August 8, 2017  NOA received at house.  15 days since ROC signed for in VSC.

August 12, 2017 ASC appointment received. 19 days since ROC in VSC.

August 25, 2017 BIO completed. 32 days since ROC received in VSC.

August 11, 2018  18 month 'Courtesy Copy' extension letter received.  Critical number  297

October 20, 2018 18 month 'Official' extension letter received.  Critical number 297

December 4, 2018  USCIS Account shows: We approved your Form I-751, Petition to Remove Conditions on Residence, 

December 4, 2018, ordered your new card for Receipt # EAC17297003XX, and will mail to the address you gave.

491 days from NOA issued by VSC until Petition approved.

December 7, 2018 USCIS sent notice:  Card mailed.

December 12, 2018 Ten year Green Card received from Lees Summit, MO

499 days from NOA issued by VSC until Green Card received.

- - - - - - - - - - 

CITIZENSHIP PROCESS

December 6, 2018 submitted N-400 application on-line.  Estimated Completion Time: 8 months or August 2019.

December 8, 2018 received notice on USCIS that Biometrics scheduled . . . but the actual date was not yet shown.

December 11, 2018 saw in 'Documents' section of USCIS that Bio scheduled for 24 December 2018.

December 21, 2018 saw on USCIS website that they will be closed 24 December 2018 as extra holiday.

January 9, 2019 went for re-scheduled BIO appointment.  33 days after N-400 submitted on-line.

February 19, 2019 received letter in US mail that Citizenship interview scheduled for 26 March 2019. 74 days after submission on-line.

March 26, 2019 Citizenship interview scheduled for.  109 days after N-400 submitted on-line.

March 26, 2019 Passed Citizenship interview.

April 12, 2019  Received notice that Oath Ceremony had been scheduled for 24 April 2019.  17 days after interview.

April 24, 2019  Oath Ceremony completed.  29 days after interview.     139 days after N-400 submitted on-line.

April 25, 2019  USA Passport Application submitted.

May 3, 2019     USA Passport received.    149 days after N-400 submitted on-line.

May 9, 2019     Certificate of Naturalization and Citizenship returned in mail.

 

 

 

 

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Mexico
Timeline

Wifey got email and website notification that EAD card is in production.

Pretty good timing at something just over 2 months.

Yay!!! Congrats, Leo!!!

12/29/2014 Married my love (L)

2/8/2015 Applications Mailed via Fedex

2/11/2015 Applications Delivered Day 3

2/17/2015 Status Changed online Day 9

2/18/2015 Checks Cashed Day 10

2/21/2015 I-797C NOA Received Day 13

3/2/2015 Biometrics Appointment Letter Received (for 3/13/15) Day 22

3/13/2015 Biometrics Successfully Completed Day 33

4/16/2015 Text Notification- Card is being produced/AP Approved! Day 67

4/20/2015 I-797 Received- EAD/AP Approved Day 71
4/22/2015 Text Notification- Card has been mailed. Day 73
4/24/2015 EAD/AP Received Day 75

10/26/2015 Text/Email Notification-Interview Scheduled 12/1

12/1/2015 Interview and Approval!!! Day 286

Link to comment
Share on other sites

Filed: AOS (apr) Country: Colombia
Timeline

I am still unclear as to the exact process, but I think that the EAD/AP cards are processed and produced by NBC in Missouri for most of us, and at other centers for the few of us in February who are adjusting from Work visa.

So, most of us will receive EAD/AP cards in rough approximation of time from submission.

There will be some variation because each application can probably be assigned to different persons at NBC, and those individuals can work at different speeds or have different backlogs due to sick days off, etc.

But, I believe the I-130 and I-485 parts are processed almost entirely at local branches.

This can lead to widely (and perhaps even wildly) different processing times because of extreme workload differences from local office to local office.

Thus, I would expect to see some of our February group processed for Green card within 3 months and others dragged out 4-6 months or more.

Unfortunately for wifey, we could be on the long end because I was told that Pittsburgh was the processing center for Bhutan refugees coming into USA.

This makes a lot of sense of why I already have an interview scheduled for April 30 when I sent my package on February 13th but still haven't heard anything about the EAD and AP ...Im so nervous, in 20 days at around this time I would be updating about how my interview went and hopefully with great news ?

And congratulations Leo

Link to comment
Share on other sites

Filed: AOS (pnd) Country: England
Timeline

It is KMA's spouse who needs to have biometrics done . . . not her.

Oh....well then I guess the spouse does have to go then LOL! I didn't KMA was the USC

Sorry KMA!

********AOS Status********

February/March - Working on AOS Packet

March 12, 2015 (Day 1) - Priority Express Mailed AOS Packet to Dearborn Address

March 13, 2015 (Day 2) - Package delivered and signed for

March 20, 2015 (Day 8) - Checks Cleared Bank

March 24, 2015 (Day 12) - Received NOA hard copies in mail (I130, I485, I765, I131)

March 27, 2015 (Day 15) - Biometrics appointment received - April 8th

April 8, 2015 (Day 27) - Biometrics complete

May 6, 2015 (Day 54) - waiting..... :whistle:

May 8, 2015 (Day 56) - Interview scheduled for June 10th!

May 27, 2015 (Day 75) - EAD Card being Produced & AP Approved

June 3, 2015 (Day 82) - Received EAD card in mail

June 10, 2015 (Day 89) - Approved I-485

June 18, 2015 (Day 97) - Received GC in Mail!!! :dance:

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Mexico
Timeline

Wifey got email and website notification that EAD card is in production.

Pretty good timing at something just over 2 months.

WOHOOO!! Congrats!!!!! :dancing:

AOS trough Marriage


Came from Mexico: 1989 (9 months old)


Married 5/2010


DACA Approved 5/2013!


-----------------------------------


Day 0- Sent Package to Chicago: 2/5/2015 (Filed I-130 and I485 with AP)


Day 1- Package Received: 2/6/2015


Day 6- Received Text/Email: 2/11


Day 14- Received Letters: 2/19


Day 19- Received Biometrics Letter: 2/24 (Scheduled for 3/5)


Day 20- Biometrics Walk-In: 2/25 (Successful!)


Day 50- Received Txt- Case is ready for Interview: 3/27


Day 66- EAD in Production: 4/14


Day 75- EAD Arrived 4/22


Day 81- Interview Scheduled for 6/1: 4/28


Waiting....... :dancing:


Day 115- Interview: 6/1


Waiting....... :dancing:

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Ukraine
Timeline

[quote name="chewy2012" post="7567951" timestamp="1428690365" I didn't KMA was the USC

= = = = = = = =

Hey, I post the list of February group on Sundays showing this info.

You better keep read-up on such stuff, or else you will be in big trouble when quiz time comes!! :-)

Leo

Edited by Leo7777


- - - - - - - - - - - - - - - - Time Line - - - - - - - - - - - - - - - - - -

10 YEAR GREEN CARD PROCESS

July 22, 2017  ROC packet sent to Vermont.

July 24, 2017  ROC packet signed for in Vermont.

August 8, 2017  NOA received at house.  15 days since ROC signed for in VSC.

August 12, 2017 ASC appointment received. 19 days since ROC in VSC.

August 25, 2017 BIO completed. 32 days since ROC received in VSC.

August 11, 2018  18 month 'Courtesy Copy' extension letter received.  Critical number  297

October 20, 2018 18 month 'Official' extension letter received.  Critical number 297

December 4, 2018  USCIS Account shows: We approved your Form I-751, Petition to Remove Conditions on Residence, 

December 4, 2018, ordered your new card for Receipt # EAC17297003XX, and will mail to the address you gave.

491 days from NOA issued by VSC until Petition approved.

December 7, 2018 USCIS sent notice:  Card mailed.

December 12, 2018 Ten year Green Card received from Lees Summit, MO

499 days from NOA issued by VSC until Green Card received.

- - - - - - - - - - 

CITIZENSHIP PROCESS

December 6, 2018 submitted N-400 application on-line.  Estimated Completion Time: 8 months or August 2019.

December 8, 2018 received notice on USCIS that Biometrics scheduled . . . but the actual date was not yet shown.

December 11, 2018 saw in 'Documents' section of USCIS that Bio scheduled for 24 December 2018.

December 21, 2018 saw on USCIS website that they will be closed 24 December 2018 as extra holiday.

January 9, 2019 went for re-scheduled BIO appointment.  33 days after N-400 submitted on-line.

February 19, 2019 received letter in US mail that Citizenship interview scheduled for 26 March 2019. 74 days after submission on-line.

March 26, 2019 Citizenship interview scheduled for.  109 days after N-400 submitted on-line.

March 26, 2019 Passed Citizenship interview.

April 12, 2019  Received notice that Oath Ceremony had been scheduled for 24 April 2019.  17 days after interview.

April 24, 2019  Oath Ceremony completed.  29 days after interview.     139 days after N-400 submitted on-line.

April 25, 2019  USA Passport Application submitted.

May 3, 2019     USA Passport received.    149 days after N-400 submitted on-line.

May 9, 2019     Certificate of Naturalization and Citizenship returned in mail.

 

 

 

 

Link to comment
Share on other sites

Filed: AOS (pnd) Country: Philippines
Timeline

[quote name="chewy2012" post="7567951" timestamp="1428690365" I didn't KMA was the USC

= = = = = = = =

Hey, I post the list of February group on Sundays showing this info.

You better keep read-up on such stuff, or else you will be in big trouble when quiz time comes!! :-)

Leo

LOL, Congrats to your wife Leo.....

AOS Timeline / Family-based

Feb 24, 2015 (day 0) - Sent Forms I-130, I-485, I-765, I-131 via USPS to Chicago Lockbox
Feb 26, 2015 (day 2) - Package delivered and received.
Mar 03, 2015 (day 7) - Text / email messages from USCIS, receiving Forms I-130, I-485,
I-131 and I-765.
USD 420 and 1,070 Checks were cashed.
Mar 08, 2015 (day 12) - Paper receipts of I-797C for I-130, I-485, I-131 and I-765 from mail.

Mar 13, 2015 (day 17) - Mail notice received for Biometrics appointment on March 25, 2015.

Mar 25, 2015 (day 29) - Completed Biometrics, as scheduled.

May 12, 2015 (day 75) - AP/EAD approved and Card has been ordered.

May 27, 2015 (day 90) - AP/EAD Card received in the mailbox.

June 3, 2015 (day 97) - Received NPIW letter in the mailbox.

Sept 24, 2015 (day 212) - I-130/I-485 approved. No Interview.

Sept 28, 2015 (day 216) - GC mailed.

Sept 30, 2015 (day 218) - GC received.

Link to comment
Share on other sites

Filed: AOS (pnd) Country: England
Timeline

[quote name="chewy2012" post="7567951" timestamp="1428690365" I didn't KMA was the USC

= = = = = = = =

Hey, I post the list of February group on Sundays showing this info.

You better keep read-up on such stuff, or else you will be in big trouble when quiz time comes!! :-)

Leo

Damn I hate quizes :blink:

********AOS Status********

February/March - Working on AOS Packet

March 12, 2015 (Day 1) - Priority Express Mailed AOS Packet to Dearborn Address

March 13, 2015 (Day 2) - Package delivered and signed for

March 20, 2015 (Day 8) - Checks Cleared Bank

March 24, 2015 (Day 12) - Received NOA hard copies in mail (I130, I485, I765, I131)

March 27, 2015 (Day 15) - Biometrics appointment received - April 8th

April 8, 2015 (Day 27) - Biometrics complete

May 6, 2015 (Day 54) - waiting..... :whistle:

May 8, 2015 (Day 56) - Interview scheduled for June 10th!

May 27, 2015 (Day 75) - EAD Card being Produced & AP Approved

June 3, 2015 (Day 82) - Received EAD card in mail

June 10, 2015 (Day 89) - Approved I-485

June 18, 2015 (Day 97) - Received GC in Mail!!! :dance:

Link to comment
Share on other sites

Filed: Other Country: Mexico
Timeline

We made it there an hour and 17 minutes late. USCIS Raleigh NC. The security guard was really nice, everyone there was. We were out in twenty minutes. So glad they let us get it done.

Pre AOS

Brought Illegally to USA in 1996

Gained DACA in October 2013

Applied for advanced parole February 2014

First child born US citizen March 2014

Approved for advanced parole June 2014

Travelled to Mexico July 2014

Returned to USA July 2014 with Stamped I-94

Married US Citizen September 2014

AOS (I-485 & I-130)Mailed to Chicago Lockbox 13February15

Stated delivered on 17February15 (USPS tracking #)

Email and Text G-1145 confirmations 24February15

Hardcopies of receipts arrived 02March15

USCIS website updated to RFE mailed 11March15

Hardcopies of RFE received 16March15

RFE mailed back 26March15

USCIS Status updated to RFE received 1April15

Notice of bio apt arrived, apt was for same day. 10April15

Completed bio apt 10April15
Received interview notice in mail 15June15
Interview scheduled for 16July15

Awarded conditional 2 year residency 16July15

Joined US Navy DEP with a leave date of 15Sept16

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Uganda
Timeline

Wifey got email and website notification that EAD card is in production.

Pretty good timing at something just over 2 months.

Congrats!

Link to comment
Share on other sites

Congrats Leo. ?

By the way, I received also an email notification about the interview and it's scheduled on the 18th of May. ?

-------------------------------AOS TIMELINE-----------------------------
February 23,2015 - Sent in my AOS Application (I130, I485 and I765)
March 2, 2015 - AOS packet received in Chicago.
March 4, 2015 - AOS packet assigned to Missouri National Benefits Center. 3 emails received.
March 9, 2015 - Hard copies received for NOA1 for I-130, I-485 and I-765.
March 14, 2015 - Mail notice received for Biometrics appointment on March 23, 2015.
March 23, 2015 - Completed Biometrics at appointed time.
April 10, 2015 - Received an email notification for Interview appointment set on May 18, 2015.
May 18, 2015 - Interview day. APPROVED 
May 23, 2015 - Received my 2years GC
------------------------------1-751 REMOVAL OF CONDITIONAL RESIDENCY-----------
March 30, 2017 - sent package to CSC
March 31, 2017 - package received at CSC
 
 
Link to comment
Share on other sites

Filed: AOS (pnd) Country: Philippines
Timeline

Congrats Leo. ?

By the way, I received also an email notification about the interview and it's scheduled on the 18th of May. ?

Congrats Kabayan, Wow that's super fast too, if your GC will be approved on the spot on May 18, 2015, it will just be less than 90 days processing time for you...... You may not be needing that EAD approval anymore.....

Edited by rodeo

AOS Timeline / Family-based

Feb 24, 2015 (day 0) - Sent Forms I-130, I-485, I-765, I-131 via USPS to Chicago Lockbox
Feb 26, 2015 (day 2) - Package delivered and received.
Mar 03, 2015 (day 7) - Text / email messages from USCIS, receiving Forms I-130, I-485,
I-131 and I-765.
USD 420 and 1,070 Checks were cashed.
Mar 08, 2015 (day 12) - Paper receipts of I-797C for I-130, I-485, I-131 and I-765 from mail.

Mar 13, 2015 (day 17) - Mail notice received for Biometrics appointment on March 25, 2015.

Mar 25, 2015 (day 29) - Completed Biometrics, as scheduled.

May 12, 2015 (day 75) - AP/EAD approved and Card has been ordered.

May 27, 2015 (day 90) - AP/EAD Card received in the mailbox.

June 3, 2015 (day 97) - Received NPIW letter in the mailbox.

Sept 24, 2015 (day 212) - I-130/I-485 approved. No Interview.

Sept 28, 2015 (day 216) - GC mailed.

Sept 30, 2015 (day 218) - GC received.

Link to comment
Share on other sites

Congrats Leo. ?

By the way, I received also an email notification about the interview and it's scheduled on the 18th of May. ?

Congratulations mrsalmadro!
02/21/2015 - AOS package (I-485, I-130, I-765) sent via USPS to Chicago lockbox

02/24/2015 - Package delivered to Chicago lockbox (USPS tracking confirmation)

03/03/2015 - USCIS email and text confirmations;

03/03/2015 - Routed to the USCIS National Benefits Center for processing

03/03/2015 - $1,490 check cashed

03/09/2015 - NOAs received for I-485, I-130, and I-765

03/14/2015 - Had to submit an AR-11

03/17/2015 - Received SMS/email notice for RFE

03/23/2015 - Hardcopy of RFE received

03/26/2015 - Mailed response to RFE via Fedex

03/30/2015 - Email & sms notification acknowledging receipt of response to RFE

04/07/2015 - NOA for biometrics (I-485 & I-765)

04/09/2015 - Biometrics completed (I-485 & I-765)

05/06/2015 - EAD Approved Date

05/15/2015 - EAD received in mail

07/09/2015 - Interview Scheduled for August 11, 2015

08/11/2015 - Interview Completed, received notice that GC has been ordered 3hrs later

08/12/2015 - I-130/I-485 approved, notice mailed

08/17/2015- Welcome notice received

08/21/2015- GC Received

05/12/2017- Mailed ROC packet to CSC 

05/15/2017- Package delivered AM (USPS tracking confirmation)

05/18/2017- Check cashed

05/20/2017- I-797 received dated 05/15/17 

05/27/2017- I-797C (Biometrics) received dated 05/19/17   

06/06/2017 - Biometrics completed 

 

 

 


 

 

 

 

 

Link to comment
Share on other sites

Filed: AOS (pnd) Country: England
Timeline

Congrats Leo. ?

By the way, I received also an email notification about the interview and it's scheduled on the 18th of May. ?

Congrats!!! :dancing:

********AOS Status********

February/March - Working on AOS Packet

March 12, 2015 (Day 1) - Priority Express Mailed AOS Packet to Dearborn Address

March 13, 2015 (Day 2) - Package delivered and signed for

March 20, 2015 (Day 8) - Checks Cleared Bank

March 24, 2015 (Day 12) - Received NOA hard copies in mail (I130, I485, I765, I131)

March 27, 2015 (Day 15) - Biometrics appointment received - April 8th

April 8, 2015 (Day 27) - Biometrics complete

May 6, 2015 (Day 54) - waiting..... :whistle:

May 8, 2015 (Day 56) - Interview scheduled for June 10th!

May 27, 2015 (Day 75) - EAD Card being Produced & AP Approved

June 3, 2015 (Day 82) - Received EAD card in mail

June 10, 2015 (Day 89) - Approved I-485

June 18, 2015 (Day 97) - Received GC in Mail!!! :dance:

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
“;}
×
×
  • Create New...