just called NVC few min ago. After being on hold for long i thought i was going to get a hope. Unfortunately not! The rep told me that they have recived the package but it will take 60 days for it to be reviewed. The rep also said that my DS260 has been reviewed and looks good. Okay here is where i am puzzeled. Looks good? i hope she meant the review is completed. I then asked her if it was possible to speak to an supervisor she told me to hold another few min . After holding I spoke to the supervisor she was helpful i asked her if she can expidaite my case? She said yes i can tell you how to but its not under my control. She told me to email the embassy and request for an expidaite.

DS260 is reviewd so it means IV is reviewed? which is what?

Citizenship Timeline:

 

Service Center : Online  |  CIS Office : Philadelphia  |  Date Filed : 2018-08-23  |  NOA Date : 2018-08-24  |  Bio. Appt. : 2018-09-20  |  Interview Date : 4th April  (scheduled on 25th feb) |  RFE: 25th April. Approved : MAY 15/ In line for Oath 17th MaY |  Oath Ceremony :30th MaY

 

USCIS

13-12-2013 - Sent i-130 received

17-12-2013 - NOA1 hard copy

06-06-2014-I-130 RFE

13-06-2014 - RFE hard copy

25-06-2014 - RFE sent

01-07-2014 - RFE response review email received

22-07-2014 - NOA2 (approved in 221 days)

30-07-2014=i-130 Sent to NVC

NVC

12-08-2014 - NVC received the case

22-08-2014 - NVC case number assigned

23-08-2014 - I-864(AOS) Bill Generated

25-08-2014 - DS-261 completed online

25-08-2014 -AOS Bill paid ($ 88)

26-08-2014--AOS bill appeared as PAID

29-08-2014 - Sent I-864(AOS) Package (via USPS Certified Mail)

02-09-2014 - AOS Package Received and scanned at NVC

26-09-2014 --IV bill invoiced and paid

02-10-2014 --Iv package sent via usps

06-10-2014 --Iv package Received and scanned at nvc

08-10-2014--DS-260 completed online

14-11-2014--- checklist (AOS)

17-11-2014---- checklist sent via USPS

19-11-2014 checklist received at nvc

12-02-2015--- checklist (IV-police certificate)

17-02-2015 checklist received at nvc

11-03-2015 Case Complete

25-03-2015 - Interview scheduled

Consulate
16-04-2015 - Medical
19-05-2015 - Interview (approved) but put me on AP for no reason.

20-09-2015-Visa Issued at CEAC website
21-09-2015 - Visa in hand
01-10-2015 - POE

11-01-2016- Received 10 years green card

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Spain
Timeline

Hi all,

I just made the following list with all the users and their latest scan date I found on this thread so we can get an idea. Feel free to update it or add yourself!

10/01 - Antre
10/08 - laje
10/09 - red_tree
10/10 - newbie87
10/14 - boardercrosser
10/14 - Dilber13
10/14 - VictorAshley87
10/14 - kins8487
10/17 - patnjac
10/20 - Pogácsa
10/20 - laurenmat
10/20 - abutalha
10/21 - brijakash
10/21 - jcruzazucar
10/21 - e&g12.05.13
10/21 - mccartna
10/22 - Soloenta
10/23 - mofatsd
10/23 - Rlelle09
10/23 - dehiguey23
10/24 - Chelsy01
10/24 - Boris&Kassie
10/24 - S. & A.
10/28 - Hikerwa
10/28 - Jeliica
10/31 - Sdg612
11/04 - Senator-Mel
11/07 - Paavy
11/14 - Husakovic
11/19 - Azim
11/21 - dkhurana
11/28 - SofiWaits

Our Relationship
11/06/2010: Met in Spain
11/21/2010: Officially became an item
08/12/2011: A moved to USA

09/09/2012: A moved back to Spain
01/26/2013: I proposed in Barcelona
07/19/2013: WEDDING DAY! (L)

USCIS
05/16/2014: I-130 package scanned

05/19/2014: I-130 NOA1 electronic copy received
05/27/2014: I-130 NOA1 hard copy received
05/23/2014: I-130 NOA2 ELECTRONIC COPY RECEIVED! :dancing:


NVC
06/03/2014: NVC received case
06/23/2014: NVC Case Number and Invoice ID Number assigned
07/09/2014: DS-261 completed online & accepted
07/10/2014: AoS bill invoiced & paid
08/05/2014: AoS package scanned
09/08/2014: IV bill invoiced & paid
09/10/2014: IV package scanned
09/28/2014: DS-260 completed online & accepted
10/17/2014: AoS checklist email received

10/21/2014: AoS checklist package scanned

12/13/2014: CASE COMPLETE! :dancing:
12/29/2014: Interview scheduled

12/30/2014: P4 email received

12/31/2014: Case file shipped to the Embassy (In-Transit)

Embassy

01-05-2015: Case file arrived (Ready)
02-10-2015: Medical appointment in Madrid
02-12-2015: Interview in Madrid:
APPROVED! :dancing::dance:

02-13-2015: Visa issued

02-17-2015: Visa in hand

02-25-2015: POE

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Hi all,

I just made the following list with all the users and their latest scan date I found on this thread so we can get an idea. Feel free to update it or add yourself!

10/01 - Antre

10/08 - laje

10/09 - red_tree

10/10 - newbie87

10/14 - boardercrosser

10/14 - Dilber13

10/14 - VictorAshley87

10/14 - kins8487

10/17 - patnjac

10/20 - Pogácsa

10/20 - laurenmat

10/20 - abutalha

10/21 - brijakash

10/21 - jcruzazucar

10/21 - e&g12.05.13

10/21 - mccartna

10/22 - Soloenta

10/23 - mofatsd

10/23 - Rlelle09

10/23 - dehiguey23

10/24 - Chelsy01

10/24 - Boris&Kassie

10/24 - S. & A.

10/28 - Hikerwa

10/28 - Jeliica

10/31 - Sdg612

11/04 - Senator-Mel

11/07 - Paavy

11/14 - Husakovic

11/19 - Azim

11/21 - dkhurana

11/28 - SofiWaits

I am 8/10/23

Is it normal for affidavit support recommend and civil document to be N/A even tho I sent them already?

If you are talking about on the ceac website and your AOS is N/A you have a case complete. Call to confirm. What is your scan date?

USCIS 04-26-2014: Filed I-130

04-29-2014: NOA1 re-routed to CSC

05-14-2014: RFE

05-30 2014: RFE response sent

05-30-2014: RFE RESPONSE RECEIVED

06-04-2014: NOA2 I-130 Approved!

NVC

06-13-2014: Arrived at NVC

06-30-2014: Case # and IIN assigned

07-18-2014: D-261 sub mitted

07-18-2014: AOS fee invoiced

07-19-2014: AOS fee paid

07-25-2014: AOS package sent

07-28-2014 NVC received AOS

07-29-2014 NVC Scanned AOS

08-14-2014: resubmitted AOS

08-21-2014: NVC scanned AOS

09-02-2014: DS-261 reviewed and ACCEPTED! Woot!

10-03-2014: DS-260 completed

09-08-2014: IV fee invoiced

09-09-2014: IV fee paid

09-23-2014: AOS Checklist

10-08-2014: IV package scan date

10-10-2014: AOS Checklist scan date

10-23-1014: checklist scan date

12-05-2014: Case Complete

12-12-2014: Interview date scheduled

xx-xx-2014: Sent to embassy in Montreal

01-23-2015: Interview APPROVED!!

xx-xx-2014: Visa Received

xx-xx-2014: POE

Link to comment
Share on other sites

just called NVC few min ago. After being on hold for long i thought i was going to get a hope. Unfortunately not! The rep told me that they have recived the package but it will take 60 days for it to be reviewed. The rep also said that my DS260 has been reviewed and looks good. Okay here is where i am puzzeled. Looks good? i hope she meant the review is completed. I then asked her if it was possible to speak to an supervisor she told me to hold another few min . After holding I spoke to the supervisor she was helpful i asked her if she can expidaite my case? She said yes i can tell you how to but its not under my control. She told me to email the embassy and request for an expidaite.

DS260 is reviewd so it means IV is reviewed? which is what?

DS260 is the online form. Meaning that looks good to them (it's submitted into their system and it shows they have received it). So they are confirming they have received your checklist and it will take 60 days from the scan date (hopefully sooner!)...

Expedite is something all different that she is talking about - that's if you have a serious situation that if you don't get to the US faster it will be life or financially threatening (and other reasons too, but you get the jist). She was just saying she can tell you about the expedite process but can't make your checklist go any faster.

Hope that helps!

IR-1/CR-1 Visa

Service Center : California Service Center

Consulate : Switzerland

Marriage: 2008-08-07

I-130 Sent : 2014-08-02

I-130 NOA1 : 2014-08-05

I-130 Approved : 2014-08-25

NVC Received : 2014-09-12

NVC Case & IIN Number Assigned: 2014-09-22

DS-261 Filled and Submitted: 2014-09-22

AOS Bill / Payment Made: 2014-09-23

Received IV Bill: 2014-10-02

Paid IV Bill: 2014-10-03

Sent AOS & IV: 2014-10-19

Package Received by NVC: 2014-10-22

Scanned Date into NVC (e-mail received): 2014-10-23

Submitted DS-260: 2014-10-23

Checklist received (AOS - missing check box): 2014-12-17

Re-submitted documents (received by NVC): 2014-12-30

Submitted expedite request: 2015-01-02

Expedite approved by embassy: 2015-01-05

Files shipped to embassy: 2015-01-07

Medical scheduled: 2015-01-13

Embassy received files: 2014-01-12

Processing
Estimates/Stats :

* I-130 was approved in 20 days from NOA1 date.

* NVC received case in 18 days from NOA2 date.

* NVC assigned Case & IIN # in 10 days from NVC received date.

* DS-261 Filled out in 0 days from receiving Case number.

* AOS Bill paid in 1 day from filing DS-261

* IV Bill Received 11 days after filling DS-261

* NVC Scanned AOS/IV Package 3 days after sending

* Checklist received 55 days after sending documents

* Expedite approved 3 days after submission

* Files shipped to embassy 2 days after expedite approved

* Files received by embassy 5 days after shipped from NVC

Link to comment
Share on other sites

I am 8/10/23

If you are talking about on the ceac website and your AOS is N/A you have a case complete. Call to confirm. What is your scan date?

Well, maybe not case complete: if the N/A is where the "Paid" tab is supposed to be, then it's a CC, but if its next to it, that means they haven't reveiwed your case yet.

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Canada
Timeline

Mine is October 31

Edited by Dualie

ROC

01/18/2017   Sent in I-751

01/26/2017   Check cashed

01/28/2017   Received NOA dated 01/20/2017

02/16/2017   Biometrics done

10/24/2017   Traveled to Minneapolis for I551 stamp

02/26/2018     Case received by Field Office - S. Paul

05/012018     Case transferred to another USCIS office for processing 

N-400

02/02/2018    Filed N-400 online

02/05/2018    NOA online - NOA letter 02/09/2018

02/21/2018     Biometrics walk-in

 

Link to comment
Share on other sites

Filed: Citizen (apr) Country: Canada
Timeline

Hang in there! Ive been waiting forever also. We are in the home stretch now. I can't wait to be with my wife. The real head scratcher is why are Fiance visas processed so much faster than marriage visas. It makes no sense whatsoever other than economic sense. Just my $.02.

Good luck to everybody.

scan date October 14.

Fiance visas are not considered immigrant visas. They don't go through the AOS and the IV stages until after arrival in the US. Our wait is longer because we go through all of that prior to the issuance of our visa and arrival into the US.

ROC

01/18/2017   Sent in I-751

01/26/2017   Check cashed

01/28/2017   Received NOA dated 01/20/2017

02/16/2017   Biometrics done

10/24/2017   Traveled to Minneapolis for I551 stamp

02/26/2018     Case received by Field Office - S. Paul

05/012018     Case transferred to another USCIS office for processing 

N-400

02/02/2018    Filed N-400 online

02/05/2018    NOA online - NOA letter 02/09/2018

02/21/2018     Biometrics walk-in

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Spain
Timeline

10/01 - Antre
10/08 - laje
10/09 - red_tree
10/10 - newbie87
10/14 - boardercrosser
10/14 - Dilber13
10/14 - VictorAshley87
10/14 - kins8487
10/17 - patnjac
10/20 - Pogácsa
10/20 - laurenmat
10/20 - abutalha
10/21 - brijakash
10/21 - jcruzazucar
10/21 - e&g12.05.13
10/21 - mccartna
10/22 - Soloenta
10/23 - mofatsd
10/23 - Rlelle09
10/23 - dehiguey23
10/24 - Chelsy01
10/24 - Boris&Kassie
10/24 - S. & A.
10/28 - Hikerwa
10/28 - Jeliica
10/31 - Sdg612

10/31 - Dualie
11/04 - Senator-Mel
11/07 - Paavy
11/14 - Husakovic
11/19 - Azim
11/21 - dkhurana
11/28 - SofiWaits

Our Relationship
11/06/2010: Met in Spain
11/21/2010: Officially became an item
08/12/2011: A moved to USA

09/09/2012: A moved back to Spain
01/26/2013: I proposed in Barcelona
07/19/2013: WEDDING DAY! (L)

USCIS
05/16/2014: I-130 package scanned

05/19/2014: I-130 NOA1 electronic copy received
05/27/2014: I-130 NOA1 hard copy received
05/23/2014: I-130 NOA2 ELECTRONIC COPY RECEIVED! :dancing:


NVC
06/03/2014: NVC received case
06/23/2014: NVC Case Number and Invoice ID Number assigned
07/09/2014: DS-261 completed online & accepted
07/10/2014: AoS bill invoiced & paid
08/05/2014: AoS package scanned
09/08/2014: IV bill invoiced & paid
09/10/2014: IV package scanned
09/28/2014: DS-260 completed online & accepted
10/17/2014: AoS checklist email received

10/21/2014: AoS checklist package scanned

12/13/2014: CASE COMPLETE! :dancing:
12/29/2014: Interview scheduled

12/30/2014: P4 email received

12/31/2014: Case file shipped to the Embassy (In-Transit)

Embassy

01-05-2015: Case file arrived (Ready)
02-10-2015: Medical appointment in Madrid
02-12-2015: Interview in Madrid:
APPROVED! :dancing::dance:

02-13-2015: Visa issued

02-17-2015: Visa in hand

02-25-2015: POE

Link to comment
Share on other sites

After nearly a year, we are finally done with this process!! My husband had his interview in Sydney yesterday and said it was a breeze and he was approved on the spot! Woooooo!!! Thank you to everyone here for their support, help, and heart. We did this without a lawyer and because of Visa Journey, we had no hiccups or checklists what so ever. Best of luck to all those still waiting, your turn will come (and it feels SO good!). Happy Holidays everyone :)

Special thanks to Salin for her attention to detail, organization, patience and dedication to helping all those going through this heart-breaking process. Your wiki and posts were life savers and we really couldn't have done this without you!

Link to comment
Share on other sites

Fiance visas are not considered immigrant visas. They don't go through the AOS and the IV stages until after arrival in the US. Our wait is longer because we go through all of that prior to the issuance of our visa and arrival into the US.

K1 visa applicants still have a package 3 they have to submit directly to the embassy (after their case has arrived there from NVC), which contains a lot of the same information and documents as the AOS and IV packages. But I'm guessing the embassy is quicker in reviewing it and don't issue checklists like NVC does.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline

After nearly a year, we are finally done with this process!! My husband had his interview in Sydney yesterday and said it was a breeze and he was approved on the spot! Woooooo!!! Thank you to everyone here for their support, help, and heart. We did this without a lawyer and because of Visa Journey, we had no hiccups or checklists what so ever. Best of luck to all those still waiting, your turn will come (and it feels SO good!). Happy Holidays everyone :)

Special thanks to Salin for her attention to detail, organization, patience and dedication to helping all those going through this heart-breaking process. Your wiki and posts were life savers and we really couldn't have done this without you!

Congratssss and happy re-union

After nearly a year, we are finally done with this process!! My husband had his interview in Sydney yesterday and said it was a breeze and he was approved on the spot! Woooooo!!! Thank you to everyone here for their support, help, and heart. We did this without a lawyer and because of Visa Journey, we had no hiccups or checklists what so ever. Best of luck to all those still waiting, your turn will come (and it feels SO good!). Happy Holidays everyone :)

Special thanks to Salin for her attention to detail, organization, patience and dedication to helping all those going through this heart-breaking process. Your wiki and posts were life savers and we really couldn't have done this without you!

Congratssss and happy re-union

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Poland
Timeline

It seems like the invoice processing stage has been a tad slow of recent weeks. We were allocated our case number and IIN on 11/10, submitted our DS-261 on 11/12, but only just received (and paid) our AoS invoice today (12/02) and are still waiting on our IV invoice. Still, NVC probably lost a few days over that time with Veterans' Day and Thanksgiving, so it's not too surprising. At least things are moving along.

Really hoping this month brings a lot of joy to a lot of deserving people. Stay positive everyone.

You don't have to wait for IV to be invoiced to send your docs, if you have them ready send it now - it will save you some time , I have seen people here doing it with no further problems from nvc, of course it is up to you :goofy:

December 2013 Spreadsheet

NOA1-12/5/2013

NOA2-8/11/2014

Scan date-11/12/2014

Case Complete - 12/30/2014

Interview Date - 2/3/2015

Link to comment
Share on other sites

Filed: EB-3 Visa Country: New Zealand
Timeline

Hi any idea if for employment based petition..the waiting period was also the same as you guys =) I see very seldom posts on the work section that is why im reading all your posts here just to have an idea regarding the length of case completion..I was also given the 60 day waiting period.. Hope you can share your thoughts..My scan date is October 14.And by the way you guys are way too lucky because I have waited for more than 6 years before I reached the case completion stage due to retrogression..=) feeling positive with all your inputs here

Hi there, we're on the same boat. Scan date for checklist was 24th of October. And yes, I also waited for 6 yrs for this.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Italy
Timeline

I am 10/29.. Finger crossed for fast approvals!!

Hi all,

I just made the following list with all the users and their latest scan date I found on this thread so we can get an idea. Feel free to update it or add yourself!

10/01 - Antre

10/08 - laje

10/09 - red_tree

10/10 - newbie87

10/14 - boardercrosser

10/14 - Dilber13

10/14 - VictorAshley87

10/14 - kins8487

10/17 - patnjac

10/20 - Pogácsa

10/20 - laurenmat

10/20 - abutalha

10/21 - brijakash

10/21 - jcruzazucar

10/21 - e&g12.05.13

10/21 - mccartna

10/22 - Soloenta

10/23 - mofatsd

10/23 - Rlelle09

10/23 - dehiguey23

10/24 - Chelsy01

10/24 - Boris&Kassie

10/24 - S. & A.

10/28 - Hikerwa

10/28 - Jeliica

10/31 - Sdg612

11/04 - Senator-Mel

11/07 - Paavy

11/14 - Husakovic

11/19 - Azim

11/21 - dkhurana

11/28 - SofiWaits

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...