Jump to content

14 posts in this topic

Recommended Posts

Filed: Citizen (apr) Country: England
Timeline
Posted

The ausssiewench post about shortcuts was super dooper and I can actually understand it...

My commiserations to her that her brain works like mine or vice versa

I am a bit apprehensive of using the full thing with bar codes etc as we have nobody in the states we can easily ask to do any of it......

I will certainly try and get the DS 3032 (name that agent form ) done by email which should save at least 10 days mail time each way and perhaps a few days preparation time at NVC too...

Question, if I wait for the I-230 and do it the slow way, what is the time cost >>>

A: from the time they say it is being sent on the answer line , to actual dispatch day - I guess at a week ?

B: mail time to UK - how long is their snail mail ? I guess at 10 days ?

I guess A+B + 10 days for royal mail to send back to new hampshire from UK is the total time and if I deduct time from relative sending in the form from somewhere in the US to new Hampshire (1 day fast mail) then that is the total saving for the James' short cut on the I-230....

are the guesses for A and B realistic ?

thanks alan

moresheep400100.jpg

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted
The ausssiewench post about shortcuts was super dooper and I can actually understand it...

My commiserations to her that her brain works like mine or vice versa

I am a bit apprehensive of using the full thing with bar codes etc as we have nobody in the states we can easily ask to do any of it......

I will certainly try and get the DS 3032 (name that agent form ) done by email which should save at least 10 days mail time each way and perhaps a few days preparation time at NVC too...

Question, if I wait for the I-230 and do it the slow way, what is the time cost >>>

A: from the time they say it is being sent on the answer line , to actual dispatch day - I guess at a week ?

B: mail time to UK - how long is their snail mail ? I guess at 10 days ?

I guess A+B + 10 days for royal mail to send back to new hampshire from UK is the total time and if I deduct time from relative sending in the form from somewhere in the US to new Hampshire (1 day fast mail) then that is the total saving for the James' short cut on the I-230....

are the guesses for A and B realistic ?

thanks alan

The only thing you would be waiting for with the DS230 packet is going to be the bar code cover sheet. What I did was make a photocopy of the AOS cover sheet before sending it.. dowloaded the bar code cover sheet from the shortcut you referenced and deleted the bar code and the case number and printed that off. Then I cut the bar code cover sheet from the AOS and overlayed it on to the DS230 coversheet and photocopied that.. to have a final DS230 barcode cover sheet.. with that I sent of the DS230 packet before it arrived.. by the way, I still have not received my offical DS230 packet from the NVC yet and I'm in the USA.

good luck

08/06/06 - Married in India 3dflagsdotcom_ukeng_2fawm.gif3dflagsdotcom_india_2fawm.gif

------------------------------------USCIS - CSS-----------------------------------------

09/09/06 - Submited I-130

09/19/06 - NOA1

11/27/06 - NOA2 - Approval

----------------------------------------NVC------------------------------------------------

12/07/06 - NVC Received and Case # Assigned

12/18/06 - AOS Fee Bill and DS-3032generated

12/19/06 - E-mail DS-3032 Choice of Agent to NVC

12/20/06 - AOS Fee Bill sent next day delivery to St. Louis by USPS

12/22/06 - DS-3032 Choice of Agent Accepted (received e-mail conformation from NVC)

12/25/06 - IV Fee Bill Generated by NVC

01/03/07 - ASO Application generated by NVC

01/06/07 - IV Fee Bill Received (snail mail)

01/08/07 - IV Fee Bill sent next day delivery to St. Louis by USPS

01/12/07 - ASO Application received (snail mail)

01/13/07 - ASO I864-EZ application sent to NVC priority mail (3 day delivery)

01/15/07 - DS230 Generated

01/18/07 - DS230 sent to NVC - overnight delivery by USPS

01/26/07 - DS230 finally received 11 days after it was generated.. can anyone say snail mail..

02/20/07 - CASE COMPLETE AT NVC

02/28/07 - Case left NVC

03/03/07 - Case received at Mumbai Embassy

05/22/07 - Medical Interview Breach Candy Mumbai

05/24/07 - Interview date at Mumbai consulate - APPROVED!

06/02/07 - Mumbai - Paris - Atlanta - Charlotte. Departs June 1st 4.45am EST Arrives June 2nd 4.12pm EST

07/10/07 - Received Conditional Greencard. Still waiting on the SSN

Filed: Citizen (apr) Country: England
Timeline
Posted
The ausssiewench post about shortcuts was super dooper and I can actually understand it...

My commiserations to her that her brain works like mine or vice versa

I am a bit apprehensive of using the full thing with bar codes etc as we have nobody in the states we can easily ask to do any of it......

I will certainly try and get the DS 3032 (name that agent form ) done by email which should save at least 10 days mail time each way and perhaps a few days preparation time at NVC too...

Question, if I wait for the I-230 and do it the slow way, what is the time cost >>>

A: from the time they say it is being sent on the answer line , to actual dispatch day - I guess at a week ?

B: mail time to UK - how long is their snail mail ? I guess at 10 days ?

I guess A+B + 10 days for royal mail to send back to new hampshire from UK is the total time and if I deduct time from relative sending in the form from somewhere in the US to new Hampshire (1 day fast mail) then that is the total saving for the James' short cut on the I-230....

are the guesses for A and B realistic ?

thanks alan

The only thing you would be waiting for with the DS230 packet is going to be the bar code cover sheet. What I did was make a photocopy of the AOS cover sheet before sending it.. dowloaded the bar code cover sheet from the shortcut you referenced and deleted the bar code and the case number and printed that off. Then I cut the bar code cover sheet from the AOS and overlayed it on to the DS230 coversheet and photocopied that.. to have a final DS230 barcode cover sheet.. with that I sent of the DS230 packet before it arrived.. by the way, I still have not received my offical DS230 packet from the NVC yet and I'm in the USA.

good luck

ok so its 10 days since your 230 was generated and you are in the US and you haven't got it yet - so it will be at least 15 days to arrive in the UK (from generation time) and possibly a week or two more than that...

I know James' shortcuts were supposed to work with a friend/relative/spouse in the US mailing the form, but it looks as though directly sending it from the UK (once generation is confirmed) , is still going to save weeks..

ok question --- if you send your 'own' 230, will you be able to call them and confirm it has been received - if you use a courier then you will know it has arrived, but how do you know it's acceptable ? is the only was to wait for an rfe if you mess up the bar code etc or can you ask about it's progress/acceptability once it is received ?

This lot is a worrier's dream come true !

thanks alan

moresheep400100.jpg

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted

I sent all the documents the two fees for AOS and Immigrant Visa fees and the actual forms by overnight delivery so I was able to track when they were delivered. The NVC telephone number also provides updated messages as well once your documents have been loaded into their system.. but normally takes 4-5 days after it is delivered to the NVC before it's been loaded into their system and acknowledged on the phone system. You should also be able to talk directly to an operator if needs be...

You've got a long way to go before you get to NVC.. probably about 3 months I reckon.. don't worry yourslef too much right now...

08/06/06 - Married in India 3dflagsdotcom_ukeng_2fawm.gif3dflagsdotcom_india_2fawm.gif

------------------------------------USCIS - CSS-----------------------------------------

09/09/06 - Submited I-130

09/19/06 - NOA1

11/27/06 - NOA2 - Approval

----------------------------------------NVC------------------------------------------------

12/07/06 - NVC Received and Case # Assigned

12/18/06 - AOS Fee Bill and DS-3032generated

12/19/06 - E-mail DS-3032 Choice of Agent to NVC

12/20/06 - AOS Fee Bill sent next day delivery to St. Louis by USPS

12/22/06 - DS-3032 Choice of Agent Accepted (received e-mail conformation from NVC)

12/25/06 - IV Fee Bill Generated by NVC

01/03/07 - ASO Application generated by NVC

01/06/07 - IV Fee Bill Received (snail mail)

01/08/07 - IV Fee Bill sent next day delivery to St. Louis by USPS

01/12/07 - ASO Application received (snail mail)

01/13/07 - ASO I864-EZ application sent to NVC priority mail (3 day delivery)

01/15/07 - DS230 Generated

01/18/07 - DS230 sent to NVC - overnight delivery by USPS

01/26/07 - DS230 finally received 11 days after it was generated.. can anyone say snail mail..

02/20/07 - CASE COMPLETE AT NVC

02/28/07 - Case left NVC

03/03/07 - Case received at Mumbai Embassy

05/22/07 - Medical Interview Breach Candy Mumbai

05/24/07 - Interview date at Mumbai consulate - APPROVED!

06/02/07 - Mumbai - Paris - Atlanta - Charlotte. Departs June 1st 4.45am EST Arrives June 2nd 4.12pm EST

07/10/07 - Received Conditional Greencard. Still waiting on the SSN

Filed: Citizen (apr) Country: England
Timeline
Posted

yes sounds good - think i will practice with some with bar codes using last years ref numbers then do it for real in 3 months or so - 3 month to NOA2 on an IR1 would be very nice ...yes I will definitely do it - I thought at first sight that the short cuts were meant for people with a US based spouse/helper but I can see it will help me a lot too as the time from generation to actual dispatch plus mailing to the UK may be say 20 days -ish ......

Looks like the longest bit is the wait to interview in London which is taking ages - I got an interview in about 10 days when I did KI as i got my medical etc early - (I was a worrier/optimizer back then) but they have stopped that now...

Although I want to enter on November 5th to get an unconditional green card, I want to cut the time to visa down so i can ship my stuff and sell my house etc and I don't want to do that until I get my mits on the visa

ok thanks for the info - the time from generation to actual receipt of the 230 is an interesting statistic

alan

moresheep400100.jpg

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted
What are these James' shortcuts and where can I find them?

Thank you very much

Henia,

James' shortcuts are for people applying for CR1/IR1 visas only. If you are applying for anything other than that.. it will not apply to you. You can find James' shortcuts pinned at the top of the NVC discussion forum.

08/06/06 - Married in India 3dflagsdotcom_ukeng_2fawm.gif3dflagsdotcom_india_2fawm.gif

------------------------------------USCIS - CSS-----------------------------------------

09/09/06 - Submited I-130

09/19/06 - NOA1

11/27/06 - NOA2 - Approval

----------------------------------------NVC------------------------------------------------

12/07/06 - NVC Received and Case # Assigned

12/18/06 - AOS Fee Bill and DS-3032generated

12/19/06 - E-mail DS-3032 Choice of Agent to NVC

12/20/06 - AOS Fee Bill sent next day delivery to St. Louis by USPS

12/22/06 - DS-3032 Choice of Agent Accepted (received e-mail conformation from NVC)

12/25/06 - IV Fee Bill Generated by NVC

01/03/07 - ASO Application generated by NVC

01/06/07 - IV Fee Bill Received (snail mail)

01/08/07 - IV Fee Bill sent next day delivery to St. Louis by USPS

01/12/07 - ASO Application received (snail mail)

01/13/07 - ASO I864-EZ application sent to NVC priority mail (3 day delivery)

01/15/07 - DS230 Generated

01/18/07 - DS230 sent to NVC - overnight delivery by USPS

01/26/07 - DS230 finally received 11 days after it was generated.. can anyone say snail mail..

02/20/07 - CASE COMPLETE AT NVC

02/28/07 - Case left NVC

03/03/07 - Case received at Mumbai Embassy

05/22/07 - Medical Interview Breach Candy Mumbai

05/24/07 - Interview date at Mumbai consulate - APPROVED!

06/02/07 - Mumbai - Paris - Atlanta - Charlotte. Departs June 1st 4.45am EST Arrives June 2nd 4.12pm EST

07/10/07 - Received Conditional Greencard. Still waiting on the SSN

Filed: IR-1/CR-1 Visa Country: India
Timeline
Posted
yes sounds good - think i will practice with some with bar codes using last years ref numbers then do it for real in 3 months or so - 3 month to NOA2 on an IR1 would be very nice ...yes I will definitely do it - I thought at first sight that the short cuts were meant for people with a US based spouse/helper but I can see it will help me a lot too as the time from generation to actual dispatch plus mailing to the UK may be say 20 days -ish ......

Looks like the longest bit is the wait to interview in London which is taking ages - I got an interview in about 10 days when I did KI as i got my medical etc early - (I was a worrier/optimizer back then) but they have stopped that now...

Although I want to enter on November 5th to get an unconditional green card, I want to cut the time to visa down so i can ship my stuff and sell my house etc and I don't want to do that until I get my mits on the visa

ok thanks for the info - the time from generation to actual receipt of the 230 is an interesting statistic

alan

Alan,

The stat on the generation to delivery doesn't really mean much in my opionion, since the documents could be generated.. but take a while for the folks at NVC to physically mail it out to you.. if they are backloged it could be several days before they put it in the mail, and they send it regular mail.. so that could also add significant delays also

08/06/06 - Married in India 3dflagsdotcom_ukeng_2fawm.gif3dflagsdotcom_india_2fawm.gif

------------------------------------USCIS - CSS-----------------------------------------

09/09/06 - Submited I-130

09/19/06 - NOA1

11/27/06 - NOA2 - Approval

----------------------------------------NVC------------------------------------------------

12/07/06 - NVC Received and Case # Assigned

12/18/06 - AOS Fee Bill and DS-3032generated

12/19/06 - E-mail DS-3032 Choice of Agent to NVC

12/20/06 - AOS Fee Bill sent next day delivery to St. Louis by USPS

12/22/06 - DS-3032 Choice of Agent Accepted (received e-mail conformation from NVC)

12/25/06 - IV Fee Bill Generated by NVC

01/03/07 - ASO Application generated by NVC

01/06/07 - IV Fee Bill Received (snail mail)

01/08/07 - IV Fee Bill sent next day delivery to St. Louis by USPS

01/12/07 - ASO Application received (snail mail)

01/13/07 - ASO I864-EZ application sent to NVC priority mail (3 day delivery)

01/15/07 - DS230 Generated

01/18/07 - DS230 sent to NVC - overnight delivery by USPS

01/26/07 - DS230 finally received 11 days after it was generated.. can anyone say snail mail..

02/20/07 - CASE COMPLETE AT NVC

02/28/07 - Case left NVC

03/03/07 - Case received at Mumbai Embassy

05/22/07 - Medical Interview Breach Candy Mumbai

05/24/07 - Interview date at Mumbai consulate - APPROVED!

06/02/07 - Mumbai - Paris - Atlanta - Charlotte. Departs June 1st 4.45am EST Arrives June 2nd 4.12pm EST

07/10/07 - Received Conditional Greencard. Still waiting on the SSN

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

For my IV Bill, it was generated on January 1st, but didn't mail out until January 18th, and I didn't receive it until the 22nd. Not that I could have generated it myself, but it definitely reinforced me wanting to use all of the shortcuts :)

Sandy

Michael's I-130:

NOA1: 5-10-2006----updated w/ citizenship: 9-25-06----had to call back 10/25, touch 10/26

12/06/06 - Approved!- - - 12/08/06 - Touch---01/25/07 - Touch

I130 at NVC

12/14/06 - case number assigned

12/25/06 - DS3032 & AOS Fee Bill Mailed (phone system updated 12/27)

12/27/06 - emailed choice of agent; 12/29/06 - received email from NVC confirming choice of agent!

01/01/07 - NVC generated IV Fee Bill (postmarked 1/17 though!)

01/03/07 - returned AoS Fee Bill via Priority Mail (James' shortcut)

01/15/07 - NVC generated AOS package

01/22/07 - received IV Fee Bill - overnighted back to NVC same day

01/27/07 - recieved I864 package; 01/29/07 - overnighted I864 to NVC

01/29/07 - DS230 generated (phone system not updated, email response 2/5/07)

02/05/07 - mailed DS-230 to NVC via express mail

02/20/07 - CASE COMPLETE!!

04/18/07 - INTERVIEW!!!! - APPROVED!!!!

Michael's K-3:

09/28/06 - NOA1

1/25/07 - approved ...NOA2 via snail mail - 1/29/07

03/16/07 - chose not to return packet 3 to Montreal

Filed: Citizen (apr) Country: England
Timeline
Posted

yes I will use them...I just have to check that cover sheets/forms etc haven't changed 3 month from now - but thanks to VJ people I will be able to do that.... I could end up chopping 20 days+ off the 230 and a similar chunk off the 3032 ...

Aussiewench reckons the beneficiary (visa applicant) part is the most laborious so might let the Affidavit of support part go the long way round and let them meet together on the same date ! (jeez what an optimist)

Nobody has come on here saying that the short cuts messed up their application and threw them back weeks - on the contrary, lots and lots of people have used them and report no problem..

so yes i am convinced..

alan

moresheep400100.jpg

Filed: IR-1/CR-1 Visa Country: Colombia
Timeline
Posted (edited)

Look at my signature. I got the DS-230 generated by the NVC in what appears to be record time according to all other posts. I reckon from the get go, using the shortcuts saved me at least 2-3 weeks time. I say that thinking if I had to wait the normal 2-3 weeks for the DS-230 my savings would have been even greater. I was gone over the holidays, in Bogota, so lost a little time there in returning my I-864. They are quite simple to use. Just pay attention to every detail. Good luck.

Doug

Edited by dougyceci

I-130

2006 09 06 Mailed I-130

2006 09 07 Rec'd at CA Center

2006 09 13 I-130 NOA1 receipt date

2006 11 22 NOA2, approved

2007 02 15 Case complete at NVC

2007 02 21 Case forwarded to Bogota Embassy

2007 02 23 Case received at Embassy

2007 04 12 Interview,VISA GRANTED

I-751- Removing Conditions

2009 04 08 Overnight Application

2009 04 09 Rec'd Application at CSC

2009 04 17 Rec'd NOA

2009 05 10 Called CSC - No Biometrix letter, 45 day Inquiry starts

2009 05 18 Made Info Pass appointment for June 2

2009 05 26 Rec'd response and copy of Bio Appt letter dated May 14, Appt on May 28

2009 05 27 Biometrix-walked in a day early and completed appointment

2009 06 01 Approved Conditions Removed (rec'd Congratulations letter on June 9)

2009 06 12 Touched but nothing changed on USCIS website

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...