Jump to content

1,529 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

And yet another one on fb sent their AOS and IV on aug 11 (they don't know the scan date) and they recieved a checklist regarding 'fee payment'. They had not payed their IV fee. Can it mean their AOS was already approved! We are yet to find out In the morning!!

I feel like a script writer of a suspense show :rofl:

...to be continued :rofl:

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

Am equally waiting to hear his response, maybe one of his family member works at NVC or he got help from his Senator/Congress man or his related to the president.

Honestly I think some of us should start considering working at NVC. Not as a phone rep but as a reviewer or supervisor so we all can help our family and friends with a faster review.

**Any idea on how to apply for the job? :bonk: :bonk:

That would actually be great. But I think I read somewhere that the phone representatives and the supervisors are not allowed to talk about those cases to each other! So those who are lucky among us and who go to a supervisor from VJ will make the most out of it ;)

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Posted

It's official... I had a Hat-trick today... third AP in as many consecutive visa applications !!!!

Had the most grueling interview today. Arrived at the embassy at 12:30 and left at 3:00 pm. The CO interview alone lasted over an hour and a half !!! Half way through the interview the CO was about to reject the application citing a missing requirement from the petition (a tenure-track job offer). I had to painstakingly convince him that he was citing the requirements of the wrong visa category altogether. Once that was squared away, I had to walk him through my 14-page petition letter and all the evidence contained in it which exceed the requirements of the correct petition category. Glad I had a duplicate of everything I submitted... it was like one of my lectures... CO said as much jokingly at the end.

At the end, we reached a compromisee that I provide a fresh letter from CU-Boulder that they are expecting my arrival and are providing their research facilities for my use (received a 221(g) letter detailing this request). I had a formal letter to that effect from CU-Boulder, but the CO wanted a reaffirmation !!!

So drained now... I need to rest before I contact CU-Boulder.

Oh mobar65

This is crazy. How can they do this to you? What does it mean that you are in AP? Has the Visa been approved? I don't really understand what AP ISO?

You must be so wiped out today. What is the next stage?

2013/9/17 - Mailed I-130

2013/9/20 - Received NOA1

2014/2/26 - Transferred to TSC

2014/3/21 - Received email NOA2

2014/3/21 - I-130 Approved

2014/3/26 - Email received File Received

2014/4/02 - NVC received file

2014/5/1 - Case Number and IIN assigned

2014/5/7 - DS-261 available and completed

2014/5/8 - AOS invoice available and paid

2014/5/9 - AOS showing as paid

2014/5/20 - AOS Package sent

2014/6/3 - AOS Scanned and Under Review

2014/6/9 - IV Fee Invoice available and Paid

2014/6/10 - DS-260 available

2014/6/10 - IV package couriered to NVC

2014/6/10 - IV invoice showing Paid

2014/6/11 - DS-260 submitted

2014/6/16 - IV package delivered to NVC

2014/6/20 - IV package scanned

2014/7/11 - Received Checklist for AOS - one tiny thing!

2014/7/15 - Checklist response couriered to NVC by Lawyers

2014/7/18 - AOS Checklist delivered to NVC

2014/7/22 - AOS Checklist scanned in

2014/8/5 - IV Checklist Received

2014/8/20 - Supervisor reviewed Adoption Certificate Checklist and found it acceptable

2014/8/26 - Couriered Singapore Police Certificate to NVC

2014/8/28 - Package delivered to NVC

2014/8/29 - IV checklist scanned in

2014/9/12 - AOS Checklist accepted

2024/10/27 - called NVC to be advised last scanned document is now September 17th, an email I sent early August and they looked at on September 17th.

2014/9/17 - last scanned date. Waiting for a Case Complete.

2014/10/30 - CASE COMPLETE

2014/11/10 - Interview Scheduled

2014/12/23 - Interview - going to try to move up a week but we will see.

2014/12/2 - interview and APPROVED

2014/12/18 - Smooth and quick POE at LAX then onto JFK by domestic

Filed: EB-1 Visa Country: Kuwait
Timeline
Posted

Oh mobar65

This is crazy. How can they do this to you? What does it mean that you are in AP? Has the Visa been approved? I don't really understand what AP ISO?

You must be so wiped out today. What is the next stage?

They could do anything they like and there is no possible legal recourse. AP is the dreaded Administrative Processing which could last weeks or years in some cases.

The good news is, he asked for a specific document which I already acquired today and will be delivered to the embassy by noon.

The bad news is, the CO could still get back at me for daring to quote for him USCIS regulations and pointing out that he was looking at the wrong section of the rulebook. Kind of bringing a basketball rule book to coach a football team.

We'll know soon enough, I guess. If I get denied, it would be another USCIS/NVC/Consulate round, I'm afraid.

Wife is just too furious for words. I'm just moving on while re-evaluating my options as I go.

21-MAR-2014 I-140 + PP sent to USCIS

31-MAR-2014 Petition approved

16-APR-2014 Case shipped to NVC

29-APR-2014 Case received by NVC

23-MAY-2014 Case # assigned

4-JUN-2014 IV Bill invoiced and PAID (AOS Exempt, DS-261 Waived)

6-JUN-2014 DS-260 forms submitted

10-JUN-2014 IV Docs received by NVC

13-JUN-2014 IV Docs matched to case (scanned)

30-JUL-2014 Case Complete, CC email auto-sent one week later

20-AUG-2014 AOS fee changed to N/A (Final clearance for interview scheduling?)

29-AUG-2014 Consular Interview scheduled on Oct 1st. Later rescheduled to Sep 24th. P4 Letter received following business day

14-SEP-2014 CEAC status changed to Ready

15-SEP-2014 Medical results delivered to Embassy by Panel Physician

24-SEP-2014 Consular Interview, went into AP (3rd AP in as many consecutive visa applications)

14-OCT-2014 Visa issued

22-OCT-2014 POE at Dulles Airport, Washington, D.C.

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

Ok so the one who got called by Nvc had contacted their elected officials. Now makes more sense lol

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline
Posted

Things are looking up for you, it seems. I hope we'll both hear good news by next week.

Thank you Soloenta... Really appreciate your high opinion of me. And thanks for the "invitation" and the virtual tours. I'll watch them when I'm more up-beat.

I emailed CU-Boulder before I went to bed with the CO's request, and woke up this morning with the requested supporting letter already in my mailbox. GO C U !!! as we used to chant during CU's football games ages ago. I'll hand-deliver the letter to the embassy later this morning.

Am so happy for you on the progress :dancing: :joy: hopefully you should hear good news from the embassy next week.

Posted

They could do anything they like and there is no possible legal recourse. AP is the dreaded Administrative Processing which could last weeks or years in some cases.

The good news is, he asked for a specific document which I already acquired today and will be delivered to the embassy by noon.

The bad news is, the CO could still get back at me for daring to quote for him USCIS regulations and pointing out that he was looking at the wrong section of the rulebook. Kind of bringing a basketball rule book to coach a football team.

We'll know soon enough, I guess. If I get denied, it would be another USCIS/NVC/Consulate round, I'm afraid.

Wife is just too furious for words. I'm just moving on while re-evaluating my options as I go.

I just feel so flat thinking about what you have gone through today. I hope your wife is OK. Let's just hope that it is a brief setback and that it will be resolved really quickly. I can only imagine how you must be feeling tonight. My thoughts are with you and your family right now.

2013/9/17 - Mailed I-130

2013/9/20 - Received NOA1

2014/2/26 - Transferred to TSC

2014/3/21 - Received email NOA2

2014/3/21 - I-130 Approved

2014/3/26 - Email received File Received

2014/4/02 - NVC received file

2014/5/1 - Case Number and IIN assigned

2014/5/7 - DS-261 available and completed

2014/5/8 - AOS invoice available and paid

2014/5/9 - AOS showing as paid

2014/5/20 - AOS Package sent

2014/6/3 - AOS Scanned and Under Review

2014/6/9 - IV Fee Invoice available and Paid

2014/6/10 - DS-260 available

2014/6/10 - IV package couriered to NVC

2014/6/10 - IV invoice showing Paid

2014/6/11 - DS-260 submitted

2014/6/16 - IV package delivered to NVC

2014/6/20 - IV package scanned

2014/7/11 - Received Checklist for AOS - one tiny thing!

2014/7/15 - Checklist response couriered to NVC by Lawyers

2014/7/18 - AOS Checklist delivered to NVC

2014/7/22 - AOS Checklist scanned in

2014/8/5 - IV Checklist Received

2014/8/20 - Supervisor reviewed Adoption Certificate Checklist and found it acceptable

2014/8/26 - Couriered Singapore Police Certificate to NVC

2014/8/28 - Package delivered to NVC

2014/8/29 - IV checklist scanned in

2014/9/12 - AOS Checklist accepted

2024/10/27 - called NVC to be advised last scanned document is now September 17th, an email I sent early August and they looked at on September 17th.

2014/9/17 - last scanned date. Waiting for a Case Complete.

2014/10/30 - CASE COMPLETE

2014/11/10 - Interview Scheduled

2014/12/23 - Interview - going to try to move up a week but we will see.

2014/12/2 - interview and APPROVED

2014/12/18 - Smooth and quick POE at LAX then onto JFK by domestic

Filed: EB-1 Visa Country: Kuwait
Timeline
Posted

Ok so the one who got called by Nvc had contacted their elected officials. Now makes more sense lol

I know some would disagree with me on this one, but elected reps have no business intervening for individual cases. If they see injustices going on they should intervene to fix the system as a whole and/or make incompetent agency planners account for their failings. The reason I say this is, far too often in less transparent systems of government, this practice can easily morph into a situation where no one will get justice without some rep intervening on their behalf and reaping some kind of payback, financially or at the ballot box.

Am so happy for you on the progress :dancing: :joy: hopefully you should hear good news from the embassy next week.

Thanks... fingers crossed for all of us.

I just feel so flat thinking about what you have gone through today. I hope your wife is OK. Let's just hope that it is a brief setback and that it will be resolved really quickly. I can only imagine how you must be feeling tonight. My thoughts are with you and your family right now.

Actually, when I went to bed last night after the day's ordeal, I realized that my wife is right next to me and my kids are fast asleep and safe next-doors. At that moment, nothing else really mattered and I trusted the next day will bring its own mix of news. Sure enough, I was woken up by an email ping on my phone around 4:30 in the morning with the CU-Boulder supporting letter. I usually wake up at that time anyway to tend my garden before the school run.

21-MAR-2014 I-140 + PP sent to USCIS

31-MAR-2014 Petition approved

16-APR-2014 Case shipped to NVC

29-APR-2014 Case received by NVC

23-MAY-2014 Case # assigned

4-JUN-2014 IV Bill invoiced and PAID (AOS Exempt, DS-261 Waived)

6-JUN-2014 DS-260 forms submitted

10-JUN-2014 IV Docs received by NVC

13-JUN-2014 IV Docs matched to case (scanned)

30-JUL-2014 Case Complete, CC email auto-sent one week later

20-AUG-2014 AOS fee changed to N/A (Final clearance for interview scheduling?)

29-AUG-2014 Consular Interview scheduled on Oct 1st. Later rescheduled to Sep 24th. P4 Letter received following business day

14-SEP-2014 CEAC status changed to Ready

15-SEP-2014 Medical results delivered to Embassy by Panel Physician

24-SEP-2014 Consular Interview, went into AP (3rd AP in as many consecutive visa applications)

14-OCT-2014 Visa issued

22-OCT-2014 POE at Dulles Airport, Washington, D.C.

Posted

I know some would disagree with me on this one, but elected reps have no business intervening for individual cases. If they see injustices going on they should intervene to fix the system as a whole and/or make incompetent agency planners account for their failings. The reason I say this is, far too often in less transparent systems of government, this practice can easily morph into a situation where no one will get justice without some rep intervening on their behalf and reaping some kind of payback, financially or at the ballot box.

Thanks... fingers crossed for all of us.

Actually, when I went to bed last night after the day's ordeal, I realized that my wife is right next to me and my kids are fast asleep and safe next-doors. At that moment, nothing else really mattered and I trusted the next day will bring its own mix of news. Sure enough, I was woken up by an email ping on my phone around 4:30 in the morning with the CU-Boulder supporting letter. I usually wake up at that time anyway to tend my garden before the school run.

What a great attitude. You are right, it all gets put into perspective. Another one who gets up at 4.30 in the morning. I am also up at that time to drive my son to swimming training but I do admit that I go to bed early.

Great news about getting the letter so quickly. After dealing with NVC I am always amazed now when organisations do things quickly. NVC have tarred me. Get that letter down to the Embassy and let's get this all sorted out as soon as possible.

2013/9/17 - Mailed I-130

2013/9/20 - Received NOA1

2014/2/26 - Transferred to TSC

2014/3/21 - Received email NOA2

2014/3/21 - I-130 Approved

2014/3/26 - Email received File Received

2014/4/02 - NVC received file

2014/5/1 - Case Number and IIN assigned

2014/5/7 - DS-261 available and completed

2014/5/8 - AOS invoice available and paid

2014/5/9 - AOS showing as paid

2014/5/20 - AOS Package sent

2014/6/3 - AOS Scanned and Under Review

2014/6/9 - IV Fee Invoice available and Paid

2014/6/10 - DS-260 available

2014/6/10 - IV package couriered to NVC

2014/6/10 - IV invoice showing Paid

2014/6/11 - DS-260 submitted

2014/6/16 - IV package delivered to NVC

2014/6/20 - IV package scanned

2014/7/11 - Received Checklist for AOS - one tiny thing!

2014/7/15 - Checklist response couriered to NVC by Lawyers

2014/7/18 - AOS Checklist delivered to NVC

2014/7/22 - AOS Checklist scanned in

2014/8/5 - IV Checklist Received

2014/8/20 - Supervisor reviewed Adoption Certificate Checklist and found it acceptable

2014/8/26 - Couriered Singapore Police Certificate to NVC

2014/8/28 - Package delivered to NVC

2014/8/29 - IV checklist scanned in

2014/9/12 - AOS Checklist accepted

2024/10/27 - called NVC to be advised last scanned document is now September 17th, an email I sent early August and they looked at on September 17th.

2014/9/17 - last scanned date. Waiting for a Case Complete.

2014/10/30 - CASE COMPLETE

2014/11/10 - Interview Scheduled

2014/12/23 - Interview - going to try to move up a week but we will see.

2014/12/2 - interview and APPROVED

2014/12/18 - Smooth and quick POE at LAX then onto JFK by domestic

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

Things are looking up for you, it seems. I hope we'll both hear good news by next week.

Thank you Soloenta... Really appreciate your high opinion of me. And thanks for the "invitation" and the virtual tours. I'll watch them when I'm more up-beat.

I emailed CU-Boulder before I went to bed with the CO's request, and woke up this morning with the requested supporting letter already in my mailbox. GO C U !!! as we used to chant during CU's football games ages ago. I'll hand-deliver the letter to the embassy later this morning.

Well its true and what great news, I just can't wait I wonder if they let you hand deliver it to the punk so he can say " your visa will be ready in the next few days" . OMG I'll start praying this second. (F) (L) (F) t0803.gif

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

Someone on fb got a case complete with scan date of aug 12!!! :wow: hold on the surprise doesn't end here.... Nvc actually called them to say u have a case complete! :wow: :wow: :wow:

surprised-bird-smiley-emoticon.gifwhat-smiley-emoticon.gif Why can't we have this kind of luck? I'm happy for them but would like the same thing everyone else gets without all the BS!

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted (edited)

good luck to all of you

Thank you and to you and picgifs-welcome-2-8100585.gifto the thread. :D(L)

Edited by Soloenta

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

No NVC operator called me up when I got a CC! :bonk: I feel less special now! :dead:

Well your special to us and that's all that matters. :Dt5063.gif

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Filed: EB-1 Visa Country: Kuwait
Timeline
Posted

Get that letter down to the Embassy and let's get this all sorted out as soon as possible.

Yes Ma'am... Will do.................. There... Done! :)

Door-to-door, the embassy is less than a mile from my house, as the crow flies.

Well its true and what great news, I just can't wait I wonder if they let you hand deliver it to the punk so he can say " your visa will be ready in the next few days" . OMG I'll start praying this second. (F) (L) (F) t0803.gif

Please keep it up. The requested document should be in his hand by now, unless he's busy with another victim applicant.

21-MAR-2014 I-140 + PP sent to USCIS

31-MAR-2014 Petition approved

16-APR-2014 Case shipped to NVC

29-APR-2014 Case received by NVC

23-MAY-2014 Case # assigned

4-JUN-2014 IV Bill invoiced and PAID (AOS Exempt, DS-261 Waived)

6-JUN-2014 DS-260 forms submitted

10-JUN-2014 IV Docs received by NVC

13-JUN-2014 IV Docs matched to case (scanned)

30-JUL-2014 Case Complete, CC email auto-sent one week later

20-AUG-2014 AOS fee changed to N/A (Final clearance for interview scheduling?)

29-AUG-2014 Consular Interview scheduled on Oct 1st. Later rescheduled to Sep 24th. P4 Letter received following business day

14-SEP-2014 CEAC status changed to Ready

15-SEP-2014 Medical results delivered to Embassy by Panel Physician

24-SEP-2014 Consular Interview, went into AP (3rd AP in as many consecutive visa applications)

14-OCT-2014 Visa issued

22-OCT-2014 POE at Dulles Airport, Washington, D.C.

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

Am equally waiting to hear his response, maybe one of his family member works at NVC or he got help from his Senator/Congress man or his related to the president.

Honestly I think some of us should start considering working at NVC. Not as a phone rep but as a reviewer or supervisor so we all can help our family and friends with a faster review.

**Any idea on how to apply for the job? :bonk: :bonk:

I wouldn't mind but not moving to NH that's for sure! :((L) :D

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...