Jump to content

1,529 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

Well last night I was thinking out this whole scenario. NVC started implementing the 60 day thing mid July and I think they delayed a lot of the invoices then too, which could have caused lesser packages to be mailed....since people kept on waiting for the invoices to become available prior to sending out the package.

So maybe they are getting through to the review faster because less packages were received :lol:

Ok I need to clearly stop this imagination of mine, the only true explanation could be that the workers are finally awake and are actually getting some work done.

Filed: IR-1/CR-1 Visa Country: Mexico
Timeline
Posted

Hello and welcome!

My signature and timeline should hopefully tell you quite a bit. My case was expedited at USCIS and was approved on July 10th and then it took around a month to submit the first "form" (DS-261) to NVC on Aug 13th. I then paid the AOS fee on Aug 14th and sent my documents the following week. I sent both the AOS and IV documents together and waited from Aug 13th to today to receive the IV fee. Therefore, i've only been at NVC since the end of July. I now need to wait "at least 60 days" from my last scan date (Sep 3rd) before a checklist or case complete.

I hope that helps somewhat.

Best wishes!

.

You helped out alot!! Thank you, wish you good luck! Hope i have a process as smooth as yours.. Its the best timeline i have seen...

130 PD: 3/31/14

129F PD: 4/25/14

!30 Approved: 9/5/14

129F Approved: 9/5/14

NVC Received: Anxiously waiting..

NVC Assigned Case #:

Posted

.

You helped out alot!! Thank you, wish you good luck! Hope i have a process as smooth as yours.. Its the best timeline i have seen...

Thanks, Tavotevi. That's probably because i'm only early in the process. Unfortunately, NVC likes to hand out checklists (that add 60 days) for very small reasons so it might not always look this smooth sailing.

My husband is being "removed" from my country (UK) in a couple of weeks for no reason other than I used to be a US resident and the UK thinks I can move back. My 5 year old daughter and I are heartbroken but if i'm lucky with the rest of the process we should all be reunited by January (I hope).

Be sure to fill out your signature and keep your timeline up to date. Also, feel free to complain and share your thoughts. The people in this thread are quite lovely :luv:

Second IR-1 Green Card journey

06/04/2014 - sent I-130

06/11/2014 - case received at Chicago Lockbox

06/16/2014 - case sent to Nebraska Service Centre

06/18/2014 - expedite requested

06/24/2014 - received e-mail from NSC that expedite is being considered

07/10/2014 - I-130 approved

07/17/2014 - approved case sent to NVC

08/11/2014 - expedite requested

08/12/2014 - NVC case number assigned (no IIN)

08/13/2014 - IIN received by email while on hold to NVC

08/13/2014 - DS-261 submitted

08/14/2014 - AOS fee billed

08/15/2014 - AOS fee paid

08/18/2014 - expedite denied :-(

08/27/2014 - Sent AOS and IV package

09/02/2014 - USPS shows package delivered

09/03/2014 - AOS and IV scan date

09/08/2014 - email from NVC stating to wait 60 days for review

09/17/2014 - IV fee invoiced (invoice date of 09/15/2014, therefore 33 days since submitting DS-261)

09/19/2014 - IV fee paid

09/22/2014 - IV fee shows "paid". DS-260 became available.

09/24/2014 - DS-260 completed.

10/28/2014 - AOS Checklist. Checking/savings account verification requested, despite joint-sponsor's AOS package being accepted. Told to send in letter to disregard checking/savings account in the application. Checklist states 60 BUSINESS days to review. :cry:

11/05/2014 - Letter sent to NVC requesting them to disregard checking/savings account.

11/13/2014 - AOS Checklist scan date.

01/07/2015 - Case Complete!!!

01/15/2015 - Interview scheduled for Feb 9!

02/09/2015 - Interview - APPROVED! :dancing:

02/10/2015 - Visa Issued

02/12/2015 - Visa handed over to courier

02/13/2015 - Visa delivered at 8am

02/22/2015 - POE (Orlando, FL)

Posted

Well last night I was thinking out this whole scenario. NVC started implementing the 60 day thing mid July and I think they delayed a lot of the invoices then too, which could have caused lesser packages to be mailed....since people kept on waiting for the invoices to become available prior to sending out the package.

So maybe they are getting through to the review faster because less packages were received :lol:

Ok I need to clearly stop this imagination of mine, the only true explanation could be that the workers are finally awake and are actually getting some work done.

Isn't it awful that we are forced to daydream about NVC and not something wonderful??!! ARGHH

I'm not sure if you saw a few days ago, but I received an email from NVC that was from a contractor. I'm wondering if the contractor has helped to speed things up. Maybe their employees have come in and started kicking butt. Now i'm daydreaming about NVC! :ranting:

:goofy:

Second IR-1 Green Card journey

06/04/2014 - sent I-130

06/11/2014 - case received at Chicago Lockbox

06/16/2014 - case sent to Nebraska Service Centre

06/18/2014 - expedite requested

06/24/2014 - received e-mail from NSC that expedite is being considered

07/10/2014 - I-130 approved

07/17/2014 - approved case sent to NVC

08/11/2014 - expedite requested

08/12/2014 - NVC case number assigned (no IIN)

08/13/2014 - IIN received by email while on hold to NVC

08/13/2014 - DS-261 submitted

08/14/2014 - AOS fee billed

08/15/2014 - AOS fee paid

08/18/2014 - expedite denied :-(

08/27/2014 - Sent AOS and IV package

09/02/2014 - USPS shows package delivered

09/03/2014 - AOS and IV scan date

09/08/2014 - email from NVC stating to wait 60 days for review

09/17/2014 - IV fee invoiced (invoice date of 09/15/2014, therefore 33 days since submitting DS-261)

09/19/2014 - IV fee paid

09/22/2014 - IV fee shows "paid". DS-260 became available.

09/24/2014 - DS-260 completed.

10/28/2014 - AOS Checklist. Checking/savings account verification requested, despite joint-sponsor's AOS package being accepted. Told to send in letter to disregard checking/savings account in the application. Checklist states 60 BUSINESS days to review. :cry:

11/05/2014 - Letter sent to NVC requesting them to disregard checking/savings account.

11/13/2014 - AOS Checklist scan date.

01/07/2015 - Case Complete!!!

01/15/2015 - Interview scheduled for Feb 9!

02/09/2015 - Interview - APPROVED! :dancing:

02/10/2015 - Visa Issued

02/12/2015 - Visa handed over to courier

02/13/2015 - Visa delivered at 8am

02/22/2015 - POE (Orlando, FL)

Posted

NVC with your money money-pile-smiley-emoticon.gif You after paying NVCno-money-smiley-emoticon.gif And with some luck maybe they will be speeding up. :D

Hahahaha. I was in a horrible mood until I saw this.

Thank you :rofl::luv:

Second IR-1 Green Card journey

06/04/2014 - sent I-130

06/11/2014 - case received at Chicago Lockbox

06/16/2014 - case sent to Nebraska Service Centre

06/18/2014 - expedite requested

06/24/2014 - received e-mail from NSC that expedite is being considered

07/10/2014 - I-130 approved

07/17/2014 - approved case sent to NVC

08/11/2014 - expedite requested

08/12/2014 - NVC case number assigned (no IIN)

08/13/2014 - IIN received by email while on hold to NVC

08/13/2014 - DS-261 submitted

08/14/2014 - AOS fee billed

08/15/2014 - AOS fee paid

08/18/2014 - expedite denied :-(

08/27/2014 - Sent AOS and IV package

09/02/2014 - USPS shows package delivered

09/03/2014 - AOS and IV scan date

09/08/2014 - email from NVC stating to wait 60 days for review

09/17/2014 - IV fee invoiced (invoice date of 09/15/2014, therefore 33 days since submitting DS-261)

09/19/2014 - IV fee paid

09/22/2014 - IV fee shows "paid". DS-260 became available.

09/24/2014 - DS-260 completed.

10/28/2014 - AOS Checklist. Checking/savings account verification requested, despite joint-sponsor's AOS package being accepted. Told to send in letter to disregard checking/savings account in the application. Checklist states 60 BUSINESS days to review. :cry:

11/05/2014 - Letter sent to NVC requesting them to disregard checking/savings account.

11/13/2014 - AOS Checklist scan date.

01/07/2015 - Case Complete!!!

01/15/2015 - Interview scheduled for Feb 9!

02/09/2015 - Interview - APPROVED! :dancing:

02/10/2015 - Visa Issued

02/12/2015 - Visa handed over to courier

02/13/2015 - Visa delivered at 8am

02/22/2015 - POE (Orlando, FL)

Filed: Citizen (pnd) Country: Canada
Timeline
Posted

Well last night I was thinking out this whole scenario. NVC started implementing the 60 day thing mid July and I think they delayed a lot of the invoices then too, which could have caused lesser packages to be mailed....since people kept on waiting for the invoices to become available prior to sending out the package.

So maybe they are getting through to the review faster because less packages were received :lol:

Ok I need to clearly stop this imagination of mine, the only true explanation could be that the workers are finally awake and are actually getting some work done.

I was thinking about the same thing. :idea:

People were waiting for the IV fee invoice so they weren't sending their IV packages. :wacko:

Now more people are sending their IV packages with the AOS cover letter... :unsure:

Well, think positive! :yes: They may hire additional reviewers soon since they've raised the AOS and IV fees. :whistle:

Naturalization

N-400 Sent: Aug 22, 2017

NOA: Aug 24, 2017

Biometrics: Sept 22, 2017

Interview: Oct 22, 2018 (Approved)

Oath Ceremony: Oct 23, 2018

 

Removing Conditions

I-751 Sent: Aug 22, 2016

NOA1: Aug 25, 2016

Biometrics: Oct 12, 2016

Interview: Oct 22, 2018 (Approved)

 

I-130 Application

NOA1: Oct 4, 2013

NOA2: Apr 11, 2014

NVC Received: Apr 30

Case Number: May 23

DS-261 / AOS Fee: June 5

AOS Package (Scan): June 16

IV Fee: July 18

IV Package (Scan): July 25

DS-260 Form: July 25

AOS Package (Accepted): July 29

Case Complete: Sept 16

Medical Exam: Oct 16

Interview: Nov 10

Visa Received: Nov 19

POE: Nov 20, 2014

 

Filed: Citizen (pnd) Country: Canada
Timeline
Posted

Ok spoke to Ivy who gave her name as Abby at first (confused me) she insisted my AOS was all messed up hahaha but I told her Don said it was accepted 08/10 and I asked Ivy to please speak to a supervisor who later found out is Mary. Mary said all is good documents are under review and should have CC soon and AOS accepted. I asked if they could remove that, it's only confusing the Reps and she said it will be. So only God in heaven knows. :D No CC for me which is fine doesn't make me happy but what are you going to do. :D

I remember your initial AOS package contained errors so you fixed the application and sent the corrected one a week later. :idea:

I think they initially gave you a checklist; then, they received your corrected AOS application a week later and accepted your AOS package. :star:

Maybe that's confusing them> They're probably thinking that it usually takes 45-55 days for them to receive a checklist document after a checklist being issued. Maybe they're too dumb to realize that you sent the corrected AOS application before the checklist? Maybe the reviewer who reviewed your corrected AOS application didn't write a note in your file? :angry:

I really hope this is your week, Soloenta! You've been waiting for this too long! Fingers crossed! :thumbs:

Naturalization

N-400 Sent: Aug 22, 2017

NOA: Aug 24, 2017

Biometrics: Sept 22, 2017

Interview: Oct 22, 2018 (Approved)

Oath Ceremony: Oct 23, 2018

 

Removing Conditions

I-751 Sent: Aug 22, 2016

NOA1: Aug 25, 2016

Biometrics: Oct 12, 2016

Interview: Oct 22, 2018 (Approved)

 

I-130 Application

NOA1: Oct 4, 2013

NOA2: Apr 11, 2014

NVC Received: Apr 30

Case Number: May 23

DS-261 / AOS Fee: June 5

AOS Package (Scan): June 16

IV Fee: July 18

IV Package (Scan): July 25

DS-260 Form: July 25

AOS Package (Accepted): July 29

Case Complete: Sept 16

Medical Exam: Oct 16

Interview: Nov 10

Visa Received: Nov 19

POE: Nov 20, 2014

 

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

called to check up on my IV fee status and got great news! DS 261 was reviewed two days ago so I should get the fees soon!!! Maybe the sleeping giant is finally awake hahaha

I have a question i asked in the main NVC thread, ill put it here. I asked the rep who should I mark the package attention to, he said whatever is on the AOS sheet, which is attention CMS. But the NVC site shows attention DR with this new process update.

So am a bit confused now. Anyone who just got the IV fees invoiced, what does your document sheet show?

This is from the NVC site

Method 3: Mail processing

If neither Method 1: Email processing nor Method 2: Choice of processing applies to your case, mail your financial forms and evidence, supporting documents, translations, and photocopies, with the Document Cover Sheet included with your NVC Welcome Letter, to the following address:

National Visa Center

Attn: DR

31 Rochester Ave. Suite 100

Portsmouth, NH 03801-2914

Very nice congratulations so happy for you. :)

Last scan date july 24th, fee changed to NA

WOOOOOOOOOOOOOOOOOOOOOOOOOO HOOOOOOOOOOOOOOOOOOOO CONGRATULATIONS SO VERY HAPPY FOR YOU.

m0113.gift9304.gifegyptian.gifegyptian.gifh0403.gifegyptian.gifegyptian.gift9304.gifm0113.gif

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

I had my IV fee issued today and the IV bar-coded cover states this address:

National Visa Center

Attn. CMR

31 Rochester Avenue Suite 100

Portsmouth, NH 03801-2914

I sent my IV package before I got the fee and I put CMR/DR (civil documents inside).

My package arrived perfectly on Sept 11th.

Now I am waiting for DS260 becomes available. I think by tomorrow. I will submit it then. Will it be my last scan date or the Iv package one?

Wonderful your well on your way. :) soon you'll be out of here. ;)

No Case Number yet :cry:

Eager to get started...

Awww be patient it will come soon :) We'll wait with you. (F) (L) (F)

Nice one :D I don't think I'd be happy if someone was waiting over 70 days, it'd be best if I remain the super-awesome-mega-invoice-waiter. Where do I get my trophy? :D

There you go doll wish you would have gotten the one for shortest wait time. won-the-trophy-smiley-emoticon.gif

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

Very nice congratulations so happy for you. :)

Thanks! I hope you get your CC soon!!!

IV fees got invoiced an hour ago and paid as well! sending out packages this weekend :)

USCIS

January 8th 2014 - NOA1

July 10th 2014 - NOA2

NVC

July 17th 2014 - Case shipped to NVC

July 30th 2014 - Case received by NVC

August 13th 2014 - Case number and IIN received by email

August 13th 2014 - DS-261 Form Completed

August 14th 2014 - AOS Fees Invoiced and Paid

September 17th 2014 - IV Fees Invoiced and Paid

September 19th 2014 - DS260 Completed

October 6th 2014 - AOS and IV Packages Received

November 28th 2014 - AOS and IV Checklist (4 items in total. 3 for documents they lost. Called on December 9 and a rep said no checklist for IV....go figure)

December 8th 2014 - Checklist scan date.

December 30th 2014 - Case Compl........NOT. So after not having an interview date yet, I called again on Jan 30th and apparently its in final review with a supervisor.

February 6th 2015 - Case Complete: Supervisor called from NVC to confirm everything has been completed now.

March 27 2015 - Interview Date

March 27 2015 - Approved!

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

Hahahaha. I was in a horrible mood until I saw this.

Thank you :rofl::luv:

Hahaha well I'm happy to have made you laugh. :D:thumbs:

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

I remember your initial AOS package contained errors so you fixed the application and sent the corrected one a week later. :idea:

I think they initially gave you a checklist; then, they received your corrected AOS application a week later and accepted your AOS package. :star:

Maybe that's confusing them> They're probably thinking that it usually takes 45-55 days for them to receive a checklist document after a checklist being issued. Maybe they're too dumb to realize that you sent the corrected AOS application before the checklist? Maybe the reviewer who reviewed your corrected AOS application didn't write a note in your file? :angry:

I really hope this is your week, Soloenta! You've been waiting for this too long! Fingers crossed! :thumbs:

Thank you my friend, who knows with them the supervisors seem to get it right away but don't understand why they don't remove that to eliminate the confusion but then that would be logical and it's against their policy. TY again. t5063.gif

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Posted

Thank you all for your congratulations!

I am happy to hear that the NVC is correcting their errors in your cases, Soloenta and Romii! You both are due for a CC!

Here's hoping that the NVC improves on their current ~55 day review period!

Click "Show" to see my timeline.

Petitioner and Beneficiary both live temporarily in France, no DCF

USCIS
04/18/14: I-130 sent via Chronopost
04/21/14: NOA1
05/01/14: NOA2

NVC
05/12/14: NVC received case
06/04/14: Case number assigned (wrong embassy); received IIN
06/12/14: Case number reassigned to correct embassy, same IIN
06/13/14: Received DS-261 email and AOS invoice; completed DS-261 and paid AOS fee
06/18/14: AOS fee appears as "Paid" in the portal
06/26/14: AOS package sent via FedEx
06/30/14: AOS package delivered to NVC
07/07/14: AOS package scanned in
07/18/14: Received IV fee invoice; paid IV fee.
07/21/14: Sent IV package
07/21/14: IV Fee shows as paid
07/21/14: Submitted DS-260
07/23/14: IV packaged delivered to NVC
07/25/14: IV package scanned in
08/21/14: Received false checklist for IV documents -- AOS approved!
09/16/14: AOS fee changed from "Paid" to "N/A" -- CASE COMPLETE!
09/23/14: Received Case Complete email from NVC
10/06/14: Received Interview Date
10/07/14: Received interview letter via email
11/04/14: Medical
11/12/14: INTERVIEW! Approved! :dancing:

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

Thank you all for your congratulations!

I am happy to hear that the NVC is correcting their errors in your cases, Soloenta and Romii! You both are due for a CC!

Here's hoping that the NVC improves on their current ~55 day review period!

Thank you TM my friend for your kind words. :)t5063.gif

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

Good morning VJ Friends,

Got a checklist email from NVC last night (I think it's false). The confusing thing here is that my lawyer told me just yesterday that he was gonna be mailing my AOS & IV documents to NVC yesterday.....and as far as I know, we can't do EP since it's not available for Egypt. The good news is that it says they will review my documents in 30 days and not the standard 60 days. :huh:

Below is the email I received. Any thoughts why NVC sent this?

September 16, 2014

NVC Case Number: CROXXXXXXXXXX

Dear XXXX

We reviewed the documents you submitted to us. This letter has a list of documents that are missing or

that need additional information. Please review the instructions and send us the required information. If

you do not provide this information, it will delay your immigrant visa interview.

If you have any questions about this letter, please send us an email at asknvc@state.gov or call us at

(603) 334-0700 between 7:00am and 12 midnight U.S. Eastern Time.

When you send us your response, include a copy of this letter. Also, clearly write your case number

XXXXX-XXXXX-XXX on the upper right-hand corner of every document you send.

After you email or mail the requested information, allow us 30 business days to review your response.

When we complete our review, we will send you information about the next processing step.

If a period of one year passes without contacting the NVC (by email, telephone, or mail), all

submitted fees and documents will expire. If this happens, you will need to resubmit the fees and

documents to continue the immigration process.

Case Number: XXXXXXXXXXXXX

Beneficiary's Name: XXXXXXXXXX

Preference Category: CR1 - CONDITIONAL SPOUSE OF U.S. CITIZEN

Priority Date: 11DEC2013

National Visa Center

Case Number Barcode Cover Sheet

______________________________________________

INSTRUCTIONS FOR: XXXXXXXX—XXXXXXX, XXXXXXXX XXXXXXXXX

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

______CORRESPONDENCE INSTRUCTIONS:_________________________________

When responding to the National Visa Center, please include the bar code sheet that came with this

letter. Failure to include the bar code sheet may cause a delay in the processing of your case. The bar

code sheet should be placed on top of all documents being submitted for this case and mailed to the

address provided.

______2 - PASSPORT:________________________________________________

Please submit a copy of the biographic data page of this person's passport, including the expiration date of the passport. The passport must be valid.

______3 - BIRTH CERTIFICATE:_______________________________________

Please submit this applicant's original, or a certified copy of the original document listed above. Each

applicant must obtain an original birth certificate issued by the official custodian of birth records in the

country of birth, showing the date and place of birth, and the parentage of the alien, based upon the

original registration of birth.

Documents must be from the appropriate issuing government authority. Failure to provide the correct document will delay your case and may result in re-scheduling of your interview or refusal of a visa.

The certificate must contain the following information:

· Person's date of birth

· Person's place of birth

· Names of both parents, and

· Annotation by the appropriate authority indicating that it is an extract from the official records

If the certificate is a certified copy of the original, it must come from the issuing government authority

and it must contain annotation by the issuing authority indicating that it is an extract from the official

records.

In addition to sending the original documents or certified copies of the documents to the NVC, a

photocopy of the original documents must be submitted.

Unobtainable birth certificates

If the applicant's birth record is unobtainable, please obtain a certified statement from the appropriate

government authority stating the reason that the applicant's birth record is not available. The applicant

must submit secondary evidence with the certified statement. For example:

· A baptismal certificate that contains the date and place of birth, as well as both parents names (providing the baptism took place shortly after birth)

· An adoption decree for an adopted child

· An affidavit from a close relative, preferably the applicant's mother, stating the date and place of birth, both parents names, and the mother's maiden name

Suitability of documentation for immigration purposes

For many countries, the U.S. Department of State has established country-specific criteria for ensuring

that applicants submit documents appropriate for visa processing. Please go to our website http://nvc.state.gov to determine if the U.S. Department of State has issued any country-specific

guidelines for the document requested.

All documents not in English or in the official language of the country where the visa application will be processed must be accompanied by a certified translation. Your translation must include a statement by

the translator which includes the following:

· Translation is accurate.

Translator is competent to translate.

______5 - MARRIAGE CERTIFICATE:____________________________________

Please submit this applicant's original marriage certificate, or a certified copy, bearing the appropriate

seal or stamp of the issuing authority. If the certificate is a certified copy of the original it must come

from the issuing government authority and it must contain annotation by the issuing government

authority indicating that it is an extract from the official records.

Documents must be from the appropriate issuing government authority. Failure to provide the

correct document will delay your case and may result in re-scheduling of your interview, or

refusal of a visa.

In addition to the original documents, or certified copies of the documents, a photocopy of the original

documents must be submitted to the NVC.

For many countries, the U.S. Department of State has established country-specific criteria for ensuring

that applicants submit documents appropriate for visa processing. Please go to http://nvc.state.gov to

determine if the U.S. Department of State has issued any country-specific guidelines for the requested

document.

All document not in English, or the official language of the country where the visa application will be

processed, must be accompanied by a certified translation. Your translation must include a statement

signed by the translator that states the following:

· Translation is accurate

· Translator is competent to translate

If it is impossible to obtain an original document or a certified copy of the original document because

records have been destroyed or the appropriate government authority will not issue one, you should

obtain a certified statement from the appropriate government authority stating the reason your record is not available.

______F - FINANCIAL EVIDENCE:______________________________________

We received your Immigrant Visa Application; however, we have not received an Affidavit of Support

form. You must submit an Affidavit of Support form before we can complete your case.

Please go to our website http://nvc.state.gov for instructions on how to obtain, complete, and submit an Affidavit of Support form.

When responding to the National Visa Center, please include the bar code sheet that came with this

letter. Failure to include the bar code sheet may cause a delay in the processing of your case. The bar

code sheet should be placed on top of all documents being submitted for this case and mailed to the

address provided.

______10 - EGYPT POLICE CERTIFICATE:_______________________________

Egypt: Available. Police certificates are obtainable by both Egyptians and non-Egyptians who were born in, or who permanently reside or have resided in Egypt. The Police Certificate, called a "Criminal Status Record" (Saheefat al Hala al Gina'iyya), may be obtained upon application to the police station nearest to the applicant's residence in Egypt, and normally takes between one and five working days. Applicants must be fingerprinted on the reverse side of application form. Upon completion of the investigation the certificate is delivered to the applicant with appropriate notations covering arrests which have resulted in charges being brought before a court and previous convictions, if any. An applicant abroad should make application to the nearest Egyptian consular officer who will fingerprint them and forward their

applications to the Ministry of Interior, Cairo, for investigation. Upon completion of the investigation, the application is then returned to the applicant. The latter procedure usually involves considerable delay. Since the certificates are eventually issued, they must be considered available.

______10 - LEBANON POLICE CERTIFICATE:_____________________________

LEBANON: Available. To obtain the "Judiciary Police Record", the individual who is physically present in Lebanon, must personally apply, accompanied by his/her Lebanese identity card to the Police Record Department, Internal Security Forces, Ministry of Interior. The document will be issued within 48 hours.

For those not residing in Lebanon, the request must be processed through Lebanese embassies/consulates, but applicants may experience extremely long waiting periods before they receive the documents, or may not receive them at all. The "Judiciary Police Record" may also be requested through a lawyer having a power of attormey from the individual authorizing the request.

______10 - MALAYSIA POLICE CERTIFICATE:____________________________

MALAYSIA: Available. Both Malaysians and non-Malaysians who have resided in Malaysia for a period of more than one year may apply for a Malaysian certificate of good conduct. Applicants residing in Malaysia should submit their applications to:

Consular Division

Ministry of Foreign Affairs Malaysia

Wisma Putra

No. 1 Jalan Wisma Putra

Precinct 2

62602 Putrajaya

Selangor

Tel: 6-03-8887-4000

Applicants residing outside Malaysia should contact the nearest Malaysian embassy or consulate in their

country of current residence. The application form for the Malaysian Certificate of Good Conduct, as well as the addresses and telephone numbers of Malaysian Missions abroad are available at the Malaysian Ministry of Foreign Affairs website at www.klm.gov.my.

Applications for the Certificate of Good Conduct must be accompanied with the following documents:

(1) 2 Malaysian passport size photographs (40cm x 55cm);

(2) 2 copies of the applicant's Malaysian identification card;

(3) 2 copies of the applicant's passport (for non-Malaysians, copies of all passport pages);

(4) A self-addressed stamped envelope;

(5) An introduction letter from the employer (for non-Malaysians).

Processing fee of Malaysian ringgit 20.00 in cash or Malaysian postal order made under the name of

Akauntan Negara Malaysia.

Processing time for the certificate is one to two months from the date of submission. The certificate of

good conduct will be forwarded to the applicant using their self-addressed stamped envelope. The

certificate may also be collected by the applicant at the consular division counter.

[bNN 09/16/2014] CROXXXXXXXXXX

So I called NVC and spoke with Gus. He was very nice and answered all of my questions. Basically he said that we got that email because our DS-260 Form was reviewed and accepted recently but they didn't find any AOS or IV docs for me. (Of course, since my lawyer recently mailed them yesterday). He said not to worry about it.

I also told him that we did not include the Police Certificates for Malalysia and Lebanon as we're currently waiting for them and I told him our lawyer included a letter explaining this and he said that is perfect. He told me that NVC does not necessarily need the Originals and as long as we mail a scan copy to the NVC, they should be able to approve our case and my husband can take the originals when he has his interview. Doesn't sound correct right? Just in case...as soon as my husband gets the Lebanon Police Certificate we'll send them to NVC just to be safe. :rolleyes:

I asked him to confirm the address where to send the documents and this is what he gave me:

National Visa Center

Attn: DR

31 Rochester Avenue, Suite 100

Portsmouth, NH 03801-2914

I hope any of this info is helpful to someone. Also for anyone needing a background check for Lebanon, it's quicker if you have a friend or relative currently living in Lebanon do it for you on your behalf since it's quicker (About 20 -30 days) instead of doing it thru the Lebanon Embassy in your country (which can take up to 6mos or you may never receive it.)

Gus told me to wait 60 days to review & approve my docs once they get them but he said they're working very hard to reduce that (he said working OT).

SOLOENTA!!! Where is your CC?? Praying for you and everyone else here waiting for a CC!!

USCIS

Date I-130 Sent : Dec-09-2013 | Date I-130 NOA1 : Dec-11-2013| Date I-130 NOA2 : June-16-2014 |Date Sent to NVC: June-19-2014|

Service Center: Texas Service Center (TSC)

Lawyer: Yes

NVC

Date Package Received By NVC : June-30-2014 |Date Case # assigned : July-29 -2014 | Received AOS & IV Bill : July-29-2014 |

Paid AOS & IV Bill : Aug-02-2014 | AOS & IV Payment Cleared in bank: Aug- 05-2014 | DS-260 Available: Aug -05-2014 | Submit DS-260 : Aug-21-2014 |

Sent AOS & IV Package to lawyer: Sept -04-2014 | Lawyer sent AOS & IV Package to NVC: Sept - 16-2014 | AOS & IV Package Delivered to NVC : Sept -18-2014 |

Received email from NVC Confirming they received AOS & IV Packages: Sept -19- 2014 | AOS & IV Package Scan Date(s): Sept -18-2014 | 60 Days Deadline for AOS & IV Package: Nov -18-2014 | Scan Date for Police Certificates: Oct -7-2014 | 60 Days Deadline for Police Certificates: Dec -7-2014 |

Case Completed at NVC : Nov-18-2014 :dancing:

Interview & POE

Interview Date Provided by NVC: Dec -15-2014 | Interview Letter (P4) Received: Dec-16-2014 | Date Package Left From NVC : Dec -17-2014 |

Date Package Arrived at Cairo Embassy: Dec -21-2014 | Medical Appt: Dec-18-2014 | Received Medical Results: Dec -25-2014 |

Interview Date: JANUARY 11, 2015 at 7:30am | Interview Result:: APPROVED!!! :dancing: | CEAC Website changed to AP: Jan-12- 2015 |

CEAC Website changed to ISSUED: Jan-13-2015 | Date IR-1 / CR1 Visa Received: Jan-18-2015 | Date of US Entry : Jan 30-2015 |

ROC

-Sent I-751 Form: Oct-11-2016

-Arrived at USCIS (Per USPS Tracking): Oct-13-2016

-USCIS Returned I-751 Form & all documentation: Oct-17-2016 (Date of Letter: Oct-13-2016) Reason: Filed more than 90days before GC Expiration Date

Let's try again....

- Re-Sent I-751Form: Oct-31-2016

- Date Received at USCIS: Nov-01-2016

- NOA1 Received:

- Biometrics Appointment:

- Date Approved:

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...