Jump to content

1,137 posts in this topic

Recommended Posts

Posted

Well, got my approval letter exactly one week to the day after the Supervisor marked the case complete in the system. I am going to call the NVC just for the hell of it.

Yeah, I don't understand why they like to keep the case complete news a secret for exactly one week... but they do so without fail!

Let us know what you hear from our friends at the NVC. It sounds like they had not done any scheduling when they went home last night. :clock:

I'm the USC petitioner. My wife is British (now a USC!!!), generally awesome, and amazingly patient.

CR-1

 

USCIS:

09/09/2013 PD
09/10/2013 NOA1
02/25/2014 TRANSFER NSC
03/25/2014 NOA2
03/28/2014 NVC SHIPPED

NVC:
04/11/2014 NVC RECEIVED
05/09/2014 NVC CASE # ASSIGNED
05/15/2014 AOS/IV FEES INVOICED
05/16/2014 AOS/IV FEES PAID
05/19/2014 AOS/IV FEES CLEARED BANK ACCOUNT
05/20/2014 AOS/IV FEES SHOWING PAID
05/22/2014 DS-260 SUBMITTED
05/23/2014 AOS/IV SHIPPED
05/29/2014 AOS/IV DELIVERED
06/03/2014 AOS/IV SCANNED
07/10/2014 IV ACCEPTED
07/15/2014 AOS CHECKLIST
07/16/2014 AOS CHECKLIST SHIPPED
07/18/2014 AOS CHECKLIST DELIVERED
07/22/2014 AOS CHECKLIST SCANNED

09/11/2014 CASE COMPLETE
10/03/2014 INTERVIEW SCHEDULED (11/21/2014)
10/07/2014 INTERVIEW LETTER RECEIVED

10/15/2014 CEAC: IN TRANSIT
 
EMBASSY:
10/08/2014 MEDICAL
10/17/2014 CEAC: READY
10/17/2014 REQUEST INTERVIEW RESCHEDULE WITH EMBASSY
10/23/2014 CEAC: READY STATUS DATE UPDATED
10/25/2014 INTERVIEW RESCHEDULED (10/31/2014)
10/31/2014 INTERVIEW: APPROVED!
10/31/2014 CEAC: ADMINISTRATIVE PROCESSING
10/31/2014 CEAC: ISSUED
11/03/2014 COURIER EMAIL
11/04/2014 VISA IN HAND
 
POE:
11/04/2014 ELIS: IMMIGRATION FEE PAID
11/27/2014 POE: JFK
12/03/2014 ELIS: RECEIVED
12/12/2014 ELIS: OPTIMIZED
12/12/2014 IOE: ACCEPTED
12/15/2014 IOE: PRODUCING
12/16/2014 APPLY FOR SSN CARD
12/18/2014 ELIS: CLOSED
12/18/2014 IOE: MAILED
12/19/2014 IOE: DELIVERED
12/22/2014 RECEIVED SSN CARD
ROC
Spoiler
08/29/2016 90 DAY WINDOW OPENS
09/14/2016 I-751 PACKET MAILED TO VSC
09/15/2016 I-751 PACKET RECEIVED
09/16/2016 NOA DATE
09/20/2016 CHECK CASHED
09/22/2016 NOA RECEIVED
10/01/2016 BIOMETRICS NOTICE DATE
10/07/2016 BIOMETRICS NOTICE RECEIVED
10/17/2016 BIOMETRICS
08/15/2017 APPROVAL NOTICE DATE
08/19/2017 APPROVAL NOTICE RECEIVED
08/21/2017 CARD BEING PRODUCED
08/24/2017 CARD MAILED
08/26/2017 CARD ARRIVED

N-400

Spoiler
03/27/2018 FILED ONLINE
03/27/2018 PAYMENT POSTED
03/27/2018 NOA
03/31/2018 BIOMETRICS SCHEDULED
04/17/2018 BIOMETRICS
02/22/2019 INTERVIEW SCHEDULED
04/04/2019 INTERVIEW: APPROVED!
04/25/2019 OATH

 

Posted

I call nvc just now and lady told me that my wife case in under reviewed now for checklist I send on Aug 15 so it's that mean I should hear something soon??

You should really follow the NVC thread: http://www.visajourney.com/forums/topic/512491-nvc-filers-september-2014/page-216

Latest reports are that NVC is reviewing documents they received on August 1st.

I'm the USC petitioner. My wife is British (now a USC!!!), generally awesome, and amazingly patient.

CR-1

 

USCIS:

09/09/2013 PD
09/10/2013 NOA1
02/25/2014 TRANSFER NSC
03/25/2014 NOA2
03/28/2014 NVC SHIPPED

NVC:
04/11/2014 NVC RECEIVED
05/09/2014 NVC CASE # ASSIGNED
05/15/2014 AOS/IV FEES INVOICED
05/16/2014 AOS/IV FEES PAID
05/19/2014 AOS/IV FEES CLEARED BANK ACCOUNT
05/20/2014 AOS/IV FEES SHOWING PAID
05/22/2014 DS-260 SUBMITTED
05/23/2014 AOS/IV SHIPPED
05/29/2014 AOS/IV DELIVERED
06/03/2014 AOS/IV SCANNED
07/10/2014 IV ACCEPTED
07/15/2014 AOS CHECKLIST
07/16/2014 AOS CHECKLIST SHIPPED
07/18/2014 AOS CHECKLIST DELIVERED
07/22/2014 AOS CHECKLIST SCANNED

09/11/2014 CASE COMPLETE
10/03/2014 INTERVIEW SCHEDULED (11/21/2014)
10/07/2014 INTERVIEW LETTER RECEIVED

10/15/2014 CEAC: IN TRANSIT
 
EMBASSY:
10/08/2014 MEDICAL
10/17/2014 CEAC: READY
10/17/2014 REQUEST INTERVIEW RESCHEDULE WITH EMBASSY
10/23/2014 CEAC: READY STATUS DATE UPDATED
10/25/2014 INTERVIEW RESCHEDULED (10/31/2014)
10/31/2014 INTERVIEW: APPROVED!
10/31/2014 CEAC: ADMINISTRATIVE PROCESSING
10/31/2014 CEAC: ISSUED
11/03/2014 COURIER EMAIL
11/04/2014 VISA IN HAND
 
POE:
11/04/2014 ELIS: IMMIGRATION FEE PAID
11/27/2014 POE: JFK
12/03/2014 ELIS: RECEIVED
12/12/2014 ELIS: OPTIMIZED
12/12/2014 IOE: ACCEPTED
12/15/2014 IOE: PRODUCING
12/16/2014 APPLY FOR SSN CARD
12/18/2014 ELIS: CLOSED
12/18/2014 IOE: MAILED
12/19/2014 IOE: DELIVERED
12/22/2014 RECEIVED SSN CARD
ROC
Spoiler
08/29/2016 90 DAY WINDOW OPENS
09/14/2016 I-751 PACKET MAILED TO VSC
09/15/2016 I-751 PACKET RECEIVED
09/16/2016 NOA DATE
09/20/2016 CHECK CASHED
09/22/2016 NOA RECEIVED
10/01/2016 BIOMETRICS NOTICE DATE
10/07/2016 BIOMETRICS NOTICE RECEIVED
10/17/2016 BIOMETRICS
08/15/2017 APPROVAL NOTICE DATE
08/19/2017 APPROVAL NOTICE RECEIVED
08/21/2017 CARD BEING PRODUCED
08/24/2017 CARD MAILED
08/26/2017 CARD ARRIVED

N-400

Spoiler
03/27/2018 FILED ONLINE
03/27/2018 PAYMENT POSTED
03/27/2018 NOA
03/31/2018 BIOMETRICS SCHEDULED
04/17/2018 BIOMETRICS
02/22/2019 INTERVIEW SCHEDULED
04/04/2019 INTERVIEW: APPROVED!
04/25/2019 OATH

 

Posted (edited)

Well, got my approval letter exactly one week to the day after the Supervisor marked the case complete in the system. I am going to call the NVC just for the hell of it.

Well that was a waste of my time. The lady could barely speak English. She seemed to be new. I asked her questions and she could not answer them and then hung up on me! hahaha!

She did say the will start scheduling November interviews on Oct 1. She was a NEWB, so who knows.

She wont last long.

Edited by 100JH

CR1 Visa

Embassy: Bogota, Colombia

08/31/2013 -- Married in Colombia

USCIS

10/07/2013 -- I130 Sent
10/18/2013 -- I130 NOA1 date

03/07/2014 -- I130 transferred to California Service Center

03/27/2014 -- RFE Issued

04/15/2014 -- RFE received and info sent (resubmit Marriage Certificate)

04/28/2014 -- RFE received at CSC ("In Review")

05/06/2014 -- I130 NOA2

05/07/2014 – I130 Mailed to NVC
NVC
05-14-2014 -- NVC received
06-20-2014 -- NVC case number assigned case (AoS/IV bills received)
06-29-2014 -- AoS and IV bills paid

07-03-2014 -- AOS & IV bills in "Paid" status

07-08-2014 -- DS-260 completed

07-08-2014 -- Sent AoS and IV Packages

07-15-2014 -- AoS and IV scans

09-11-2014 -- Checklist for Police Records
09-19-2014 -- Case Complete
10-03-2014 -- Interview Scheduled
Embassy
10-16-2014 -- Medical
11-13-2014 -- Interview - APPROVED!
11-20-2014 -- VISA IN HAND!
12-02-2014 -- POE (Dulles) :dance:

Posted

Well that was a waste of my time. The lady could barely speak English. She seemed to be new. I asked her questions and she could not answer them and then hung up on me! hahaha!

She did say the will start scheduling November interviews on Oct 1. She was a NEWB, so who knows.

She wont last long.

I don't think the phone reps have any knowledge of when scheduling will start. They read on their screen if an interview has been scheduled for a particular case and that's it.

I'm the USC petitioner. My wife is British (now a USC!!!), generally awesome, and amazingly patient.

CR-1

 

USCIS:

09/09/2013 PD
09/10/2013 NOA1
02/25/2014 TRANSFER NSC
03/25/2014 NOA2
03/28/2014 NVC SHIPPED

NVC:
04/11/2014 NVC RECEIVED
05/09/2014 NVC CASE # ASSIGNED
05/15/2014 AOS/IV FEES INVOICED
05/16/2014 AOS/IV FEES PAID
05/19/2014 AOS/IV FEES CLEARED BANK ACCOUNT
05/20/2014 AOS/IV FEES SHOWING PAID
05/22/2014 DS-260 SUBMITTED
05/23/2014 AOS/IV SHIPPED
05/29/2014 AOS/IV DELIVERED
06/03/2014 AOS/IV SCANNED
07/10/2014 IV ACCEPTED
07/15/2014 AOS CHECKLIST
07/16/2014 AOS CHECKLIST SHIPPED
07/18/2014 AOS CHECKLIST DELIVERED
07/22/2014 AOS CHECKLIST SCANNED

09/11/2014 CASE COMPLETE
10/03/2014 INTERVIEW SCHEDULED (11/21/2014)
10/07/2014 INTERVIEW LETTER RECEIVED

10/15/2014 CEAC: IN TRANSIT
 
EMBASSY:
10/08/2014 MEDICAL
10/17/2014 CEAC: READY
10/17/2014 REQUEST INTERVIEW RESCHEDULE WITH EMBASSY
10/23/2014 CEAC: READY STATUS DATE UPDATED
10/25/2014 INTERVIEW RESCHEDULED (10/31/2014)
10/31/2014 INTERVIEW: APPROVED!
10/31/2014 CEAC: ADMINISTRATIVE PROCESSING
10/31/2014 CEAC: ISSUED
11/03/2014 COURIER EMAIL
11/04/2014 VISA IN HAND
 
POE:
11/04/2014 ELIS: IMMIGRATION FEE PAID
11/27/2014 POE: JFK
12/03/2014 ELIS: RECEIVED
12/12/2014 ELIS: OPTIMIZED
12/12/2014 IOE: ACCEPTED
12/15/2014 IOE: PRODUCING
12/16/2014 APPLY FOR SSN CARD
12/18/2014 ELIS: CLOSED
12/18/2014 IOE: MAILED
12/19/2014 IOE: DELIVERED
12/22/2014 RECEIVED SSN CARD
ROC
Spoiler
08/29/2016 90 DAY WINDOW OPENS
09/14/2016 I-751 PACKET MAILED TO VSC
09/15/2016 I-751 PACKET RECEIVED
09/16/2016 NOA DATE
09/20/2016 CHECK CASHED
09/22/2016 NOA RECEIVED
10/01/2016 BIOMETRICS NOTICE DATE
10/07/2016 BIOMETRICS NOTICE RECEIVED
10/17/2016 BIOMETRICS
08/15/2017 APPROVAL NOTICE DATE
08/19/2017 APPROVAL NOTICE RECEIVED
08/21/2017 CARD BEING PRODUCED
08/24/2017 CARD MAILED
08/26/2017 CARD ARRIVED

N-400

Spoiler
03/27/2018 FILED ONLINE
03/27/2018 PAYMENT POSTED
03/27/2018 NOA
03/31/2018 BIOMETRICS SCHEDULED
04/17/2018 BIOMETRICS
02/22/2019 INTERVIEW SCHEDULED
04/04/2019 INTERVIEW: APPROVED!
04/25/2019 OATH

 

Filed: EB-1 Visa Country: Kuwait
Timeline
Posted

Well that was a waste of my time. The lady could barely speak English. She seemed to be new. I asked her questions and she could not answer them and then hung up on me! hahaha!

She did say the will start scheduling November interviews on Oct 1. She was a NEWB, so who knows.

She wont last long.

They said the same and consistently last month... "will start scheduling for October early September." They were half done before September started... later than usual as a matter of fact.

21-MAR-2014 I-140 + PP sent to USCIS

31-MAR-2014 Petition approved

16-APR-2014 Case shipped to NVC

29-APR-2014 Case received by NVC

23-MAY-2014 Case # assigned

4-JUN-2014 IV Bill invoiced and PAID (AOS Exempt, DS-261 Waived)

6-JUN-2014 DS-260 forms submitted

10-JUN-2014 IV Docs received by NVC

13-JUN-2014 IV Docs matched to case (scanned)

30-JUL-2014 Case Complete, CC email auto-sent one week later

20-AUG-2014 AOS fee changed to N/A (Final clearance for interview scheduling?)

29-AUG-2014 Consular Interview scheduled on Oct 1st. Later rescheduled to Sep 24th. P4 Letter received following business day

14-SEP-2014 CEAC status changed to Ready

15-SEP-2014 Medical results delivered to Embassy by Panel Physician

24-SEP-2014 Consular Interview, went into AP (3rd AP in as many consecutive visa applications)

14-OCT-2014 Visa issued

22-OCT-2014 POE at Dulles Airport, Washington, D.C.

Filed: IR-1/CR-1 Visa Country: Russia
Timeline
Posted

Hello to you all,

We got the original marriage certificate from Zagc today but i must confess that it was very difficult because we were just moving up and down but hurray we got it and we sent it to the embassy in the morning by pony express has they have requested on the 221g. Now we will start calling them and emailing them as soon as they receive it on tuesday.

Congratulations to those who have already collected their visas and also gotten their interview date from NVC and for those people who are still waiting for their interview dates hang in there, you will get it pretty soon. Thanks

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

Just got a letter from NVC addressed to my husband that days, "we updated the mailing/email address for this case. Please continue to notify the NVC of any change of mailing/email address, or change and personal situation that may affect the principal applicant entitlement to a Visa."

The funny thing is, we didn't change anything. I'm on hold now to find out what's going on, will ask about interview while I'm on the phone. I only hope they answer soon, on hold 18 minutes and I have to leave for work in another 20.

Married: May 19, 2002
NOA1: November 25, 2013
NOA2: May 19, 2014 (anniversary gift!)
NVC received: June 3, 2014
Case # assigned: June 23, 2014
DS-261 complete: July 7, 2014
DS-261 accepted: July 9, 2014
Email received from NVC re: AOS fee: July 8, 2014
AOS fee paid: July 9, 2014
(waited 1 more week for snail mail tax transcript, still hasn't arrived a month after sending request, decided to send I-864 with photocopy instead)

I-864 sent: July 19, 2014 (Decided on Electronic Processing)
I-864 accepted: July 28 & 31 (sent twice because of PDF password thingy)
Sent IV package: August 7, 2014
IV package accepted: August 8, 2014
IV fee invoiced/paid: August 19, 2014
DS-260 completed: August 22, 2014
CASE COMPLETE: September 19, 2014 :dancing: :joy: :dancing:
Medical: November 3, 2014
Interview: November 7, 2014

APPROVED APPROVED APPROVED :dancing: :dancing: :dancing:

Posted

Just got a letter from NVC addressed to my husband that days, "we updated the mailing/email address for this case. Please continue to notify the NVC of any change of mailing/email address, or change and personal situation that may affect the principal applicant entitlement to a Visa."

The funny thing is, we didn't change anything. I'm on hold now to find out what's going on, will ask about interview while I'm on the phone. I only hope they answer soon, on hold 18 minutes and I have to leave for work in another 20.

I think this has happened to other people when their case is being worked on. Hopefully they are scheduling interviews.

I'm the USC petitioner. My wife is British (now a USC!!!), generally awesome, and amazingly patient.

CR-1

 

USCIS:

09/09/2013 PD
09/10/2013 NOA1
02/25/2014 TRANSFER NSC
03/25/2014 NOA2
03/28/2014 NVC SHIPPED

NVC:
04/11/2014 NVC RECEIVED
05/09/2014 NVC CASE # ASSIGNED
05/15/2014 AOS/IV FEES INVOICED
05/16/2014 AOS/IV FEES PAID
05/19/2014 AOS/IV FEES CLEARED BANK ACCOUNT
05/20/2014 AOS/IV FEES SHOWING PAID
05/22/2014 DS-260 SUBMITTED
05/23/2014 AOS/IV SHIPPED
05/29/2014 AOS/IV DELIVERED
06/03/2014 AOS/IV SCANNED
07/10/2014 IV ACCEPTED
07/15/2014 AOS CHECKLIST
07/16/2014 AOS CHECKLIST SHIPPED
07/18/2014 AOS CHECKLIST DELIVERED
07/22/2014 AOS CHECKLIST SCANNED

09/11/2014 CASE COMPLETE
10/03/2014 INTERVIEW SCHEDULED (11/21/2014)
10/07/2014 INTERVIEW LETTER RECEIVED

10/15/2014 CEAC: IN TRANSIT
 
EMBASSY:
10/08/2014 MEDICAL
10/17/2014 CEAC: READY
10/17/2014 REQUEST INTERVIEW RESCHEDULE WITH EMBASSY
10/23/2014 CEAC: READY STATUS DATE UPDATED
10/25/2014 INTERVIEW RESCHEDULED (10/31/2014)
10/31/2014 INTERVIEW: APPROVED!
10/31/2014 CEAC: ADMINISTRATIVE PROCESSING
10/31/2014 CEAC: ISSUED
11/03/2014 COURIER EMAIL
11/04/2014 VISA IN HAND
 
POE:
11/04/2014 ELIS: IMMIGRATION FEE PAID
11/27/2014 POE: JFK
12/03/2014 ELIS: RECEIVED
12/12/2014 ELIS: OPTIMIZED
12/12/2014 IOE: ACCEPTED
12/15/2014 IOE: PRODUCING
12/16/2014 APPLY FOR SSN CARD
12/18/2014 ELIS: CLOSED
12/18/2014 IOE: MAILED
12/19/2014 IOE: DELIVERED
12/22/2014 RECEIVED SSN CARD
ROC
Spoiler
08/29/2016 90 DAY WINDOW OPENS
09/14/2016 I-751 PACKET MAILED TO VSC
09/15/2016 I-751 PACKET RECEIVED
09/16/2016 NOA DATE
09/20/2016 CHECK CASHED
09/22/2016 NOA RECEIVED
10/01/2016 BIOMETRICS NOTICE DATE
10/07/2016 BIOMETRICS NOTICE RECEIVED
10/17/2016 BIOMETRICS
08/15/2017 APPROVAL NOTICE DATE
08/19/2017 APPROVAL NOTICE RECEIVED
08/21/2017 CARD BEING PRODUCED
08/24/2017 CARD MAILED
08/26/2017 CARD ARRIVED

N-400

Spoiler
03/27/2018 FILED ONLINE
03/27/2018 PAYMENT POSTED
03/27/2018 NOA
03/31/2018 BIOMETRICS SCHEDULED
04/17/2018 BIOMETRICS
02/22/2019 INTERVIEW SCHEDULED
04/04/2019 INTERVIEW: APPROVED!
04/25/2019 OATH

 

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

After 33 minutes on hold, I just got disconnected... No time to call back now, I am fuming!!!! Have to try back later

Married: May 19, 2002
NOA1: November 25, 2013
NOA2: May 19, 2014 (anniversary gift!)
NVC received: June 3, 2014
Case # assigned: June 23, 2014
DS-261 complete: July 7, 2014
DS-261 accepted: July 9, 2014
Email received from NVC re: AOS fee: July 8, 2014
AOS fee paid: July 9, 2014
(waited 1 more week for snail mail tax transcript, still hasn't arrived a month after sending request, decided to send I-864 with photocopy instead)

I-864 sent: July 19, 2014 (Decided on Electronic Processing)
I-864 accepted: July 28 & 31 (sent twice because of PDF password thingy)
Sent IV package: August 7, 2014
IV package accepted: August 8, 2014
IV fee invoiced/paid: August 19, 2014
DS-260 completed: August 22, 2014
CASE COMPLETE: September 19, 2014 :dancing: :joy: :dancing:
Medical: November 3, 2014
Interview: November 7, 2014

APPROVED APPROVED APPROVED :dancing: :dancing: :dancing:

Posted

Just got a letter from NVC addressed to my husband that days, "we updated the mailing/email address for this case. Please continue to notify the NVC of any change of mailing/email address, or change and personal situation that may affect the principal applicant entitlement to a Visa."

The funny thing is, we didn't change anything. I'm on hold now to find out what's going on, will ask about interview while I'm on the phone. I only hope they answer soon, on hold 18 minutes and I have to leave for work in another 20.

We got that, too. Like twice; once after the interview email and again after the case left or was being prepared to ship to the embassy. I never called and all was fine. :)

2013-02-18

Married

2013-03-15

Sent I-130 Packet to USCIS

2013-03-28

NOA1

2013-11-13

Case transferred to NSC

2014-01-23

NOA2 given by USCIS

2014-01-24

Case sent to NVC

2014-02-06

Case received by NVC

2014-03-14

NVC case number assigned

2014-03-17

DS-261 completed

2014-06-25

NVC Case Complete

2014-07-09

Interview Appointment Scheduled

2014-08-07

Interview Appointment Date

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

I think this has happened to other people when their case is being worked on. Hopefully they are scheduling interviews.

Thanks for the reassurance :-)

Just noticed the date on the letter is 9/17 and was only addressed to my husband, I did not get one. Maybe that is the date we got a cc? I found out about the cc on 9/19 because that is when I called, and we both got the email on 9/22 so our emails are both still working. I'll try to call when I get home from work at 9pm.

Married: May 19, 2002
NOA1: November 25, 2013
NOA2: May 19, 2014 (anniversary gift!)
NVC received: June 3, 2014
Case # assigned: June 23, 2014
DS-261 complete: July 7, 2014
DS-261 accepted: July 9, 2014
Email received from NVC re: AOS fee: July 8, 2014
AOS fee paid: July 9, 2014
(waited 1 more week for snail mail tax transcript, still hasn't arrived a month after sending request, decided to send I-864 with photocopy instead)

I-864 sent: July 19, 2014 (Decided on Electronic Processing)
I-864 accepted: July 28 & 31 (sent twice because of PDF password thingy)
Sent IV package: August 7, 2014
IV package accepted: August 8, 2014
IV fee invoiced/paid: August 19, 2014
DS-260 completed: August 22, 2014
CASE COMPLETE: September 19, 2014 :dancing: :joy: :dancing:
Medical: November 3, 2014
Interview: November 7, 2014

APPROVED APPROVED APPROVED :dancing: :dancing: :dancing:

Posted

After 33 minutes on hold, I just got disconnected... No time to call back now, I am fuming!!!! Have to try back later

Noooooooooooooo... I can't take the suspense!

Good thing today is friday: AustinCanada has been saying all week that he would call today.

I'm the USC petitioner. My wife is British (now a USC!!!), generally awesome, and amazingly patient.

CR-1

 

USCIS:

09/09/2013 PD
09/10/2013 NOA1
02/25/2014 TRANSFER NSC
03/25/2014 NOA2
03/28/2014 NVC SHIPPED

NVC:
04/11/2014 NVC RECEIVED
05/09/2014 NVC CASE # ASSIGNED
05/15/2014 AOS/IV FEES INVOICED
05/16/2014 AOS/IV FEES PAID
05/19/2014 AOS/IV FEES CLEARED BANK ACCOUNT
05/20/2014 AOS/IV FEES SHOWING PAID
05/22/2014 DS-260 SUBMITTED
05/23/2014 AOS/IV SHIPPED
05/29/2014 AOS/IV DELIVERED
06/03/2014 AOS/IV SCANNED
07/10/2014 IV ACCEPTED
07/15/2014 AOS CHECKLIST
07/16/2014 AOS CHECKLIST SHIPPED
07/18/2014 AOS CHECKLIST DELIVERED
07/22/2014 AOS CHECKLIST SCANNED

09/11/2014 CASE COMPLETE
10/03/2014 INTERVIEW SCHEDULED (11/21/2014)
10/07/2014 INTERVIEW LETTER RECEIVED

10/15/2014 CEAC: IN TRANSIT
 
EMBASSY:
10/08/2014 MEDICAL
10/17/2014 CEAC: READY
10/17/2014 REQUEST INTERVIEW RESCHEDULE WITH EMBASSY
10/23/2014 CEAC: READY STATUS DATE UPDATED
10/25/2014 INTERVIEW RESCHEDULED (10/31/2014)
10/31/2014 INTERVIEW: APPROVED!
10/31/2014 CEAC: ADMINISTRATIVE PROCESSING
10/31/2014 CEAC: ISSUED
11/03/2014 COURIER EMAIL
11/04/2014 VISA IN HAND
 
POE:
11/04/2014 ELIS: IMMIGRATION FEE PAID
11/27/2014 POE: JFK
12/03/2014 ELIS: RECEIVED
12/12/2014 ELIS: OPTIMIZED
12/12/2014 IOE: ACCEPTED
12/15/2014 IOE: PRODUCING
12/16/2014 APPLY FOR SSN CARD
12/18/2014 ELIS: CLOSED
12/18/2014 IOE: MAILED
12/19/2014 IOE: DELIVERED
12/22/2014 RECEIVED SSN CARD
ROC
Spoiler
08/29/2016 90 DAY WINDOW OPENS
09/14/2016 I-751 PACKET MAILED TO VSC
09/15/2016 I-751 PACKET RECEIVED
09/16/2016 NOA DATE
09/20/2016 CHECK CASHED
09/22/2016 NOA RECEIVED
10/01/2016 BIOMETRICS NOTICE DATE
10/07/2016 BIOMETRICS NOTICE RECEIVED
10/17/2016 BIOMETRICS
08/15/2017 APPROVAL NOTICE DATE
08/19/2017 APPROVAL NOTICE RECEIVED
08/21/2017 CARD BEING PRODUCED
08/24/2017 CARD MAILED
08/26/2017 CARD ARRIVED

N-400

Spoiler
03/27/2018 FILED ONLINE
03/27/2018 PAYMENT POSTED
03/27/2018 NOA
03/31/2018 BIOMETRICS SCHEDULED
04/17/2018 BIOMETRICS
02/22/2019 INTERVIEW SCHEDULED
04/04/2019 INTERVIEW: APPROVED!
04/25/2019 OATH

 

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...