Jump to content
Saylin

NVC Filers - September 2014

 Share

3,637 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: India
Timeline

Hello

Also what are the most common reasons people get checklisted for IV docs. Please share your experiences

Thanks

Haven't experienced it myself but from what I have seen from others, people usually get a checklist for missing translation, poorly translated documents, not original/certified civil documents or simply a document may be missing. Sometimes the document may be sent but NVC may say they have not received it. Someone also got a checklist because their certificate was too plain-looking.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

:dancing::dancing::dancing: OMG OMG OMG CASE COMPLETE!!!!!!! :dancing::dancing::dancing:

Just called and talked to Yvette, she said our case is complete, just waiting for the interview to be scheduled, and they are still scheduling for October interviews!!!!

Paid still says Paid. lol

July 18th scan date

Cool! So happy for you. Looks like you will make the 2nd round of October interviews. Good luck!

Oops, I replied to the wrong message! That last message was meant for nicholemariev. Note that I'm still generally happy for you as well, jsumner86! :)

I'm the USC petitioner. My wife is British (now a USC!!!), generally awesome, and amazingly patient.

CR-1

 

USCIS:

09/09/2013 PD
09/10/2013 NOA1
02/25/2014 TRANSFER NSC
03/25/2014 NOA2
03/28/2014 NVC SHIPPED

NVC:
04/11/2014 NVC RECEIVED
05/09/2014 NVC CASE # ASSIGNED
05/15/2014 AOS/IV FEES INVOICED
05/16/2014 AOS/IV FEES PAID
05/19/2014 AOS/IV FEES CLEARED BANK ACCOUNT
05/20/2014 AOS/IV FEES SHOWING PAID
05/22/2014 DS-260 SUBMITTED
05/23/2014 AOS/IV SHIPPED
05/29/2014 AOS/IV DELIVERED
06/03/2014 AOS/IV SCANNED
07/10/2014 IV ACCEPTED
07/15/2014 AOS CHECKLIST
07/16/2014 AOS CHECKLIST SHIPPED
07/18/2014 AOS CHECKLIST DELIVERED
07/22/2014 AOS CHECKLIST SCANNED

09/11/2014 CASE COMPLETE
10/03/2014 INTERVIEW SCHEDULED (11/21/2014)
10/07/2014 INTERVIEW LETTER RECEIVED

10/15/2014 CEAC: IN TRANSIT
 
EMBASSY:
10/08/2014 MEDICAL
10/17/2014 CEAC: READY
10/17/2014 REQUEST INTERVIEW RESCHEDULE WITH EMBASSY
10/23/2014 CEAC: READY STATUS DATE UPDATED
10/25/2014 INTERVIEW RESCHEDULED (10/31/2014)
10/31/2014 INTERVIEW: APPROVED!
10/31/2014 CEAC: ADMINISTRATIVE PROCESSING
10/31/2014 CEAC: ISSUED
11/03/2014 COURIER EMAIL
11/04/2014 VISA IN HAND
 
POE:
11/04/2014 ELIS: IMMIGRATION FEE PAID
11/27/2014 POE: JFK
12/03/2014 ELIS: RECEIVED
12/12/2014 ELIS: OPTIMIZED
12/12/2014 IOE: ACCEPTED
12/15/2014 IOE: PRODUCING
12/16/2014 APPLY FOR SSN CARD
12/18/2014 ELIS: CLOSED
12/18/2014 IOE: MAILED
12/19/2014 IOE: DELIVERED
12/22/2014 RECEIVED SSN CARD
ROC
Spoiler
08/29/2016 90 DAY WINDOW OPENS
09/14/2016 I-751 PACKET MAILED TO VSC
09/15/2016 I-751 PACKET RECEIVED
09/16/2016 NOA DATE
09/20/2016 CHECK CASHED
09/22/2016 NOA RECEIVED
10/01/2016 BIOMETRICS NOTICE DATE
10/07/2016 BIOMETRICS NOTICE RECEIVED
10/17/2016 BIOMETRICS
08/15/2017 APPROVAL NOTICE DATE
08/19/2017 APPROVAL NOTICE RECEIVED
08/21/2017 CARD BEING PRODUCED
08/24/2017 CARD MAILED
08/26/2017 CARD ARRIVED

N-400

Spoiler
03/27/2018 FILED ONLINE
03/27/2018 PAYMENT POSTED
03/27/2018 NOA
03/31/2018 BIOMETRICS SCHEDULED
04/17/2018 BIOMETRICS
02/22/2019 INTERVIEW SCHEDULED
04/04/2019 INTERVIEW: APPROVED!
04/25/2019 OATH

 

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Try this link and also ask in dwheels interview thread.

http://caracas.usembassy.gov/mobile//

Hello everyone,

Thrilled to see that there are a few CC's already this week... congrats to all the recipients.

I have a question that I asked last week, and didn't get an answers, or at least not any that I know of. So I thought I would ask again, although maybe this is not the right place... if you know of a better forum in which to ask please let me know.

I will be leaving at the end of the week to go visit my husband in Venezuela. We are waiting for a CC, hopefully some time this month, and I was hoping to be able to take any documents that would be necessary for the interview to him. Where could I find a list of what he will need? In the embassy information on Visa JOurney, it seems to mostly talk about K1 interviews, not CR-1.

Any ideas would be appreciated. Thanks!

P.S. perhaps I should post in the regional forum as well?

Edited by dilmera

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

http://caracas.usembassy.gov/mobile//quote name="dawning" post="7233094" timestamp="1410304527"]

Hello everyone,

Thrilled to see that there are a few CC's already this week... congrats to all the recipients.

I have a question that I asked last week, and didn't get an answers, or at least not any that I know of. So I thought I would ask again, although maybe this is not the right place... if you know of a better forum in which to ask please let me know.

I will be leaving at the end of the week to go visit my husband in Venezuela. We are waiting for a CC, hopefully some time this month, and I was hoping to be able to take any documents that would be necessary for the interview to him. Where could I find a list of what he will need? In the embassy information on Visa JOurney, it seems to mostly talk about K1 interviews, not CR-1.

Any ideas would be appreciated. Thanks!

P.S. perhaps I should post in the regional forum as well?

Try this link:

Hello I don't know if embassy in Venezuela asks for the same documents as the New Delhi Embassy but here's what I found.. i hope it's helpful :)Scroll down to the second page:

http://travel.state.gov/content/dam/visas/Supplemental/NWD%20-%20New%20Delhi.pdf

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline

Congratulations to all the Vjers that had progress with the immigration process. Hoping and praying NVC review more packages and if possible finish up the whole of July packages this week.

** wishful thinking**

Link to comment
Share on other sites

It is so wonderful to see so many Case Completes today. Congratulations to you all.

Let's hope NVC keep forging ahead with some sense of urgency and that we can all be reunited with our loved ones as soon as possible.

Hugs to everyone.

Samreen - great to see you back. Glad you are feeling a bit better. You have my sincere sympathies and understanding. This process is SO stressful for everyone. The job certainly sounds like it can at least keep your mind busy.

2013/9/17 - Mailed I-130

2013/9/20 - Received NOA1

2014/2/26 - Transferred to TSC

2014/3/21 - Received email NOA2

2014/3/21 - I-130 Approved

2014/3/26 - Email received File Received

2014/4/02 - NVC received file

2014/5/1 - Case Number and IIN assigned

2014/5/7 - DS-261 available and completed

2014/5/8 - AOS invoice available and paid

2014/5/9 - AOS showing as paid

2014/5/20 - AOS Package sent

2014/6/3 - AOS Scanned and Under Review

2014/6/9 - IV Fee Invoice available and Paid

2014/6/10 - DS-260 available

2014/6/10 - IV package couriered to NVC

2014/6/10 - IV invoice showing Paid

2014/6/11 - DS-260 submitted

2014/6/16 - IV package delivered to NVC

2014/6/20 - IV package scanned

2014/7/11 - Received Checklist for AOS - one tiny thing!

2014/7/15 - Checklist response couriered to NVC by Lawyers

2014/7/18 - AOS Checklist delivered to NVC

2014/7/22 - AOS Checklist scanned in

2014/8/5 - IV Checklist Received

2014/8/20 - Supervisor reviewed Adoption Certificate Checklist and found it acceptable

2014/8/26 - Couriered Singapore Police Certificate to NVC

2014/8/28 - Package delivered to NVC

2014/8/29 - IV checklist scanned in

2014/9/12 - AOS Checklist accepted

2024/10/27 - called NVC to be advised last scanned document is now September 17th, an email I sent early August and they looked at on September 17th.

2014/9/17 - last scanned date. Waiting for a Case Complete.

2014/10/30 - CASE COMPLETE

2014/11/10 - Interview Scheduled

2014/12/23 - Interview - going to try to move up a week but we will see.

2014/12/2 - interview and APPROVED

2014/12/18 - Smooth and quick POE at LAX then onto JFK by domestic

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Well..... my wife and I are devastated. She is in tears. Crushed. After surviving the USCIS backlog and 11 months in process both our IV and AOS packages were reviewed yesterday and we are getting a Checklist. I cannot adequately express our sadness at this time as it looks like it might be another Christmas separated.

And it's so frustrating of an error. Checklist on the AOS. Section 6, 13.A.1 Total Income. I really can't believe it. Something so basic. Something covered here countless times by many others. We used an attorney and he totally blew it by using line 37 instead of line 22 on the 1040. I pay some spousal support to my old ex which is the only difference in the 2 lines. But I'm crushed....it's my fault. Although she insisted on using an attorney her relatives "highly recommended" I never trusted him completely. I continually questioned him along the way and he seemed to know his stuff. Unfortunately I let my guard down and did not follow up on this one point to make sure he used the right number. Everything else was accepted. Just this one number doesn't match the tax return that was submitted right along side it. Kind of silly if you think about it.

We will likely get the stinging email in a day or two.

And given the ridiculous incompetence of our government offices and the NVC's inability to plan for this predictible backlog, this will cost Rosalit and I another two months waiting. This is the worst possible time to be checklisted by the NVC.

Sorry for the rant and thanks for listening. Congrats to everyone that have received their CC recently. Someday we hope to join you guys.

Well, I'm going to sign off of VJ for a while. I was here frequently the last 2 weeks as our 60 day wait was coming to pass. But now I can't bear to even think about this process any more for a while.

I feel for you, you're the second one today who got a checklist because of a lawyer. NVC seriously needs to put checklists on a priority. I heard checklists sent in by lawyers get reviewed faster, don't know how much truth there's to it. Let us know what happens.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

EYYYYYYY :dancing: :idea: :goofy: (L) :dancing: MY CASE IS COMPLETED TODAY AFTER 58 DAYS OF AOS RFE REVIEW.... THANK YOU LORD JESUS

Congratulations, looks like NVC has finally woken up. Lots of action on the thread.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

So are we going to use the old aos cover page. We have an error in part 4 and 6

Great hope you can get it to NVC as soon as possible. :)

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

Hi guys!I really need your help!

We just paid our IV fee today. And we are planning to send our IV package as soon as our payment shows PAID. We sent our AOS on August 14. However, I read from NVC website the new rules on sending documents. It says that both AOS and IV as ONE package. I am confused, should we include another AOS in our IV package? Or we only need to submit IV docs?

Thanks guys!

Here's the link:

http://travel.state.gov/content/visas/english/immigrate/immigrant-process/documents/Submit_documents.html

Edited by NKrishMT

USCIS

05/13/2014: Sent I-130 to USCIS

05/19/2014: NOA1 Email Received. Assigned to NSC.

05/22/2014: NOA1 Hardcopy

06/16/2014: NOA2 Email. Approved. :dancing:

06/19/2014: NOA2 Hardcopy

06/20/2014: I-130 shipped to NVC

NVC

07/02/2014: Case received at NVC

07/11/2014: NVC confirmed they received our package on July 2.

07/23/2014: Got Case Number, IIN, BIN

07/30/2014: DS-261 Available and Completed

08/01/2014: Received NVC Instructions & AOS Invoice (Email)

08/01/2014: Called NVC to rectify spelling of address

08/03/2014: Paid AOS fee on CEAC (in process)

08/05/2014: AOS Fee in PAID status

08/13/2014: AOS Packet Mailed

08/14/2014: AOS Received at NVC

08/15/2014: AOS Scanned

09/03/2014: DS-261 Reviewed according to NVC rep

Waited for 41 days (29 business days) for IV invoice :dancing:

09/09/2014: Received IV invoice (Email)

09/10/2014: Paid IV fee on CEAC (in process)

09/11/2014: IV fee in PAID status

09/11/2014: IV Packet Mailed

09/12/2014: DS-260 Completed

09/12/2014: IV Packed received at NVC
09/15/2014: IV Scanned
Waited for 35 calendar days for AOS Acceptance and Case Complete :clock:

10/21/2014: Case Complete :dancing::whistle:

10/31/2014: Received Interview Instructions (P4)

EMBASSY

11/04/2014: Medical Exam at SLEC (2-day process) PASSED!

12/01/2014: Interview APPROVED! :dance:

12/09/2014: Visa on Hand

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Finally got notice to pay our IV bill and was able to (dated 9/4)

We decided to wait to make this payment before sending off our original documents (even though that seems to be changing). Congrats to all those who received their bill as well.

Link to comment
Share on other sites

Hope so!!

Will def let you know. you do the same :)

Hey just letting you know I got my fee invoices this morning at 2:29am EST. Hope that means something for you too!

i-130 Process

 

02/24/2014 - Sent i-130 to Chicago Lockbox via UPS
02/28/2014 - NOA1 i-130 accepted and sent to Vermont Service Center
03/04/2014 - NOA1 hard copy06/25/2014 - NOA2 i-130 approved and sent to NVC
07/01/2014 - NOA2 hard copy07/02/2014 - NVC received
07/25/2014 - Case number assigned* (actually 07/15)
07/31/2014 - DS261 completed. Hubby's B-day!! <3
08/01/2014 - AoS fee invoiced/paid
08/04/2014 - AoS fee processed
08/05/2014 - AoS documents e-mailed
08/08/2014 - AoS "received"
09/04/2014 - DS261 reviewed and accepted
09/10/2014 - IV invoiced at 2:30am, unlocked and paid at 11:30am
09/10/2014 - Civil documents e-mailed
09/11/2014 - IV fee processed
09/11/2014 - DS260 completed
09/12/2014 - Documents received, got the "60 Day" email
09/29/2014 - Case complete, AoS showed as n/a then called to confirm
10/03/2014 - Interview scheduled
10/06/2014 - Interview(P4) letter received
10/07/2014 - Medical appointment booked with Dr. Randall T. Lee
10/21/2014 - Medical appointment
11/19/2014 - Interview
11/24/2014 - POE

12/29/2014 - Green Card received

i-751 Process

08/31/2016 - i-751 sent via USPS Express to VSC
09/01/2016 - Delivered and signed for by L. Zuchowski

09/07/2016 - Cheque cashed

09/09/2016 - NOA received, dated 09/02/16

09/23/2016 - Biometrics letter received in mail! Scheduled for 10/04/2016 at 2pm

09/27/2016 - Walk-in Biometrics completed.

09/11/2017 - Approval letter received in mail! Approval date of 09/06/2017

Link to comment
Share on other sites

Finally got notice to pay our IV bill and was able to (dated 9/4)

We decided to wait to make this payment before sending off our original documents (even though that seems to be changing). Congrats to all those who received their bill as well.

Hi congrats on your IV. I hope you can help me. ? thanks!

Hi guys!I really need your help!

We just paid our IV fee today. And we are planning to send our IV package as soon as our payment shows PAID. We sent our AOS on August 14. However, I read from NVC website the new rules on sending documents. It says that both AOS and IV as ONE package. I am confused, should we include another AOS in our IV package? Or we only need to submit IV docs?

Thanks guys!

Here's the link:

http://travel.state.gov/content/visas/english/immigrate/immigrant-process/documents/Submit_documents.html

USCIS

05/13/2014: Sent I-130 to USCIS

05/19/2014: NOA1 Email Received. Assigned to NSC.

05/22/2014: NOA1 Hardcopy

06/16/2014: NOA2 Email. Approved. :dancing:

06/19/2014: NOA2 Hardcopy

06/20/2014: I-130 shipped to NVC

NVC

07/02/2014: Case received at NVC

07/11/2014: NVC confirmed they received our package on July 2.

07/23/2014: Got Case Number, IIN, BIN

07/30/2014: DS-261 Available and Completed

08/01/2014: Received NVC Instructions & AOS Invoice (Email)

08/01/2014: Called NVC to rectify spelling of address

08/03/2014: Paid AOS fee on CEAC (in process)

08/05/2014: AOS Fee in PAID status

08/13/2014: AOS Packet Mailed

08/14/2014: AOS Received at NVC

08/15/2014: AOS Scanned

09/03/2014: DS-261 Reviewed according to NVC rep

Waited for 41 days (29 business days) for IV invoice :dancing:

09/09/2014: Received IV invoice (Email)

09/10/2014: Paid IV fee on CEAC (in process)

09/11/2014: IV fee in PAID status

09/11/2014: IV Packet Mailed

09/12/2014: DS-260 Completed

09/12/2014: IV Packed received at NVC
09/15/2014: IV Scanned
Waited for 35 calendar days for AOS Acceptance and Case Complete :clock:

10/21/2014: Case Complete :dancing::whistle:

10/31/2014: Received Interview Instructions (P4)

EMBASSY

11/04/2014: Medical Exam at SLEC (2-day process) PASSED!

12/01/2014: Interview APPROVED! :dance:

12/09/2014: Visa on Hand

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline

Hi guys!I really need your help!

We just paid our IV fee today. And we are planning to send our IV package as soon as our payment shows PAID. We sent our AOS on August 14. However, I read from NVC website the new rules on sending documents. It says that both AOS and IV as ONE package. I am confused, should we include another AOS in our IV package? Or we only need to submit IV docs?

Thanks guys!

Here's the link:

http://travel.state.gov/content/visas/english/immigrate/immigrant-process/documents/Submit_documents.html

You don't need to send another AOS package unless you feel you made an error with the initial AOS package you sent before. Have only seen one Vjer having both packages reviewed together. Am still on the look out to see more vjers that will get their packages reviewed together.

Personally I won't send another AOS package.

Link to comment
Share on other sites

Hi congrats on your IV. I hope you can help me. ? thanks!

Hi guys!I really need your help!

We just paid our IV fee today. And we are planning to send our IV package as soon as our payment shows PAID. We sent our AOS on August 14. However, I read from NVC website the new rules on sending documents. It says that both AOS and IV as ONE package. I am confused, should we include another AOS in our IV package? Or we only need to submit IV docs?

Thanks guys!

Here's the link:

http://travel.state.gov/content/visas/english/immigrate/immigrant-process/documents/Submit_documents.html

I would say just send in the IV package alone.

Those new rules don't seem to be in effect yet, and it doesn't look like they apply to people who are already in the middle of their NVC process. More likely the new rules will start applying later in the month when the fees go up, for new NVC filers. So send just IV package.

USCIS
4/8/14 - Sent I-130
4/17/14 - Received NAO 1
4/29/14 - I-130 Approval/NAO 2

NVC
5/8/14 - Case received
6/2/14 - Case number/IIN assigned
6/11/14 - DS-261 Completed online
6/11/14 - AOS Bill invoiced and paid
6/13/14 - AOS Bill "PAID" status
6/16/14 - AOS Package sent
6/23/14 - AOS Package arrived at NVC
6/30/14 - AOS Package scanned
7/15/14 - IV Bill invoiced and paid
7/17/14 - IV Bill "PAID" status
7/18/14 - IV Package sent
7/18/14 - DS-260 Completed online
7/24/14 - IV Package arrived at NVC
7/28/14 - IV Package scanned
8/7/14 - AOS Reviewed and Accepted (called to confirm) - 27 business days from scan
8/11/14 - False checklist email regarding Civil Documents for DS-260


9/17/14 - Case Complete - 51 days from last scan date

10/3/14 - Interview Scheduled

11/04/14 - Interview (Approved)

1/??/15 - POE

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...