Jump to content
Saylin

NVC Filers - September 2014

 Share

3,637 posts in this topic

Recommended Posts

My bad, it wasn't clear enough. I know you're overwhelmed with the sudden approval and knowing all about the NVC process. See, what you do is print out the AOS barcode sheet and white out the AOS in Attn: CMR AOS and use that barcode sheet for IV documents. Many seem to say that their IV barcode sheet was Attn: CMR.

Gotcha. I will need to send it to my PIL to print out so I'll print, white out and then scan it back in for them. Perfect. Thanks dilmera as always!

I am the beneficiary. My husband is the petitioning USC.

Relationship:

Met in Washington DC - 13 February 2013

6 visits (Guam and Australia) in 2013

Engaged on Guam - 31 December 2013

Start living together in Australia - 3 March 2014

<3 Married in Queensland <3 - 28 June 2014

USCIS/NVC:

I-130 Package received Chicago - 14 July 2014

NOA1 - 17 July 2014

NOA2 - 28 July 2014

Email from NVC with Case Number etc - 18 August 2014

Completed DS-261 online - 19 August 2014

Paid AOS Bill - 20 August 2014

AOS Bill shows "PAID" 22 August 2014

Sent AOS Package to Parents in Law for signing 5 September 2014

AOS Package scanned at NVC 19 September 2014

IV Bill Paid 24 September 2014

DS-260 completed online 25 September 2014

Send IV Package 26 September 2014 (from NH)

IV Package Scanned 29 September 2014

CHECKLIST RECEIVED 26 November 2014

Checklist sent from NH 8 December 2014

Checklist scanned 11 December 2014

Case Complete 4 February 2015 - 192 days since NOA2. 171 days at NVC.

Medical Appointment 12 February 2015

P4 Letter Received 13 February 2015

Interview 17 March 2015 - ADMINISTRATIVE PROCESSING?! Missing my joint sponsor's W2 which he DOESN'T GET, HE IS SELF EMPLOYED, GRRRRR! Trying to sort it out ... :(

Status changed to "Ready" 24 March 2015

Status changed to "Issued" 27 March 2015! :D :D

Visa in hand 31 March 2015 - mere hours before I leave for Brisbane to fly to LA.

POE LAX extremely easy and pleasant - 1 April 2015

Reuinted with husband at Boston Airport - 2 April 2015

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

You are in my prayers already Soloenta.

Thank you my friend as you are in my prayers. :)

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

I am in Australia so calling is really difficult, though I have sent an email to the new contact email. Hopefully they will answer overnight otherwise if they haven't, I will call in the morning my time and try to squeeze that in before work.

I found that calling at 9pm (Melbourne time) is the best for me. That is 7am NVC time and the last couple of times have gotten through within a couple of minutes (when I call before work Melb time, I am on hold for about 45 minutes). Also, I call through Skype and it costs next to nothing.

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

well it was a CC!!! omg i am still in shock So it appears they are now putting the packages together for reviews everyone as our aos was July 11th scan date and aug8th for iv.

Link to comment
Share on other sites

well it was a CC!!! omg i am still in shock So it appears they are now putting the packages together for reviews everyone as our aos was July 11th scan date and aug8th for iv.

Congratulations! You're on EP right?

NVC

06/20/2014 - case received

07/03/2014 - case number and IIN assigned

07/18/2014 - DS-261 Completed

07/19/2014 - AOS fee invoiced and paid

07/24/2014 - AOS Packet Scanned in

08/22/2014 - IV fee invoiced and paid

08/25/2014 - DS-260 Completed

08/27/2014 - IV Packet Scanned in

10/24/2014 - CASE COMPLETE‼️?

11/06/2014 - Medical - DONE❗️

12/01/2014 - Interview @ 6:15am - APPROVED and VISA ISSUED❗️❗️❗️❗️

12/03/2014 - passport ready for pick up

12/08/2014 - Passport with VISA in hand?

12/20/2014 - POE

Link to comment
Share on other sites

Hi VJ friends! Just checking in to say hi. Glad to see some progress happening over here. :dancing: I hope some of the new changes will improve review times for you!

As for me, I am still waiting for my interview date to be assigned. I tell ya, if someone is going to be delayed at every step it would be me! The majority of people with CCs from 2 weeks ago already have their interview date, but of course not me. :ranting:

I thought I was finally done with NVC torture when I got the CC on Aug 26th, but they still have me in their grasp. Let me go NVC, let me go! I wanna go HOME!!!! :crying:

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Link to comment
Share on other sites

Please read what I quoted from seanimo, this is a new thing and Saylin will be updating her wiki later this week. You can use the barcode sheet of AOS, just change Attn: CMR AOS to Attn: CMR/DR. Some people say it's DR, that's what the NVC reps are telling but on the barcode sheet for IV it's Attn: CMR. To send both packages together, put all your AOS stuff in one envelope, IV in another and put both of these in a larger manila envelope.

Uh, no :no: I won't be updating until AT LEAST the 22nd. Not only because I'll be busy planning this week and be on vacation next week, but I also want to see how the process is with others before doing a major overhaul on the wiki, so it might even be later as it depends how many people here are at the start of the NVC process and actually update on how the new path goes.

Guess I'm gonna have to make a new flowchart as well :jest:

Link to comment
Share on other sites

Good tip!

Just spoke to Arthur at the NVC and he said NOT to send the IV package and to wait until we have paid the bill. So is this change official, or is it just some shortcut that has been discovered? Haha. I asked him if there'd been a change to this process recently enabling people to send both things at once and he said no. He also said that our ds-261 might be "in the building" but it's still being processed even though it says "completed" on the invoice page so... is Arthur a little behind the times or something? :|

I am the beneficiary. My husband is the petitioning USC.

Relationship:

Met in Washington DC - 13 February 2013

6 visits (Guam and Australia) in 2013

Engaged on Guam - 31 December 2013

Start living together in Australia - 3 March 2014

<3 Married in Queensland <3 - 28 June 2014

USCIS/NVC:

I-130 Package received Chicago - 14 July 2014

NOA1 - 17 July 2014

NOA2 - 28 July 2014

Email from NVC with Case Number etc - 18 August 2014

Completed DS-261 online - 19 August 2014

Paid AOS Bill - 20 August 2014

AOS Bill shows "PAID" 22 August 2014

Sent AOS Package to Parents in Law for signing 5 September 2014

AOS Package scanned at NVC 19 September 2014

IV Bill Paid 24 September 2014

DS-260 completed online 25 September 2014

Send IV Package 26 September 2014 (from NH)

IV Package Scanned 29 September 2014

CHECKLIST RECEIVED 26 November 2014

Checklist sent from NH 8 December 2014

Checklist scanned 11 December 2014

Case Complete 4 February 2015 - 192 days since NOA2. 171 days at NVC.

Medical Appointment 12 February 2015

P4 Letter Received 13 February 2015

Interview 17 March 2015 - ADMINISTRATIVE PROCESSING?! Missing my joint sponsor's W2 which he DOESN'T GET, HE IS SELF EMPLOYED, GRRRRR! Trying to sort it out ... :(

Status changed to "Ready" 24 March 2015

Status changed to "Issued" 27 March 2015! :D :D

Visa in hand 31 March 2015 - mere hours before I leave for Brisbane to fly to LA.

POE LAX extremely easy and pleasant - 1 April 2015

Reuinted with husband at Boston Airport - 2 April 2015

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Received 60 days email from NVC this morning. Sent IV documents on September 3rd and they scanned it in their system on Sept. 5th that's the date letter is showing. The thing that worries me I didn't get the 60 days email in August when I sent my AOS package.

IR1/CR1 Timeline:

01/24/2014: Married

02/11/2014: I130 Sent

02/19/2014: I130 NOA1

06/25/2014: I130 Approved (NOA2)

07/07/2014: NVC Received

07/16/2014: Case # and IIN Assigned

08/04/2014: Received DS 261 and AOS Invoice Email

08/04/2014: Submitted DS 261

08/06/2014: Paid AOS Fee

08/07/2014: AOS Package Sent

08/11/2014: AOS Package Scanned

08/30/2014: Received IV Bill

08/30/2014: Paid IV Bill

09/03/2014: IV Package Sent

09/03/2014: Submitted Ds-260

09/05/2014: IV Package Scanned

10/14/2014: Case Complete

12/01/2014: Medical (Completed)

12/16/2014: Interview Scheduled for 7:00 AM (APPROVED) :dancing: :dancing: :dancing:

12/17/2014: Visa "ISSUED" :dancing::dancing::dancing::dancing::dancing:

01/24/2015: POE - JFK, NY

ROC Timeline:

11/11/2016: I-751 sent to VSC

11/14/2016: I-751 package received at VSC

11/16/2016: Check cashed

11/18/2016: NOA1 Received

12/14/2016: Biometrics Appointment

10/17/17: Approval letter received in mail

Link to comment
Share on other sites

Rang NVC last night to check if our case is complete as I saw the AOS fee when from PAID to N/A and it is!!! Case complete as of 5th September. YAY!!!! Now to just wait for the Sydney consulate to contact us for the interview.

Link to comment
Share on other sites

Good tip!

Just spoke to Arthur at the NVC and he said NOT to send the IV package and to wait until we have paid the bill. So is this change official, or is it just some shortcut that has been discovered? Haha. I asked him if there'd been a change to this process recently enabling people to send both things at once and he said no. He also said that our ds-261 might be "in the building" but it's still being processed even though it says "completed" on the invoice page so... is Arthur a little behind the times or something? :|

In the couple of weeks I've been calling (they love me...err...I think) to help with questions regarding all the paperwork I'm just prepping up I've spoken to Arthur a couple of times. Just a feeling but I think he goes 'by the book' - while I feel sending in the both packets at the same time has proved successful, just not an actual process that has been integrated...but that's just my feeling.

P.S. He gave me a 5 week waiting time for my file to be received by NVC from USCIS today (I wasn't calling for that) so perhaps that's just a spiel he's offering up to keep the phone volumes under control.

IR-1/CR-1 Visa

Service Center : California Service Center

Consulate : Switzerland

Marriage: 2008-08-07

I-130 Sent : 2014-08-02

I-130 NOA1 : 2014-08-05

I-130 Approved : 2014-08-25

NVC Received : 2014-09-12

NVC Case & IIN Number Assigned: 2014-09-22

DS-261 Filled and Submitted: 2014-09-22

AOS Bill / Payment Made: 2014-09-23

Received IV Bill: 2014-10-02

Paid IV Bill: 2014-10-03

Sent AOS & IV: 2014-10-19

Package Received by NVC: 2014-10-22

Scanned Date into NVC (e-mail received): 2014-10-23

Submitted DS-260: 2014-10-23

Checklist received (AOS - missing check box): 2014-12-17

Re-submitted documents (received by NVC): 2014-12-30

Submitted expedite request: 2015-01-02

Expedite approved by embassy: 2015-01-05

Files shipped to embassy: 2015-01-07

Medical scheduled: 2015-01-13

Embassy received files: 2014-01-12

Processing
Estimates/Stats :

* I-130 was approved in 20 days from NOA1 date.

* NVC received case in 18 days from NOA2 date.

* NVC assigned Case & IIN # in 10 days from NVC received date.

* DS-261 Filled out in 0 days from receiving Case number.

* AOS Bill paid in 1 day from filing DS-261

* IV Bill Received 11 days after filling DS-261

* NVC Scanned AOS/IV Package 3 days after sending

* Checklist received 55 days after sending documents

* Expedite approved 3 days after submission

* Files shipped to embassy 2 days after expedite approved

* Files received by embassy 5 days after shipped from NVC

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Just got off the call with Olivia from NVC... She said that my AOS with a scan date of 30th July has not been reviewed yet and should be touched only by this month end (that's when I touch 60 days)... My IV Package with a scan date of 28th June was approved on Aug 13th....

So I'm quite sure that this new process is not going to make any difference to anyone of us with scan dates prior to Sep 2014.....

USCIS
2013/04/27 : Mailed I-130 petition to USCIS Phoenix Lockbox, Arizona.
2013/04/30 : I-130 PETITION PRIORITY DATE (NOA1).
2013/05/02 : Received (NOA1) hardcopy by mail from National Benefits Center (NBC).
2013/12/04 : I-130 petition transferred from National Benefits Center (NBC) to Nebraska Service Center (NSC).
2014/02/12 : I-130 PETITION APPROVED (NOA2) at Nebraska Service Center (NSC).
2014/02/13 : Approved I-130 petition shipped from Nebraska Service Center (NSC) to National Visa Center (NVC).
2014/02/18 : Received (NOA2) hardcopy by mail from Nebraska Service Center (NSC).
NATIONAL VISA CENTER (NVC)
2014/02/25 : National Visa Center (NVC) received approved I130 petition from Nebraska Service Center (NSC).
2014/03/31 : Case Number, IIN & BIN generated.
2014/04/01 : DS-261 available. Completed & submitted online.
2014/04/01 : AOS fee bill invoiced & paid online.

2014/04/04 : AOS fee payment status appears as PAID.

2014/04/08 : IV fee bill invoiced & paid online.

2014/04/11 : IV fee payment status appears as PAID.

2014/04/12 : DS-260 available. Completed & submitted online.

2014/06/24 : IV packet delivered at National Visa Center (NVC).

2014/07/01 : IV packet scanned into system.

2014/07/28 : AOS packet delivered at National Visa Center (NVC).

2014/07/30 : AOS packet scanned into system.

2014/08/13 : IV packet reviewed & accepted by National Visa Center (NVC).

2014/09/23 : AOS checklist email received from National Visa Center (NVC).

2014/09/24 : AOS checklist correction mailed to National Visa Center (NVC).

2014/09/29 : AOS checklist correction scanned into system at National Visa Center (NVC).

2014/11/17 : CASE COMPLETED at National Visa Center (NVC).

2014/12/03 : Interview scheduled by National Visa Center (NVC).

2014/12/09 : Received interview letter (P4) email from National Visa Center (NVC).

2014/12/19 : Case shipped from National Visa Center (NVC) to US consulate Mumbai. CEAC status says 'In Transit'.

INTERVIEW & POE

2014/12/15 : Medicals completed.

2014/12/22 : Case received at US consulate Mumbai. CEAC status says 'Ready'.

2015/01/05 : Biometrics appointment scheduled.

2015/01/20 : INTERVIEW at US consulate Mumbai.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Chile
Timeline

Good tip!

Just spoke to Arthur at the NVC and he said NOT to send the IV package and to wait until we have paid the bill. So is this change official, or is it just some shortcut that has been discovered? Haha. I asked him if there'd been a change to this process recently enabling people to send both things at once and he said no. He also said that our ds-261 might be "in the building" but it's still being processed even though it says "completed" on the invoice page so... is Arthur a little behind the times or something? :|

Not sure if he's behind the times or not but my guess is if you called 4 more times and spoke to 4 more reps you would get 4 different answers. The change is no shortcut, it's what it actually says on the NVC process website.i'm just not so sure it applies to the people that are in the middle of the process. And as Saylin is saying (who has likely been through a great many changes here) let's all wait and see how this plays out for people. I didn't send ours right away, I waited until 30 business days from our ds261 and had reps tell me that I should send it because I would get me fee invoiced and paid before they ever looked at it. But this was before the new process. I would suggest calling again. Arthur is a notorious grump!

And the individual packages should be marked with the case number and either AOS or IV. The address on the outside of the oracle is the one where you have to be concerned with the attn. And I didn't white out anything! I didn't have any reps tell me that. I'm sure they actually scan the barcode and that's the only part that matters to them on that sheet.

Good luck!

USCIS

12-09-2013: NOA1

05-29-2014: NOA2- I-130 Approved!!!

NVC

06-04-2014: I-130 shipped from TSC to NVC

06-13-2014: Arrived at NVC

07-01-2014: Case # and IIN assigned

07-17-2014: D-261 submitted

07-18-2014: AOS fee invoiced

07-18-2014: AOS fee paid

07-18-2014: AOS package sent (call me crazy!!!)

07-21-2014: AOS package arrived to NVC (confirmed by FedEx)

07-22-2014: AOS bill showed "Paid"

07-22-2014: AOS package scanned by NVC (originally told July 23rd, but the 60 day letter said July 22nd, confirmed by NVC)

09-02-2014: DS-261 reviewed/accepted (notified by calling NVC on 09-05-2014)

09-08-2014: IV fee invoiced/paid

08-28-2014: IV package sent

08-29-2014: IV package arrived at NVC

09-02-2014: IV package scanned by NVC

09-15-2014: AOS package reviewed/accepted

09-19-2014: DS-260 completed

10-25-2014: Case Complete! (11/1/14 would be 60 days) Confirmed by phone on 10-27-2014

10-31-2014: Interview scheduled

11-25-2014: Medical

12-01-2014: Interview

12-19-2014: Visa Received

12-29-2014: POE in Atlanta, GA!!!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Rang NVC last night to check if our case is complete as I saw the AOS fee when from PAID to N/A and it is!!! Case complete as of 5th September. YAY!!!! Now to just wait for the Sydney consulate to contact us for the interview.

Wonderful news!!!! Congrats.... What was your last scan date by the way?

USCIS
2013/04/27 : Mailed I-130 petition to USCIS Phoenix Lockbox, Arizona.
2013/04/30 : I-130 PETITION PRIORITY DATE (NOA1).
2013/05/02 : Received (NOA1) hardcopy by mail from National Benefits Center (NBC).
2013/12/04 : I-130 petition transferred from National Benefits Center (NBC) to Nebraska Service Center (NSC).
2014/02/12 : I-130 PETITION APPROVED (NOA2) at Nebraska Service Center (NSC).
2014/02/13 : Approved I-130 petition shipped from Nebraska Service Center (NSC) to National Visa Center (NVC).
2014/02/18 : Received (NOA2) hardcopy by mail from Nebraska Service Center (NSC).
NATIONAL VISA CENTER (NVC)
2014/02/25 : National Visa Center (NVC) received approved I130 petition from Nebraska Service Center (NSC).
2014/03/31 : Case Number, IIN & BIN generated.
2014/04/01 : DS-261 available. Completed & submitted online.
2014/04/01 : AOS fee bill invoiced & paid online.

2014/04/04 : AOS fee payment status appears as PAID.

2014/04/08 : IV fee bill invoiced & paid online.

2014/04/11 : IV fee payment status appears as PAID.

2014/04/12 : DS-260 available. Completed & submitted online.

2014/06/24 : IV packet delivered at National Visa Center (NVC).

2014/07/01 : IV packet scanned into system.

2014/07/28 : AOS packet delivered at National Visa Center (NVC).

2014/07/30 : AOS packet scanned into system.

2014/08/13 : IV packet reviewed & accepted by National Visa Center (NVC).

2014/09/23 : AOS checklist email received from National Visa Center (NVC).

2014/09/24 : AOS checklist correction mailed to National Visa Center (NVC).

2014/09/29 : AOS checklist correction scanned into system at National Visa Center (NVC).

2014/11/17 : CASE COMPLETED at National Visa Center (NVC).

2014/12/03 : Interview scheduled by National Visa Center (NVC).

2014/12/09 : Received interview letter (P4) email from National Visa Center (NVC).

2014/12/19 : Case shipped from National Visa Center (NVC) to US consulate Mumbai. CEAC status says 'In Transit'.

INTERVIEW & POE

2014/12/15 : Medicals completed.

2014/12/22 : Case received at US consulate Mumbai. CEAC status says 'Ready'.

2015/01/05 : Biometrics appointment scheduled.

2015/01/20 : INTERVIEW at US consulate Mumbai.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Rang NVC last night to check if our case is complete as I saw the AOS fee when from PAID to N/A and it is!!! Case complete as of 5th September. YAY!!!! Now to just wait for the Sydney consulate to contact us for the interview.

Congratulations!!! What was your last scan date and were you doing EP?

USCIS:
Service Center : Vermont Service Centre
Consulate : New Delhi, India.
2013/12/02 : Got Married in India

2014/02/13 : Mailed I-130 application
2013/02/18 : NOA 1
2014/06/04 : Received NOA2


NATIONAL VISA CENTER (NVC):
2014/06/30 : National Visa Center (NVC) received approved I-130 petition from Vermont Service Centre
2014/07/10 : National Visa Center (NVC) Case Number, IIN & BIN generated.
2014/07/18 : DS-261 available. Completed & submitted online.
2014/07/18 : AOS fee bill invoiced & paid online.

2014/08/15 : Mailed AOS package (Scan date-19th August)

2014/09/04 : IV fee bill invoiced & paid online.

2014/09/06 : Mailed IV package (scanned into system on September 10th)

2014/09/10 : Submitted DS-260

2014/11/07: New scan date for AOS checklist

2015/01/05: Case Complete

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...