Jump to content
Saylin

NVC Filers - September 2014

 Share

3,637 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: Italy
Timeline

OK thanks. Takes so long! Would think that it would be easier for them to let both the IV and AOS fees become available at the same time. Anyway, let me not tell them how to do their job. *Sigh*

This wait is torture!

Cases arriving at NVC lately seem to be moving along fast. At least as far as paying fees and sending in packets.

Service Center : Texas Service Center

Consulate : Naples, Italy

Marriage : 2014-02-14

U S C I S

I-130 Sent : 2014-02-27

I-130 NOA1 : 2014-02-28

I-130 RFE : 2014-07-05

I-130 RFE Sent : 2014-07-07

I-130 Approved : 2014-07-16 :thumbs:

N V C

NVC Received : 2014-07-28

Received DS-261 / AOS Bill : 2014-08-11

Pay AOS Bill : 2014-08-13

Send AOS Package : 2014-08-14

Scan AOS Package : 2014-08-18

Submit DS-261 : 2014-08-12

Receive IV Bill : 2014-09-11

Pay IV Bill : 2014-09-12

Send IV Package : 2014-09-09

Scan IV Package : 2014-09-10

DS-260 COMPLETE : 2014-09-15

Case Completed at NVC : 2014-10-17 :dance: :dance: :dance: :dance:

Interview Date Via Phone call to NVC: 2014-12-02

Receive Instruction and Interview appointment letter : 2014-11-03

Visa Approved: 2014-12-02

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Case Complete. Scan date: July 31.

Got a checklist September 24 for document oversight from the reviewer, Hubby called and requested for supervisor review. Supervisor Octavio pulled our file, checked and saw the missing document.

A special thanks to Saylin for all her help and efforts, Saylin you are indeed a blessing. I say a big thank you to all the Vjers here for your help and support. I also pray for those still at NVC stage that you all get thru ASAP.

Hey, congratulations!!! Interesting to know about your checklist and how it was resolved. Thanks for sharing.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Thanks a ton for the quick reply. Another small hing that I wanted to confirm was Birth Certificate. Can i send 10th class passing certificate or do I have to send the original birth certificate? In case of latter, I may have to get it translated to English as the particulars have been filled in Hindi . Please advise.

hi, sorry for late reply, was without Internet, saw no one replied to you. No, you cannot send your 10th class passing certificate and you HAVE to send your original birth certificate and its translation in English and the translation should have this line on it, "Translation is 100% accurate and translator is competent to translate."

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I'm right behind you... August 8th

Actually, when I had called after sending documents in I was told August 8 as the date I should consider, but the official wording from NVC (60-day letter) said August 7 :). Did you receive the 60-day email?

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Can't wait for Monday... Seems like people who got to NVC after me are flying out of the door poor me stuck their for 5+ months... Waiting one month for case number and two months for IV fees invoice killed me. The good news they working now between August 1st and 6th...

How do you know that? In this thread last progress was August 4. Was there mention of CC or AOS approval on any other thread with August 6 date?

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Hello VJ members

I got the 60 day waiting time letter on 22/14, but i donot know where to check my scan date, where do i have to check it, do i havee to call them and ask about it..??????

Hi, does your letter mention what date NVC received your documents? You can consider that as your scan date.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Italy
Timeline

How do you know that? In this thread last progress was August 4. Was there mention of CC or AOS approval on any other thread with August 6 date?

I seen an Aug 6th (checklist scan) case complete on Facebook.

Service Center : Texas Service Center

Consulate : Naples, Italy

Marriage : 2014-02-14

U S C I S

I-130 Sent : 2014-02-27

I-130 NOA1 : 2014-02-28

I-130 RFE : 2014-07-05

I-130 RFE Sent : 2014-07-07

I-130 Approved : 2014-07-16 :thumbs:

N V C

NVC Received : 2014-07-28

Received DS-261 / AOS Bill : 2014-08-11

Pay AOS Bill : 2014-08-13

Send AOS Package : 2014-08-14

Scan AOS Package : 2014-08-18

Submit DS-261 : 2014-08-12

Receive IV Bill : 2014-09-11

Pay IV Bill : 2014-09-12

Send IV Package : 2014-09-09

Scan IV Package : 2014-09-10

DS-260 COMPLETE : 2014-09-15

Case Completed at NVC : 2014-10-17 :dance: :dance: :dance: :dance:

Interview Date Via Phone call to NVC: 2014-12-02

Receive Instruction and Interview appointment letter : 2014-11-03

Visa Approved: 2014-12-02

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I seen an Aug 6th (checklist scan) case complete on Facebook.

I think they are processing checklists faster now, so not much hope there my mind says, but my heart is now going to make me compulsively check CEAC website. Something should happen this coming week.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Italy
Timeline

I think they are processing checklists faster now, so not much hope there my mind says, but my heart is now going to make me compulsively check CEAC website. Something should happen this coming week.

From what I've always heard from them "they process documents in the order that they are received". Your case will be completed soon I am sure.

Service Center : Texas Service Center

Consulate : Naples, Italy

Marriage : 2014-02-14

U S C I S

I-130 Sent : 2014-02-27

I-130 NOA1 : 2014-02-28

I-130 RFE : 2014-07-05

I-130 RFE Sent : 2014-07-07

I-130 Approved : 2014-07-16 :thumbs:

N V C

NVC Received : 2014-07-28

Received DS-261 / AOS Bill : 2014-08-11

Pay AOS Bill : 2014-08-13

Send AOS Package : 2014-08-14

Scan AOS Package : 2014-08-18

Submit DS-261 : 2014-08-12

Receive IV Bill : 2014-09-11

Pay IV Bill : 2014-09-12

Send IV Package : 2014-09-09

Scan IV Package : 2014-09-10

DS-260 COMPLETE : 2014-09-15

Case Completed at NVC : 2014-10-17 :dance: :dance: :dance: :dance:

Interview Date Via Phone call to NVC: 2014-12-02

Receive Instruction and Interview appointment letter : 2014-11-03

Visa Approved: 2014-12-02

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Question: if during NVC process the petitioner still recovering from physical injuries and on temporary disabilities , earned more than $80k+ for the past 3 tax years and paid all taxes, can't file employment verification letter,due to work related injury , is enough to file the explaination letter enough or attorney letter head is required.

Any one who is some knowledge please response . Thank you in advance.

Link to comment
Share on other sites

hi all :)

have been following the nvc thread since august ..have been in the nvc stage since april...

scan date: aug 14 and we got an AOS checklist july 21 …hoping to hear good news soon …hubby is from the dominican republic

best to all

07 may - nvc email to pay both IV and AOS fee :goofy:

07 may - aos fee paid :crying::crying:

16 may - visa fee paid :crying::crying:

30 may - sent in ds-260 electronic form :dancing:

09 june - NVC received both IV and AOS packages :idea:

11 july - i emailed nvc about our case :clock:

21 july - NVC AOS checklist for putting wrong income :ranting:

28 july - sent back NVC checklist :sleepy:

15 aug - scan date at NVC by phone

16 aug - NVC email inquiry response saying we got all documents

22 sept - nvc 60 day email letter received with scan date of AUG 14 :cry:

7 oct - the same damn checklist for wrong income and missing pages…ugh

10 oct - sent out our 2nd checklist …once again asking for the SAME DAMN THING!

14 oct - NVC email saying documents received and scan date of OCT 14 ..let the 60day wait begin :(

15 oct - sent expedite email request to NVC and embassy

20 oct - expedite email APPROVED!

22 OCT - NVC confirmed case is no longer there and ceac processing site changed from NVC to SANTO DOMINGO! BYE BYE NVC!!!!!

:cry: ****60 days for CC will be DEC 14 ……have been in NVC since April 2013 :crying:

Link to comment
Share on other sites

Well my package should be arriving at NVC tomorrow according to USPS so hopefully our scan date will be Tues or Wed. Parents in law sent it off from within NH on Friday.

It's Monday in Australia so nearly time to start another week at NVC and hopefully LOTS AND LOTS of Case Completes this week. Crossing my fingers for you all!

I am the beneficiary. My husband is the petitioning USC.

Relationship:

Met in Washington DC - 13 February 2013

6 visits (Guam and Australia) in 2013

Engaged on Guam - 31 December 2013

Start living together in Australia - 3 March 2014

<3 Married in Queensland <3 - 28 June 2014

USCIS/NVC:

I-130 Package received Chicago - 14 July 2014

NOA1 - 17 July 2014

NOA2 - 28 July 2014

Email from NVC with Case Number etc - 18 August 2014

Completed DS-261 online - 19 August 2014

Paid AOS Bill - 20 August 2014

AOS Bill shows "PAID" 22 August 2014

Sent AOS Package to Parents in Law for signing 5 September 2014

AOS Package scanned at NVC 19 September 2014

IV Bill Paid 24 September 2014

DS-260 completed online 25 September 2014

Send IV Package 26 September 2014 (from NH)

IV Package Scanned 29 September 2014

CHECKLIST RECEIVED 26 November 2014

Checklist sent from NH 8 December 2014

Checklist scanned 11 December 2014

Case Complete 4 February 2015 - 192 days since NOA2. 171 days at NVC.

Medical Appointment 12 February 2015

P4 Letter Received 13 February 2015

Interview 17 March 2015 - ADMINISTRATIVE PROCESSING?! Missing my joint sponsor's W2 which he DOESN'T GET, HE IS SELF EMPLOYED, GRRRRR! Trying to sort it out ... :(

Status changed to "Ready" 24 March 2015

Status changed to "Issued" 27 March 2015! :D :D

Visa in hand 31 March 2015 - mere hours before I leave for Brisbane to fly to LA.

POE LAX extremely easy and pleasant - 1 April 2015

Reuinted with husband at Boston Airport - 2 April 2015

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...