Jump to content
UnaMexicana

I-130 August 2014 filers

 Share

724 posts in this topic

Recommended Posts

We have placed your case on a processing hold, because the required security checks remain pending. Until we receive the results of these security checks, we cannot move forward on your case. We require the results of security checks before we make a decision on any pending case.

We cannot predict when we will receive the results of these security checks. Please be assured that we will make every effort to make a decision in your case as soon as the security checks are complete.

The wording of this reply sounds very much like a standard type response - The I-130 is used solely to provide USCIS with details of the petitioner so that they can judge whether or not he's putting forward a genuine case. Thus all I-130's are 'on hold' until USCIS have performed and reviewed the results of 'security checks'.

Strikes me very much as their way of saying 'we've not yet got round to your case and we'll let you know when we do'. On the bright side it does imply that they've actually started to review the I-130 so hopefully it's moving now rather than just sitting in the 'inbox'

Wishing you the best

08/08/2014 - Married
25/08/2014 - I-130 received by USCIS
27/08/2014 - Emailed (NOA1) received
28/08/2014 - Check for I-130 cashed
05/09/2014 - Mailed I-797c Received (NOA1)
18/02/2015 - USCIS case status shows 'I-130 Approved'
21/02/2015 - Mailed I-797 Received (NOA2)
26/02/2015 - USCIS case status shows 'Documents shipped to NVC (DoS)'
07/03/2015 - Case# and IID# assigned
14/03/2015 - Receive welcome package from NVC with Case# and IID#, submit DS-261 and paid AOS fee :)
17/03/2015 - Received email of DS-261 confirmation
17/03/2015 - AOS fee processed
19/03/2015 - NVC site shows AOS fee processed
24/04/2015 - Email from NVC, 'Choice of agent' form (DS-261) accepted
27/04/2015 - IV fee showing as available to pay on CEAC site and paid

10/05/2015 - DS-260 submitted

15/07/2015 - AOS and IV documents mailed to NVC

22/07/2015 - Email from NVC confirming document receipt on 17th July (Scan date?) and advising of 30 day period until case is reviewed.

05/08/2015 - Case complete

12/08/2015 - Email from NVC advising that an interview will be scheduled

26/08/2015 - P4 email from NVC, interview scheduled for 30th September

04/09/2015 - CEAC visa status changed to showing as 'In Transit'

10/09/2015 - Medical attended

11/09/2015 - CEAC visa status changed to 'Ready'

30/09/2015 - Interview, Visa Approved :dancing:

02/10/2015 - CEAC visa status changed to 'Issued'

06/10/2015 - Collected passport from courier and, later, paid $165 Green card processing fee

28/10/2015 - POE

09/11/2015 - SSN card arrives in mail

01/12/2015 - One nice shiny Green Card arrives in the mail :dancing:

Link to comment
Share on other sites

Our NOA2 approved on 01/30/2015 states that the NVC will contact beneficiary within 30 days if not to email nvcinquiry. Just sent them an email. Hopefully would hear back.

Has anyone taken the route of writing to this email?

Their phone line is impossible to get through to and the only time my husband got through to them they haven't given any information stating to call back if we don't hear from them within their timeline of 35 days.

We also received an email notification from USCIS on 02/12/2015 that said our case was sent to NVC. Hopefully 30 days would be from the date of approval and not from the date they sent the file to NVC.

I am the beneficiary- Spouse (Sri Lankan citizen) to a US citizen

USCIS

08-26-2014 Form I-130 submitted

08-28-2014 Received NOA1 for I-130

10-01-2014 Form I-129F (K3 visa) submitted

10-14-2014 Received NOA1 for I-129F

01-30-2015 Received NOA 2 for I-130 (5 months and 3 days after) :D

01-30-2015 Received NOA 2 for I-129F (3 months and 2 weeks after)

02-11-2015 Received USCIS update (email notification) that case was dispatched to NVC

NVC

03-03-2015 Received NVC welcome letter via email with the case no and IIN (31 days from NOA2 date)

03-03-2015 Submitted DS-261

03-03-2015 Paid AOS fee

03-18-2015 AOS payment shown as 'paid' (NVC payment portal have had a problem with payments made hence the delay in processing)

03-24-2015 NVC reviewed the DS-261 (spoke to an agent and she reviewed the form over the phone)

03-26-2015 Paid IV fee

03-31-2015 IV payment shown as 'paid'

03-31-2015 Sent in the AOS & IV packages

04-01-2015 Scan date (NVC letter received)

04-02-2015 Submitted DS-260

04-24-2015 Case Complete (24 days from scan date!) :dance:

05-05-2015 Confirmed interview date with NVC over the phone (06-11-2015)

05-07-2015 Received P4 letter

SRI LANKA CONSULATE PROCESSING

05-12-2015 Medical examination (Asiri Surgical Hospital)

05-22-2015 Received of the medical report

06-11-2015 Interview at US Consulate in SL - VISA APPROVED! :D

06-30-2015 Collected the passport form the Consulate (passport was due to be collected in a week from interview date but delay in issuing visa due to the system failure in the US Department of State)

07-12-2015 POE-Minneapolis

Link to comment
Share on other sites

Our NOA2 approved on 01/30/2015 states that the NVC will contact beneficiary within 30 days if not to email nvcinquiry. Just sent them an email. Hopefully would hear back.

Has anyone taken the route of writing to this email?

Their phone line is impossible to get through to and the only time my husband got through to them they haven't given any information stating to call back if we don't hear from them within their timeline of 35 days.

We also received an email notification from USCIS on 02/12/2015 that said our case was sent to NVC. Hopefully 30 days would be from the date of approval and not from the date they sent the file to NVC.

I got the update as well and confirmed over the phone that they had physically rec'd the cases in office about a week after the date in the 2nd message.

As for the phones, exercise great patience and just keep at it..... I use Google Hangouts on my cellphone so that there is no long distance...

Best wishes!!

Met in the SCA - DRACO INVICTUS!  08-14-2014 Married in Ann Arbor, MI

Spoiler

 

USCIS.... DONE  in 150 day from NOA1 to NOA2 (TSC)

NVC... DONE  in 116 days from NOA2 to final CC

Final Steps... DONE in 350 days from NOA1 to POE
POE 08-11-2015 in Detroit, MI 

 

 

 

 

Removal of Conditions

07-11-2017 NOA1 date (rec'd on 14th)

08-03-2017 Daughter and I completed biometrics; May 2018 - I had to redo my biometrics (reason unknown)

WAC17283xxxxx....and we wait...400 days

07-13-2018 I-551 extension stamp (12 mths) obtained at USCIS office in Detroit

09-20-2018 Transferred to TSC

10-15-2018 Text notification "New Card Being Produced"   YAY!!

Link to comment
Share on other sites

Are you calling NVC from outside of USA with no charge? If so please let me know how? Would make life so much easier if I am able to call to from Sri Lanka.

I got the update as well and confirmed over the phone that they had physically rec'd the cases in office about a week after the date in the 2nd message.

As for the phones, exercise great patience and just keep at it..... I use Google Hangouts on my cellphone so that there is no long distance...

Best wishes!!

I am the beneficiary- Spouse (Sri Lankan citizen) to a US citizen

USCIS

08-26-2014 Form I-130 submitted

08-28-2014 Received NOA1 for I-130

10-01-2014 Form I-129F (K3 visa) submitted

10-14-2014 Received NOA1 for I-129F

01-30-2015 Received NOA 2 for I-130 (5 months and 3 days after) :D

01-30-2015 Received NOA 2 for I-129F (3 months and 2 weeks after)

02-11-2015 Received USCIS update (email notification) that case was dispatched to NVC

NVC

03-03-2015 Received NVC welcome letter via email with the case no and IIN (31 days from NOA2 date)

03-03-2015 Submitted DS-261

03-03-2015 Paid AOS fee

03-18-2015 AOS payment shown as 'paid' (NVC payment portal have had a problem with payments made hence the delay in processing)

03-24-2015 NVC reviewed the DS-261 (spoke to an agent and she reviewed the form over the phone)

03-26-2015 Paid IV fee

03-31-2015 IV payment shown as 'paid'

03-31-2015 Sent in the AOS & IV packages

04-01-2015 Scan date (NVC letter received)

04-02-2015 Submitted DS-260

04-24-2015 Case Complete (24 days from scan date!) :dance:

05-05-2015 Confirmed interview date with NVC over the phone (06-11-2015)

05-07-2015 Received P4 letter

SRI LANKA CONSULATE PROCESSING

05-12-2015 Medical examination (Asiri Surgical Hospital)

05-22-2015 Received of the medical report

06-11-2015 Interview at US Consulate in SL - VISA APPROVED! :D

06-30-2015 Collected the passport form the Consulate (passport was due to be collected in a week from interview date but delay in issuing visa due to the system failure in the US Department of State)

07-12-2015 POE-Minneapolis

Link to comment
Share on other sites

Are you calling NVC from outside of USA with no charge? If so please let me know how? Would make life so much easier if I am able to call to from Sri Lanka.

I use the Google Hangouts app on my phone.... it works from my laptop as well.... it's a free app, just need a Google account

Met in the SCA - DRACO INVICTUS!  08-14-2014 Married in Ann Arbor, MI

Spoiler

 

USCIS.... DONE  in 150 day from NOA1 to NOA2 (TSC)

NVC... DONE  in 116 days from NOA2 to final CC

Final Steps... DONE in 350 days from NOA1 to POE
POE 08-11-2015 in Detroit, MI 

 

 

 

 

Removal of Conditions

07-11-2017 NOA1 date (rec'd on 14th)

08-03-2017 Daughter and I completed biometrics; May 2018 - I had to redo my biometrics (reason unknown)

WAC17283xxxxx....and we wait...400 days

07-13-2018 I-551 extension stamp (12 mths) obtained at USCIS office in Detroit

09-20-2018 Transferred to TSC

10-15-2018 Text notification "New Card Being Produced"   YAY!!

Link to comment
Share on other sites

I use the Google Hangouts app on my phone.... it works from my laptop as well.... it's a free app, just need a Google account

Awesome! Thanks so much!

I am the beneficiary- Spouse (Sri Lankan citizen) to a US citizen

USCIS

08-26-2014 Form I-130 submitted

08-28-2014 Received NOA1 for I-130

10-01-2014 Form I-129F (K3 visa) submitted

10-14-2014 Received NOA1 for I-129F

01-30-2015 Received NOA 2 for I-130 (5 months and 3 days after) :D

01-30-2015 Received NOA 2 for I-129F (3 months and 2 weeks after)

02-11-2015 Received USCIS update (email notification) that case was dispatched to NVC

NVC

03-03-2015 Received NVC welcome letter via email with the case no and IIN (31 days from NOA2 date)

03-03-2015 Submitted DS-261

03-03-2015 Paid AOS fee

03-18-2015 AOS payment shown as 'paid' (NVC payment portal have had a problem with payments made hence the delay in processing)

03-24-2015 NVC reviewed the DS-261 (spoke to an agent and she reviewed the form over the phone)

03-26-2015 Paid IV fee

03-31-2015 IV payment shown as 'paid'

03-31-2015 Sent in the AOS & IV packages

04-01-2015 Scan date (NVC letter received)

04-02-2015 Submitted DS-260

04-24-2015 Case Complete (24 days from scan date!) :dance:

05-05-2015 Confirmed interview date with NVC over the phone (06-11-2015)

05-07-2015 Received P4 letter

SRI LANKA CONSULATE PROCESSING

05-12-2015 Medical examination (Asiri Surgical Hospital)

05-22-2015 Received of the medical report

06-11-2015 Interview at US Consulate in SL - VISA APPROVED! :D

06-30-2015 Collected the passport form the Consulate (passport was due to be collected in a week from interview date but delay in issuing visa due to the system failure in the US Department of State)

07-12-2015 POE-Minneapolis

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Mexico
Timeline

YES! it works for me in Mexico also. Just a google account and you get Hangouts and then you can dial to US.

Best,

UnaMexicana

Awesome! Thanks so much!

:yes:Intelligence trumps muscle... Imagination trumps both! :yes:

IR-1/CR-1 Visa
Service Center : Nebraska Service Center
Consulate : Cd. Juarez, Mexico
Met: January, 2006 :D
Marriage (if applicable): 2012-10-26 (L)
I-130 Sent : 2014-08-01
I-130 NOA1 : 2014-08-04

I-130 NOA2 : 2015-05-14

Shipped to DoS: 2015-05-22

Received at NVC: 2015-06-01

Case Created at NVC: 2015-06-10 (from Julian Date calculation)

AOS and IV Fee Invoiced: 2015-06-11
AOS and IV Fee Paid: Website down as of 06-15... Just waiting...
AOS and IV Fee Paid: 2015-07-05 CEAC site finally UP! :dancing:

AOS and Civil Docs received at NVC: 2015-10-13

NVC checklist for obsolete i864: 2015-11-25

Submit updated i864: ?????? when my lawyer desires... :clock:
Submit updated i864: Did NOT wait for lawywer. Did it myself 2015-12-10
NVC received reply to checklist i864: 2015-12-10 (yes.. same day O.O)

NVC case completed: 2016-01-07
NVC assigned interview date: 2016-01-23
Interview at CJS consulate: 2016-03-30

Visa "Issued": 2016-04-05
Entered the US: 2016-04-27

SSN Arrived: 2016-05-07 ... wow TEN days!

N-400

Filed Online: 2020-06-30

NOA: 2020-07-01

Biometrics Letter: 2021-04-08
Biometrics Appointment: 2021-05-03
Interview Scheduled/Cancelled: 2021-06-25 (never received online nor mail notification, just an email reply to tier 2 inquiry about status)

Interview ReScheduled: 2021-11-02

Interview Date: 2021-11-30

Oath ceremony Scheduled/Cancelled/Placed in Line: 2021-12-01
Oath: 2022-1-24 ... JOURNEY OVER! 😺
 

event.png

event.png

Link to comment
Share on other sites

I just received the NVC welcome letter with all the details (case no & IIN) to my husband's (petitioner) email. Yay! My NOA2 date was 01.30.2015 so anybody around the same time should keep a close eye on their email cos it's on it's way :)

All the best!

Our NOA2 approved on 01/30/2015 states that the NVC will contact beneficiary within 30 days if not to email nvcinquiry. Just sent them an email. Hopefully would hear back.

Has anyone taken the route of writing to this email?

Their phone line is impossible to get through to and the only time my husband got through to them they haven't given any information stating to call back if we don't hear from them within their timeline of 35 days.

We also received an email notification from USCIS on 02/12/2015 that said our case was sent to NVC. Hopefully 30 days would be from the date of approval and not from the date they sent the file to NVC.

I am the beneficiary- Spouse (Sri Lankan citizen) to a US citizen

USCIS

08-26-2014 Form I-130 submitted

08-28-2014 Received NOA1 for I-130

10-01-2014 Form I-129F (K3 visa) submitted

10-14-2014 Received NOA1 for I-129F

01-30-2015 Received NOA 2 for I-130 (5 months and 3 days after) :D

01-30-2015 Received NOA 2 for I-129F (3 months and 2 weeks after)

02-11-2015 Received USCIS update (email notification) that case was dispatched to NVC

NVC

03-03-2015 Received NVC welcome letter via email with the case no and IIN (31 days from NOA2 date)

03-03-2015 Submitted DS-261

03-03-2015 Paid AOS fee

03-18-2015 AOS payment shown as 'paid' (NVC payment portal have had a problem with payments made hence the delay in processing)

03-24-2015 NVC reviewed the DS-261 (spoke to an agent and she reviewed the form over the phone)

03-26-2015 Paid IV fee

03-31-2015 IV payment shown as 'paid'

03-31-2015 Sent in the AOS & IV packages

04-01-2015 Scan date (NVC letter received)

04-02-2015 Submitted DS-260

04-24-2015 Case Complete (24 days from scan date!) :dance:

05-05-2015 Confirmed interview date with NVC over the phone (06-11-2015)

05-07-2015 Received P4 letter

SRI LANKA CONSULATE PROCESSING

05-12-2015 Medical examination (Asiri Surgical Hospital)

05-22-2015 Received of the medical report

06-11-2015 Interview at US Consulate in SL - VISA APPROVED! :D

06-30-2015 Collected the passport form the Consulate (passport was due to be collected in a week from interview date but delay in issuing visa due to the system failure in the US Department of State)

07-12-2015 POE-Minneapolis

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline

Hi everyone,

Any NVC updates for anyone yet? We submitted our I-130 and it was received on Aug 26th, 2014. Just got the notice that it was transferred on feb 12th, 2015 to the NVC. I've been reading the forums and noticing that its best to wait a month before calling NVC to follow up on the case numbers etc so that we can continue with the necessary forms. We're halfway there though! ...keeping hopeful! :)


I just received the NVC welcome letter with all the details (case no & IIN) to my husband's (petitioner) email. Yay! My NOA2 date was 01.30.2015 so anybody around the same time should keep a close eye on their email cos it's on it's way :)

All the best!

congrats! how exciting!! Do you know how i can go about changing the email address i initially set up? Will they also send us a physical piece of mail with the NVC welcome letter?

Thanks for your help in advance!

July 18, 2014 - Married in Fiji
Aug 21, 2014 - Sent I-130
Aug 26, 2014 - I-130 recieved
Feb 12, 2015 - I-130 Approved!
Mar 6, 2015 - NVC receieved our case (found this out on Mar 11th phone call with NVC rep)
Mar 11, 2015 - Called NVC, was given case # & invoice #
Mar 11, 2015 - Paid AOS Bill
Mar 13, 2015 - AOS Fee deducted from bank account
Mar 14, 2015 - Received DS-261/AOS Bill (in mail)
Mar 16, 2015 - Called NVC, was instructed to mail out AOS/I-864, mailed I-864EZ/AOS/Documents (2 day shipping)
Mar 18, 2015 - Packet received by NVC, AOS Fee marked as PAID on ceac.state.gov website

Mar 23, 2015 - Called NVC: 1.to verify packet received(was told to allow 60 days for review) 2. to ask if DS-261 was entered in the system (was told case is too new to revivew over the phone, but I could call back in a few days if I wish to see if we could review it over the phone)
Mar 24, 2015 - Called NVC and was able to review DS-261 over the phone; added emails, designated self as agent of choice. Should be able to pay IV Fee & fill out DS-260 in one week (31/03/15)
Mar 25, 2015 - Paid IV Fee
Mar 26, 2015 - IV Fee shown as 'Paid'
Mar 28, 2015 - Submit DS-260

April 1, 2015 - Medical Exam in Suva, called NVC for update on case: said it wasnt in the system yet, still in review. allow 45 days for case complete (hey, thats better than the 60 they said earlier!) They will only email us if they need further information, otherwise expect interview letter in the mail.

April 7, 2015 - Called NVC to follow up, no update given

April 14, 2015 - Checked ceac.state.gov website, saw that there were 3 N/A's, called NVC to verify that case was complete

April 15, 2015 - Received false checklist, called NVC to verify that was actually false checklist (re: police certificate would be sent directly to embassy and therefore was not included with support documents submitted in IV Packet)

April 16, 2015 - Called NVC to re-verify that received false checklist. Confirmed AND was told that interview date was scheduled

May 28, 2015 - Interview Scheduled at 8am, Suva Embassy (need to reschedule due to conflicting obligations)

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Taiwan
Timeline

Hi everyone,

Any NVC updates for anyone yet? We submitted our I-130 and it was received on Aug 26th, 2014. Just got the notice that it was transferred on feb 12th, 2015 to the NVC. I've been reading the forums and noticing that its best to wait a month before calling NVC to follow up on the case numbers etc so that we can continue with the necessary forms. We're halfway there though! ...keeping hopeful! :)

I'd say wait at least 20 days then start calling.

My case took around 2 weeks to get NVC and aother 30 days or so to get the case number .

Link to comment
Share on other sites

Hi everyone,

Any NVC updates for anyone yet? We submitted our I-130 and it was received on Aug 26th, 2014. Just got the notice that it was transferred on feb 12th, 2015 to the NVC. I've been reading the forums and noticing that its best to wait a month before calling NVC to follow up on the case numbers etc so that we can continue with the necessary forms. We're halfway there though! ...keeping hopeful! :)

congrats! how exciting!! Do you know how i can go about changing the email address i initially set up? Will they also send us a physical piece of mail with the NVC welcome letter?

Thanks for your help in advance!

My guess is that the only way to go about changing your email address would be to call NVC and give the details. Cos the welcome letter comes to the email address given to USCIS and once NVC starts processing your case you can give your contact details in the DS 261.

Haven't recieved the welcome letter via post yet. Email works for me :)

I am the beneficiary- Spouse (Sri Lankan citizen) to a US citizen

USCIS

08-26-2014 Form I-130 submitted

08-28-2014 Received NOA1 for I-130

10-01-2014 Form I-129F (K3 visa) submitted

10-14-2014 Received NOA1 for I-129F

01-30-2015 Received NOA 2 for I-130 (5 months and 3 days after) :D

01-30-2015 Received NOA 2 for I-129F (3 months and 2 weeks after)

02-11-2015 Received USCIS update (email notification) that case was dispatched to NVC

NVC

03-03-2015 Received NVC welcome letter via email with the case no and IIN (31 days from NOA2 date)

03-03-2015 Submitted DS-261

03-03-2015 Paid AOS fee

03-18-2015 AOS payment shown as 'paid' (NVC payment portal have had a problem with payments made hence the delay in processing)

03-24-2015 NVC reviewed the DS-261 (spoke to an agent and she reviewed the form over the phone)

03-26-2015 Paid IV fee

03-31-2015 IV payment shown as 'paid'

03-31-2015 Sent in the AOS & IV packages

04-01-2015 Scan date (NVC letter received)

04-02-2015 Submitted DS-260

04-24-2015 Case Complete (24 days from scan date!) :dance:

05-05-2015 Confirmed interview date with NVC over the phone (06-11-2015)

05-07-2015 Received P4 letter

SRI LANKA CONSULATE PROCESSING

05-12-2015 Medical examination (Asiri Surgical Hospital)

05-22-2015 Received of the medical report

06-11-2015 Interview at US Consulate in SL - VISA APPROVED! :D

06-30-2015 Collected the passport form the Consulate (passport was due to be collected in a week from interview date but delay in issuing visa due to the system failure in the US Department of State)

07-12-2015 POE-Minneapolis

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I was approved on Jan. 22 and sent to NVC on Jan. 28. I received NVC letter on Mar. 1. The NVC letter is dated Feb. 25

USCIS
06 Aug 2014 - Sent I-130
07 Aug 2014 - NOA1

22 Jan 2015 - NOA2

28 Jan 2015 - Sent to NVC

NVC

25-Feb 2015 - Case and IIN # assigned

02-Mar 2015 - Received NVC welcome letter

02-Mar 2015 - Completed DS-261

02-Mar 2015 - Paid AOS fee

06-Mar 2015 - Mailed AOS & IV package info

09-Mar 2015 - Scan date

09-Apr 2015 - Had agent review my DS-261 over the phone

10-Apr 2015 - Paid IV fee

16-Apr-2015 - Completed DS-260

21-Apr 2015 - Checklist for DS-261 :ranting: So stupid!
22-Apr-2015 - NVC informed me checklist was a misprint and it was supposed to be a checklist for DS-260.
26-May-2015 - Escalated for Supervisor review of DS-260
01-Jul-2015 - Escalated AGAIN for Supervisor review of DS-260 :ranting: :ranting: :ranting: :ranting: :ranting:
16-Jul-2015 - CASE COMPLETE!
10-Sep-2015 - Interview date assigned!
01-Oct-2015 - Interview date
Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Lebanon
Timeline

Hi guys my priority date is 18 of september 2014 any thread open for september 2014? And is it true that nebraska service center is now processing 9 september 2014 filers?

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Fiji
Timeline

I'd say wait at least 20 days then start calling.

My case took around 2 weeks to get NVC and aother 30 days or so to get the case number .

Thanks so much for the advice. Guess I should start calling around the end of March/beginning of April to get our case number then?

My guess is that the only way to go about changing your email address would be to call NVC and give the details. Cos the welcome letter comes to the email address given to USCIS and once NVC starts processing your case you can give your contact details in the DS 261.

Haven't recieved the welcome letter via post yet. Email works for me :)

I thought there would have been something on line. I saw that you were notified of your acceptance on Jan 30th. Did you receive anything in the physical mail between Jan 30th and March 3rd (when you filled out your DS-260)? Or everything was done via email? Thanks for your help!

I was approved on Jan. 22 and sent to NVC on Jan. 28. I received NVC letter on Mar. 1. The NVC letter is dated Feb. 25

Thank you so much for your example. It definitely helps me set a timeline of when I can expect to hear from the NVC.

July 18, 2014 - Married in Fiji
Aug 21, 2014 - Sent I-130
Aug 26, 2014 - I-130 recieved
Feb 12, 2015 - I-130 Approved!
Mar 6, 2015 - NVC receieved our case (found this out on Mar 11th phone call with NVC rep)
Mar 11, 2015 - Called NVC, was given case # & invoice #
Mar 11, 2015 - Paid AOS Bill
Mar 13, 2015 - AOS Fee deducted from bank account
Mar 14, 2015 - Received DS-261/AOS Bill (in mail)
Mar 16, 2015 - Called NVC, was instructed to mail out AOS/I-864, mailed I-864EZ/AOS/Documents (2 day shipping)
Mar 18, 2015 - Packet received by NVC, AOS Fee marked as PAID on ceac.state.gov website

Mar 23, 2015 - Called NVC: 1.to verify packet received(was told to allow 60 days for review) 2. to ask if DS-261 was entered in the system (was told case is too new to revivew over the phone, but I could call back in a few days if I wish to see if we could review it over the phone)
Mar 24, 2015 - Called NVC and was able to review DS-261 over the phone; added emails, designated self as agent of choice. Should be able to pay IV Fee & fill out DS-260 in one week (31/03/15)
Mar 25, 2015 - Paid IV Fee
Mar 26, 2015 - IV Fee shown as 'Paid'
Mar 28, 2015 - Submit DS-260

April 1, 2015 - Medical Exam in Suva, called NVC for update on case: said it wasnt in the system yet, still in review. allow 45 days for case complete (hey, thats better than the 60 they said earlier!) They will only email us if they need further information, otherwise expect interview letter in the mail.

April 7, 2015 - Called NVC to follow up, no update given

April 14, 2015 - Checked ceac.state.gov website, saw that there were 3 N/A's, called NVC to verify that case was complete

April 15, 2015 - Received false checklist, called NVC to verify that was actually false checklist (re: police certificate would be sent directly to embassy and therefore was not included with support documents submitted in IV Packet)

April 16, 2015 - Called NVC to re-verify that received false checklist. Confirmed AND was told that interview date was scheduled

May 28, 2015 - Interview Scheduled at 8am, Suva Embassy (need to reschedule due to conflicting obligations)

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Mexico
Timeline

They say this date, then this other date, then another date. I would not trust that one bit... BUT.. many August filers have been approved between Jan and today, so hang in there as yours is surely on the way.

Hi guys my priority date is 18 of september 2014 any thread open for september 2014? And is it true that nebraska service center is now processing 9 september 2014 filers?

:yes:Intelligence trumps muscle... Imagination trumps both! :yes:

IR-1/CR-1 Visa
Service Center : Nebraska Service Center
Consulate : Cd. Juarez, Mexico
Met: January, 2006 :D
Marriage (if applicable): 2012-10-26 (L)
I-130 Sent : 2014-08-01
I-130 NOA1 : 2014-08-04

I-130 NOA2 : 2015-05-14

Shipped to DoS: 2015-05-22

Received at NVC: 2015-06-01

Case Created at NVC: 2015-06-10 (from Julian Date calculation)

AOS and IV Fee Invoiced: 2015-06-11
AOS and IV Fee Paid: Website down as of 06-15... Just waiting...
AOS and IV Fee Paid: 2015-07-05 CEAC site finally UP! :dancing:

AOS and Civil Docs received at NVC: 2015-10-13

NVC checklist for obsolete i864: 2015-11-25

Submit updated i864: ?????? when my lawyer desires... :clock:
Submit updated i864: Did NOT wait for lawywer. Did it myself 2015-12-10
NVC received reply to checklist i864: 2015-12-10 (yes.. same day O.O)

NVC case completed: 2016-01-07
NVC assigned interview date: 2016-01-23
Interview at CJS consulate: 2016-03-30

Visa "Issued": 2016-04-05
Entered the US: 2016-04-27

SSN Arrived: 2016-05-07 ... wow TEN days!

N-400

Filed Online: 2020-06-30

NOA: 2020-07-01

Biometrics Letter: 2021-04-08
Biometrics Appointment: 2021-05-03
Interview Scheduled/Cancelled: 2021-06-25 (never received online nor mail notification, just an email reply to tier 2 inquiry about status)

Interview ReScheduled: 2021-11-02

Interview Date: 2021-11-30

Oath ceremony Scheduled/Cancelled/Placed in Line: 2021-12-01
Oath: 2022-1-24 ... JOURNEY OVER! 😺
 

event.png

event.png

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...