Hi Saylin,

Just an observation, I was going thru the nvc wiki and under the icon of How to Find Out WHEN Your Case Number was Assigned. I think The next three numbers are the Julian date it was assigned, MINUS 500. Because I calculated mine by subtracting the Julian date it was assigned Minus the 500 and I got the correct date my case number was assigned. attachicon.gifvScreenshot_1407258460783.jpgattachicon.gifvScreenshot_1407258460783.jpg

I wrote it correctly. I said the next three numbers was the Julian date plus 500. I'm explaining what the RESULT is, so 315 + 500 = 815.

If you want to work backwards to calculate the date the case number was assigned, then yes, it's minus 500, but that's not how I worded it.

60 day email today. I'll call later, but my guess is nothing actually happened. way too early. But the good news is, the date on the letter is July 22 and they told me July 23. Saylin, do you want us to update the new spreadsheet with the dates from our letters? I realize that I only want to do this because I like my new date better. Others may want to ignore this!

Please call and confirm that earlier date before submitting an update. I thought I had read here a lot of people's dates were off by a few days, so it may be the case with you as well. So, see what NVC has in their system first (even though this new date is nicer as it's earlier :P )

Link to comment
Share on other sites

I wonder how they picked and chose certain cases with the petitioner living abroad to be auto-expedited because I am NOT one of the ones that was picked. Hmmmm....

(this is not an attack against you, just me thinking/venting out loud)

Because all of those in 2013 got stuck in the backlog and they weren't auto-expediting those abroad due to it.

Hey guys...

So..I got the "60 day" email as well.

I randomly looked at CEAC to see if there is any progress on my case...

The AoS fee has been changed to "N/A"!!!!!

Just spoke with Abby(?) at NVC...CASE COMPLETE - August 4th!!!!!!

Thank you..baby Jesus!!

Awaiting Interview Date!!!!!!!!!!!!!!!!!

Congratulations!

I-130 STAGE
-------------------------------
16th May 2013- I-130 PD Date
30th Dec 2013- Transferred to TSC
13th Mar 2014- I-130 Approved
20th Mar 2014- Cased shipped to NVC.


NVC STAGE
--------------------------------
28th Mar 14 Case received at NVC
28th Apr 14 Case # & IIN assigned

13th May 14 AOS package scanned into the system
14th May 14 DS260 available/completed.
20th May 14 IV package scanned into the system

12th June 14 AOS checklist- NVC error-

13th June 14 Supervisor review, said she would remove it when spoke to her. (Up to 30 business days).

28th July 14 CASE COMPLETE!!!!

19th August 2014- Medical

5th September 2014- Interview @ London

05th Sep 2014-Interview

05th Sep 2014- APPROVED! Visa Status Issued same day!

10th Sep 2014- Visa in hand

18th September 2014- POE ORLANDO FL! DISNEY!! :dancing:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Serbia
Timeline

I wonder how they picked and chose certain cases with the petitioner living abroad to be auto-expedited because I am NOT one of the ones that was picked. Hmmmm....

(this is not an attack against you, just me thinking/venting out loud)

Man no kidding! What I wouldn't give to know the answer to that. If there was an actually line, black and white, it would be so much easier to deal with. You send it in, you wait your turn, you get your chance, done. I feel like a fish in a barrel.

USCIS
09/03/2013 - Sent I-130
09/13/2013 - NOA1

04/23/2014 - I-130 Approval/NOA2

NVC

06/02/2014 - DS -261 & AOS invoice Available

06/03/2014 - AOS invoice paid & DS-261 completed
06/04/2014 - DS-261 received by NVC

06/10/2014 - AOS Package sent
​06/16/2014 - AOS received/scanned by NVC
08/01/2014 - AOS checklist via email*
08/04/2014 - AOS checklist packet sent

08/06/2014 - IV Package sent with AOS barcode coversheet
08/07/2014 - DS-261 reviewed by NVC

08/09/2014 - IV Bill invoiced

08/11/2014 - IV Bill paid
08/12/2014 - AOS checklist scanned at NVC

08/13/2014 - DS-260 Completed online

08/13/2014 - IV Package scanned at NVC

09/09/2014 - AOS checklist hard-copy*

09/11/2014 - "Real" AOS checklist packet sent*

09/15/2014 - "Real" AOS checklist scanned at NVC

10/03/2014 - NVC received emailed expedite request, forwarded to Belgrade Embassy (financial)

10/09/2014 - Belgrade Embassy denied expedite (financial)

10/16/2014 - Emailed expedite request to NVC, forwarded to Belgrade Embassy (NVC error)

10/17/2014 - Expedite ACCEPTED!!! (NVC error)

10/23/2014 - NVC shipped case to BLG

11/07/2014 - Called BLG, inquired about case and received interview date, interview packet was mailed 11/6/14, never received any email
11/13/2014 - Received interview packet, postmarked 11/10/14 even though BLG said sent on 11/6/14

Embassy
11/13/2014 - Medical

11/19/2014 - Interview- APPROVED!!

11/21/2014 - BLG posted visa packet through DHL to Čačak (has tracking number)
11/24/2014 - Visa in hand (picked up in Čačak at DHL)

11/28/2014 - Goodbye Serbia!
11/29/2014 - POE in Seattle

*On 08/01/14 I received a checklist via email and responded right away. Over a month later, on 09/09/14, I received the hard-copy in the mail. Upon reading the hard-copy, I found that NVC made a mistake and emailed me the wrong checklist. I contacted a supervisor at NVC and she instructed me to write a letter of explanation to accompany my "real" checklist response. She also told me this may not help me and that we may be back in line. Lord help us!

Link to comment
Share on other sites

Filed: Citizen (pnd) Country: Canada
Timeline

Email Recvd for the 60 day :(

now looking at end of AUGUST or may be FIrst week of September :( for a CC.. if not yet another checklist.

IR-1/CR-1 Visa

Service Center : National Benefits Center

Consulate : Montreal, Canada

Marriage : 2012-12-15

USCIS

I-130 Sent : 2013-04-10

I-130 NOA1 : 2013-04-17

I-130 Transferred to CSC: 2013-11-26

I-130 Approved (NOA-2): 2014-02-19

NVC

NVC Received: 2014-02-28

NVC Case # and IIN Assigned: 2014-04-01

Paid AOS & IV Bill : April 9th 2014

AOS Received by NVC: May 9th 2014

IV Bill:

IV Bill Shows PAID: April 9 2014

IV Package Sent to NVC :

IV Package Received by NVC: May 9th 2014

DS-260 Available/Completed/Submitted: April 23, 2014

AOS & Poilce Certificate Checklist: June 9th 2014

Checklist documents sent & Received by NVC : July 01, 2014

Docs Scanned: July 9th 2014

60 days Email Notice Received: August 02, 2014

Case Completed at NVC: August 21, 2014

Email Rcvd from NVC for CC: August 28, 2014

Interview scheduled: 2014-10-08

US Montreal Consulate
Medical: 2014-09-17
Interview: 2014-10-08

Result : Placed on ADMINISTRATIVE PROCESSING (AP) (OCTOBER 8th 2014)

AUGUST 31 2015: Waiting :(((((((((((

OCTOBER 02 2015 - VISA ISSUED

OCTOBER 14 2015 - POE ( TORONTO PEARSON)

Link to comment
Share on other sites

How did you do your own calculations?

Because based on the example Saylin gave:

815-500=315 which is the 11th of November

When I did my own calculation which is:

643-500=143 which is 23rd May and that was when my case number was assigned.

You should check the next 3 figures after 2014 and subtract 500, you will get the date your case number was assigned.

Yeah I realized it worked both ways. She just means it's the Julian Date + 500. If you subtract 500 then you'll figure out what your Julian Date is. So both ways are correct.

Also, your signature says April 24 for your case number, that's why I got confused. You should update it to May.

i-130 Process

 

02/24/2014 - Sent i-130 to Chicago Lockbox via UPS
02/28/2014 - NOA1 i-130 accepted and sent to Vermont Service Center
03/04/2014 - NOA1 hard copy06/25/2014 - NOA2 i-130 approved and sent to NVC
07/01/2014 - NOA2 hard copy07/02/2014 - NVC received
07/25/2014 - Case number assigned* (actually 07/15)
07/31/2014 - DS261 completed. Hubby's B-day!! <3
08/01/2014 - AoS fee invoiced/paid
08/04/2014 - AoS fee processed
08/05/2014 - AoS documents e-mailed
08/08/2014 - AoS "received"
09/04/2014 - DS261 reviewed and accepted
09/10/2014 - IV invoiced at 2:30am, unlocked and paid at 11:30am
09/10/2014 - Civil documents e-mailed
09/11/2014 - IV fee processed
09/11/2014 - DS260 completed
09/12/2014 - Documents received, got the "60 Day" email
09/29/2014 - Case complete, AoS showed as n/a then called to confirm
10/03/2014 - Interview scheduled
10/06/2014 - Interview(P4) letter received
10/07/2014 - Medical appointment booked with Dr. Randall T. Lee
10/21/2014 - Medical appointment
11/19/2014 - Interview
11/24/2014 - POE

12/29/2014 - Green Card received

i-751 Process

08/31/2016 - i-751 sent via USPS Express to VSC
09/01/2016 - Delivered and signed for by L. Zuchowski

09/07/2016 - Cheque cashed

09/09/2016 - NOA received, dated 09/02/16

09/23/2016 - Biometrics letter received in mail! Scheduled for 10/04/2016 at 2pm

09/27/2016 - Walk-in Biometrics completed.

09/11/2017 - Approval letter received in mail! Approval date of 09/06/2017

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline

I wrote it correctly. I said the next three numbers was the Julian date plus 500. I'm explaining what the RESULT is, so 315 + 500 = 815.

If you want to work backwards to calculate the date the case number was assigned, then yes, it's minus 500, but that's not how I worded it.

Yea I calculated it backwards. I just hope my brain is not working backwards with this NVC long process.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Serbia
Timeline

So how many people are going to send their IV packet with the AOS barcode sheet? I need to call myself but if that is a real option I want it!

USCIS
09/03/2013 - Sent I-130
09/13/2013 - NOA1

04/23/2014 - I-130 Approval/NOA2

NVC

06/02/2014 - DS -261 & AOS invoice Available

06/03/2014 - AOS invoice paid & DS-261 completed
06/04/2014 - DS-261 received by NVC

06/10/2014 - AOS Package sent
​06/16/2014 - AOS received/scanned by NVC
08/01/2014 - AOS checklist via email*
08/04/2014 - AOS checklist packet sent

08/06/2014 - IV Package sent with AOS barcode coversheet
08/07/2014 - DS-261 reviewed by NVC

08/09/2014 - IV Bill invoiced

08/11/2014 - IV Bill paid
08/12/2014 - AOS checklist scanned at NVC

08/13/2014 - DS-260 Completed online

08/13/2014 - IV Package scanned at NVC

09/09/2014 - AOS checklist hard-copy*

09/11/2014 - "Real" AOS checklist packet sent*

09/15/2014 - "Real" AOS checklist scanned at NVC

10/03/2014 - NVC received emailed expedite request, forwarded to Belgrade Embassy (financial)

10/09/2014 - Belgrade Embassy denied expedite (financial)

10/16/2014 - Emailed expedite request to NVC, forwarded to Belgrade Embassy (NVC error)

10/17/2014 - Expedite ACCEPTED!!! (NVC error)

10/23/2014 - NVC shipped case to BLG

11/07/2014 - Called BLG, inquired about case and received interview date, interview packet was mailed 11/6/14, never received any email
11/13/2014 - Received interview packet, postmarked 11/10/14 even though BLG said sent on 11/6/14

Embassy
11/13/2014 - Medical

11/19/2014 - Interview- APPROVED!!

11/21/2014 - BLG posted visa packet through DHL to Čačak (has tracking number)
11/24/2014 - Visa in hand (picked up in Čačak at DHL)

11/28/2014 - Goodbye Serbia!
11/29/2014 - POE in Seattle

*On 08/01/14 I received a checklist via email and responded right away. Over a month later, on 09/09/14, I received the hard-copy in the mail. Upon reading the hard-copy, I found that NVC made a mistake and emailed me the wrong checklist. I contacted a supervisor at NVC and she instructed me to write a letter of explanation to accompany my "real" checklist response. She also told me this may not help me and that we may be back in line. Lord help us!

Link to comment
Share on other sites

Hi to all, My husband and I both received the same 60 day email everyone else got yesterday but I as agent also received this one...,

We received Xxxxxx Choice of Address and Agent form. The next step is to pay the immigrant visa application fee. We will send an invoice to the designated agent after the form is processed.

What does this mean??????

Has anyone received this yet?

I got that email on June 17th. I submitted the DS-261 on May 30th and still have no invoice, so I don't think that email means anything is imminent, unfortunately :(

ROC from CR-1 visa (Green Card expiration date was Nov 24th 2016)

 

Link to the evidence I submitted. Be sure to send evidence spanning your entire marriage (especially for K-1) or as far back as you can. Just one or two bank statements will not cut it. I primarily focused on the two years of living here since I came in on a CR-1. If you don't have the fundamentals (i.e. joint accounts/policies), you can explain why in the covering letter. E.g. "While we do not have joint utilities, we both contribute to them from our joint bank account".

 

September 26th 2016: I-751 package sent to CSC

September 28th 2016: Package delivered
September 30th 2016: Check cashed
October 3rd 2016: NOA1 received with receipt date of 09/28/16
November 3rd 2016: Biometrics received with appointment date of 11/14/16.
November 14th 2016: Attended biometrics appointment
October 30th 2017: Infopass appointment to get I-551 stamp
February 26th 2018: I-751 case number (aka the NOA1 receipt number) becomes trackable
March 14th 2018: Submitted service request due to being outside of processing time.

March 15th 2018: ROC approved. 535 days (1 year, 5 months and 17 days)

March 29th 2018: Card being produced

April 4th 2018: Card mailed out

April 6th 2018: Card in hand. Has incorrect "resident since" date. Submitted service request on I-751 case (typographical error on permanent resident card) and an I-90 online.

April 2018 - August 7th 2018: Tons of service requests, emails and now senator involvement to get my corrected green card back because what the heck, USCIS. Also some time in May I sent a letter to Potomac telling them I want to withdraw my I-90 since CSC were handling it.

August 8th 2018: Card in production thanks to the direct involvement of Senator Sherrod Brown's team

August 13th 2018: Card mailed

August 15th 2018: Card in hand with correct date. :joy:

October 31st 2018: Potomac sends out a notice stating they have closed out my I-90 per my request. Yay for no duplicate card drama.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I am expecting a checklist for IV civil documents. I have not sent the original birth certificate. My bad. Called NVC, then the operator said either original or a certified copy and said also, better wait to see untill the docs are reviewed. The NVC site says originbal document, but the operator says either original or certifiled one. Which one I should beleive? Do I need to really send the original/certified now or wait till they review it?

Appreciate for all the answers.

Kutty


So how many people are going to send their IV packet with the AOS barcode sheet? I need to call myself but if that is a real option I want it!

I sent it on 31st July with AOS coversheet and is scanned today

10/4/13 - I-130 filed

4/17/14 - USCIS shipped case to NVC

10/29 - CC

11/15 - Medical

12/11 - Interview

Kutty - Petitioner

Link to comment
Share on other sites

I am expecting a checklist for IV civil documents. I have not sent the original birth certificate. My bad. Called NVC, then the operator said either original or a certified copy and said also, better wait to see untill the docs are reviewed. The NVC site says originbal document, but the operator says either original or certifiled one. Which one I should beleive? Do I need to really send the original/certified now or wait till they review it?

Appreciate for all the answers.

Kutty

I sent it on 31st July with AOS coversheet and is scanned today

They will accept both.. It doesn't really matter which one, as long as it's what they ask for.

I-130 STAGE
-------------------------------
16th May 2013- I-130 PD Date
30th Dec 2013- Transferred to TSC
13th Mar 2014- I-130 Approved
20th Mar 2014- Cased shipped to NVC.


NVC STAGE
--------------------------------
28th Mar 14 Case received at NVC
28th Apr 14 Case # & IIN assigned

13th May 14 AOS package scanned into the system
14th May 14 DS260 available/completed.
20th May 14 IV package scanned into the system

12th June 14 AOS checklist- NVC error-

13th June 14 Supervisor review, said she would remove it when spoke to her. (Up to 30 business days).

28th July 14 CASE COMPLETE!!!!

19th August 2014- Medical

5th September 2014- Interview @ London

05th Sep 2014-Interview

05th Sep 2014- APPROVED! Visa Status Issued same day!

10th Sep 2014- Visa in hand

18th September 2014- POE ORLANDO FL! DISNEY!! :dancing:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Serbia
Timeline

I am expecting a checklist for IV civil documents. I have not sent the original birth certificate. My bad. Called NVC, then the operator said either original or a certified copy and said also, better wait to see untill the docs are reviewed. The NVC site says originbal document, but the operator says either original or certifiled one. Which one I should beleive? Do I need to really send the original/certified now or wait till they review it?

Appreciate for all the answers.

Kutty

I sent it on 31st July with AOS coversheet and is scanned today

Thanks!

I would send the original. I have seen people getting checklists when sending a certified copy.

USCIS
09/03/2013 - Sent I-130
09/13/2013 - NOA1

04/23/2014 - I-130 Approval/NOA2

NVC

06/02/2014 - DS -261 & AOS invoice Available

06/03/2014 - AOS invoice paid & DS-261 completed
06/04/2014 - DS-261 received by NVC

06/10/2014 - AOS Package sent
​06/16/2014 - AOS received/scanned by NVC
08/01/2014 - AOS checklist via email*
08/04/2014 - AOS checklist packet sent

08/06/2014 - IV Package sent with AOS barcode coversheet
08/07/2014 - DS-261 reviewed by NVC

08/09/2014 - IV Bill invoiced

08/11/2014 - IV Bill paid
08/12/2014 - AOS checklist scanned at NVC

08/13/2014 - DS-260 Completed online

08/13/2014 - IV Package scanned at NVC

09/09/2014 - AOS checklist hard-copy*

09/11/2014 - "Real" AOS checklist packet sent*

09/15/2014 - "Real" AOS checklist scanned at NVC

10/03/2014 - NVC received emailed expedite request, forwarded to Belgrade Embassy (financial)

10/09/2014 - Belgrade Embassy denied expedite (financial)

10/16/2014 - Emailed expedite request to NVC, forwarded to Belgrade Embassy (NVC error)

10/17/2014 - Expedite ACCEPTED!!! (NVC error)

10/23/2014 - NVC shipped case to BLG

11/07/2014 - Called BLG, inquired about case and received interview date, interview packet was mailed 11/6/14, never received any email
11/13/2014 - Received interview packet, postmarked 11/10/14 even though BLG said sent on 11/6/14

Embassy
11/13/2014 - Medical

11/19/2014 - Interview- APPROVED!!

11/21/2014 - BLG posted visa packet through DHL to Čačak (has tracking number)
11/24/2014 - Visa in hand (picked up in Čačak at DHL)

11/28/2014 - Goodbye Serbia!
11/29/2014 - POE in Seattle

*On 08/01/14 I received a checklist via email and responded right away. Over a month later, on 09/09/14, I received the hard-copy in the mail. Upon reading the hard-copy, I found that NVC made a mistake and emailed me the wrong checklist. I contacted a supervisor at NVC and she instructed me to write a letter of explanation to accompany my "real" checklist response. She also told me this may not help me and that we may be back in line. Lord help us!

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Canada
Timeline

Congradulations!!!!! What a huge relief that is for you! Cheers!

Thanks, yours is coming! :luv:

Dated my husband for 7 years

Married July 29,2013

USCIS

August 21st, 2013: NOA 1

February 21st, 2014: Transferred to California

March 4th, 2014: NOA 2

March 8th, 2014: NOA 2 Hard Copy

NVC

March 14, 2014 Case received by NVC

April 14, 2014: Case number, IIN and BIN assigned :dancing:

April 21, 2014: AOS & IV Bill Invoiced & Paid

April 21, 2014: EP enrollment sent

April 24, 2014 : AOS Bill showing paid

April 25, 2014 : IV Bill showing paid

April 29, 2014: AOS Packet sent (electronic)

May 22, 2014: EP enrollment confirmation received

May 27, 2014: Completed DS-260 & email IV package

June 2, 2014: AOS reviewed and approved

June 19, 2014: Sent missing document (mistake made by paralegal) :ranting:

July 1, 2014: Case Complete! :dance:

July 9, 2014: Received CC email

July 9, 2014-Interview August 18 received date by phone :dance:
July 10,2014-Consulate Received

July 16, 2014: Re-schedule interview for August 5th
July 16, 2014-Medical
August 5, 2014-Interview Visa approved :dancing::dancing:
August 8, 2014 -Visa in Hand :dance: :dance:

POE Montreal: August 11, 2014 :jest:

Link to comment
Share on other sites

Thanks!

I would send the original. I have seen people getting checklists when sending a certified copy.

Those checklists are probably for notarised copies, not certified.

ROC from CR-1 visa (Green Card expiration date was Nov 24th 2016)

 

Link to the evidence I submitted. Be sure to send evidence spanning your entire marriage (especially for K-1) or as far back as you can. Just one or two bank statements will not cut it. I primarily focused on the two years of living here since I came in on a CR-1. If you don't have the fundamentals (i.e. joint accounts/policies), you can explain why in the covering letter. E.g. "While we do not have joint utilities, we both contribute to them from our joint bank account".

 

September 26th 2016: I-751 package sent to CSC

September 28th 2016: Package delivered
September 30th 2016: Check cashed
October 3rd 2016: NOA1 received with receipt date of 09/28/16
November 3rd 2016: Biometrics received with appointment date of 11/14/16.
November 14th 2016: Attended biometrics appointment
October 30th 2017: Infopass appointment to get I-551 stamp
February 26th 2018: I-751 case number (aka the NOA1 receipt number) becomes trackable
March 14th 2018: Submitted service request due to being outside of processing time.

March 15th 2018: ROC approved. 535 days (1 year, 5 months and 17 days)

March 29th 2018: Card being produced

April 4th 2018: Card mailed out

April 6th 2018: Card in hand. Has incorrect "resident since" date. Submitted service request on I-751 case (typographical error on permanent resident card) and an I-90 online.

April 2018 - August 7th 2018: Tons of service requests, emails and now senator involvement to get my corrected green card back because what the heck, USCIS. Also some time in May I sent a letter to Potomac telling them I want to withdraw my I-90 since CSC were handling it.

August 8th 2018: Card in production thanks to the direct involvement of Senator Sherrod Brown's team

August 13th 2018: Card mailed

August 15th 2018: Card in hand with correct date. :joy:

October 31st 2018: Potomac sends out a notice stating they have closed out my I-90 per my request. Yay for no duplicate card drama.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline

I wrote it correctly. I said the next three numbers was the Julian date plus 500. I'm explaining what the RESULT is, so 315 + 500 = 815.

If you want to work backwards to calculate the date the case number was assigned, then yes, it's minus 500, but that's not how I worded it.

Yea I calculated it backwards. I just hope my brain is not working backwards with this NVC long process.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...