Hi everyone, well we just got off the phone with NVC, and they said that our CASE IS COMPLETE!! :wow::dancing:

Apparently, case complete was on 8/25, although we haven't gotten any notification yet. We had given up on calling all the time, so I was shocked that it was actually complete! Maybe last week when I called NVC and yelled and complained to a supervisor about our case, NVC actually did something? Our DS-260 was sent in on June 3, but because they somehow missed receiving it (how do you miss an electronic submission to your website?!). So then it got sent for Supervisor Review on July 22...so I guess that's our official last scan date...it was approved without us having to provide any other info.

Good luck to everybody else going through this craziness...hang in there, mid-2013 USCIS folks...there is light at the end of the tunnel! :thumbs:

Congratulations! :dancing:

Checklist guys. As expected. But shockingly it wasn't for the w2 that I was thinking. They accepted all the sponsor's documents. She said the petetioner didn't check yes or no in a military question. And that we didn't add up the household size correctly. I don't know how is that possible. We marked one for himself, one for adding all others and n/a in married. Now let's wait for the email. I m still surprised though that they accepted the tax returns without w2 from what the operator told me.

Sorry to hear you got a checklist. Fingers crossed for a speedy review of your response! (L)

http://travel.state.gov/content/visas/english/fees/fees-visa-services.html

It looks like the AOS fee will be increased from $88 to $120 from Sept 12th.

And the IV fee will be from $230 to $325 from Sept 12th.

This must be to pay all of the "overtime and holidays they are working" :rofl::rofl: :rofl:

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline

It's alright Austin. Surprisingly I m not feeling as bummed as I would have because I was so mentally prepared for a checklist. Guess everything happens for a reason. If we had sent in everything I would have been totally shattered. Now let's see when they review the checklist. Please u, eoc, soloenta hang around with me while I m dangling with this checklist :cry:

Am so sorry for the checklist, please send in the checklist as soon as possible so that it can be scanned in and reviewed soonest. You are in my prayers and am seriously hoping you get thru this process as soon as possible. Don't worry we are here for you and will always hang around.

Am sending you a very big hug.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

I too am there with you Samreen.... Stay strong!!!

USCIS
2013/04/27 : Mailed I-130 petition to USCIS Phoenix Lockbox, Arizona.
2013/04/30 : I-130 PETITION PRIORITY DATE (NOA1).
2013/05/02 : Received (NOA1) hardcopy by mail from National Benefits Center (NBC).
2013/12/04 : I-130 petition transferred from National Benefits Center (NBC) to Nebraska Service Center (NSC).
2014/02/12 : I-130 PETITION APPROVED (NOA2) at Nebraska Service Center (NSC).
2014/02/13 : Approved I-130 petition shipped from Nebraska Service Center (NSC) to National Visa Center (NVC).
2014/02/18 : Received (NOA2) hardcopy by mail from Nebraska Service Center (NSC).
NATIONAL VISA CENTER (NVC)
2014/02/25 : National Visa Center (NVC) received approved I130 petition from Nebraska Service Center (NSC).
2014/03/31 : Case Number, IIN & BIN generated.
2014/04/01 : DS-261 available. Completed & submitted online.
2014/04/01 : AOS fee bill invoiced & paid online.

2014/04/04 : AOS fee payment status appears as PAID.

2014/04/08 : IV fee bill invoiced & paid online.

2014/04/11 : IV fee payment status appears as PAID.

2014/04/12 : DS-260 available. Completed & submitted online.

2014/06/24 : IV packet delivered at National Visa Center (NVC).

2014/07/01 : IV packet scanned into system.

2014/07/28 : AOS packet delivered at National Visa Center (NVC).

2014/07/30 : AOS packet scanned into system.

2014/08/13 : IV packet reviewed & accepted by National Visa Center (NVC).

2014/09/23 : AOS checklist email received from National Visa Center (NVC).

2014/09/24 : AOS checklist correction mailed to National Visa Center (NVC).

2014/09/29 : AOS checklist correction scanned into system at National Visa Center (NVC).

2014/11/17 : CASE COMPLETED at National Visa Center (NVC).

2014/12/03 : Interview scheduled by National Visa Center (NVC).

2014/12/09 : Received interview letter (P4) email from National Visa Center (NVC).

2014/12/19 : Case shipped from National Visa Center (NVC) to US consulate Mumbai. CEAC status says 'In Transit'.

INTERVIEW & POE

2014/12/15 : Medicals completed.

2014/12/22 : Case received at US consulate Mumbai. CEAC status says 'Ready'.

2015/01/05 : Biometrics appointment scheduled.

2015/01/20 : INTERVIEW at US consulate Mumbai.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Brazil
Timeline

Hi there! So, I've been to my doctor for a routine exam and I found out that I have a medical condition which would put me on a possible case expedite (I'm not in a life-dead situation, but I need to be followed constantly by a doctor, and this month I lost my job and with that my insurance in Brazil, but I have a good health insurance in the US due to my husband's job). Anyway, we're considering to send the documents to prove that and ask for an expedite, but in case they deny, would that make my case go slower?? Thanks and congrats to all the CCs!! I can't imagine the joy of it!

12/05/2013 Got married

CR1 Visa process
12/26/2013 NOA1 date
07/07/2014 NOA2 date (7 loooong months).
07/10/2014 left USCIS
07/22 arrived at NVC
07/31 Case# assigned
08/01 AOS Bill invoiced and DS 261
08/02 AOS bill paid and DS 261 completed
08/05 AOS bill shows PAID in the ceac website
08/13 AOS package sent
08/18 AOS package delivered (USPS website track number)
09/11 IV Bill invoiced
09/12 IV bill shows PAID
09/12 DS 260 completed
09/12 IV package sent
09/18 IV package received (rep. told this date but the 60 days waiting letter says 09/16).
10/17 - AOS checklist. Tax transcripst 2013 missing (husband thought W2s were enough)
10/21 - Checklist scanned
12/12 - Case Complete!!!!!!!!!!! thank God!
01/06/2015 - Medicals
01/12/2015 - Interview date ((It was Feb 27th but due to a cancellation they rescheduled to Jan 21!!!!!) - VISA APPROVED!!! Interview review on my timeline. :)
01/15/2015 - Visa in hand
01/22/2015 - POE (Los Angeles)!!!!!!!!

I-751 Removal of Conditions

11/03/2016 - Package sent

11/09/2016 - Check deposited and NOA 1 received

11/04/2016 - NOA 1 Date
12/08/2016 - Biometric Appt.

"God is always with us"

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline

Folks, about paying the fee difference in reference to December 11/12 interviews, that's only for NON-IMMIGRANT visas. That does not apply to you :no: Please read carefully before freaking out ;)

Thanks for clearing that up :thumbs:

You are a darling

Link to comment
Share on other sites

Sigh. Australia Post tell me that the package of AOS joint sponsor documents sent from USA to us is lost :cry: I don't know what to do.. wait a few more days or parents in law to send again.. Why even have such a service as tracked express courier post? Cranky+++ about this. Oh well. Not much we can do I suppose :(

I am the beneficiary. My husband is the petitioning USC.

Relationship:

Met in Washington DC - 13 February 2013

6 visits (Guam and Australia) in 2013

Engaged on Guam - 31 December 2013

Start living together in Australia - 3 March 2014

<3 Married in Queensland <3 - 28 June 2014

USCIS/NVC:

I-130 Package received Chicago - 14 July 2014

NOA1 - 17 July 2014

NOA2 - 28 July 2014

Email from NVC with Case Number etc - 18 August 2014

Completed DS-261 online - 19 August 2014

Paid AOS Bill - 20 August 2014

AOS Bill shows "PAID" 22 August 2014

Sent AOS Package to Parents in Law for signing 5 September 2014

AOS Package scanned at NVC 19 September 2014

IV Bill Paid 24 September 2014

DS-260 completed online 25 September 2014

Send IV Package 26 September 2014 (from NH)

IV Package Scanned 29 September 2014

CHECKLIST RECEIVED 26 November 2014

Checklist sent from NH 8 December 2014

Checklist scanned 11 December 2014

Case Complete 4 February 2015 - 192 days since NOA2. 171 days at NVC.

Medical Appointment 12 February 2015

P4 Letter Received 13 February 2015

Interview 17 March 2015 - ADMINISTRATIVE PROCESSING?! Missing my joint sponsor's W2 which he DOESN'T GET, HE IS SELF EMPLOYED, GRRRRR! Trying to sort it out ... :(

Status changed to "Ready" 24 March 2015

Status changed to "Issued" 27 March 2015! :D :D

Visa in hand 31 March 2015 - mere hours before I leave for Brisbane to fly to LA.

POE LAX extremely easy and pleasant - 1 April 2015

Reuinted with husband at Boston Airport - 2 April 2015

Link to comment
Share on other sites

Thanks for clearing that up :thumbs:

You are a darling

No problem. Wanted to clear it up before more people freaked out ;)

Bummer about the price raises next month... Although, the IV fee will still be cheaper than when I went through. It used to be $404 <_<

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Hi everyone, well we just got off the phone with NVC, and they said that our CASE IS COMPLETE!! :wow::dancing:

Apparently, case complete was on 8/25, although we haven't gotten any notification yet. We had given up on calling all the time, so I was shocked that it was actually complete! Maybe last week when I called NVC and yelled and complained to a supervisor about our case, NVC actually did something? Our DS-260 was sent in on June 3, but because they somehow missed receiving it (how do you miss an electronic submission to your website?!). So then it got sent for Supervisor Review on July 22...so I guess that's our official last scan date...it was approved without us having to provide any other info.

Good luck to everybody else going through this craziness...hang in there, mid-2013 USCIS folks...there is light at the end of the tunnel! :thumbs:

Congratulations

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

i got case complete email today.. and i got case complete on phone on august 21 :)

You should update your dates on Saylin's spreadsheet

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

I'm sorry if my questions sound stupid, but I seem to NOT find the answers anywhere even though I've looked everywhere. In filling out the AOS packet, on question #1 of part 2, the "last name" of the immigrant, do I put her new last name, meaning mine? They do not specify if maiden or not. Also, besides sending transcripts from IRS, and my paystubs showing proof of income, what are the other documents I need to send? I'm thinking of proof of my 401K as well. But what other documents do I need to gather together with the I-864EZ? Is this when I send proof of employment? or is it at another time? I need major help Please people! Also, someone here told me to make sure to put my address in question 9 of Part 3 because even though it says (if different from mailing address), they may still mark it "with a checkmark" and cause delay. And lastly, if some questions do not need an answer, for example, my wife doesn't have a middle name, do we just leave blank, or write "n/a", or "none" Thanks for all the answers ahead of time, and sorry if I seem too innocent about all this, but I don't wanna get it wrong since it causes so many delays. :content:

P.S.

I have seen the "sample of I-864EZ", and still none of my questions are answered in there. :oops:

Link to comment
Share on other sites

Congratulations to the case completes!

Our AOS fee is N/A now, could this mean we finally have a CC? :o

Congrats to you!

Call the NVC though

09-27-2013 NOA1

03-21-2014 I-130 approved in 183 days

03-31-2014 Case received by NVC

05-09-2014 Accepted DS-261

05-15-2014 Pay AOS Bill

05-19-2014 Pay IV Bill

05-26-2014 Sent AOS Package & IV package

05-29-2014 NVC received both packages

06-02-2014 NVC scanned both packages

07-09-2014 IV Package accepted (Fake A.O.S. Checklist)

07-14-2014 Real Checklist for A.O.S. (petitioner I-864 zeros and N/As missing)

07-17-2014 Checklist sent

07-21-2014 Checklist scanned

09-10-2014 Case Complete

09-27-2014 Medical

10-19-2014 Interview >> (A.P.)

10-30-2014 Visa Issued

11-13-2014 POE (IAD)

Link to comment
Share on other sites

Congratulations to the case completes!

Our AOS fee is N/A now, could this mean we finally have a CC? :o

Congrats to you!

Call the NVC though (5 more hours to wait .. lol)

hey was your last scanned document 3rd JULY?!

they should be working on the 11th (MAYBEEEE 14th .. not sure)

ask them when your case was complete for us please

gr8 news

09-27-2013 NOA1

03-21-2014 I-130 approved in 183 days

03-31-2014 Case received by NVC

05-09-2014 Accepted DS-261

05-15-2014 Pay AOS Bill

05-19-2014 Pay IV Bill

05-26-2014 Sent AOS Package & IV package

05-29-2014 NVC received both packages

06-02-2014 NVC scanned both packages

07-09-2014 IV Package accepted (Fake A.O.S. Checklist)

07-14-2014 Real Checklist for A.O.S. (petitioner I-864 zeros and N/As missing)

07-17-2014 Checklist sent

07-21-2014 Checklist scanned

09-10-2014 Case Complete

09-27-2014 Medical

10-19-2014 Interview >> (A.P.)

10-30-2014 Visa Issued

11-13-2014 POE (IAD)

Link to comment
Share on other sites

Filed: EB-1 Visa Country: Kuwait
Timeline

Please, tell me about the supervisor. Does he consider cases in less than 60 days? Or does he review cases at a certain stage of the process? We have the e-mail of 19 June "Please send everything else to nvcinquiry@state.gov (type "ATTN: PI Supervisor" in the subject line of the email). What does it mean? Or all applicants have similar e-mail?

Thank you.

You need to request it yourself if your case drags longer than the others.

Last night I realized I didn't print out the DS-260 confirmation page so I hunted for it and only saw the DS-261 I called NVC and the lady weird name said to go to payment page (which I had) and it would be there. I told her the only one I see was DS-261 but she insisted. I went back and nothing so I decided to click on the IV and went from one page to the next until I got to the end and sure enough you can print it out or send via e-mail. So I sent one to my husband and one to myself and it arrived promptly which doesn't usually happen. Just now I open my e-mail and there is another one but looks totally different than the one they sent me last night. Looks like the one below what do you think? Just a duplicate? The face of the one I requested they send me only had a few words in the body this one had all the below. :D

Dear Applicant,

Thank you for being a valued U.S. Consular Electronic Application Center (CEAC) customer. Your online Immigrant Visa and Alien Registration Application Form(DS-260) has been submitted.

Name Provided:

Completed On: 20 JULY 2014 00:59:06 EST

Case Number:

YOUR CONFIRMATION PAGE IS ATTACHED TO THIS EMAIL IN A PDF FILE!

You must follow the instructions on the confirmation page in order for the U.S. Department of State to continue processing your visa application.

How to print your Confirmation Page:

1. DOUBLE CLICK on the attached file.

2. From within Adobe Reader, go to FILE and select PRINT

Please double check to see that you indeed have Adobe Acrobat installed on your system. If you do not have Adobe Acrobat Reader, you may download it for free at: http://www.adobe.com/products/acrobat/readstep2.html

That's about all the added value you'll get from the fee increases LOL.

21-MAR-2014 I-140 + PP sent to USCIS

31-MAR-2014 Petition approved

16-APR-2014 Case shipped to NVC

29-APR-2014 Case received by NVC

23-MAY-2014 Case # assigned

4-JUN-2014 IV Bill invoiced and PAID (AOS Exempt, DS-261 Waived)

6-JUN-2014 DS-260 forms submitted

10-JUN-2014 IV Docs received by NVC

13-JUN-2014 IV Docs matched to case (scanned)

30-JUL-2014 Case Complete, CC email auto-sent one week later

20-AUG-2014 AOS fee changed to N/A (Final clearance for interview scheduling?)

29-AUG-2014 Consular Interview scheduled on Oct 1st. Later rescheduled to Sep 24th. P4 Letter received following business day

14-SEP-2014 CEAC status changed to Ready

15-SEP-2014 Medical results delivered to Embassy by Panel Physician

24-SEP-2014 Consular Interview, went into AP (3rd AP in as many consecutive visa applications)

14-OCT-2014 Visa issued

22-OCT-2014 POE at Dulles Airport, Washington, D.C.

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...