Filed: IR-1/CR-1 Visa Country: Chile
Timeline
Posted

Hi everybody and congrats to all the CC!!

I am preparing package IV and this is probably a stupid question but how long a birth certificate is valid? I have one from may 2013, that would be ok?

Also I am seriously considering to send the package before paying the fee. NVC received my case July 1st, case number July 14th, and AOS fee on August 20 :(

I don't know why It took so long for the AOS fee but I am so tired of this all entire process. I know a lot of people has been waiting longer than I at USCIS (me "only" 6 months) but this is so frustrating... Anyway, what cover sheet should I put on my IV package if I decide to send it before paying the fee?

Thank you so much to everybody!

Caroline

I think (as was said above) that the birth certificate doesn't expire like the police certificates do. At least I've never heard of that!

I am also planning to send our IV package today. Tomorrow will be 30 business days since the DS-261and the rep I talked to last night said it should be fine and just to send it with the AOS bar code sheet. The only difference if you decide to send it is the address is ATTN: DR.

I'm hoping this works out as well as it has for a few others and maybe just the act of sending it will magically release the IV fee!!!

Wish me luck!

USCIS

12-09-2013: NOA1

05-29-2014: NOA2- I-130 Approved!!!

NVC

06-04-2014: I-130 shipped from TSC to NVC

06-13-2014: Arrived at NVC

07-01-2014: Case # and IIN assigned

07-17-2014: D-261 submitted

07-18-2014: AOS fee invoiced

07-18-2014: AOS fee paid

07-18-2014: AOS package sent (call me crazy!!!)

07-21-2014: AOS package arrived to NVC (confirmed by FedEx)

07-22-2014: AOS bill showed "Paid"

07-22-2014: AOS package scanned by NVC (originally told July 23rd, but the 60 day letter said July 22nd, confirmed by NVC)

09-02-2014: DS-261 reviewed/accepted (notified by calling NVC on 09-05-2014)

09-08-2014: IV fee invoiced/paid

08-28-2014: IV package sent

08-29-2014: IV package arrived at NVC

09-02-2014: IV package scanned by NVC

09-15-2014: AOS package reviewed/accepted

09-19-2014: DS-260 completed

10-25-2014: Case Complete! (11/1/14 would be 60 days) Confirmed by phone on 10-27-2014

10-31-2014: Interview scheduled

11-25-2014: Medical

12-01-2014: Interview

12-19-2014: Visa Received

12-29-2014: POE in Atlanta, GA!!!

Posted

I think (as was said above) that the birth certificate doesn't expire like the police certificates do. At least I've never heard of that!

I am also planning to send our IV package today. Tomorrow will be 30 business days since the DS-261and the rep I talked to last night said it should be fine and just to send it with the AOS bar code sheet. The only difference if you decide to send it is the address is ATTN: DR.

I'm hoping this works out as well as it has for a few others and maybe just the act of sending it will magically release the IV fee!!!

Wish me luck!

Thank you for your reply and thanks for the replies of the other members!

I will call NVC today and see what the rep will say (it is very stupid but i will feel better sending IV package in advance with the "blessing" of someone from there ;)).

I wish you good luck for your case and hope that everybody will be in the US soon!!!

USCIS

12-12-2013 - Sent i-130 received
12-17-2013 - NOA1

06-13-2014 - NOA2

07-30-2014 - i-130 Sent to NVC

NVC
07-01-2014 - NVC received the case

07-14-2014 - NVC case number assigned

07-30-2014 - DS-261 generated

07-30-2014 - DS-261 completed

08-20-2014 - I-864(AOS) Bill Generated and paid
08-25-2014 - Sent I-864(AOS) Package

08-28-2014 - AOS scan date

XX-XX-2014 - IV bill invoiced and paid

XX-XX-2014 - DS-260 completed online
XX-XX-2014 - IV packets sent
XX-XX-2014 - Case completed
XX-XX-2014 - Interview scheduled


Consulate
XX-XX-2014 - Medical
XX-XX-2014 - Interview
XX-XX-2014 - Visa in hand
XX-XX-2014 - POE

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

I think (as was said above) that the birth certificate doesn't expire like the police certificates do. At least I've never heard of that!

I am also planning to send our IV package today. Tomorrow will be 30 business days since the DS-261and the rep I talked to last night said it should be fine and just to send it with the AOS bar code sheet. The only difference if you decide to send it is the address is ATTN: DR.

I'm hoping this works out as well as it has for a few others and maybe just the act of sending it will magically release the IV fee!!!

Wish me luck!

Good luck sending your IV documents earlier. Isn't the address for IV docs is also ATTN: CMR

The only difference is IV docs will say ATTN: CMR while AOS address said ATTN: CMR AOS

Please clarify. Thanks.

IR1/CR1 Timeline:

01/24/2014: Married

02/11/2014: I130 Sent

02/19/2014: I130 NOA1

06/25/2014: I130 Approved (NOA2)

07/07/2014: NVC Received

07/16/2014: Case # and IIN Assigned

08/04/2014: Received DS 261 and AOS Invoice Email

08/04/2014: Submitted DS 261

08/06/2014: Paid AOS Fee

08/07/2014: AOS Package Sent

08/11/2014: AOS Package Scanned

08/30/2014: Received IV Bill

08/30/2014: Paid IV Bill

09/03/2014: IV Package Sent

09/03/2014: Submitted Ds-260

09/05/2014: IV Package Scanned

10/14/2014: Case Complete

12/01/2014: Medical (Completed)

12/16/2014: Interview Scheduled for 7:00 AM (APPROVED) :dancing: :dancing: :dancing:

12/17/2014: Visa "ISSUED" :dancing::dancing::dancing::dancing::dancing:

01/24/2015: POE - JFK, NY

ROC Timeline:

11/11/2016: I-751 sent to VSC

11/14/2016: I-751 package received at VSC

11/16/2016: Check cashed

11/18/2016: NOA1 Received

12/14/2016: Biometrics Appointment

10/17/17: Approval letter received in mail

Filed: IR-1/CR-1 Visa Country: Iran
Timeline
Posted

Hi everyone, well we just got off the phone with NVC, and they said that our CASE IS COMPLETE!! :wow::dancing:

Apparently, case complete was on 8/25, although we haven't gotten any notification yet. We had given up on calling all the time, so I was shocked that it was actually complete! Maybe last week when I called NVC and yelled and complained to a supervisor about our case, NVC actually did something? Our DS-260 was sent in on June 3, but because they somehow missed receiving it (how do you miss an electronic submission to your website?!). So then it got sent for Supervisor Review on July 22...so I guess that's our official last scan date...it was approved without us having to provide any other info.

Good luck to everybody else going through this craziness...hang in there, mid-2013 USCIS folks...there is light at the end of the tunnel! :thumbs:

Embassy: Kuala Lumpur, Malaysia

2013-04-06 - Married in Phuket, Thailand 💓

USCIS (I-130)

2013-06-12 -- I-130 sent                                                                          2013-06-17 -- I-130 NOA1 Priority Date

2013-12-26 -- Transfer Notice (Nebraska Service Center)                2014-03-25 -- I-130 NOA2 approved (281 DAYS!!)

NVC 

2014-04-11 -- NVC Received Case                                                        2014-03-25 -- I-130 NOA2 approved (281 DAYS!!)

2014-06-04 -- AOS and IV Packages Sent to NVC                              2014-08-25 -- NVC CASE COMPLETE!! :dance::dancing:

2014-09-03 -- Sent to Embassy in Kuala Lumpur

 

CONSULATE

2014-09-26 -- Medical Exam                                                                   2014-10-09 -- Interview - CASE APPROVED! :dancing::dance:

2014-11-10 -- POE in JFK, New York City!!                                           508 DAYS FROM I-130 APPLICATION TO POE!

 

REMOVAL OF CONDITIONS (ROC) - I-751

2016-09-12 -- I-751 Sent to Vermont Service Center (VSC)               2016-09-15 -- VSC NOA1

2016-10-20 -- Biometrics                                                                         2017-08-21 -- Received Approval Letter! :dancing::dance:

2017-09-11 -- Received 10 Year Green Card!                                       EXACTLY ONE YEAR TO COMPLETE ROC AND GET GREEN CARD!

 

CITIZENSHIP (N-400)

2018-03-19 --N-400 Sent in (NOA1)                                                        2018-04-16 - Biometrics

2019-01-26 - Interview Letter Received                                                 2019-03-05  - Interview

Filed: IR-1/CR-1 Visa Country: Chile
Timeline
Posted

Good luck sending your IV documents earlier. Isn't the address for IV docs is also ATTN: CMR

The only difference is IV docs will say ATTN: CMR while AOS address said ATTN: CMR AOS

Please clarify. Thanks.

I've asked a few reps about this (because I've been thinking about doing this for awhile and I also feel better, inexplicably, having the OK from some ding dong rep at NVC) and they have all told me to send to ATTN: DR.

Hope that helps!

USCIS

12-09-2013: NOA1

05-29-2014: NOA2- I-130 Approved!!!

NVC

06-04-2014: I-130 shipped from TSC to NVC

06-13-2014: Arrived at NVC

07-01-2014: Case # and IIN assigned

07-17-2014: D-261 submitted

07-18-2014: AOS fee invoiced

07-18-2014: AOS fee paid

07-18-2014: AOS package sent (call me crazy!!!)

07-21-2014: AOS package arrived to NVC (confirmed by FedEx)

07-22-2014: AOS bill showed "Paid"

07-22-2014: AOS package scanned by NVC (originally told July 23rd, but the 60 day letter said July 22nd, confirmed by NVC)

09-02-2014: DS-261 reviewed/accepted (notified by calling NVC on 09-05-2014)

09-08-2014: IV fee invoiced/paid

08-28-2014: IV package sent

08-29-2014: IV package arrived at NVC

09-02-2014: IV package scanned by NVC

09-15-2014: AOS package reviewed/accepted

09-19-2014: DS-260 completed

10-25-2014: Case Complete! (11/1/14 would be 60 days) Confirmed by phone on 10-27-2014

10-31-2014: Interview scheduled

11-25-2014: Medical

12-01-2014: Interview

12-19-2014: Visa Received

12-29-2014: POE in Atlanta, GA!!!

Posted

Hi everyone, well we just got off the phone with NVC, and they said that our CASE IS COMPLETE!! :wow::dancing:

Apparently, case complete was on 8/25, although we haven't gotten any notification yet. We had given up on calling all the time, so I was shocked that it was actually complete! Maybe last week when I called NVC and yelled and complained to a supervisor about our case, NVC actually did something? Our DS-260 was sent in on June 3, but because they somehow missed receiving it (how do you miss an electronic submission to your website?!). So then it got sent for Supervisor Review on July 22...so I guess that's our official last scan date...it was approved without us having to provide any other info.

Good luck to everybody else going through this craziness...hang in there, mid-2013 USCIS folks...there is light at the end of the tunnel! :thumbs:

July 22? really? wow congrats!!!

did your aos in ceac website changed to n/a?

Filed: IR-1/CR-1 Visa Country: Iran
Timeline
Posted

July 22? really? wow congrats!!!

did your aos in ceac website changed to n/a?

Nope. I had checked it before calling, so I was not expecting anything, except hearing the usual 30 or 60 business day thing, and then asking for a supervisor again, etc...

Their processing is so screwed up, you never know if they change the status on line first, or email you, or they don't do anything, but you call in and then they surprise you!

Embassy: Kuala Lumpur, Malaysia

2013-04-06 - Married in Phuket, Thailand 💓

USCIS (I-130)

2013-06-12 -- I-130 sent                                                                          2013-06-17 -- I-130 NOA1 Priority Date

2013-12-26 -- Transfer Notice (Nebraska Service Center)                2014-03-25 -- I-130 NOA2 approved (281 DAYS!!)

NVC 

2014-04-11 -- NVC Received Case                                                        2014-03-25 -- I-130 NOA2 approved (281 DAYS!!)

2014-06-04 -- AOS and IV Packages Sent to NVC                              2014-08-25 -- NVC CASE COMPLETE!! :dance::dancing:

2014-09-03 -- Sent to Embassy in Kuala Lumpur

 

CONSULATE

2014-09-26 -- Medical Exam                                                                   2014-10-09 -- Interview - CASE APPROVED! :dancing::dance:

2014-11-10 -- POE in JFK, New York City!!                                           508 DAYS FROM I-130 APPLICATION TO POE!

 

REMOVAL OF CONDITIONS (ROC) - I-751

2016-09-12 -- I-751 Sent to Vermont Service Center (VSC)               2016-09-15 -- VSC NOA1

2016-10-20 -- Biometrics                                                                         2017-08-21 -- Received Approval Letter! :dancing::dance:

2017-09-11 -- Received 10 Year Green Card!                                       EXACTLY ONE YEAR TO COMPLETE ROC AND GET GREEN CARD!

 

CITIZENSHIP (N-400)

2018-03-19 --N-400 Sent in (NOA1)                                                        2018-04-16 - Biometrics

2019-01-26 - Interview Letter Received                                                 2019-03-05  - Interview

Filed: IR-1/CR-1 Visa Country: Kenya
Timeline
Posted

Thanks for posting this! How long did it take u guys to get it? We're currently waiting for my husband's Certificate of Good Conduct.

Also, our status currently says "certificate is ready for collection" but when my husband went to Malaysia Embassy, they told him it wasnf ready. What does the status show online when it is complete?

Thanks for any input.

Thanks for posting this! How long did it take u guys to get it? We're currently waiting for my husband's Certificate of Good Conduct.

Also, our status currently says "certificate is ready for collection" but when my husband went to Malaysia Embassy, they told him it wasnf ready. What does the status show online when it is complete?

Thanks for any input.

She applied on the Aug 18th and got it yesterday, so about a week and half. When we checked online it said "certificate is ready for collection" and when we called them, they asked her to email copy of her passport and copy of the online application. Couple of days later we got email saying bring fees and come for the certificate.

Filed: EB-1 Visa Country: Kuwait
Timeline
Posted

Hi everyone, well we just got off the phone with NVC, and they said that our CASE IS COMPLETE!! :wow::dancing:

Apparently, case complete was on 8/25, although we haven't gotten any notification yet. We had given up on calling all the time, so I was shocked that it was actually complete! Maybe last week when I called NVC and yelled and complained to a supervisor about our case, NVC actually did something? Our DS-260 was sent in on June 3, but because they somehow missed receiving it (how do you miss an electronic submission to your website?!). So then it got sent for Supervisor Review on July 22...so I guess that's our official last scan date...it was approved without us having to provide any other info.

Good luck to everybody else going through this craziness...hang in there, mid-2013 USCIS folks...there is light at the end of the tunnel! :thumbs:

Even supervisor reviews are taking a whole month now!!! Unbelievable!

Glad it's behind you now. Just curious, your profile says Iran and your signature says Kuala Lumpur!

21-MAR-2014 I-140 + PP sent to USCIS

31-MAR-2014 Petition approved

16-APR-2014 Case shipped to NVC

29-APR-2014 Case received by NVC

23-MAY-2014 Case # assigned

4-JUN-2014 IV Bill invoiced and PAID (AOS Exempt, DS-261 Waived)

6-JUN-2014 DS-260 forms submitted

10-JUN-2014 IV Docs received by NVC

13-JUN-2014 IV Docs matched to case (scanned)

30-JUL-2014 Case Complete, CC email auto-sent one week later

20-AUG-2014 AOS fee changed to N/A (Final clearance for interview scheduling?)

29-AUG-2014 Consular Interview scheduled on Oct 1st. Later rescheduled to Sep 24th. P4 Letter received following business day

14-SEP-2014 CEAC status changed to Ready

15-SEP-2014 Medical results delivered to Embassy by Panel Physician

24-SEP-2014 Consular Interview, went into AP (3rd AP in as many consecutive visa applications)

14-OCT-2014 Visa issued

22-OCT-2014 POE at Dulles Airport, Washington, D.C.

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

I think they're working on July 10-11, roughly.

Thanks! They have been working on July 10th since last week. Sighs..

I'm not sure "working" is the most accurate way to describe what they are currently doing, but those are the dates. :)

How hard is it to look at a document and check off it is correct or not? IMHO the NVC is useless. The consulate should do a quick review of the documents at the time of interview.

I am july 10th and they told me to wait AT LEAST 60 days. I dont know what they're doing but it feels like they're on vacation.

That's super harsh. I hope it doesn't take that long. They put that 60 days number out there to cover their butts.

NOA2: 4/13/2014

NVC Received Case: 4/28/2014

NVC Assigned Case no and IIN: 5/21/2014

DS261 available and submitted: 5/31/2014

AOS fees available and paid: 6/2/2014

AOS package sent out:6/3/2014

AOS fee shows paid: 6/4/2014

Resubmitted DS261 because it showed incomplete: 6/5/2014

AOS Package scanned at NVC: 6/9/2014 :protest:

IV fees paid: 7/10/14 :ranting:

DS260 Submitted: 7/12/14 :ranting:

IV Packaged Scanned by NVC: 7/15/2014 :ranting:

CC:9/7/2014 :dancing:

Interview:10/29/2014 :dancing: :dancing::dancing:

POE:11/09/2014 :dancing::dancing::dancing:

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline
Posted

Hi everyone, well we just got off the phone with NVC, and they said that our CASE IS COMPLETE!! :wow::dancing:

Apparently, case complete was on 8/25, although we haven't gotten any notification yet. We had given up on calling all the time, so I was shocked that it was actually complete! Maybe last week when I called NVC and yelled and complained to a supervisor about our case, NVC actually did something? Our DS-260 was sent in on June 3, but because they somehow missed receiving it (how do you miss an electronic submission to your website?!). So then it got sent for Supervisor Review on July 22...so I guess that's our official last scan date...it was approved without us having to provide any other info.

Good luck to everybody else going through this craziness...hang in there, mid-2013 USCIS folks...there is light at the end of the tunnel! :thumbs:

Congratulations. :thumbs::dancing:

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline
Posted

FYI my expedite was approved on 8/20. My point is not to believe everything people tell you. Have a blessed day!

Oh my well congratulations didn't mean to get you all upset yikes excuuuuuuuuuuuuuuuuuuuuuuuse me. :D You have a blessed day also. (F) (L) (F)

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...