NVC says they may take upto 60 days to review AOS package. But can somebody tell, how long is it actually taking? and God forbids if someone gets checklist, how long after scan date, they issue checklist and time taken to review checklist?

They took 30 days to review my AOS. And got a checklist exactly on the 30th day after i sent my AOS. My case was reviewed and declared closed after almost 2 months of me responding to the checklist.

Sent AOS: may 15th 2014

Got reviewed and given a checklist: 15th June 2014

Responded to checklist 24th June, 2014

Case closed: 19th Aug 2014 ( called)

official email of case closed: 21st Aug 2014.

Hope this helps

IR-1/CR-1 Visa

Consulate: Mumbai, India

02/11/2013: Married

04/03/2013: I-130 Sent

03/01/2014: I-130 Approved (finally after 9 months of no activity at USCIS)

01/15/2014: NVC Received

03/10/2014: Assigned NVC case no.

04/03/2014: Paid AOS Fee

05/09/2014: Sent AOS package

05/15/2014: Sent package IV

06/15/2014: Received checklist for AOS. :huh:

06/24/2014: Responded to checklist.

08//14/2014: NVC case closed (phone) :dancing:

08/21/2014: NVC case closed email :dancing: ( After 7 months at NVC)

09/02/2014: Interview Scheduled for 1st Oct. (confirmed by call)

09/10/2014: Interview email received

09/11/2014: Medicals.

09/12/2014: Biometrics.

10/01/2014: INTERVIEW : APPROVED

Online status shows "VISA ISSUED AND PRINTED" within 2 hrs of interview

10/07/2014: Visa and passport in hand

10/08/2014: POE (Atlanta)

:dance:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Well, it's up to the embassy of who they want to expedite and on what grounds to accept it. Being pregnant is not an automatic expedite in the process. They would argue that you could have prevented that by taking simple common measures. At the end of the day, it's not NVC that accepts the expedite, It's the embassy and they're all different.

OP is trying to prove he still has domicile in the states, where as you live in the States, and you are current at that resident address the CO at interview wouldn't bother really giving much thought into the letter.

Congrats.. Yes, make sure when you send a correction on the I-864 you send all 9 pages again.. Make sure you bring the updated one to interview! :):dancing:

Congratulations! :):dancing:

Yes I m not talking about Nvc expedite since it depends on embassy. I was talking about Uscis expedite because a lot of people apply for that yet get denied. So that's y I think they do not treat people equally.

Edited to say that I don't know if Uscis also sends requests to embassy. If that's the case then it makes sense :)

Edited by samreen23

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Japan
Timeline

I think for USCIS, if you both are married and live abroad, you have a very high chance of getting an expedite. For NVC stage to embassy, I think some embassies are just less busy than others. Since NVC is so backed up right now, it actually probably speeds things up for everyone if some embassies can take some cases early to lessen the burden on NVC, resulting in NVC hopefully being able to process things more quickly.

Edited by elvenshadow

I - 130 sent 2014-04-18

Got NOA1 2014-04-22

I-130 approved 2014-05-14

NVC received 2014-05-23

DS-261/AOS bill 2014-07-01

Submit DS-261 2014-07-01

Paid AOS 2014-07-01

Sent AOS pack 2014-07-04

IV fee invoice ???

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

They took 30 days to review my AOS. And got a checklist exactly on the 30th day after i sent my AOS. My case was reviewed and declared closed after almost 2 months of me responding to the checklist.

Sent AOS: may 15th 2014

Got reviewed and given a checklist: 15th June 2014

Responded to checklist 24th June, 2014

Case closed: 19th Aug 2014 ( called)

official email of case closed: 21st Aug 2014.

Hope this helps

That was informative, Thanks and Congrats for your CC :-)

USCIS:
Service Center : Vermont Service Centre
Consulate : New Delhi, India.
2013/12/02 : Got Married in India

2014/02/13 : Mailed I-130 application
2013/02/18 : NOA 1
2014/06/04 : Received NOA2


NATIONAL VISA CENTER (NVC):
2014/06/30 : National Visa Center (NVC) received approved I-130 petition from Vermont Service Centre
2014/07/10 : National Visa Center (NVC) Case Number, IIN & BIN generated.
2014/07/18 : DS-261 available. Completed & submitted online.
2014/07/18 : AOS fee bill invoiced & paid online.

2014/08/15 : Mailed AOS package (Scan date-19th August)

2014/09/04 : IV fee bill invoiced & paid online.

2014/09/06 : Mailed IV package (scanned into system on September 10th)

2014/09/10 : Submitted DS-260

2014/11/07: New scan date for AOS checklist

2015/01/05: Case Complete

Link to comment
Share on other sites

Yes I m not talking about Nvc expedite since it depends on embassy. I was talking about Uscis expedite because a lot of people apply for that yet get denied. So that's y I think they do not treat people equally.

Because USCIS is different from NVC and the Embassy. USCIS was expediting those in serious natural disasters, serious medical issues.. etc.. It even lists the criteria on the website. I've never seen anyone that was pregnant get expedited during USCIS unless there was a serious medical issue there. The US government would have said it wasn't their fault that you chose to get pregnant and not trying to prevent it until after the process was over. USCIS deals with all applications, it would be hard to try to expedite everyone if they were pregnant. Could you imagine if everyone just got pregnant just for the sake of getting expedited?

Edited by jsumner86

I-130 STAGE
-------------------------------
16th May 2013- I-130 PD Date
30th Dec 2013- Transferred to TSC
13th Mar 2014- I-130 Approved
20th Mar 2014- Cased shipped to NVC.


NVC STAGE
--------------------------------
28th Mar 14 Case received at NVC
28th Apr 14 Case # & IIN assigned

13th May 14 AOS package scanned into the system
14th May 14 DS260 available/completed.
20th May 14 IV package scanned into the system

12th June 14 AOS checklist- NVC error-

13th June 14 Supervisor review, said she would remove it when spoke to her. (Up to 30 business days).

28th July 14 CASE COMPLETE!!!!

19th August 2014- Medical

5th September 2014- Interview @ London

05th Sep 2014-Interview

05th Sep 2014- APPROVED! Visa Status Issued same day!

10th Sep 2014- Visa in hand

18th September 2014- POE ORLANDO FL! DISNEY!! :dancing:

Link to comment
Share on other sites

Yes I m not talking about Nvc expedite since it depends on embassy. I was talking about Uscis expedite because a lot of people apply for that yet get denied. So that's y I think they do not treat people equally.

Edited to say that I don't know if Uscis also sends requests to embassy. If that's the case then it makes sense :)

No they don't send the expedite request to the embassy. If you are approved at USCIS for an expedite request, you then have to put in another expedite request at NVC stage which then sends it to the embassy.

I-130 STAGE
-------------------------------
16th May 2013- I-130 PD Date
30th Dec 2013- Transferred to TSC
13th Mar 2014- I-130 Approved
20th Mar 2014- Cased shipped to NVC.


NVC STAGE
--------------------------------
28th Mar 14 Case received at NVC
28th Apr 14 Case # & IIN assigned

13th May 14 AOS package scanned into the system
14th May 14 DS260 available/completed.
20th May 14 IV package scanned into the system

12th June 14 AOS checklist- NVC error-

13th June 14 Supervisor review, said she would remove it when spoke to her. (Up to 30 business days).

28th July 14 CASE COMPLETE!!!!

19th August 2014- Medical

5th September 2014- Interview @ London

05th Sep 2014-Interview

05th Sep 2014- APPROVED! Visa Status Issued same day!

10th Sep 2014- Visa in hand

18th September 2014- POE ORLANDO FL! DISNEY!! :dancing:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

One thing I don't understand, people who submitted their DS- 261 in July are still waiting for IV fee invoice and people who did that in August (seen 2-3 cases) have their IV fee unlocked? why is it so? Aren't they reviewing the online forms in order. I want to be honest. I am Jealousssss. Why am I not lucky? :crying: It hurts :cry:

Edited by Paavy

USCIS:
Service Center : Vermont Service Centre
Consulate : New Delhi, India.
2013/12/02 : Got Married in India

2014/02/13 : Mailed I-130 application
2013/02/18 : NOA 1
2014/06/04 : Received NOA2


NATIONAL VISA CENTER (NVC):
2014/06/30 : National Visa Center (NVC) received approved I-130 petition from Vermont Service Centre
2014/07/10 : National Visa Center (NVC) Case Number, IIN & BIN generated.
2014/07/18 : DS-261 available. Completed & submitted online.
2014/07/18 : AOS fee bill invoiced & paid online.

2014/08/15 : Mailed AOS package (Scan date-19th August)

2014/09/04 : IV fee bill invoiced & paid online.

2014/09/06 : Mailed IV package (scanned into system on September 10th)

2014/09/10 : Submitted DS-260

2014/11/07: New scan date for AOS checklist

2015/01/05: Case Complete

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Because USCIS is different from NVC and the Embassy. USCIS was expediting those in serious natural disasters, serious medical issues.. etc.. It even lists the criteria on the website. I've never seen anyone that was pregnant get expedited during USCIS unless there was a serious medical issue there. The US government would have said it wasn't their fault that you chose to get pregnant and not trying to prevent it until after the process was over. USCIS deals with all applications, it would be hard to try to expedite everyone if they were pregnant. Could you imagine if everyone just got pregnant just for the sake of getting expedited?

Lol jmsumner but that's exactly what I m saying that they didn't use to do it in the past and now they have started doing it so that I found weird. In case u missed some previous posts someone got the expedite for pregnancy. And also at Nvc again. So basically they got done with the whole process in 3 months.

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

That was informative, Thanks and Congrats for your CC :-)

Thanks :) Waiting on my interview date. Do you have any idea how long does it take for them to give an interview date after CC at mumbai consulate?

Dont worry. You are getting there too. When did you submit your AOS? good luck! :)

IR-1/CR-1 Visa

Consulate: Mumbai, India

02/11/2013: Married

04/03/2013: I-130 Sent

03/01/2014: I-130 Approved (finally after 9 months of no activity at USCIS)

01/15/2014: NVC Received

03/10/2014: Assigned NVC case no.

04/03/2014: Paid AOS Fee

05/09/2014: Sent AOS package

05/15/2014: Sent package IV

06/15/2014: Received checklist for AOS. :huh:

06/24/2014: Responded to checklist.

08//14/2014: NVC case closed (phone) :dancing:

08/21/2014: NVC case closed email :dancing: ( After 7 months at NVC)

09/02/2014: Interview Scheduled for 1st Oct. (confirmed by call)

09/10/2014: Interview email received

09/11/2014: Medicals.

09/12/2014: Biometrics.

10/01/2014: INTERVIEW : APPROVED

Online status shows "VISA ISSUED AND PRINTED" within 2 hrs of interview

10/07/2014: Visa and passport in hand

10/08/2014: POE (Atlanta)

:dance:

Link to comment
Share on other sites

Lol jmsumner but that's exactly what I m saying that they didn't use to do it in the past and now they have started doing it so that I found weird. In case u missed some previous posts someone got the expedite for pregnancy. And also at Nvc again. So basically they got done with the whole process in 3 months.

Not everyone tells you exactly the whole reasoning they give for expediting too.. Gotta remember that as well ;).

I-130 STAGE
-------------------------------
16th May 2013- I-130 PD Date
30th Dec 2013- Transferred to TSC
13th Mar 2014- I-130 Approved
20th Mar 2014- Cased shipped to NVC.


NVC STAGE
--------------------------------
28th Mar 14 Case received at NVC
28th Apr 14 Case # & IIN assigned

13th May 14 AOS package scanned into the system
14th May 14 DS260 available/completed.
20th May 14 IV package scanned into the system

12th June 14 AOS checklist- NVC error-

13th June 14 Supervisor review, said she would remove it when spoke to her. (Up to 30 business days).

28th July 14 CASE COMPLETE!!!!

19th August 2014- Medical

5th September 2014- Interview @ London

05th Sep 2014-Interview

05th Sep 2014- APPROVED! Visa Status Issued same day!

10th Sep 2014- Visa in hand

18th September 2014- POE ORLANDO FL! DISNEY!! :dancing:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline

Not everyone tells you exactly the whole reasoning they give for expediting too.. Gotta remember that as well ;).

Yes that's true :)

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Thanks :) Waiting on my interview date. Do you have any idea how long does it take for them to give an interview date after CC at mumbai consulate?

Dont worry. You are getting there too. When did you submit your AOS? good luck! :)

I have no idea about interview scheduling. I am still waiting for IV fee to be invoiced (Submitted DS-261 on July 18th) and AOS package scan date is August 19. With that I think I might get an interview date in December or next year January :/

USCIS:
Service Center : Vermont Service Centre
Consulate : New Delhi, India.
2013/12/02 : Got Married in India

2014/02/13 : Mailed I-130 application
2013/02/18 : NOA 1
2014/06/04 : Received NOA2


NATIONAL VISA CENTER (NVC):
2014/06/30 : National Visa Center (NVC) received approved I-130 petition from Vermont Service Centre
2014/07/10 : National Visa Center (NVC) Case Number, IIN & BIN generated.
2014/07/18 : DS-261 available. Completed & submitted online.
2014/07/18 : AOS fee bill invoiced & paid online.

2014/08/15 : Mailed AOS package (Scan date-19th August)

2014/09/04 : IV fee bill invoiced & paid online.

2014/09/06 : Mailed IV package (scanned into system on September 10th)

2014/09/10 : Submitted DS-260

2014/11/07: New scan date for AOS checklist

2015/01/05: Case Complete

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

AOS changed to N/A today,,, and got an email with a cheklist.. its mention there that i should submit the cheklist in interview..

I have a question, i got the same cheklist now as it was before.. what to do i don't know.. my wife rectified it with a lawyer and she paid $80 for it..

should i correct all the following points plz

P.s : we only submitted the part 6 page, while it was written in the old cheklist that plz submit all nine pages..

so should we redo all these things..

Please review the instructions below then refer to the final page of this checklist for mailing

instructions.

I-864, Affidavit of Support Checklist

[x] The NVC recently completed our review of your visa case. While you meet the minimum qualifications for a visa

interview to be scheduled your Affidavit of Support contained one or more sections with missing or incorrect

information. Please review the additional instructions below then complete a new Affidavit of Support. (You can

download the I-864 form and instructions at http://www.uscis.gov/i-864.) Once you have completed the new

Affidavit of Support, please provide it to the principal applicant to bring to his or her visa interview. Do not submit

your new Affidavit of Support to the NVC, as doing so will reopen your case and cause processing delays.

In Part 1. Basis for Filing Affidavit of Support, please correct the following...

In Part 2. Information on the Principal Immigrant, please correct the following...

In Part 3, Information on the Immigrant(s) You are sponsoring, please correct the following...

In part 4. Information on the Sponsor, please correct the following...

In Part 5. Sponsor's Household Size, please correct the following...

In Part 6. Sponsor's Income and Employment, please correct the following...

[x] Items 13.a.1. The income you enter must match the total (gross) income reported on your most recent Federal

income tax return. If you filed Form 1040EZ, use the adjusted gross income instead.

In Part 8, Sponsor's Contract, please correct the following...

The Form I-864 we received was missing the following page(s). Please ensure you include all nine pages when you

resubmit the form.

You must submit the following financial evidence:

Woooooo Hooo CONGRATULATIONS so happy for you and your love one. :Dt9304.gifegyptian.gifegyptian.gifh0403.gifegyptian.gifegyptian.gift9304.gif

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Iran
Timeline

Ok, good.

Now I filled out my Affidavit of Support, this time I put N/A in all the parts for 7 a,b,c,d because I do not want to use asset as supplemental income. This is the stupid reason why I am in this mess. Everything is approved (cosigner and all documents) just my stupidity in filling out this section and NOT sending in bank statements caused my 2ND CHECKLIST. Even though I am below poverty line and even though my income wont be looked at.

Should I still send bank statements? I am so paranoid now that they will still be like "Well checklist said bank statements..." even though I completed a new Affidavit of Support and omitted part 7.

Now I included a letter explaining I made a mistake and i didnt want asset as supplemental income included and signed it. That is what a rep told me to do, he said you dont even need to include a new form and I said Well too bad I am sending it.

I dont know if should just send teh bank statements as well even though technically they are no longer needed :unsure::unsure: Then I am afraid I send them and they are like "why is he sending these for they are no longer needed, maybe he filled out form wrong...checklist!"

Anyone else have opinion on what I should do?

Is it ok to submit a new affidavit omitting part 7 with a signed letter explaining that? I will include bank statements just to be safe.

The issue is those balances were from 4 months ago so what do you? If you decide to include assets do you update the amounts on a new AOS to reflect that? Do you not? Rep said minor fluctuations are fine yeah whatever like I'm going to believe him.

I don't want to use assets to supplement income I have a cosigner for that

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...