Jump to content
Saylin

NVC Filers - August 2014

 Share

5,163 posts in this topic

Recommended Posts

Filed: IR-1/CR-1 Visa Country: India
Timeline

CC on the phone this morning as of this morning. last scanned july 3rd for AOS check list for something they already had. EP filing for china.

I had to go outside and run.

Congratulations

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: Other Country: Greece
Timeline

Not sure if anyone answered you but YES why not that's the way I've been doing it and everyone else. I mark each envelope with my name address, case number and phone number and IV and beneficiarys name along with it. :D. (F) (L) (F)

Yes Soloenta that's how i did it. Each case in separate folders and into one mailing envelope . :dancing:

Thank you very much (F)

Daughters case USCIS Wife's case

Form I-130 Form I-130

Date I-130 Sent :01/22/2014..........................................01/22/2014
Date I-130 NOA1 :01/24/2014.........................................01/25/2014
Date I-130 NOA2 :05/08/2014.............Expedite...............06/25/2014

NVC

Daughter's case Wife's case

Date Package Received.............05/21/2014..............07/14/2014
Case # Assigned.........................06/12/2014..............07/29/2014
DS-261/AOS Bill invoiced...........06/25/2014..............07/30/2014
Pay Aos Bil....................................06/26/2014..............08/01/2014
DS-261 completed.......................06/26/2014............ 08/03/2014
Aos Sent.........................................07/03/2014..............08/11/2014
Aos Scanned.................................07/11/2014..............08/14/2014
IV Bill Invoiced...............................08/08/2014..............08/08/2014
IV Bill Paid.......................................08/09/2014..............08/09/2014
DS 260 Completed........................08/15/2014..............08/15/2014
IV Sent.............................................08/18/2014..............08/18/2014

IV Scanned.....................................08/21/2014..............08/21/2014

AOS Approved...............................08/26/2014..............?????????

CASE COMPLETE....................????????................????????


Link to comment
Share on other sites

Couldnt get through NVC line today. I have always been able to contact them in the past. :(

I'm the beneficiary.

USCIS

05/13/2014: Sent I-130 to USCIS

05/19/2014: NOA1 Email Received. Assigned to NSC.

05/22/2014: NOA1 Hardcopy

06/16/2014: NOA2 Email. Approved. :dancing:

06/19/2014: NOA2 Hardcopy

06/20/2014: I-130 shipped to NVC

NVC

07/02/2014: Case received at NVC

07/11/2014: NVC confirmed they received our package on July 2.

07/23/2014: Got Case Number, IIN, BIN

07/30/2014: DS-261 Available and Completed

08/01/2014: Received NVC Instructions & AOS Invoice (Email)

08/01/2014: Called NVC to rectify spelling of address

08/03/2014: Paid AOS fee on CEAC (in process)

08/05/2014: AOS Fee in PAID status

08/13/2014: AOS Packet Mailed

08/14/2014: AOS Received at NVC

08/15/2014: AOS Scanned

09/03/2014: DS-261 Reviewed according to NVC rep

Waited for 41 days (29 business days) for IV invoice :dancing:

09/09/2014: Received IV invoice (Email)

09/10/2014: Paid IV fee on CEAC (in process)

09/11/2014: IV fee in PAID status

09/11/2014: IV Packet Mailed

09/12/2014: DS-260 Completed

09/12/2014: IV Packed received at NVC
09/15/2014: IV Scanned
Waited for 35 calendar days for AOS Acceptance and Case Complete :clock:

10/21/2014: Case Complete :dancing::whistle:

10/31/2014: Received Interview Instructions (P4)

EMBASSY

11/04/2014: Medical Exam at SLEC (2-day process) PASSED!

12/01/2014: Interview APPROVED! :dance:

12/09/2014: Visa on Hand

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

My husband needed a certificate of good conduct from Malaysia and we requested it online on July 16th (my husband is egyptian & lived in malaysia 2yrs & is now in egypt) A few days (5-7days) after we submitted everything.... The application status changed to "Certificate is ready for collection" so we assumed it was ready but when my husband went to the Malaysia embassy in Cairo and even had 20Malaysian ringitt, they told him its not ready and to check status online and when it changes to say "ready to pay" then he needs to go back to malaysia embassy in cairo pay the fee and they will give it to him that same day once he pats the fees...and we're still waiting for that before we send AOS & IV packages ?

OMG I hope they hurry up so you can send the packages for Pete's sake! What is taking them so long. :(m1741.gif

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

Alright.... 10 more days until my 30th business day since IV package scan date. Time has actually been flying by for some reason right now, so the next 10 days should be no different. :) Will be receiving good news soon!

P.S. I'm trying out this whole positivity thing. I've decided that I can either be sad and worry.... or I can just put a fake smile on my face and try to forget about all this nonsense... and either way, it's going to take a long time. So I am choosing the fake smile for now!

P.P.S. I'm also choosing to pretend that the 60 day letter thing never happened. Ignorance is bliss! :goofy:

:girlwerewolf2xn:

:rofl: :rofl: :rofl: :rofl: Hahahahahaa I'm going to try the same thing :Ddancing1.gifdancing1.gifYou and me. :D

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Egypt
Timeline

So as usual Nvc was sleeping on Monday. Let's see what Tuesday has in hold for us.

I know I still have to wait a while, my IV was scanned on the 25 Th of July. :( But God willing it will be soon for all of us. :D

America, Give Me My Spouse/Fiancé !

https://www.youtube....O6dwPf8HqZBzjUA

Help us make processing times at USCIS service centers fairer.
http://helptsc.tumblr.com/

-----------------------------------------------------------------------------------------------

Married. 10-16-2011. (L)

I-130 Sent. 03-14-2014 PD changed 6-24-2013. Received DS-261 / AOS Bill: 05-28-2014.

I-130 NOA1. 03-20-2013. Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

Returned to me due to mistake. 04-27-2013. Submit DS-261: 05-28-2014 Scanned on May 30 Th.
Returned to USCIS
04-30-2013. Send AOS Package: 06-10-2014.
Returned to me again USCIS mistake.
05-14-2013. Send AOS Package: 06-10-2014.
Returned to USCIS. 06-24-2013 due to travel. Receive IV Bill: 07-07-2014. 2uge4p4.gif
I-130 NOA2, Approved. 04-08-2014. Send IV Package: 07-22-2014 Scanned 07/24/2014.
Your I-130 was approved in 283, actual 343 days.
Submitted DS-260; 07/14/2014

Arrived NVC. 04-25-2014. NVC requested parents marriage cert, 10/10/2014

Case number given. 05-20-2014. Last scan date, 10/22/2014
Sent AOS Package: 06-10-2014. AOS Approved: 12-16-2014. egyptian.gif
Sent AOS Package: 06-10-2014.
Receive I-864 Package: 06-25-2014.
Pay AOS Bill: 05-28- 2014. smileys-money-114847.gif

CASE COMPLETE : They lied, 09-17-2014 42.gifActual CC 12-16-2014. Finally smiley-sick014.gif

Interview date given on 12-29-2014. Interview date 02-19-2015

01-29-2015 - Medical

02-19-2015 - Interview: Denied, reason given does not believe we are a Bona Fide marriage. voodoo-smiley-emoticon.gif groin-kick-smiley-emoticon.gif

-----------------------------------------

9hftc5sfgir1vd95.png

Link to comment
Share on other sites

I have the EXACT same dilemma, I got my transcript on Friday after requesting it on June 14. Have you decided yet what to do? I'm leaning towards sending it in, but scared

It's too late for you Jeff because you already received your transcripts in the mail, but to everyone else who does not want to wait two months to receive their IRS transcripts, just call them up and ask to have your transcripts faxed to you.

When I originally called, I didn't have a fax number (didn't know that was an options but the agent suggested it), so asked them to mail it. But the same day searched online and found out that you can get a fax number for free 30 day trial, so I signed up, called up IRS again and gave them my fax number. The agent said it will take up to 48 hours to get my transcripts by fax, but they actually came within 2 hours, all 3 years of transcripts. Printed them out and sent in with my AOS and got accepted without any problems.

The ones ordered by mail arrived some weeks later...

USCIS
4/8/14 - Sent I-130
4/17/14 - Received NAO 1
4/29/14 - I-130 Approval/NAO 2

NVC
5/8/14 - Case received
6/2/14 - Case number/IIN assigned
6/11/14 - DS-261 Completed online
6/11/14 - AOS Bill invoiced and paid
6/13/14 - AOS Bill "PAID" status
6/16/14 - AOS Package sent
6/23/14 - AOS Package arrived at NVC
6/30/14 - AOS Package scanned
7/15/14 - IV Bill invoiced and paid
7/17/14 - IV Bill "PAID" status
7/18/14 - IV Package sent
7/18/14 - DS-260 Completed online
7/24/14 - IV Package arrived at NVC
7/28/14 - IV Package scanned
8/7/14 - AOS Reviewed and Accepted (called to confirm) - 27 business days from scan
8/11/14 - False checklist email regarding Civil Documents for DS-260


9/17/14 - Case Complete - 51 days from last scan date

10/3/14 - Interview Scheduled

11/04/14 - Interview (Approved)

1/??/15 - POE

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: Nigeria
Timeline

P.S. I'm trying out this whole positivity thing. I've decided that I can either be sad and worry.... or I can just put a fake smile on my face and try to forget about all this nonsense... and either way, it's going to take a long time. So I am choosing the fake smile for now!

P.P.S. I'm also choosing to pretend that the 60 day letter thing never happened. Ignorance is bliss! :goofy:

:girlwerewolf2xn:

:rofl: :rofl: :rofl: I second that... :rofl: :rofl:
Link to comment
Share on other sites

Hello Friends.

I am seeing an immigration attorney for the first time tomorrow as I seem to be hung up with the I-864. I need to file jointly with my dad as Joint Sponsor since I do not yet have a job in the US. Can anyone provide information on the following items?

  • I am having a hard time getting my tax transcripts - will a copy of my last three years' 1040s & the French equivalent of my last three years' W2s be acceptable (I have worked in Frnace the past three years)? Saylin says that the transcripts are recommended but I can't obtain them.
  • My dad, the Joint Sponsor, will be providing tax transcripts for the past three years
  • On the I-864 it asks for my CURRENT INCOME. I do not have a job in the US but was employed in France until August 13th. Should I use the annual income earned for 2014 from January - mid-August to describe my CURRENT INCOME?
  • My AOS fee has been invoiced and I have paid it. WHEN WILL THE IV APPLICATION PROCESSING FEES be billed? It is still listed as Payment Status: Not Invoiced

Thanks so much in advance!

Hi Bunsand,

You can get the transcripts faxed to you within a few hours. Just call them up and give them your fax number. I am also abroad and couldn't get them online. I got an online incoming fax number (US number), called IRS and had my transcripts in PDF format within 2 hours.

USCIS
4/8/14 - Sent I-130
4/17/14 - Received NAO 1
4/29/14 - I-130 Approval/NAO 2

NVC
5/8/14 - Case received
6/2/14 - Case number/IIN assigned
6/11/14 - DS-261 Completed online
6/11/14 - AOS Bill invoiced and paid
6/13/14 - AOS Bill "PAID" status
6/16/14 - AOS Package sent
6/23/14 - AOS Package arrived at NVC
6/30/14 - AOS Package scanned
7/15/14 - IV Bill invoiced and paid
7/17/14 - IV Bill "PAID" status
7/18/14 - IV Package sent
7/18/14 - DS-260 Completed online
7/24/14 - IV Package arrived at NVC
7/28/14 - IV Package scanned
8/7/14 - AOS Reviewed and Accepted (called to confirm) - 27 business days from scan
8/11/14 - False checklist email regarding Civil Documents for DS-260


9/17/14 - Case Complete - 51 days from last scan date

10/3/14 - Interview Scheduled

11/04/14 - Interview (Approved)

1/??/15 - POE

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Wow that's a long run. But don't worry we all are here. Hopefully NVC process might feel little easier to you. Its still draining me out every day. I am right behind you, my AOS was scanned on 14 august.

thank you for your kind words. After having gone through hell with USCIS, I really feel NVC is easier, but now the wait seems unbearable to my husband, lol.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Thanks everyone for the Congratulations. I'm moving to the next thread.

please change your consulate

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Well, I almost hate to say it, please don't be mad at me VJers.. but we got our case number and invoice number by email today, is that normal?! So weird but anyway we filled in the DS-261 now just waiting for our AOS Bill to come up to be paid.

Quick question. I put my husband down as my agent but they will still send stuff to both of us, won't they? No big deal if it just goes to him as we live together anyway and the US Bank accounts are his so payments will need to come from him, which is why I put him down.

Feeling very fortunate this fine Tuesday morning AEST.

Hi, it seems like you are scared to post your progress here? You got the case number and IIN about the same time everyone else is getting now, about two weeks. So far so good.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Did anybody get checklist for not providing prove of income for the current year? It says it's optional. what if you don't have paystubs or cant get a letter for your employer? lets say you own a company that its Limited liability. Technically you are an employee working for a company that you own,

Hi Peace1234,

I am a LLC and I entered my projected current income. I did NOT provide any supporting documents for that projected current income. AOS got approved.

USCIS
4/8/14 - Sent I-130
4/17/14 - Received NAO 1
4/29/14 - I-130 Approval/NAO 2

NVC
5/8/14 - Case received
6/2/14 - Case number/IIN assigned
6/11/14 - DS-261 Completed online
6/11/14 - AOS Bill invoiced and paid
6/13/14 - AOS Bill "PAID" status
6/16/14 - AOS Package sent
6/23/14 - AOS Package arrived at NVC
6/30/14 - AOS Package scanned
7/15/14 - IV Bill invoiced and paid
7/17/14 - IV Bill "PAID" status
7/18/14 - IV Package sent
7/18/14 - DS-260 Completed online
7/24/14 - IV Package arrived at NVC
7/28/14 - IV Package scanned
8/7/14 - AOS Reviewed and Accepted (called to confirm) - 27 business days from scan
8/11/14 - False checklist email regarding Civil Documents for DS-260


9/17/14 - Case Complete - 51 days from last scan date

10/3/14 - Interview Scheduled

11/04/14 - Interview (Approved)

1/??/15 - POE

Link to comment
Share on other sites

Filed: IR-1/CR-1 Visa Country: India
Timeline

Hello everyone...this morning I called NVC & to my surprise...it went through on the very first dial...I couldn't believe for quick seconds & literally looked at my phone, if it was the correct number :) then after waiting for good 25 minutes, the rep tells me that our case got completed! And she added that the next step would be to wait for the email for the interview date...she said that August is pretty full and they won't be sending email until September...which I've no clue what she meant, but anyways for now...I'm relieved...I know I should be happy right now, but since I've waited for too long, missed my 1st anniversary and all these waiting games with NVC, has made me kind of numb even to be happy..now that the case is complete...I don't think I will feel 100% myself and 100% happy until my husband arrives here....but thank you so much for all the support and strength...you guys rock!! Saylin...special thanks to you...for making this journey easy...and good luck to all of the rest of you..hope you all get your cases complete very soon & meet your special someone :)

P.S. I'll still be around...I ain't going nowhere hehe :)

We told you, congratulations again and may your husband get to you fast. What you feel about this process is how I feel about it too, I will be only truly happy when I go to my husband.

 

 

I'm the beneficiary, wife of USC.
12/30/2012: Got engaged.
1/16/2013: Got married in India.

I-130:
2/28/2013: Attorney mailed the I-130 from a U.S. address.
3/4/2013: Priority date, NOA1.
11/6/2013: Case was transferred to Nebraska Service Center.

1/6/2014: 60 days of transfer are up, put in an e-request, given 30 days' time. Contacted the senator. Senator asked to wait till Feb 6 and if nothing then she will do something.
2/5/2014: Website status changed to RFE.
2/10/2014: Attorney gets RFE. They need G325A and photos of both me and husband, original marriage certificate, copy of marriage record and it's translation.
2/15/2014: Mailed the requisite documents to husband.
2/19/2014: Documents received by husband.
2/24/2014: RFE mailed.
2/26/2014: Case status changed to RFE review.
3/6/2014: After 367 days, NOA2.

After approval kept calling NVC but NVC always had one reply, file was not in their system. Husband too called USCIS National Customer Service Center and was told case was sent to NVC.
4/2/2014: Write to NSCFollowup to know about the status of the petition.
4/10/2014: Put in a ?service request with USCIS starting with OVP to locate case.
4/16/2014: Reply from NSCFollowup that the U.S. law prohibited that office from responding to anyone other than the petitioner and to have the petitioner contact them.
4/18/2014: Sent email to NVC Research to locate the case.
4/22/2014: Petitioner sent email to NSCFollowup
5/14/2014: Receive email from NVC Research that they do not have a record of receiving the petition.
5/16/2014: Congressman's immigration caseworker contacted supervisor at NSC who said the petition is pending and will be dispatched in two weeks.
5/27/2014: Petitioner received response from NSCFollowup that the case was pending an internal extended review. Really?
6/19/2014: USCIS case status change, "On June 19, 2014, we shipped this case..."
7/1/2014: Case received at NVC.
7/14/2014: NVC case number assigned.
8/1/2014: AOS and IV fees invoiced.
8/2/2014: AOS and IV fees paid.
8/5/2014: AOS and IV fees status changed to paid.
8/6/2014: AOS and IV packages mailed, completed and submitted DS-260.
8/7/2014: AOS and IV packages delivered to NVC.
8/8/2014: AOS and IV packages put into the system (scanned).
9/20/2014: Get the 60-day email.
9/30/2014: Case Complete!
10/3/2014: Interview scheduled for November 7.
10/20/2014: Medical appointment.

11/07/2014: Interview.

11/29/2014: POE JFK.

Link to comment
Share on other sites

Just got done catching up on 11 pages with a 2-yr-old on my lap (not an easy feat at all!). Too cute, she giggles and points to all of the emoticons as I scroll through the pages. :rofl:

Nothing has changed with my AOS fee today. Can't face calling, will wait until later in the week if still no change. It's funny that I am getting more calm about it now. It's like the grieving process, I think I have come to "Acceptance". :blink:

I have gone back to may old job after a 6-month secondment and my workload is crazy right now, so unfortunately I can't check VisaJourney during the day, so I will only be able to catch up in the evenings. But, I promise I will be cheering you all on and will hop on as soon as I have some good news to share!

I must have mistaken someone else with you. Someone did tell me they were waiting since January 2013. Aren't they supposed to be reviewing checklists faster? As everyone says, call and ask for Sylvia to check what's holding you up.

I have only asked for a supervisor once and they weren't available. I will try again next time I call.

Ok everyone, let's saddle up for another week! Good luck to all of you my friends.

I now have a full cast on my arm and am getting ready to graduate tomorrow. Hubby sent me some beautiful flowers today as he can't be with me.

I will check VJ tomorrow afternoon and will look for CC especially for you Amanda.

Hugs for the week. Xxx

Thanks sweetheart for thinking of me xo By now you should be a graduate! Congrats!! Were you the only one with a cast on at the ceremony? I hope the kids took some photos for you.

I pray this week brings good lurk to everyone waiting to hear good news from NVC.

Amanda you are in my prayers. My fingers and legs are crossed for you and my ears and eyes are itching for hear your good news.

Thanks lovely, I will take any prayers, finger-crossing, voodoo spells, chanting, or anything that might help (L)

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Link to comment
Share on other sites

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...