Ok here it goes, I got an email to fill DS-261 thrice and I called NVC to know whats going on??? The rep I talked to was very very rude since the starting. He told me, he can't see my form in their system, AND I NEED TO RESUBMIT IT and I was almost into tears. Its been 30 days already.!! If I resubmit now, It would reset the clock. I just feel so low. Couple of days back a rep told me, I don't need to resubmit it because it shows completed on website and also I have the confirmation number with me. So I called NVC again, hoping for a nicer NVC rep. She told me, don't resubmit it. You need to wait couple of weeks more. It is not showing into our system because it hasn't been reviewed yet. I don't want to share all this with my hubby because he already thinks I am agonizing over this whole process. These reps are giving contradicting statements. I don't know whom to believe. If after 30 business days or whatever 60 days, it doesn't show up into their system, Can I call for a supervisor review? I don't want to resubmit it after waiting for 60 days and waiting again for another 60 days.I don't know what to do...!! I am so fed up now :cry::cry::cry::cry:

USCIS:
Service Center : Vermont Service Centre
Consulate : New Delhi, India.
2013/12/02 : Got Married in India

2014/02/13 : Mailed I-130 application
2013/02/18 : NOA 1
2014/06/04 : Received NOA2


NATIONAL VISA CENTER (NVC):
2014/06/30 : National Visa Center (NVC) received approved I-130 petition from Vermont Service Centre
2014/07/10 : National Visa Center (NVC) Case Number, IIN & BIN generated.
2014/07/18 : DS-261 available. Completed & submitted online.
2014/07/18 : AOS fee bill invoiced & paid online.

2014/08/15 : Mailed AOS package (Scan date-19th August)

2014/09/04 : IV fee bill invoiced & paid online.

2014/09/06 : Mailed IV package (scanned into system on September 10th)

2014/09/10 : Submitted DS-260

2014/11/07: New scan date for AOS checklist

2015/01/05: Case Complete

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

Ok here it goes, I got an email to fill DS-261 thrice and I called NVC to know whats going on??? The rep I talked to was very very rude since the starting. He told me, he can't see my form in their system, AND I NEED TO RESUBMIT IT and I was almost into tears. Its been 30 days already.!! If I resubmit now, It would reset the clock. I just feel so low. Couple of days back a rep told me, I don't need to resubmit it because it shows completed on website and also I have the confirmation number with me. So I called NVC again, hoping for a nicer NVC rep. She told me, don't resubmit it. You need to wait couple of weeks more. It is not showing into our system because it hasn't been reviewed yet. I don't want to share all this with my hubby because he already thinks I am agonizing over this whole process. These reps are giving contradicting statements. I don't know whom to believe. If after 30 business days or whatever 60 days, it doesn't show up into their system, Can I call for a supervisor review? I don't want to resubmit it after waiting for 60 days and waiting again for another 60 days.I don't know what to do...!! I am so fed up now :cry::cry::cry::cry:

First off DONT resubmit! Second off I m sure the first guy was just trying to give u a harder time. They get paid for this and look at their attitudes really! Did u catch his name? If yes then make a complaint. Link is in soloenta's signature. I hope u get ur invoice real soon! This wait is a torture!

Called NVC today and NO Luck.. I'm positive for next week. :clock:

Aww that's disappointing. I was hoping they reach 7 8 July today but no news on fb either.

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline
Posted

help! today i received a checklist

"All traveling immigrant visa applicants on your case are required to complete and submit the DS-260

Online Immigrant Visa Application. Even if you previously filled out a DS-230, Application for

Immigrant Visa and Alien Registration Form, you now must complete the DS-260 in order to be eligible

for a visa interview."

however in the ds-260 shows as complete.. is this a false checklist?

Marriage: 2010-08-28
I-130 Sent : 2013-07-19
I-130 NOA1 : 2013-08-02
I-130 Approved : 2014-04-14
NVC Received : 2014-05-23
Pay AOS Bill : 2014-05-29
Send AOS Package : 2014-06-26
Submit DS-261 : 2014-06-26
Receive IV Bill : 2014-05-29
Pay IV Bill : 2014-05-29
Send IV Package : 2014-06-26

Scan date: 2014-07-02

Filed: Citizen (pnd) Country: Canada
Timeline
Posted

Ok here it goes, I got an email to fill DS-261 thrice and I called NVC to know whats going on??? The rep I talked to was very very rude since the starting. He told me, he can't see my form in their system, AND I NEED TO RESUBMIT IT and I was almost into tears. Its been 30 days already.!! If I resubmit now, It would reset the clock. I just feel so low. Couple of days back a rep told me, I don't need to resubmit it because it shows completed on website and also I have the confirmation number with me. So I called NVC again, hoping for a nicer NVC rep. She told me, don't resubmit it. You need to wait couple of weeks more. It is not showing into our system because it hasn't been reviewed yet. I don't want to share all this with my hubby because he already thinks I am agonizing over this whole process. These reps are giving contradicting statements. I don't know whom to believe. If after 30 business days or whatever 60 days, it doesn't show up into their system, Can I call for a supervisor review? I don't want to resubmit it after waiting for 60 days and waiting again for another 60 days.I don't know what to do...!! I am so fed up now :cry::cry::cry::cry:

You don't want to touch the DS-261 unless you want to set a new world record of the longest waiting time to pay the IV fee. :rofl:

I suggest that you wait for 15 more days since it's been almost 30 days since you filled out the DS-261. :star:

If you don't receive the IV fee invoice email by the end of this month, I suggest that you call them up to remind them that you've waited for 30 business days (45 days) for the IV fee invoice. :yes:

Naturalization

N-400 Sent: Aug 22, 2017

NOA: Aug 24, 2017

Biometrics: Sept 22, 2017

Interview: Oct 22, 2018 (Approved)

Oath Ceremony: Oct 23, 2018

 

Removing Conditions

I-751 Sent: Aug 22, 2016

NOA1: Aug 25, 2016

Biometrics: Oct 12, 2016

Interview: Oct 22, 2018 (Approved)

 

I-130 Application

NOA1: Oct 4, 2013

NOA2: Apr 11, 2014

NVC Received: Apr 30

Case Number: May 23

DS-261 / AOS Fee: June 5

AOS Package (Scan): June 16

IV Fee: July 18

IV Package (Scan): July 25

DS-260 Form: July 25

AOS Package (Accepted): July 29

Case Complete: Sept 16

Medical Exam: Oct 16

Interview: Nov 10

Visa Received: Nov 19

POE: Nov 20, 2014

 

Posted

Ok here it goes, I got an email to fill DS-261 thrice and I called NVC to know whats going on??? The rep I talked to was very very rude since the starting. He told me, he can't see my form in their system, AND I NEED TO RESUBMIT IT and I was almost into tears. Its been 30 days already.!! If I resubmit now, It would reset the clock. I just feel so low. Couple of days back a rep told me, I don't need to resubmit it because it shows completed on website and also I have the confirmation number with me. So I called NVC again, hoping for a nicer NVC rep. She told me, don't resubmit it. You need to wait couple of weeks more. It is not showing into our system because it hasn't been reviewed yet. I don't want to share all this with my hubby because he already thinks I am agonizing over this whole process. These reps are giving contradicting statements. I don't know whom to believe. If after 30 business days or whatever 60 days, it doesn't show up into their system, Can I call for a supervisor review? I don't want to resubmit it after waiting for 60 days and waiting again for another 60 days.I don't know what to do...!! I am so fed up now :cry::cry::cry::cry:

You can call back and speak to a supervisor if it will make you feel better. The agents on the phones really don't know what goes on. They make things up on the top of their head (my experience with them). My hubby could call them and they tell him one thing, then I call 30 mins later and they tell me something totally different.. XD

help! today i received a checklist

"All traveling immigrant visa applicants on your case are required to complete and submit the DS-260

Online Immigrant Visa Application. Even if you previously filled out a DS-230, Application for

Immigrant Visa and Alien Registration Form, you now must complete the DS-260 in order to be eligible

for a visa interview."

however in the ds-260 shows as complete.. is this a false checklist?

If you filled it out, and it's completed.. Looks like it hasn't been reviewed yet!

I-130

-------------------------------

May 16th 2013- I-130 PD Date

Dec 30th 2013- Transferred to TSC

Mar 13th 2014- I-130 Approved

NVC

--------------------------------

Mar 28th 14 Case received at NVC

Apr 28th 14 Case # & IIN assigned

May 13th 14 AOS package received

May 14th 14 DS260 available & completed

May 20th 14 IV package received

Jun 12th 14 AOS checklist- NVC error-

Jun 13th 14 Supervisor review

Jul 28th 14 CASE COMPLETE!!!!

Sep 05th 14- Interview

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline
Posted

If you filled it out, and it's completed.. Looks like it hasn't been reviewed yet!

Thats what I'm hoping for.. For the cost of using a lawyer, I hope that this is not a real checklist... :)

Marriage: 2010-08-28
I-130 Sent : 2013-07-19
I-130 NOA1 : 2013-08-02
I-130 Approved : 2014-04-14
NVC Received : 2014-05-23
Pay AOS Bill : 2014-05-29
Send AOS Package : 2014-06-26
Submit DS-261 : 2014-06-26
Receive IV Bill : 2014-05-29
Pay IV Bill : 2014-05-29
Send IV Package : 2014-06-26

Scan date: 2014-07-02

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

Wow talk about timing!!! I just complained on this site today that my tax transcripts I requested in June never arrived. My husband just called me at work to let me know they arrived in today's mail. These are definitely the ones I requested in June, not July, since there were 2013 and 2011, the July request was 2013 only.

So now I am faced with a dilemma... Do I send in a copy of my 2013 transcript (I am doing electronic processing)? I know they haven't reviewed my AOS package yet so maybe they will just review it all together. Or do I wait and hope I don't get a checklist for sending in my return copy, since I never had any 1099s or w2s?

What do you guys think?

Married: May 19, 2002
NOA1: November 25, 2013
NOA2: May 19, 2014 (anniversary gift!)
NVC received: June 3, 2014
Case # assigned: June 23, 2014
DS-261 complete: July 7, 2014
DS-261 accepted: July 9, 2014
Email received from NVC re: AOS fee: July 8, 2014
AOS fee paid: July 9, 2014
(waited 1 more week for snail mail tax transcript, still hasn't arrived a month after sending request, decided to send I-864 with photocopy instead)

I-864 sent: July 19, 2014 (Decided on Electronic Processing)
I-864 accepted: July 28 & 31 (sent twice because of PDF password thingy)
Sent IV package: August 7, 2014
IV package accepted: August 8, 2014
IV fee invoiced/paid: August 19, 2014
DS-260 completed: August 22, 2014
CASE COMPLETE: September 19, 2014 :dancing: :joy: :dancing:
Medical: November 3, 2014
Interview: November 7, 2014

APPROVED APPROVED APPROVED :dancing: :dancing: :dancing:

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

Thats what I'm hoping for.. For the cost of using a lawyer, I hope that this is not a real checklist... :)

Please update ur timeline.

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

Hey guys,

I got a letter from NVC with my interview date (Montreal Consulate) today.

It's been a long Journey but I'm glad it's coming to a close. I had received a letter just 2 weeks ago saying to expect delays (60 day letter), so I'm pleasantly surprised to get this interview letter. The letter is dated Aug 15 and the interview date is Sept 23rd.

Interestingly, my AOS had changed from "PAID" to "N/A" on their website 2 days ago so I knew something was up. Like others have suggested, this may be a sign that the case is complete.

Hope others get some good news soon.

Married: Aug 30, 2013 (Wife is US Cit)

I-130 PD Oct 4, 3013 (NBC)

First File Transfer Notification: March 11, 2014

File Transferred to: Nebraska

Filed: IR-1/CR-1 Visa Country: Scotland
Timeline
Posted

Ok here it goes, I got an email to fill DS-261 thrice and I called NVC to know whats going on??? The rep I talked to was very very rude since the starting. He told me, he can't see my form in their system, AND I NEED TO RESUBMIT IT and I was almost into tears. Its been 30 days already.!! If I resubmit now, It would reset the clock. I just feel so low. Couple of days back a rep told me, I don't need to resubmit it because it shows completed on website and also I have the confirmation number with me. So I called NVC again, hoping for a nicer NVC rep. She told me, don't resubmit it. You need to wait couple of weeks more. It is not showing into our system because it hasn't been reviewed yet. I don't want to share all this with my hubby because he already thinks I am agonizing over this whole process. These reps are giving contradicting statements. I don't know whom to believe. If after 30 business days or whatever 60 days, it doesn't show up into their system, Can I call for a supervisor review? I don't want to resubmit it after waiting for 60 days and waiting again for another 60 days.I don't know what to do...!! I am so fed up now :cry::cry::cry::cry:

Don't worry, they have it, they just aren't using the right vocabulary. Hang tight for a few more weeks. It'll be coming soon!!!

I am the USC Petitioner. My wonderful wife Laura is from Scotland.

10.27.2013 ~ Married

01.23.2014 ~ I-130 sent

01.29.2014 ~ NOA1

06.02.2014 ~ APPROVED!!! NOA2

06.05.2014 ~ Shipped to NVC

06.13.2014 ~ Case received by NVC

07.03.2014 ~ Case number assigned by NVC

07.21.2014 ~ Submitted DS-261

07.24.2014 ~ AoS Invoice available, paid

07.25.2014 ~ AoS Invoice shows paid

07.30.2014 ~ AoS package mailed USPS Priority

07.31.2014 ~ Checked CEAC website 47 times

08.01.2014 ~ USPS tracking shows AoS delivered

09.17.2014 ~ IV invoice available

Filed: IR-1/CR-1 Visa Country: Pakistan
Timeline
Posted

Hey guys,

I got a letter from NVC with my interview date (Montreal Consulate) today.

It's been a long Journey but I'm glad it's coming to a close. I had received a letter just 2 weeks ago saying to expect delays (60 day letter), so I'm pleasantly surprised to get this interview letter. The letter is dated Aug 15 and the interview date is Sept 23rd.

Interestingly, my AOS had changed from "PAID" to "N/A" on their website 2 days ago so I knew something was up. Like others have suggested, this may be a sign that the case is complete.

Hope others get some good news soon.

What date u got case complete? And what was ur last document scanned date? U sent IV 8th July?

Case filed- 3rd June 2013

NOA1- 6-6-2013

Case transferred to NBC- 12-18-2013

NOA2 finally- 4-23-2014

NVC received- 5-7-2014

Case number- 5-31-2014

DS-261- June 10th!

AOS sent- 3rd july

AOS scanned- 11th July

IV paid- 14th July

DS260 submitted- 17th July

IV sent: 19th July

IV scanned: 24th July

Checklist for AOS: Email received 3rd sept :cry:

Response sent: 7th sept

Checklist scanned: 11th sept

IV approved: 17 sept :dancing:

CASE COMPLETE: 4th nov 2014!!! (AT LAST)

Interview: Dec 8th :dance: :dance:

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

Also, the subject of the interview letter email is: MTL XXXXXX (STD P4 APP (24JUN2013))

I wonder if this means they are assessing files from Jun 24th?? I had resubmitted my AOS around that time.

Married: Aug 30, 2013 (Wife is US Cit)

I-130 PD Oct 4, 3013 (NBC)

First File Transfer Notification: March 11, 2014

File Transferred to: Nebraska

Filed: IR-1/CR-1 Visa Country: Canada
Timeline
Posted

Since some of you have asked, here are my dates:

May 28 - Submitted AOS
Jun 18 - AOS Checklist: Told to resubmit AOS docs because one of the PDFs was "Password Protected"
June 20 - Resubmitted AOS
June 26 - Resubmitted AOS again because realized I had made a mistake on the June 20th Submission

June 26 - Also got IV Bill

Jul 1st - Not 100% sure about the exact date but submitted my online DS 260 around this time.
Jul 8 - Emailed Supporting Docs for DS-260

Aug 4th - NVC Email saying they received my Docs dated June 26th, 2014 and to expect 60 day delays

Aug 13 - AOS Fee went rom "PAID" to "N/A" on the CEAC website

Aug 15 - Email with Interview date received.

Sept 23 - Interview in Montreal

Good luck everyone.

Married: Aug 30, 2013 (Wife is US Cit)

I-130 PD Oct 4, 3013 (NBC)

First File Transfer Notification: March 11, 2014

File Transferred to: Nebraska

Posted

Hi Amanda

This is absolutely crazy. It doesn't make sense why you are still waiting. Clearly they are not reviewing in the order they scanned them in. I definitely think you need to speak to a Supervisor. Have you ever asked for a Supervisor. I did once but it never worked but I know many people have asked/insisted to speak to one and get put through. Let's hope you hear tomorrow. I know you will not sleep well tonight. Will be watching in the morning. Xx

I know, it is crazy. I feel like my file fell off someone's desk into the shredder or something. I have never asked to speak to a supervisor, but I might try today depending on what they tell me now that I have hit the 60 day mark. I am on hold now. Will let you know how it goes.

WOHO!!!! :dancing::dancing::dancing::dancing:

FINALLY CASE COMPLETE!!! IT'S THE BEST NEWS FOR US IN 6 MONTHS!!! WE'RE SOO HAPPY!!! :dance::dance::jest::goofy::jest::dance::dance:

Congratulations!!! :dancing:

USCIS
18 June 2013 - Sent I-130
21 June 2013 - NOA1

18 Dec 2013 - Transferred to Nebraska

6 March 2014 - I-130 Approval/NOA2

NVC
18 March 2014 - Case received

28 April 2014 - DS -261 Available and complete

28 April 2014 - AOS Bill invoiced and paid

1 May 2014 - IV Bill invoiced and paid

2 May 2014 - AOS Package sent

6 May 2014 - DS-260 Completed online

9 May 2014 - AOS Package scanned at NVC

15 May 2014 - IV Package sent

22 May 2014 - IV Package scanned at NVC

6 June 2014 - Received AOS checklist

10 June 2014 - Posted AOS checklist response

20 June 2014 - AOS checklist scanned at NVC

24 June 2014 - False checklist for AOS checklist received (IV package approved)

26 August 2014 - Case complete via supervisor review over the phone, AOS fee changed to "N/A" on CEAC website

10 September 2014 - Interview scheduled

12 September 2014 - Paperwork "In Transit" on CEAC website

Embassy
15 September 2014 - Medical

15 September 2014 - Paperwork arrived at embassy (according to DHL tracking)

19 September 2014 - Paperwork "Ready" on CEAC website
7 October 2014 - Interview - VISA APPROVED!!!

9 October 2014 - Visa in hand
22 January 2015 - POE LAX

Filed: IR-1/CR-1 Visa Country: Sweden
Timeline
Posted

Do they review the IV application (Ds 260) at the same time as the IV package? :clock:

Marriage: 2010-08-28
I-130 Sent : 2013-07-19
I-130 NOA1 : 2013-08-02
I-130 Approved : 2014-04-14
NVC Received : 2014-05-23
Pay AOS Bill : 2014-05-29
Send AOS Package : 2014-06-26
Submit DS-261 : 2014-06-26
Receive IV Bill : 2014-05-29
Pay IV Bill : 2014-05-29
Send IV Package : 2014-06-26

Scan date: 2014-07-02

 
Didn't find the answer you were looking for? Ask our VJ Immigration Lawyers.
Guest
This topic is now closed to further replies.
- Back to Top -

Important Disclaimer: Please read carefully the Visajourney.com Terms of Service. If you do not agree to the Terms of Service you should not access or view any page (including this page) on VisaJourney.com. Answers and comments provided on Visajourney.com Forums are general information, and are not intended to substitute for informed professional medical, psychiatric, psychological, tax, legal, investment, accounting, or other professional advice. Visajourney.com does not endorse, and expressly disclaims liability for any product, manufacturer, distributor, service or service provider mentioned or any opinion expressed in answers or comments. VisaJourney.com does not condone immigration fraud in any way, shape or manner. VisaJourney.com recommends that if any member or user knows directly of someone involved in fraudulent or illegal activity, that they report such activity directly to the Department of Homeland Security, Immigration and Customs Enforcement. You can contact ICE via email at Immigration.Reply@dhs.gov or you can telephone ICE at 1-866-347-2423. All reported threads/posts containing reference to immigration fraud or illegal activities will be removed from this board. If you feel that you have found inappropriate content, please let us know by contacting us here with a url link to that content. Thank you.
×
×
  • Create New...